HomeMy WebLinkAbout#9 CC Report Savona 4th Developers Agreement 3.15
MAYOR & COUNCIL
COMMUNICATION
-- page 1 --
DATE: April 5, 2016
CONSENT
ITEM # ___
AGENDA ITEM: Savona 4th Developer’s Agreement
SUBMITTED BY: Stephen Wensman, Planning Director
THROUGH: Kristina Handt, City Administrator REVIEWED BY: Jack Griffin, City Engineer
Sarah Sonsala, City Attorney
SUGGESTED ORDER OF BUSINESS (if removed from the Consent Agenda):
- Introduction of Item ..................................... Community Development Director
- Report/Presentation………………………...Community Development Director
- Questions from Council to Staff ............................................... Mayor Facilitates
- Call for Motion................................................................. Mayor & City Council
- Discussion ........................................................................ Mayor & City Council
- Action on Motion ...................................................................... Mayor Facilitates
POLICY RECOMENDER: Staff is recommending that the City Council approve a developer’s
agreement associated with the Savona 4th residential development. The agreement has been drafted based on a model agreement previously reviewed by the Council in January 2016.
FISCAL IMPACT: Direct Payments to Developer – None: there are no City payments for oversizing of utilities or for other reasons included in the agreement. Future financial impacts
include maintenance of streets, trails, sanitary sewer mains, watermains and other public infrastructure, maintenance of storm water ponding areas (after warranty period), maintenance of
the 5th Street boulevard landscaping (after three years), monthly lease payments for street lights,
and other public financial responsibilities typically associated with a new development.
SUMMARY AND ACTION REQUESTED: The City Council is being asked to authorize execution of a developer’s agreement for the Savona 4th residential development. The attached
agreement has been reviewed by the City Attorney and City Engineer, and all recommend changes
City Council Meeting [Consent Agenda Item __ ]
April 5, 2016
-- page 2 --
specific to the Savona 4th project have been incorporated into the document as drafted. This agreement must be executed and conditions complied with before any construction activity,
outside of the previously authorized grading work, may proceed on the site. No work on the site will occur until the conditions of final plat are comp lied with and the plat is recording with
Washington County. The recommended motion to take action on the request is as follows: “Move to adopt Resolution 2016-__ approving the developer’s agreement for Savona 4th
Addition”
LEGISLATIVE HISTORY/STAFF REPORT: One of the conditions attached to the Council’s
approval of the Savona Final Plat specified that the developer enter into a Developer’s Agreement prior to the execution of the plat by City officials. Staff has drafted such an agreement consistent
with the City’s developer’s agreement template modified and presented in January 2016, which is attached for consideration by the City Council. The key aspects of the agreement include the
following components:
• That all improvements to be completed by September, 2017.
• That the developer provide a letter of credit in the amount of $4,080,974 related to the cost
of the proposed improvements.
• That the developer provide a cash deposit of $522,764 for SAC and WAC charges,
engineering administration, one year of street light operating costs, and other City fees.
The proposed project does not include any specific City payments for utility oversizing or other reasons.
The City Engineer has not approved the final construction plans for the project, and no work will
be allowed to commence on the site until these plans are approved by the City and the conditions of Final Plat are complied with.
BACKGROUND INFORMATION (SWOT):
Strengths : The developer’s agreement has been drafted to guarantee that the improvements associated with Savona 4th plans will installed in accordance with City specifications.
Execution of the developer’s agreement and compliance with all conditions in the
agreement and the Final Plat approval will allow the developer to record the Savona 4th
Final Plat.
Weaknesses: The City will assume responsibility for future maintenance of the public improvements.
Opportunities: The proposed improvements include the construction of the final segment
of the 5th Street parkway within Savona.
City Council Meeting [Consent Agenda Item __ ]
April 5, 2016
-- page 3 --
Threats : The City will need to provide construction observation throughout the course of the project (these costs will be covered under an Engineering Administration Escrow).
RECOMMENDATION: Based on the above Staff report, Staff is recommending that the City Council approve the Developer’s Agreement for Savona 4th Addition and that the Council direct
the Mayor and Staff to execute this document. The suggested motion to adopt the Staff recommendation is as follows:
“Move to adopt Resolution 2016-__ approving the developer’s agreement for Savona 4th Addition”
ATTACHMENTS:
1. Resolution 2016-__
2. Savona 4th Developer’s Agreement – Final Draft
RESOLUTION NO. 2016-20
A RESOLUTION APPROVING THE DEVELOPER’S AGREEMENT FOR
SAVONA 4TH ADDITION
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, U.S. Home Corporation (d/b/a Lennar), 16305 36th Avenue North, Suite
600, Plymouth, MN (“Applicant”) has previously submitted an application to the City of Lake
Elmo (“City”) for a Final Plat for Savona 4th Addition; and
WHEREAS, the Lake Elmo City Council considered and approved the Preliminary Plat
request for Savona at a meeting held on August 6, 2013; and
WHEREAS, The Lake Elmo City Council adopted Resolution No. 2016-16 on March
15, 2016 approving the Final Plat for Savona 4th Addition; and
WHEREAS, Condition (4) of said Resolution No. 2016-16 establishes that, prior to the
execution of the Final Plat by City officials, the Applicant is to enter into a Developer’s
Agreement with the City; and
WHEREAS, the Applicant and City have agreed to enter into such a contract, and a copy
of the Developer’s Agreement was submitted to the City Council for consideration at its March
15, 2016 meeting.
NOW, THEREFORE, based on the information received, the City Council of the City
of Lake Elmo does hereby approve the Developer’s Agreement for Savona 4th Addition and
authorizes the Mayor and City Clerk to execute the document.
Passed and duly adopted this 5th day of April 2016 by the City Council of the City of Lake
Elmo, Minnesota.
__________________________________
Mike Pearson, Mayor
ATTEST:
________________________________
Julie Johnson, City Clerk
REV2: 12/15/2015 1
(reserved for recording information)
DEVELOPMENT CONTRACT
(Public sewer and water) Savona 4th Addition
AGREEMENT dated , 2016, by and between the CITY OF LAKE
ELMO a Minnesota municipal corporation (“City”), and U.S. Home Corporation, d/b/a Lennar
(the “Developer”).
1. REQUEST FOR PLAT APPROVAL. The Developer has asked the City to approve a
plat for Savona 4th Addition (referred to in this Contract as the "plat"). The land is situated in the
County of Washington, State of Minnesota, and legally described in Exhibit “A”.
2. CONDITIONS OF PLAT APPROVAL. The City hereby approves the plat on condition
that the Developer enter into this Contract, furnish the security required by it, and record the plat with the
County Recorder or Registrar of Titles within (180) days after the City Council approves the final plat.
3. RIGHT TO PROCEED. Unless separate written approval has been given by the City,
within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove
trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings
until all the following conditions have been satisfied: 1) this agreement has been fully executed by both
REV2: 12/15/2015 2
parties and filed with the City Clerk, 2) the necessary security has been received by the City, 3) the plat has
been recorded with the Washington County Recorder's Office, and 4) the City’s Planning Director has
issued a letter that all conditions have been satisfied, a preconstruction conference has been held, and that
the Developer may proceed.
4. PHASED DEVELOPMENT. If the plat is a phase of a multi-phased preliminary plat, the
City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract
and the breach has not been remedied. Development of subsequent phases may not proceed until
Development Contracts for such phases are approved by the City. Park charges and availability charges
for sewer and water referred to in this Contract are not being imposed on outlots, if any, in the plat that
are designated in an approved preliminary plat for future subdivision into lots and blocks. Such charges will
be calculated and imposed when the outlots are final platted into lots and blocks.
5. PRELIMINARY PLAT STATUS. If the plat is a phase of a multi-phased preliminary plat,
the preliminary plat approval for all phases not final platted shall lapse and be void unless final platted into
lots and blocks, not outlots, within two (2) years after preliminary plat approval.
6. CHANGES IN OFFICIAL CONTROLS. For two (2) years from the date of this Contract,
no amendments to the City's Comprehensive Plan or official controls shall apply to or affect the use,
development density, lot size, lot layout or dedications of the approved final plat unless required by state
or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything
in this Contract to the contrary, to the full extent permitted by state law, the City may require compliance
with any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements
enacted after the date of this Contract.
7. DEVELOPMENT PLANS. The plat shall be developed in accordance with the following
plans and at the Developer’s sole expense. The plans shall not be attached to this Contract. If the plans
vary from the written terms of this Contract, the written terms shall control. The plans are:
Plan A - Plat
Plan B - Final Grading, Drainage, and Erosion Control Plan
REV2: 12/15/2015 3
Plan C - Tree Preservation and Reforestation Plan Plan D - Plans and Specifications for Public Improvements
Plan E - Street Lighting Plan
Plan F - Landscape Plan 8. IMPROVEMENTS. The Developer shall install and pay for the following:
A. Streets
B. Sanitary Sewer C. Watermain D. Surface Water Facilities (pipe, ponds, rain gardens, etc.) E. Grading and Erosion Control F. Sidewalks/Trails G. Street Lighting H. Underground Utilities I. Street Signs and Traffic Control Signs J. Landscaping
K. Tree Preservation and Reforestation
L. Wetland Mitigation and Buffers
M. Monuments Required by Minnesota Statutes
N. Miscellaneous Facilities
The improvements shall be installed in accordance with the City subdivision ordinance and the City’s
Engineering Design and Construction Standards Manual and pursuant to the direction of the City Engineer.
The Developer shall submit plans and specifications which have been prepared by a competent registered
professional engineer to the City for approval by the City Engineer. The Developer shall instruct its
engineer to provide adequate field inspection personnel to assure an acceptable level of quality control to
the extent that the Developer's engineer will be able to certify that the construction work meets the
approved City standards as a condition of City acceptance. In addition, the City may, at the City's discretion
and at the Developer's expense, have one or more City inspectors and a soil engineer inspect the work on
a full or part-time basis. The Developer's engineer shall provide for on-site project management. The
Developer's engineer is responsible for design changes and contract administration between the Developer
REV2: 12/15/2015 4
and the Developer's contractor. The Developer or his engineer shall schedule a pre-construction meeting
at a mutually agreeable time at the City Hall with all parties concerned, including the City staff, to review the
program for the construction work.
All labor and work shall be done and performed in the best and most workmanlike manner and in
strict conformance with the approved plans and specifications. No deviations from the approved plans and
specifications will be permitted unless approved in writing by the City Engineer. The Developer agrees to
furnish to the City a list of contractors being considered for retention by the Developer for the performance
of the work required by the Contract. The Developer shall not do any work or furnish any materials not
covered by the plans and specifications and special conditions of this Contract, for which reimbursement is
expected from the City, unless such work is first ordered in writing by the City Engineer as provided in the
specifications.
9. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION
OBSERVATION. At the time of Final Plat, the Developer shall submit an escrow for City Engineering
Administration and Construction Observation in an amount provided under paragraph 33. Summary of
Cash Requirements. Thereafter, the Developer shall reimburse the City each month, within 30 days of
receiving an invoice, for all engineering administration and construction observation performed during the
construction of the plat After 30 days of the invoice, the City may draw upon the escrow and stop the work
on site until said escrow has been replenished in its full amount. City engineering administration will include
monitoring of construction progress and construction observation, consultation with Developer and his
engineer on status or problems regarding the project, coordination for testing, final inspection and
acceptance, project monitoring during the warranty period, and processing of requests for reduction in
security. Construction observation may be performed by the City's in-house staff or consulting engineer.
Construction observation shall include, at the discretion of the city, part or full time inspection of proposed
public utilities and street construction. Services will be billed on an hourly basis.
REV2: 12/15/2015 5
The direction and review provided through the inspection of the improvements should not be
considered a substitute for the Developer required management of the development. Developer will cause
the contractor(s) to furnish the City with a schedule of proposed operations at least five (5) days prior to the
commencement of construction of each type of Improvement. City shall inspect all Developer Installed
Improvements during and after construction for compliance with approved plans and specifications.
Developer will notify the City Engineer at such times during construction as the City Engineer requires for
inspection purposes. Such inspection is pursuant to the City’s governmental authority, and no agency or
joint venture relationship between the City and Developer is thereby created.
10. CONTRACTORS/SUBCONTRACTORS. City Council members, City employees, and
City Planning Commission members, and corporations, partnerships, and other entities in which such
individuals have greater than a 25% ownership interest or in which they are an officer or director may not
act as contractors or subcontractors for the public improvements identified in Paragraph 8 above.
11. PERMITS. The Developer shall obtain or require its contractors and subcontractors to
obtain all necessary permits, including but not limited to:
A. Right-of-Way Excavations and Obstructions:
• City of Lake Elmo, Right-of-Way Utility Installation(s)
• City of Lake Elmo, Right-of-Way Obstruction(s)
• Washington County, Utility Installations(s)
• Washington County, Street or Driveway Access(s)
• Minnesota Department of Transportation, Utility Installation
• Minnesota Department of Transportation, Right-of-Way Permit
B. Watermain Extensions:
• Minnesota Department of Health C. Sanitary Sewer Extensions:
• Minnesota Pollution Control Agency
• Metropolitan Council Environmental Services D. Stormwater Management:
• Valley Branch, Brown’s Creek and South Washington Watershed District Permit
E. Erosion, Sedimentation Control:
• Minnesota Pollution Control Agency, General NPDES Stormwater Permit
• SWPPP (Stormwater Pollution Prevention Plan)
REV2: 12/15/2015 6
F. Wetland Mitigation:
• Board of Water and Soil Resources, WCA
G. Construction Dewatering:
• Minnesota Department of Natural Resources
12. TIME OF PERFORMANCE. The Developer shall install all required public improvements
by September, 2017, with the exception of the final wear course of asphalt on streets. The Developer shall
install the bituminous wearing course of streets after the first course has weathered a winter season,
consistent with warranty requirements, however final acceptance of the improvements will not be granted
until all work is completed including the final wear course. The Developer may, however, request an
extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security
posted by the Developer to reflect cost increases and amending this agreement to reflect the extended
completion date. Final wear course placement outside of this time frame must have the written approval of
the City Engineer.
13. LICENSE. The Developer hereby grants the City, its agents, employees, officers and
contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in
conjunction with plat development.
14. CONSTRUCTION ACCESS. Construction traffic access and egress for grading, public
utility construction, and street construction is restricted to access the subdivision via
5th Street N. No construction traffic is permitted on other adjacent local streets.
15. CONSTRUCTION SEQUENCE AND COMPLIANCE. The City will require the
developer to construct the improvements in a sequence which will allow progress and compliance points
to be measured and evaluated. The Developer and/or their representatives are required to supervise
and coordinate all construction activities for all improvements and must notify the City in writing stating
when the work is ready for the inspection at each of the measurable points defined in the following
paragraphs 16, 17 and 18.
16. EROSION CONTROL. Prior to initiating site grading, the erosion control plan, Plan B,
shall be implemented by the Developer and inspected and approved by the City. Erosion control practices
REV2: 12/15/2015 7
must comply with the approved plans and specifications for the plat, with all watershed district permits and
with Minnesota Pollution Control Agency’s Best Management Practices. The City may impose additional
erosion control requirements as deemed necessary. The parties recognize that time is of the essence in
controlling erosion. If the Developer does not comply with the erosion control plan and schedule or
supplementary instructions received from the City, the City may take such action as it deems appropriate to
control erosion. The City will endeavor to notify the Developer in advance of any proposed action, but
failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. If the
Developer does not reimburse the City for any cost the City incurred for such work within ten (10) days, the
City may draw down the security to pay any costs. No development, utility or street construction will be
allowed and no building permits will be issued unless the plat is in full compliance with the approved
erosion control plan.
If building permits are issued prior to the acceptance of public improvements, the developer
assumes all responsibility for erosion control compliance throughout the plat and the City may take such
action as allowed by this agreement against the Developer for any noncompliant issue as stated above.
Erosion control plans for individual lots will be required in accordance with the City’s building permit
requirements, or as required by the City or City Engineer.
17. GRADING PLAN. The plat shall be graded in accordance with the approved grading
drainage and erosion control plan, Plan "B". The plan shall conform to the Engineering Design and
Construction Standards Manual. All grading shall be completed within the Subdivision prior to the
preparation and submittal of the as-constructed grading plan.
A. Within thirty (30) days after completion of the grading, the Developer shall provide
the City with a "record" grading plan certified by a registered land surveyor or engineer that all ponds, swales,
and ditches have been constructed on public easements or land owned by the City. The "record" plan shall
contain site grades and field verified elevations of the following: a) cross sections of ponds; b) location and
elevations along all swales, emergency overflows, wetlands, wetland mitigation areas if any, ditches,
locations and dimensions of borrow areas/stockpiles; c) lot corner elevations and house pads; and d) top
REV2: 12/15/2015 8
and bottom of retaining walls.
B. The City will not issue any building permits until the approved certified record grading
plan is on file with the City.
18. STREET AND UTILITY IMPROVEMENTS. All storm sewers, sanitary sewers, watermain, and
streets shall be installed in accordance with the approved Plans and Specifications for Public
Improvements, Plan "D". The plan shall conform to the City’s Engineering Design and Construction
Standards Manual. Curb and gutter and the first lift of the bituminous streets, sidewalks, boulevards
graded, street signs installed, and all restoration work on the site shall be completed in accordance with the
approved plans. Once the work is completed, the developer or its representative shall submit a written
request to the City asking for an inspection of the initial improvements. The City will then schedule a walk-
through to create a punch list of outstanding items to be completed. Upon receipt of the written punch list
provided by the City, the punch list items must be completed by the Developer and the City notified to re-
inspect the improvements. The final bituminous wear course shall be installed in accordance with paragraph
12 above.
19. STREET MAINTENANCE DURING CONSTRUCTION. The Developer shall be
responsible for all street maintenance until the streets are accepted by the City. Warning signs shall be placed
when hazards develop in streets to prevent the public from traveling on same and to direct attention to detours.
If and when streets become impassable, such streets shall be barricaded and closed. In the event residences
are occupied prior to completing streets, the Developer shall maintain a smooth surface and provide proper
surface drainage to insure that the streets are passable to traffic and emergency vehicles. The Developer
shall be responsible for keeping streets within and without the subdivision clean of dirt and debris that may
spill, track, or wash onto the street from Developer’s operation. The Developer may request, in writing, that
the City keep the streets open during the winter months by plowing snow from the streets prior to final
acceptance of said streets. The City shall not be responsible for repairing the streets because of snow plowing
operations. Providing snow plowing service does not constitute final acceptance of the streets by the City. The
Developer shall contract for street cleaning within and immediately adjacent to the development. At a
REV2: 12/15/2015 9
minimum, scraping and sweeping shall take place on a weekly basis. A copy of this contract shall be approved
by the City before grading is started. The contract shall provide that the City may direct the contractor to clean
the streets and the contractor will bill the Developer.
20. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and construction
required by this Contract, the improvements lying within public easements shall become City property.
Prior to acceptance of the improvements by the City, the Developer must furnish the City with a complete
set of reproducible "record" plans, an electronic file of the "record" plans in accordance with the City’s
Engineering Design and Construction Standards Manual together with the following affidavits:
- Developer/Developer Engineer’s Certificate - Land Surveyor’s Certificate
certifying that all construction has been completed in accordance with the terms of this Contract. All
necessary forms will be furnished by the City. Upon receipt of “record plans” and affidavits, and upon
review and verification by the City Engineer, the City Engineer will accept the completed public
improvements.
21. PARK DEDICATION. The Developer has satisfied park dedication requirements for all
the areas to be platted within the Savona Preliminary Plat as part of the Savona Development Contract. No
additional park dedication is required for the plat.
22. SANITARY SEWER AND WATER UTILITY AVAILABILITY CHARGES (SAC AND WAC). The Developer shall be responsible for the payment of all sewer availability charges (SAC)
and all water availability charges (WAC) with respect to the Improvements required by the City and any
state or metropolitan government agency.
The sewer availability charge (SAC) in the amount of $3,000.00 per REU shall be paid by the
Developer prior to the City recording the final plat. The total amount to be paid by the Developer is
$234,000.00. The water availability charge (WAC) in the amount of $3,000.00 per REU shall be paid by the
Developer prior to the City recording the final plat. The total amount to be paid by the Developer is
REV2: 12/15/2015 10
$234,000.00.
In addition, a sewer connection charge in the amount of $1,000.00 per REU, a Met Council sewer
availability charge in the amount of $2,485.00 per REU, and a water connection charge in the amount of
$1,000.00 per REU will be collected by the City at the time the building permit is issued for each lot. 23. TRAFFIC CONTROL SIGNS. Traffic control signs shall be included as part of the
public street improvements and the installation costs shall be included in the street construction
calculations.
24. STREET LIGHTS. The Developer is responsible for the cost of street light installation
consistent with a street lighting plan approved by the City. Before the City signs the final plat, the
Developer shall post a security for street light installation consistent with the approved plan. The
required security is $84,000 and consist of fourteen (14) decorative lights at $6,000 each. The Developer
shall also pay $1,554 in payment of the first year operating costs for street lights.
25. WETLAND MITIGATION. The Developer shall complete wetland mitigation/restoration
in accordance with the approved Plans and Specifications and in accordance with any applicable Watershed
or agency Permits. If the mitigation work is found to be incomplete or restoration is unsuccessful the City
may draw down the security at any time during the warranty period if the Developer fails to take corrective
measures to be used by the City to perform the work.
26. BUILDING PERMITS/CERTIFICATES OF OCCUPANCY.
A. Public sewer and water, curbing, and one lift of asphalt shall be installed on all
public and private streets prior to issuance of any building permits, except one model home on a lot
acceptable to the Planning Director.
B. Prior to issuance of building permits, wetland buffer monuments shall be placed in
accordance with the City’s zoning ordinance. The monument design shall be approved by the Planning
Department.
C. Written certification of the as-constructed grading must be on file at the City for the
block where the building is to be located.
REV2: 12/15/2015 11
D. Breach of the terms of this Contract by the Developer, including nonpayment of
billings from the City, shall be grounds for denial of building permits and/or withholding of other permits,
inspection or actions, including lots sold to third parties, and the halting of all work in the plat.
E. If building permits are issued prior to the acceptance of public improvements, the
Developer assumes all liability and costs resulting in delays in completion of public improvements and
damage to public improvements caused by the City, Developer, their contractors, subcontractors,
materialmen, employees, agents, or third parties.
F. No sewer and water connection permits may be issued until the streets needed for
access have been paved with a bituminous surface and the utilities are tested and approved by the City
Engineer.
G. The City will not issue a certificate of occupancy for any building constructed on
any lot or parcel in the Plat until Public sewer and water, curbing, and one lift of asphalt is installed on all
public and private streets; all utilities are tested and approved by the City Engineer; and the as-
constructed grading must be on file at the City for the block where the building is to be located. This
requirement does not allow for the development to be phased for some lots.
27. RESPONSIBILITY FOR COSTS.
A. In the event that the City receives claims from labor, materialmen, or others that
work required by this Contract has been performed, the sums due them have not been paid, and the
laborers, materialmen, or others are seeking payment from the City, the Developer hereby authorizes the
City to commence an Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the
District Courts, to draw upon the letters of credit in an amount up to 125 percent of the claim(s) and deposit
the funds in compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and
dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the District
Court, except that the Court shall retain jurisdiction to determine attorneys' fees pursuant to this Contract.
B. Except as otherwise specified herein, the Developer shall pay all costs incurred by it
or the City in conjunction with the development of the plat, including but not limited to legal, planning,
REV2: 12/15/2015 12
engineering and inspection expenses incurred in connection with approval and acceptance of the plat, the
preparation of this Contract, review of construction plans and documents, and all costs and expenses
incurred by the City in monitoring and inspecting development of the plat. All amounts incurred and due at
the time, must be fully paid prior to execution and release of the final plat for recording.
C. The Developer shall hold the City and its officers, employees, and agents harmless
from claims made by itself and third parties for damages sustained or costs incurred resulting from plat
approval and development. The Developer shall indemnify the City and its officers, employees, and agents
for all costs, damages, or expenses which the City may pay or incur in consequence of such claims,
including attorneys' fees.
D. The Developer shall reimburse the City for costs incurred in the enforcement of this
Contract, including reasonable engineering and attorneys' fees.
E. The Developer shall pay, or cause to be paid when due, and in any event before any
penalty is attached, all special assessments referred to in this Contract. This is a personal obligation of the
Developer and shall continue in full force and effect even if the Developer sells one or more lots, the entire
plat, or any part of it.
F. The Developer shall pay in full all bills submitted to it by the City for obligations
incurred under this Contract within thirty (30) days after receipt. Bills not paid within thirty (30) days shall
be assessed a late fee per the City of Lake Elmo adopted Fee Schedule. Upon request, the City will
provide copies of detailed invoices of the work performed.
28. SPECIAL PROVISIONS. The following special provisions shall apply to plat
development:
A. Implementation of the recommendations listed in the February 15, 2016
Engineering memorandum.
B. Before the City signs the final plat, the Developer shall convey Outlots A, B, C and
D, Savona 4th Addition to the City by warranty deed, free and clear of any and all encumbrances.
C. The Developer must obtain a sign permit from the City Building Official prior to
REV2: 12/15/2015 13
installation of any subdivision identification signs.
D. The Developer shall comply with the 3 items identified in the City’s Landscape
Architect’s review memorandum dated February 10, 2016.
E. The Developer shall incorporate a 3-year maintenance plan for commonly held
HOA and City outlots and rights-of-ways into the HOA covenants and a Landscape and Irrigation
License Agreement.
F. The Developer shall enter into a a Landscape and Irrigation License Agreement with
the City for the maintenance of commonly held HOA and City outlots and rights-of-ways prior to
recording the Final Plat.
29. MISCELLANEOUS. A. The Developer may not assign this Contract without the written permission of the
City Council. The Developer's obligation hereunder shall continue in full force and effect even if the
Developer sells one or more lots, the entire plat, or any part of it.
B. Retaining walls that require a building permit shall be constructed in accordance with
plans and specifications prepared by a structural or geotechnical engineer licensed by the State of
Minnesota. Following construction, a certification signed by the design engineer shall be filed with the City
Engineer evidencing that the retaining wall was constructed in accordance with the approved plans and
specifications. All retaining walls identified on the development plans or by special conditions referred to in
this Contract shall be constructed before any other building permit is issued for a lot on which a retaining
wall is required to be built.
C. Appropriate legal documents regarding Homeowner Association documents,
covenants and restrictions, as approved by the City Attorney, shall be filed with the final plat. No third-
party beneficiary is hereby conferred.
D. Developer shall take out and maintain or cause to be taken out and maintained until
six (6) months after the City has accepted the public improvements, public liability and property damage
insurance covering personal injury, including death, and claims for property damage which may arise out of
REV2: 12/15/2015 14
Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them.
Limits for bodily injury and death shall be not less than $500,000 for one person and $1,000,000 for each
occurrence; limits for property damage shall be not less than $200,000 for each occurrence; or a
combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on
the policy, and the Developer shall file with the City a certificate evidencing coverage prior to the City
signing the plat. The certificate shall provide that the City must be given thirty (30) days advance written
notice of the cancellation of the insurance.
E. Third parties shall have no recourse against the City under this Contract.
F. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this
Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of
this Contract.
G. The action or inaction of the City shall not constitute a waiver or amendment to the
provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties
and approved by written resolution of the City Council. The City's failure to promptly take legal action to
enforce this Contract shall not be a waiver or release.
H. This Contract shall run with the land and may be recorded against the title to the
property. The Developer covenants with the City, its successors and assigns, that the Developer has fee
title to the property being final platted and/or has obtained consents to this Contract, in the form attached
hereto, from all parties who have an interest in the property; that there are no unrecorded interests in the
property being final platted; and that the Developer will indemnify and hold the City harmless for any
breach of the foregoing covenants.
I. Each right, power or remedy herein conferred upon the City is cumulative and in
addition to every other right, power or remedy, express or implied, now or hereafter arising, available to
City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein
set forth or otherwise so existing may be exercised from time to time as often and in such order as may be
deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any
other right, power or remedy.
REV2: 12/15/2015 15
J. The Developer represents to the City that the plat complies with all city, county,
metropolitan, state, and federal laws and regulations, including but not limited to: subdivision ordinances,
zoning ordinances, and environmental regulations. If the City determines that the plat does not comply, the
City may, at its option, refuse to allow construction or development work in the plat until the Developer does
comply. Upon the City’s demand, the Developer shall cease work until there is compliance.
30. EVENTS OF DEFAULT. The following shall be "Events of Default" under this Agreement
and the term "Event of Default" shall mean, whenever it is used in this Agreement, any one or more of the
following events:
A. Subject to unavoidable delays, failure by Developers to commence and complete
construction of the Public Improvements pursuant to the terms, conditions and limitations of this Agreement.
B. Failure by Developers to substantially observe or perform any material covenant,
condition, obligation or agreement on their part to be observed or performed under this Agreement.
31. REMEDIES ON DEFAULT. Whenever any Event of Default occurs, the City, subject to
any rights of third parties agreed to by the City pursuant to this Agreement, or otherwise by written, executed
instrument of the City, may take any one or more of the following:
A. The City may suspend its performance under the Agreement until it receives
assurances from Developers, deemed adequate by the City, that Developers will cure their default and
continue their performance under the Agreement. Suspension of performance includes the right of the City
to withhold permits including, but not limited to, building permits.
B. The City may initiate such action, including legal or administrative action, as is
necessary for the City to secure performance of any provision of this agreement or recover any amounts
due under this Agreement from Developers, or immediately draw on the Letter of Credit, as set forth in this
Agreement.
32. ENFORCEMENT BY CITY; DAMAGES. The Developers acknowledge the right of the
City to enforce the terms of this Agreement against the Developers, by action for specific performance or
damages, or both, or by any other legally authorized means. The Developers also acknowledge that their
REV2: 12/15/2015 16
failure to perform any or all of their obligations under this Agreement may result in substantial damages to
the City; that in the event of default by the Developers, the City may commence legal action to recover all
damages, losses and expenses sustained by the City; and that such expenses may include, but are not
limited to, the reasonable fees of legal counsel employed with respect to the enforcement of this Agreement.
33. WARRANTY. The Developer warrants all improvements required to be constructed by it
pursuant to this Contract against poor material and faulty workmanship. The Developer shall submit a letter
of credit for twenty-five percent (25%) of the amount of the original cost of the improvements.
A. The required warranty period for materials and workmanship for the utility contractor
installing public sewer and water mains shall be two (2) years from the date of final written City acceptance
of the work.
B. The required warranty period for all work relating to street construction, including
concrete curb and gutter, sidewalks and trails, materials and equipment shall be subject to one (1) year
from the date of final written acceptance, unless the wearing course is placed during the same construction
season as the bituminous base course. In those instances, the Developer shall guarantee all work,
including street construction, concrete curb and gutter, sidewalks and trails, material and equipment for a
period of two (2) years from the date of final written City acceptance of the work.
C. The required warranty period for sod, trees, and landscaping is three growing seasons
following installation.
34. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance with the
terms of this agreement, payment of special assessments, payment of the costs of all public improvements,
and construction of all public improvements, the Developer shall furnish the City with an irrevocable letter of
credit, in the form attached hereto, from a bank, cash escrow or a combination cash escrow and Letter of
Credit ("security") for $4,080,974. The amount of the security was calculated as follows:
CONSTRUCTION CATEGORY: COST 125%
1. Grading
N/A
2. Sanitary Sewer
$379,407 $474,259
REV2: 12/15/2015 17
3. Watermain
$460,445 $575,556
4. Storm Sewer (includes pond structures and outfall pipes)
$449,062 $561,328
5. Streets $1, 296,601 $1,620,751
6. Trails and Sidewalks $281,412 $351,765
7. Surface Water Facilities (infiltration basins,
bio retention basins, rain gardens, etc.)
N/A
8. Street Lighting $84,000 $101,262
9. Street Signs and Traffic Control Signs
$4,650 $5,813
10. Private Utilities (electricity, natural gas, telephone, and cable)
To be coordinated by the developer
11. Landscaping $213,893 $299,733
12. Tree Preservation and Restoration
N/A
13. Wetland Mitigation and Buffers N/A
14. Monuments
$7,800 $9,750
15. Erosion and Sedimentation Control
$81,009 $101,261
16. Miscellaneous Facilities N/A
17. Developer’s Record Drawings $6,500 $8,125
CONSTRUCTION SUBTOTAL $3,264,779 N/A TOTAL PROJECT SECURITIES (at 125% Construction Costs) N/A $4,080,974
This breakdown is for historical reference; it is not a restriction on the use of the security. The bank shall be
subject to the approval of the City Administrator. The City may draw down the security, without notice, for
any violation of the terms of this Contract or if the security is allowed to lapse prior to the end of the
required term. If the required public improvements are not completed at least thirty (30) days prior to the
expiration of the security, the City may also draw it down. If the security is drawn down, the proceeds shall
be used to cure the default.
36. REDUCTION OF SECURITY. Upon written request by the Developer to the City Engineer
and upon receipt of proof satisfactory to the City Engineer that work has been completed in accordance
REV2: 12/15/2015 18
with the approved plans and specifications, and terms of this Agreement, and that all financial
obligations to the City have been satisfied, the City Engineer may approve reductions in the security as
follows:
A. Upon completion of grading operations, including temporary site restoration,
Developer shall submit an as-built grading survey to the City that at a minimum establishes the as-built
grades at all lot corners and downstream drainage conveyance systems and storm water ponds. Upon
inspection of the site and approval of the as-built survey, 100%, or $0, of the grading security may be
released. This security reduction does not include amounts related to erosion and sedimentation control.
B. Up to 75% of the security provided in accordance with paragraph 34 may be
released upon completion of the following key milestones of the project as determined by the City Engineer.
C. Construction Categories 2 and 3: The amount of $787,361 may be released when
all sanitary sewer and watermain utilities have been installed, all testing and televising has been
successfully completed, sanitary sewer as-built inverts have been verified, and the utilities are considered
ready for use by the City Engineer.
D. Construction Categories 4 and 5: The amount of $1,636,559 may be released when
all streets, and storm sewer have been installed and tested, and have been found to be complete to the
satisfaction of the City Engineer including all corrective work for any identified punch list items and including
verification of storm sewer as-built inverts, but not including the final wear course.
E. Construction Categories 6-17: The amount of $636,810 may be released when all
remaining Developer’s obligations under this Agreement have been completed including: (1) bituminous
wear course, (2) street lighting and private utilities, (3) sidewalks and trails, (4) bio retention facilities, (5)
iron monuments for lot corners have been installed, (3) all financial obligations to the City satisfied, (4) the
required "record" plans in the form of the City standards have been received and approved by the City,
and (5) the public improvements are accepted by the City Engineer and City Council.
F. At no point may the Security be reduced below twenty-five percent (25%) of the
original security amount until: (1) the warranty period has expired, (2) all improvements have been fully
completed and excepted by the City, including all corrective work and identified punch list items, and (3)
REV2: 12/15/2015 19
all financial obligations to the City have been satisfied.
G. In addition to the above project milestone based security reductions, the Developer
may submit written request to the City Engineer and upon receipt of proof satisfactory to the City
Engineer that work is progressing in accordance with the approved plans and specifications,
and terms of this Agreement, and that all financial obligations to the City have been satisfied, the City
Engineer may approve a one-time reduction in the security for Construction Categories 2-5 in an amount not to
exceed fifty percent (50%) of the initial security amounts.
H. It is the intention of the parties that the City at all times have available to it a Letter
of Credit in an amount adequate to ensure completion of all elements of the Subdivision Improvements
and other obligations of the Developer under this Agreement, including fees or costs due to the City by the
Developer. To that end and notwithstanding anything herein to the contrary, all requests by the Developer
for a reduction or release of the Letter of Credit shall be evaluated by the City in light of that principle.
36. SUMMARY OF CASH REQUIREMENTS. The following is a summary of the cash
requirements under this Contract which must be furnished to the City at the time of final plat approval:
Sewer Availability Charge (SAC) $234,000 Water Availability Charge (WAC) $234,000 Park Dedication N/A
Street Light Operating Fee $1,764
City Base Map Upgrading $3,000
City Engineering Administration Escrow $50,000(Based on two
months of
administration/observation
TOTAL CASH REQUIREMENTS $522,764
37. NOTICES. Required notices to the Developer shall be in writing, and shall be either hand
delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail at the
following address: 16305 36th Avenue N, Suite 600, Plymouth, MN 55446. Notices to the City shall be in
writing and shall be either hand delivered to the City Administrator, or mailed to the City by certified mail in
care of the City Administrator at the following address: Lake Elmo City Hall, 3800 Laverne Avenue N. Lake
Elmo, Minnesota 55042.
REV2: 12/15/2015 20
38. EVIDENCE OF TITLE. Developer shall furnish the City with evidence of fee ownership of
the property being platted by way of an attorney’s title opinion or title insurance policy dated not earlier than
thirty (30) days prior to the execution of the plat.
CITY OF LAKE ELMO (SEAL)
BY:
Mike Pearson, Mayor
REV2: 12/15/2015 21
AND
Julie Johnson, City Clerk DEVELOPER:
BY: Its
TATE OF MINNESOTA )
( ss. COUNTY OF WASHINGTON )
The foregoing instrument was acknowledged before me this day of , 2 , by and by , the
Mayor and City Clerk of the City of Lake Elmo, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council.
NOTARY PUBLIC
STATE OF MINNESOTA ) ( ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of
, 2 , by the
of .
NOTARY PUBLIC
DRAFTED BY: City of Lake Elmo 3800 Laverne Avenue North
Lake Elmo, MN 55042 (651) 747-3901
REV2: 12/15/2015 22
FEE OWNER CONSENT
TO DEVELOPMENT CONTRACT
, fee owners of all or part of
the subject property, the development of which is governed by the foregoing Development Contract, affirm and consent to the provisions thereof and agree to be bound by the provisions as the same may apply to
that portion of the subject property owned by them. Dated this day of , 2 .
STATE OF MINNESOTA ) ( ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of , 2 ,
by .
NOTARY PUBLIC
DRAFTED BY: City of Lake Elmo
3800 Laverne Avenue North Lake Elmo, MN 55042 (651) 747-3901
REV2: 12/15/2015 23
MORTGAGE CONSENT
TO DEVELOPMENT CONTRACT
, which holds a mortgage on
the subject property, the development of which is governed by the foregoing Development Contract, agrees that the Development Contract shall remain in full force and effect even if it forecloses on its mortgage.
Dated this day of , 2 .
STATE OF MINNESOTA )
( ss. COUNTY OF )
The foregoing instrument was acknowledged before me this day of _,
2 , by .
NOTARY PUBLIC
DRAFTED BY:
City of Lake Elmo 3800 Laverne Avenue North Lake Elmo, MN 55042
(651) 747-3901
REV2: 12/15/2015 24
CONTRACT PURCHASER CONSENT
TO DEVELOPMENT CONTRACT
, which/who has a
contract purchaser's interest in all or part of the subject property, the development of which is governed by the foregoing Development Contract, hereby affirms and consents to the provisions thereof and agrees to
be bound by the provisions as the same may apply to that portion of the subject property in which there is a contract purchaser's interest.
Dated this day of , 2 .
STATE OF MINNESOTA ) ( ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of _,
2 , by .
NOTARY PUBLIC
DRAFTED BY: City of Lake Elmo
3800 Laverne Avenue North Lake Elmo, MN 55042 (651) 747-3901
REV2: 12/15/2015 25
EXHIBIT “A”
TO DEVELOPMENT CONTRACT
Legal Description of Property Being Final Platted as
Savona 4th Addition
That part of the East Half of the Southwest Quarter of Section 34, Township 29, Range 21, Washington County,
Minnesota, described as follows:
Commencing at the West Quarter corner of said Section 34; thence South 00 degrees 00 minutes 40 seconds
East, along the west line of said Section 34, a distance of 472.55 feet; thence North 89 degrees 57 minutes 32
seconds East, a distance of 1315.91 feet to the west line of said East Half of the Southwest Quarter and the
point of beginning; thence South 00 degrees 02 minutes 55 seconds West, along said west line a distance of
714.99 feet; thence North 89 degrees 55 minutes 22 seconds East, a distance of 212.38 feet; thence
southeasterly along a tangential curve concave to the southwest having a central angle of 29 degrees 05
minutes 37 seconds, a radius of 1100.00 feet for an arc distance of 558.56 feet; thence South 60 degrees 59
minutes 01 seconds East, tangent to said curve, a distance of 224.27 feet; thence southeasterly along a
tangential curve, concave to the northeast, having a central angle of 29 degrees 11 minutes 27 seconds, a
radius of 760.00 feet for an arc distance of 387.20 feet to the east line of said East Half of the Southwest
Quarter; thence North 00 degrees 06 minutes 31 seconds East, not tangent to said curve and along said east
line, a distance of 1057.90 feet to a line bearing North 89 degrees 57 minutes 32 seconds East from said
point of beginning; thence South 89 degrees 57 minutes 32 seconds West, a distance of 1315.91 feet to the
point of beginning.
EXCEPT
That part of the East Half of the Southwest Quarter of Section 34, Township 29, Range 21, Washington County,
Minnesota described as follows:
Commencing at the northwest corner of said East Half of the Southwest Quarter; thence South 00 degrees 02
minutes 55 seconds West, assumed bearing, along the west line of said East Half a distance of 759.99 feet to
the point of beginning of the parcel to be described; thence South 16 degrees 08 minutes 55 seconds East,
along the centerline of the Pipeline Easement described in Document No. 3172091, a distance of 448.37 feet;
thence South 89 degrees 55 minutes 22 seconds West a distance of 125.07 feet to said west line of said East
Half; thence North 00 degrees 02 minutes 55 seconds East, along said west line a distance of 430.85 feet to
the point of beginning.
AND
That part of the East Half of the Southwest Quarter of Section 34, Township 29, Range 21, Washington County,
Minnesota, lying south of the south line of the dedicated plat of STONEGATE 2ND ADDITION and lying north of a line
described as follows:
Commencing at the West Quarter corner of said Section 34; thence South 00 degrees 00 minutes 40 seconds
East, along the west line of said Section 34, a distance of 472.55 feet to the point of beginning of the line to
be described; thence North 89 degrees 57 minutes 32 seconds East, a distance of 2631.82 feet to the east
line of said East Half of the Southwest Quarter and said line there terminating.
EXCEPTING THEREFROM;
Commencing at the Southwest corner of Lot 4, Block 3, said STONEGATE 2ND ADDITION, according to the recorded
plat thereof, Washington County, Minnesota; thence South 00 degrees 02 minutes 55 seconds West, assumed bearing
along the West line of said East Half of the Southwest Quarter, a distance of 262.00 feet; thence North 89 degrees 57
minutes 33 seconds East, a distance of 358.06 feet; thence North 00 degrees 02 minutes 55 seconds East, a distance
of 262.00 feet to the Southeast corner of said Lot 4; thence South 89 degrees 57 minutes 33 seconds West, along the
South line of said Lot 4, a distance of 358.06 feet to the point of beginning.
REV2: 12/15/2015 26
IRREVOCABLE LETTER OF CREDIT
No.
Date:
TO: City of Lake Elmo
Dear Sir or Madam:
We hereby issue, for the account of (Name of Developer) and in your favor, our Irrevocable Letter of Credit in the amount of $_ , available to you by your draft drawn on sight on the undersigned bank. The draft must: a) Bear the clause, "Drawn under Letter of Credit No. , dated , 2 , of
(Name of Bank) ";
b) Be signed by the Mayor or City Administrator of the City of Lake Elmo.
c) Be presented for payment at (Address of Bank) , on or before 4:00 p.m. on November 30, 2_ _. This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty-five (45)
days prior to the next annual renewal date (which shall be November 30 of each year), the Bank delivers written notice to the Lake Elmo City Administrator that it intends to modify the terms of, or cancel, this Letter of Credit. Written
notice is effective if sent by certified mail, postage prepaid, and deposited in the U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed as follows: City Administrator, City Hall, 3800 Laverne Ave. N. Lake
Elmo Minnesota 55042 and is actually received by the City Administrator at least thirty (30) days prior to the renewal date. This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended,
amplified, or limited by reference to any document, instrument, or agreement, whether or not referred to herein. This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under this Letter of Credit. This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for
Documentary Credits, International Chamber of Commerce Publication No. 500. We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored upon presentation.
BY:
Its