Loading...
HomeMy WebLinkAbout#8 July 2016 Monthly ReportCity of Lake Elmo Public Works Department Monthly Report July 2016 Below is a brief list of activities taking place over the past month within the Public Works Dept.  Utility walk through inspection in Village Preserve  300 tons of road salt (carry over from 80% min. order 2015-2016 winter)  Repairs made to chemical feed addition control unit at Lisbon Ave. Lift Station  63 tons of asphalt applied to potholes/patches. o Lake Elmo Heights o Old Village Streets o 31st St between CSAH 14 and CSAH 6 o Fox Fire Estates  Upgrade to Water Tower #2 communication system after July 19th system failure.  Upgraded 94 Lift Station (Hudson Blvd.) controls to work with existing SCADA system  Equipment repairs to: o 2000 Chevy Pick-up = repair holes in cab floor (4-new tires still needed) o 2004 John Deere Ditch Mower = new speed sensor and solenoid o 1998 GMC Pick-up = new radiator o Small misc. repairs to lawn mowers  Meetings w/ Wash. Co. and Focus Eng. regarding Traffic Signal and Roundabout Maint.  Bid requests for = City Hall Sidewalk Replacement, PW Roof leaks, Tree Removal on Hill Trial Drain Field., Spring Clean-up Day  Work with Planning Dept. on Irrigation Standards  Continuous items = Mowing, Ditch Mowing, Ball Field Maint., Submitted by: Rob Weldon Public Works Director