HomeMy WebLinkAbout2016 PD Work Plan (2)1
2016 Planning Department Work Plan
Prepared by the Lake Elmo Planning Commission: 4/25/16
Accepted by the City Council
Key
Status
C – Complete
IP – In Progress
Completion
Goal (CG)
A – 0 to 3 months
B – 3 to 6 months
C – 6 to 9 months
D – 9 to 12 months
PL Priority Level (1-5 with 1 being the highest priority)
Project and Description CG PL Status
ZONING INITIATIVES
Zoning Map Updates
Update Zoning Map to change Village parcels to VMX
consistent with the Comprehensive Plan
B
2
Implement zoning map changes for specific developments in
the Village and I-94 Corridor.
B 2
Zoning Text Amendments (Zoning Code Update)
Codify Zoning Ordinance D 1
General performance standards B 1
Specific development standards C 4
Public Facilities ordinance amendments B 1
Tree Preservation Ordinance perfecting amendments C 3
Home Occupation Ordinance B 2
Amend LDR Setback Requirements A 1
Landscape Ordinance Amendment D 5
Outdoor Lighting Ordinance Revisions D 3
Outdoor Wood Burning Furnaces D 5
Revise contractor work hours ordinance C 3 IP
Wireless Communications Ordinance for Microcell technology D 4
Hunting Ordinance (City Attorney) IP
Platting for Minor Subdivisions D 5
Create new zoning district for Washington County Landfill
consistent with the MPCA
D 5
Form-based Code
2
Prepare a scope of work to be accomplished including the
need for outside assistance
A 1
Draft a form-based code to supplement the Village Mixed-Use
zoning district based on the scope of work
C 2
Incorporate design standards from the Design Standards
Manual as part of a form-based code
C 2
Shoreland Ordinance Update
Obtain DNR approval of revised Shoreland Ordinance B 1 IP
Adopt final version of Shoreland Ordinance based on DNR
approval
B 1
Subdivision Ordinance
Prepare update to incorporate updated engineering standards
and to revise submission requirements
D 4
Airport Zoning
Resolve zoning conflicts with the Metropolitan Airports
Commission, Met Council, MnDOT, and Washington County
D 1 IP
Implement City airport zoning regulations for the airport safety
zones within the Village Planning Area
D 2
PLANNING INITIATIVES
Village Area Planning
Submit application for new Village Parkway railroad crossing B 2 IP
Update Village AUAR B 1
General Comprehensive Planning
Review Waste Water chapter of Comprehensive Plan in
conjunction with rural areas review
D
3
RFP for Comprehensive Planning Services B 2
Plan for possible density reductions and reguiding land use in
the Village and I-94 area to address changes in the 2015
system statement
A 1 IP
Amend Rural Single Family description to allow for sewer
service within the MUSA
A 1 IP
Park Planning
Assist with the creation of a master plan for selected City
parks, provide assistance to Parks Commission as needed
D 3
Update the Comprehensive Park and Trail System Plan C 3
Update Parks 10-year CIP B 2
Capital Improvement Plan
Planning Commission review of 10-year Capital Improvement
Plan for consistency with the Comprehensive Plan
D 2
General Planning Studies
Conduct review of 201 (community) septic system policies
and management practices. Develop system for proper
oversight, billing, and maintenance of community systems.
D 3 IP
3
Develop list of contacts and resources for private community
septic systems
C 3
TRANSPORTATION PLANNING PROJECTS
Participate in Manning Avenue (CSAH 15) study with
Washington County.
B 2 IP
ADMINISTRATIVE INITIATIVES
Developer’s Agreements and Escrows
Track planning and other review time against development
escrow accounts
A 1 IP
Building Division
Develop disaster preparedness manual for Lake Elmo D 3
Permit Software Implementation
Implement Code Enforcement Module for Permit Works A 2
Add Planning Module from PermitWorks to track planning and
zoning applications
B 1
Complete move of planning file system to PermitWorks
software
B 3 IP
Code Enforcement
Provide support to code enforcement program with the
Building Inspector as the City’s code enforcement officer
B 3 IP
File Archiving and Management
Archive older zoning files B 2 IP
Scan zoning files in to Laserfische system C 4 IP
Policy and Procedures Review
Develop application intake and completeness worksheet A 2 IP
Streamline & Improve Policies/Procedures for the handling of
routine land matters including but not limited to variances, site
plan review, setbacks et al;
A 1