Loading...
HomeMy WebLinkAbout2016 streets Change Order No 1CONTRACT CHANGE ORDER FORM CHANGE ORDER NO. DATE: TO: UNIT Amount of Original Contract $ Sum of Additions/Deductions approved to date (CO Nos.         )$ Contract Amount to date $ Amount of this Change Order   (ADD)   (DEDUCT)   (NO CHANGE)$ Revised Contract Amount $ The Contract Period for Completion will be   (UNCHANGED)  (INCREASED)  (DECREASED)days APPROVED BY ENGINEER:  FOCUS Engineering, inc. APPROVED BY CONTRACTOR DATE DATE APPROVED BY OWNER:  CITY OF LAKE ELMO, MINNESOTA DATE DATE 0 This Document will become a supplement to the Contract and all provisions will apply hereto. The Contract Documents are  modified as follows upon execution of this Change Order.  BYENGINEER 1,189,610.33 0.00 1,189,610.33 32,976.55 1,222,586.88 INCREASE/(DECREASE) HARDRIVES, INC. 14475 QUIRAM DRIVE ROGERS, MN 55374 2016 STREET, DRAINAGE AND UTILITY IMPROVEMENTS PROJECT NO. 2015.129 1 June 27, 2016 ITEM $32,976.55 NET CONTRACT CHANGE $32,976.55 CITY OF LAKE ELMO, MINNESOTA BYBY CHANGE ORDER DESCRIPTION / JUSTIFICATION: This change order is being processed to amend the Contract for the installation of draintile, cleanouts, concrete headwalls, and connection of  the draintile to the existing storm sewer at the following locations: 1) On each side of Jasmine Ave North (Station 51+40 to 53+40). 2) Around the outer edge and inner landscape area of the 9th Street N cul de sac. 3) The north side of Jasime Ave North located (Station 44+40 to 46+00). Attachments  (list documents supporting change):Itemization of Items DESCRIPTION OF PAY ITEM QTY UNIT PRICE **See attached itemization 6/27/2016 FOCUS Engineering, inc.CHANGE ORDER FORM CHANGE ORDER NO. 1 2016 STREET, DRAINAGE AND UTILITY IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2015.129 QUANTITY UNIT PRICE AMOUNT CO1‐1 LS 1.0 $1,000.00 $1,000.00 CO1‐2 LF 1,179.0 $19.45 $22,931.55 CO1‐3 EA 11.0 $330.00 $3,630.00 CO1‐4 EA 2.0 $295.00 $590.00 CO1‐5 EA 5.0 $825.00 $4,125.00 CO1‐6 EA 2.0 $350.00 $700.00 TOTALS ‐ CHANGE ORDER NO. 1 $32,976.55 MOBILIZATION 4" PVC PERFORATED EDGE DRAIN WITH BACKFILL & WRAP CONNECT TO EXISTING DRAINTILE DRAINTILE CLEANOUT PRECAST CONCRETE HEADWALL CORE DRILL INTO EXISTING STORM SEWER This change order is being processed to amend the Contract for the  installation of draintile, cleanouts, concrete headwalls, and connection  of the draintile to the existing storm sewer at the following locations: 1) On each side of Jasmine Ave North (Station 51+40 to 53+40). 2) Around the outer edge and inner landscape area of the 9th Street N  cul de sac. 3) The north side of Jasime Ave North located (Station 44+40 to 46+00). DESCRIPTION / JUSTIFICATIONITEM DESCRIPTION OF PAY ITEM UNIT CHANGE ORDER