HomeMy WebLinkAboutTablyn Park Pricing pg. 1
Tablyn Park Pricing
Feature Estimated Cost Notes
Skating Rink Parking and
Gravel Driveway
$26,200 ($2/sf based on 13,100 sf
as measured from scaled drawing)
(Pricing Source:
https://www2.monroecounty.gov/file
s/parks/EPAMPU%20(DRAFT)%20
All%20Appendices.pdf)
Skating Rink - Boards $16,900 ($65 per linear foot
based on a circumference of 260
ft as measured from the scale
drawing)
(Pricing Source: A Skating Rink
Feasibility Study
http://web.williams.edu/wp-
etc/ces/wmstn-skating-rink.pdf)
Warming House/Restrooms $1200/season The Commission would like to rent a
unit that is portable to determine its
use and possibly construct a
permanent structure in the future;
they estimated this cost.
Convert Baseball to Soccer $555 plus labor (Pricing Source:
http://buckeyeturf.osu.edu/index.php
?option=com_content&id=760:field-
renovation-on-a-shoe-string-
budget&Itemid=170)
Rebuilding stairs from parking
lot (concrete)
$15,000 (Pricing Source:
http://www.ucitymo.org/DocumentC
enter/View/7667)
Bringing switchback trail in to
ADA compliance
$21,000 for concrete trail ($70/ft
based on approx. 300 ft as
calculated from measurements of
drawing of switchback trail)
Includes clearing and grubbing,
grading, granular subbase, concrete,
seed/mulch
(Pricing Source:
http://www.nirpc.org/media/
3539/appendix_b___trailcosts.pdf)
Natural Surface Trail $1995.00 ($1.75/mi based on
approx. 1140 ft as calculated from
measurements of drawing of
entire trail)
(Pricing Source:
http://www.nirpc.org/media/3539/a
ppendix_b___trailcosts.pdf)
Lighting $26,000 Pricing based on previous research
performed 08/2015
Extended Parking Lot Area $7,000 ($3.50/sf based on 2000 sf
for parking lot extension area)
(Pricing Source:
https://www2.monroecounty.gov/file
s/parks/EPAMPU%20(DRAFT)%20
All%20Appendices.pdf)
New Playground Features $12,500 Pricing based on previous research
performed 08/2015
Pollinator Garden $1000 Pricing estimated by Parks
Commission
Total $129,350