HomeMy WebLinkAbout#16 2016 Patching - Accept Bids and Award Contract AGENDA ITEM
MAYOR & COUNCIL COMMUNICATION
-- page 1 --
DATE: May 17, 2016
CONSENT
ITEM # 16
AGENDA ITEM: 2016 Street Full Depth Patching – Accept Quotes and Award Contract
SUBMITTED BY: Ryan Stempski, Assistant City Engineer
THROUGH: Kristina Handt, City Administrator
REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director Mike Bouthilet, Public Works
SUGGESTED ORDER OF BUSINESS (if removed from the Consent Agenda):
- Questions from Council to Staff ......................................................... Mayor Facilitates
- Public Input, if Appropriate………………………………………… Mayor Facilitates
- Call for Motion ........................................................................... Mayor & City Council
- Discussion…………………………………. .............................. Mayor & City Council
- Action on Motion ............................................................................... Mayor Facilitates
POLICY RECOMMENDER: Engineering.
FISCAL IMPACT: $55,820.00.
The 2016 Street Full Depth Patching work would be paid from the Street Budget under the General Fund. With this cost the street maintenance work, including crack seal, seal coat, overlay and full depth patching
would be completed within the total 2016 budget amount. SUMMARY AND ACTION REQUESTED:
The City Council is respectfully requested to consider accepting contractor quotes and awarding a
contract for the 2016 Street Full Depth Patching project.
LEGISLATIVE HISTORY/BACKGROUND INFORMATION:
In addition to the City’s annual street maintenance work completed by Public Works staff, the City contracts out street maintenance for crack sealing, seal coating, occasional mill and overlay work and full
depth patch repairs. This work is part of the City annual street maintenance budget. To date, contractor
bids or quotes have been received for the 2016 Crack Seal Project, the 2016 Seal Coat Project and the 2016 Overlay Project. In each case, the bids or quotes have been favorable, coming in well under budget.
City Council Meeting [Consent Agenda Item X]
May 17, 2016
-- page 2 --
On May 11, 2016, staff received two contractor quotes to complete full depth street patching work along
14th Street North within the Homestead neighborhood. The work will repair localized areas of pavement
distress near the entrance of the neighborhood where the street is in significant disrepair. The work will serve to extend the useful life of this roadway and will help defer the neighborhood streets from a more
significant street improvement project. It is recommended to have this work completed in 2016. In 2017,
all streets in the neighborhood are scheduled to be seal coated.
To comply with competitive bidding law for contracts between $25,000 and $100,000, the City may use direct negotiation. When direct negotiation is used, two quotes must be obtained and kept on file for the period of one year. Contractor quotes were obtained from local, reputable paving contractors with the
following results: Hardrives, Inc. = $55,820.00.
T.A. Schifsky & Sons, Inc. = $68,040.00. The breakdown of these quote totals can be seen in the attached Contracts, with staff recommending the
low quote of $55,820.00 from Hardrives, Inc.
RECOMMENDATION:
Staff is recommending that the City Council accept the quotes and award a Contract to Hardrives, Inc. If
removed from consent, the recommended motion for this action is as follows:
“Move to accept the quotes and award a Contract to Hardrives, Inc. in the amount of $55,820.00 for the 2016 Street Full Depth Patching Project.” ATTACHMENT(S): 1. Hardrives, Inc. Construction Contract for the 2016 Street Full Depth Patching Project. 2. T.A. Schifsky & Sons, Inc. Construction Contract for the 2016 Street Full Depth Patching
Project.
Project No. 2016.115 General Conditions for 2016 Patching Project Page 1 of 2
State of Minnesota
Washington County
CONSTRUCTION CONTRACT FOR THE
2016 STREET FULL DEPTH PATCHING PROJECT
LAKE ELMO, MINNESOTA
This Contract, made this 17th day of May 2016, by the City of Lake Elmo, Minnesota (herinafter called the “Owner”) and Hardrives,
Inc. (hereinafter called the “Contractor”).
WITNESSETH that the parties hereto agree as follows:
The Contractor shall provide all labor, services, materials, equipment and machinery, transportation, tools, fuel, power, light, heat,
telephone, water, sanitary facilities, traffic control, temporary facilities, and all other facilities and incidentals, including profit and
overhead, necessary for the performance, testing, start‐up, and completion of the work as described herein:
IN WITNESS WHEREOF, the parties hereto have executed this contract as of the date first above written.
(Contractor) (City of Lake Elmo)
DESCRIPTION OF WORK: The Contractor shall complete full-depth pavement patch repairs along 14th Street North in Lake
Elmo, MN at the direction and in the locations specified by the City. All work shall be completed within the specified time frame
and under the terms and conditions provided within this Construction Contract, and in accordance with the “General Conditions”
shown in this contract. The contractor shall complete the proposed work by SEPTEMBER 30, 2016.
The extents of the patch excavation area shall be marked in the field by the City and must be sawcut perpendicular across the entire
street section from lip of curb to lip of curb. Sawcutting is incidental to the patching work.
Full-depth patching shall include the removal of the entire pavement surface layer, regardless of its thickness, over the patching
area. A Test Roll shall be completed with a fully loaded aggregate truck over the street and is incidental to the patching work. The
existing aggregate base areas that pass a Test Roll, as determined by the City inspector, shall be toleranced and re-compacted prior
to paving. The areas that do not pass a Test Roll, as determined by the City inspector, shall receive new Class 6 aggregate base
material to a depth specified by the City. Each excavation shall be inspected by the City to determine if additional base material
removal is needed to provide for a firm support. The aggregate base shall be toleranced to meet a minimum 2% crown to facilitate
drainage. The bituminous surface shall be replaced using two compacted layers and shall include tack coat between them. The
Bituminous Base Course (SPNWB230B) shall be a minimum 1.5” thick and the Bituminous Wear Course (SPWEA240B) shall be
a minimum 1.5” thick.
All bituminous testing shall be in accordance with MnDOT 2360 and is incidental to the patching work. The test procedure shall be
the Ordinary Compaction Method. Aggregate gradation testing shall be as specified in MnDOT 2211 and MnDOT 3138. Water
shall be applied at such times and in such amounts as necessary for proper aggregate compaction.
The City will make payment for the whole contract upon acceptance by the City of all work required hereunder and in compliance
with all the terms and conditions of this contract. Payment to the Contractor will be made for only the actual quantities of work
performed using the unit prices provided within this Contract and listed below, except that the total amount cannot exceed $55,820
without prior written authorization by the City Engineer. All materials, labor, tools and equipment needed to complete full-depth
pavement repair work that is not specifically itemized below with a unit price and estimated quantity shall be incidental to the
work. The City may add or reduce the project quantities in the best interest of the City.
Mobilization 1 LS - $3,000.00
Remove Bituminous and Tolerance – 3,700 SY x $2.85/SY = $10,545.00
1.5” SPNWB230B – 350 Tons x $52.00/Ton = $18,200.00
1.5” SPWEA240B – 350 Tons x $54.50/Ton = $19,075.00
Remove & Replace Class 6 Aggregate Base – 500 SY x $10.00/SY = $5,000.00
TOTAL ESTIMATED AMOUNT: $55,820.00
Project No. 2016.115 General Conditions for 2016 Patching Project Page 2 of 2
GENERAL CONDITIONS
I. CHANGES IN WORK. ‐ The Owner may at any time, make changes in the drawings and specifications, within the general scope thereof. If
such changes cause an increase or decrease in the amount due under this contract or in the time required for its performance, an
equitable adjustment will be made, and this contract will be modified accordingly by a “Contract Change Order”. No charge for any extra
work or material will be allowed unless the same has been ordered on such contract change order by the Owner and the price therefore
stated in the order.
II. INSPECTION OF WORK. ‐ All materials and workmanship will be subject to inspection, examination, and test, by the Owner, who will have
the right to reject defective material and workmanship or require its correction.
III. COMPLETION OF WORK. ‐ If the Contractor refuses or fails to complete the work within the time specified in this contract, or any
extension thereof, the Owner may terminate the Contractor’s rights to proceed. In such event the Owner may take over the work and
prosecute the same to completion by contract or otherwise, and the Contractor will be liable for any excess cost occasioned the Owner
thereby; and the Owner may take possession of and utilize in completing the work such materials and equipment as may be on the site of
the work and necessary therefore. If the Owner does not terminate the right of the Contract to proceed, the Contractor will continue the
work, in which event, actual damages for delay will be impossible to determine, and in lieu thereof, the Contractor may be required to
pay to the Owner the sum of $100 as liquidated damages for each calendar day of delay, and the Contractor will be liable for the amount
thereof: Provided, however, that the right of the Contractor to proceed will not be terminated because of delays in the completion of the
completion of the work due to unforeseeable causes beyond the Contractor’s control and without Contractor’s fault or negligence.
IV. RELEASES. ‐ Prior to final payment, the Contractor will submit evidence that all payrolls, material bills, and other indebtedness connected
with the work have been paid as required by the Owner.
V. OBLIGATION TO DISCHARGE LIENS. ‐ Acceptance by the Owner of the completed work performed by the Contractor and payment
therefore by the Owner will not relieve the Contractor of obligation to the Owner (which obligation is hereby acknowledged) to discharge
any and all liens for the benefit of subcontractors, laborers, material‐person, or any other persons performing labor upon the work or
furnishing material or machinery for the work covered by this contract, which have attached to or may subsequently attach to the
property, or interest of the Owner.
VI. NOTICES AND APPROVAL IN WRITING. ‐ Any notice, consent, or other act to be given or done hereunder will be valid only if in writing.
VII. CLEANING UP. ‐ The Contractor shall keep the premises free from accumulation of waste material and rubbish and at the completion of
the work shall remove from the premises all rubbish, implements and surplus materials.
VIII. WARRANTY. ‐ Contractor warrants and guarantees that title to all work, materials, and equipment covered by any Application for
Payment, whether incorporated in the Project or not, will pass to Owner no later than the time of payment free and clear of all Liens. If
within one year after completion of the work, any work is found to be defective, Contractor shall promptly, without cost to the Owner,
correct such defective work as approved by the Owner.
IX. IDEMNIFICATION. ‐ Contractor shall defend and indemnify the city against claims brought or actions filed against the city or any of its
officers, employees or agents for property damage, bodily injury or death to third persons, arising out of or relating to contractors work
under the contract.
X. WORKERS’ COMPENSATION INSURANCE. ‐ Contractor shall provide a certificate of insurance showing evidence of workers’ compensation
coverage or provide evidence of qualification as a self‐insurer of workers’ compensation.
XI. LIABILITY INSURANCE REQUIREMENTS. – A certificate of insurance acceptable to the City shall be filed with the City prior to the
commencement of the work. The certificate and the required insurance policies shall contain a provision that the coverage afforded
under the contract will not be canceled or allowed to expire until at least 30 days prior written notice has been given to the city.
Contractor shall maintain commercial general liability (CGL) insurance with a limit of not less than $1,000,000 each occurrence and an
aggregate limit of not less than $2,000,000. The CGL insurance shall cover liability arising from premises, operations, independent
contractors, subcontractors, products‐completed operations, personal injury and advertising injury, and contractually‐assumed liability.
The city shall be named as an additional insured under the CGL. Contractor shall maintain automobile liability insurance, and if necessary,
umbrella liability insurance with a limit of not less than $1,000,000 each accident and an aggregate limit of not less than $2,000,000. The
insurance shall cover liability arising out of any auto, including owned, hired, and non‐owned autos.
Project No. 2016.115 General Conditions for 2016 Patching Project Page 1 of 2
State of Minnesota
Washington County
CONSTRUCTION CONTRACT FOR THE
2016 STREET FULL DEPTH PATCHING PROJECT
LAKE ELMO, MINNESOTA
This Contract, made this 17th day of May 2016, by the City of Lake Elmo, Minnesota (herinafter called the “Owner”) and T.A. Schifsky
& Sons, Inc. (hereinafter called the “Contractor”).
WITNESSETH that the parties hereto agree as follows:
The Contractor shall provide all labor, services, materials, equipment and machinery, transportation, tools, fuel, power, light, heat,
telephone, water, sanitary facilities, traffic control, temporary facilities, and all other facilities and incidentals, including profit and
overhead, necessary for the performance, testing, start‐up, and completion of the work as described herein:
IN WITNESS WHEREOF, the parties hereto have executed this contract as of the date first above written.
(Contractor) (City of Lake Elmo)
DESCRIPTION OF WORK: The Contractor shall complete full-depth pavement patch repairs along 14th Street North in Lake
Elmo, MN at the direction and in the locations specified by the City. All work shall be completed within the specified time frame
and under the terms and conditions provided within this Construction Contract, and in accordance with the “General Conditions”
shown in this contract. The contractor shall complete the proposed work by SEPTEMBER 30, 2016.
The extents of the patch excavation area shall be marked in the field by the City and must be sawcut perpendicular across the entire
street section from lip of curb to lip of curb. Sawcutting is incidental to the patching work.
Full-depth patching shall include the removal of the entire pavement surface layer, regardless of its thickness, over the patching
area. A Test Roll shall be completed with a fully loaded aggregate truck over the street and is incidental to the patching work. The
existing aggregate base areas that pass a Test Roll, as determined by the City inspector, shall be toleranced and re-compacted prior
to paving. The areas that do not pass a Test Roll, as determined by the City inspector, shall receive new Class 6 aggregate base
material to a depth specified by the City. Each excavation shall be inspected by the City to determine if additional base material
removal is needed to provide for a firm support. The aggregate base shall be toleranced to meet a minimum 2% crown to facilitate
drainage. The bituminous surface shall be replaced using two compacted layers and shall include tack coat between them. The
Bituminous Base Course (SPNWB230B) shall be a minimum 1.5” thick and the Bituminous Wear Course (SPWEA240B) shall be
a minimum 1.5” thick.
All bituminous testing shall be in accordance with MnDOT 2360 and is incidental to the patching work. The test procedure shall be
the Ordinary Compaction Method. Aggregate gradation testing shall be as specified in MnDOT 2211 and MnDOT 3138. Water
shall be applied at such times and in such amounts as necessary for proper aggregate compaction.
The City will make payment for the whole contract upon acceptance by the City of all work required hereunder and in compliance
with all the terms and conditions of this contract. Payment to the Contractor will be made for only the actual quantities of work
performed using the unit prices provided within this Contract and listed below, except that the total amount cannot exceed $55,820
without prior written authorization by the City Engineer. All materials, labor, tools and equipment needed to complete full-depth
pavement repair work that is not specifically itemized below with a unit price and estimated quantity shall be incidental to the
work. The City may add or reduce the project quantities in the best interest of the City.
Mobilization 1 LS – Included at no charge.
Remove Bituminous and Tolerance – 3,700 SY x $3.70/SY = $13,690.00
1.5” SPNWB230B – 350 Tons x $70.00/Ton = $24,500.00
1.5” SPWEA240B – 350 Tons x $71.00/Ton = $24,850.00
Remove & Replace Class 6 Aggregate Base – 500 SY x $10.00/SY = $5,000.00
TOTAL ESTIMATED AMOUNT: $68,040.00
Project No. 2016.115 General Conditions for 2016 Patching Project Page 2 of 2
GENERAL CONDITIONS
I. CHANGES IN WORK. ‐ The Owner may at any time, make changes in the drawings and specifications, within the general scope thereof. If
such changes cause an increase or decrease in the amount due under this contract or in the time required for its performance, an
equitable adjustment will be made, and this contract will be modified accordingly by a “Contract Change Order”. No charge for any extra
work or material will be allowed unless the same has been ordered on such contract change order by the Owner and the price therefore
stated in the order.
II. INSPECTION OF WORK. ‐ All materials and workmanship will be subject to inspection, examination, and test, by the Owner, who will have
the right to reject defective material and workmanship or require its correction.
III. COMPLETION OF WORK. ‐ If the Contractor refuses or fails to complete the work within the time specified in this contract, or any
extension thereof, the Owner may terminate the Contractor’s rights to proceed. In such event the Owner may take over the work and
prosecute the same to completion by contract or otherwise, and the Contractor will be liable for any excess cost occasioned the Owner
thereby; and the Owner may take possession of and utilize in completing the work such materials and equipment as may be on the site of
the work and necessary therefore. If the Owner does not terminate the right of the Contract to proceed, the Contractor will continue the
work, in which event, actual damages for delay will be impossible to determine, and in lieu thereof, the Contractor may be required to
pay to the Owner the sum of $100 as liquidated damages for each calendar day of delay, and the Contractor will be liable for the amount
thereof: Provided, however, that the right of the Contractor to proceed will not be terminated because of delays in the completion of the
completion of the work due to unforeseeable causes beyond the Contractor’s control and without Contractor’s fault or negligence.
IV. RELEASES. ‐ Prior to final payment, the Contractor will submit evidence that all payrolls, material bills, and other indebtedness connected
with the work have been paid as required by the Owner.
V. OBLIGATION TO DISCHARGE LIENS. ‐ Acceptance by the Owner of the completed work performed by the Contractor and payment
therefore by the Owner will not relieve the Contractor of obligation to the Owner (which obligation is hereby acknowledged) to discharge
any and all liens for the benefit of subcontractors, laborers, material‐person, or any other persons performing labor upon the work or
furnishing material or machinery for the work covered by this contract, which have attached to or may subsequently attach to the
property, or interest of the Owner.
VI. NOTICES AND APPROVAL IN WRITING. ‐ Any notice, consent, or other act to be given or done hereunder will be valid only if in writing.
VII. CLEANING UP. ‐ The Contractor shall keep the premises free from accumulation of waste material and rubbish and at the completion of
the work shall remove from the premises all rubbish, implements and surplus materials.
VIII. WARRANTY. ‐ Contractor warrants and guarantees that title to all work, materials, and equipment covered by any Application for
Payment, whether incorporated in the Project or not, will pass to Owner no later than the time of payment free and clear of all Liens. If
within one year after completion of the work, any work is found to be defective, Contractor shall promptly, without cost to the Owner,
correct such defective work as approved by the Owner.
IX. IDEMNIFICATION. ‐ Contractor shall defend and indemnify the city against claims brought or actions filed against the city or any of its
officers, employees or agents for property damage, bodily injury or death to third persons, arising out of or relating to contractors work
under the contract.
X. WORKERS’ COMPENSATION INSURANCE. ‐ Contractor shall provide a certificate of insurance showing evidence of workers’ compensation
coverage or provide evidence of qualification as a self‐insurer of workers’ compensation.
XI. LIABILITY INSURANCE REQUIREMENTS. – A certificate of insurance acceptable to the City shall be filed with the City prior to the
commencement of the work. The certificate and the required insurance policies shall contain a provision that the coverage afforded
under the contract will not be canceled or allowed to expire until at least 30 days prior written notice has been given to the city.
Contractor shall maintain commercial general liability (CGL) insurance with a limit of not less than $1,000,000 each occurrence and an
aggregate limit of not less than $2,000,000. The CGL insurance shall cover liability arising from premises, operations, independent
contractors, subcontractors, products‐completed operations, personal injury and advertising injury, and contractually‐assumed liability.
The city shall be named as an additional insured under the CGL. Contractor shall maintain automobile liability insurance, and if necessary,
umbrella liability insurance with a limit of not less than $1,000,000 each accident and an aggregate limit of not less than $2,000,000. The
insurance shall cover liability arising out of any auto, including owned, hired, and non‐owned autos.