Loading...
HomeMy WebLinkAboutTablyn Park Pricing pg. 1 Tablyn Park Pricing Feature Estimated Cost Notes Skating Rink Parking and Gravel Driveway $26,200 ($2/sf based on 13,100 sf as measured from scaled drawing) (Pricing Source: https://www2.monroecounty.gov/file s/parks/EPAMPU%20(DRAFT)%20 All%20Appendices.pdf) Skating Rink - Boards $16,900 ($65 per linear foot based on a circumference of 260 ft as measured from the scale drawing) (Pricing Source: A Skating Rink Feasibility Study http://web.williams.edu/wp- etc/ces/wmstn-skating-rink.pdf) Warming House/Restrooms $1200/season The Commission would like to rent a unit that is portable to determine its use and possibly construct a permanent structure in the future; they estimated this cost. Convert Baseball to Soccer $555 plus labor (Pricing Source: http://buckeyeturf.osu.edu/index.php ?option=com_content&id=760:field- renovation-on-a-shoe-string- budget&Itemid=170) Rebuilding stairs from parking lot (concrete) $15,000 (Pricing Source: http://www.ucitymo.org/DocumentC enter/View/7667) Bringing switchback trail in to ADA compliance $21,000 for concrete trail ($70/ft based on approx. 300 ft as calculated from measurements of drawing of switchback trail) Includes clearing and grubbing, grading, granular subbase, concrete, seed/mulch (Pricing Source: http://www.nirpc.org/media/ 3539/appendix_b___trailcosts.pdf) Natural Surface Trail $1995.00 ($1.75/mi based on approx. 1140 ft as calculated from measurements of drawing of entire trail) (Pricing Source: http://www.nirpc.org/media/3539/a ppendix_b___trailcosts.pdf) Lighting $26,000 Pricing based on previous research performed 08/2015 Extended Parking Lot Area $7,000 ($3.50/sf based on 2000 sf for parking lot extension area) (Pricing Source: https://www2.monroecounty.gov/file s/parks/EPAMPU%20(DRAFT)%20 All%20Appendices.pdf) New Playground Features $12,500 Pricing based on previous research performed 08/2015 Pollinator Garden $1000 Pricing estimated by Parks Commission Total $129,350