Loading...
HomeMy WebLinkAbout08-16-16 City Council Meeting Packet 1 of 3 NOTICE OF MEETING City Council Meeting Tuesday, August 16, 2016 7:00 P.M. City of Lake Elmo | 3800 Laverne Avenue North Agenda F. Call to Order/Pledge of Allegiance G. Approval of Agenda H. Approval of Minutes 1. August 2, 2016 I. Public Comments/Inquiries J. Presentations 2. Promotion of Two Probationary Firefighters K. Consent Agenda 3. Approve Payment of Disbursements 4. Accept July 2016 Financial Statements 5. Accept July 2016 Assessor’s Report 6. Accept July 2016 Building Department Report 7. Accept July Fire Chief’s Report 8. Accept July Public Works Department Report 9. Approve Special Assessment Abatement Requested by Washington County-Resolution 2016-66 10. Approve 2016 Seal Coat Project – Pay Request No. 1 (FINAL). 11. Approve 2016 Street, Drainage, and Utility Improvements – Pay Request No. 3. 12. Approve Inwood Trunk Watermain Improvements – Pay Request No. 4. 13. Approve Inwood Booster Station – Pay Request No. 3. 14. Approve Inwood Booster Station – Change Order No. 1. 15. Approve Inwood Water Tower (No. 4) – Pay Request No. 3. L. Regular Agenda 16. Dan Greensweig, LMCIT Assistant Administrator 17. CSAH 13 (Ideal Avenue/Olson Lake Trail) – Approve Feasibility Report- Resolution 2016-67 18. OP4 Boulder Ponds LLC Zoning Map Amendment/PUD Amendment- Resolution 08-149 19. Title XV, Chapter 154 of the Lake Elmo City Code Related to Temporary Health Care Dwellings – Ordinance 08-151 20. Pigeon Ordinance- Ordinance 08-148; Resolution 2016-68 21. Fence Ordinance Revisions 22. Village Preserve 2nd Addition Developer Agreement- Resolution 2016-70 23. Hammes Estates Development Agreement – Resolution 2016-71 24. RFP for Job Classification and Compensation Study 25. An Ordinance Amending The Lake Elmo City Code of Ordinance by Amending the City’s Provisions Related to the City Council and Summary Publication – Ordinance No. 08-150; Resolution 2016-69 26. No-Wake High Water Elevation Level for Lake Demontreville and Olson Lake M. Council Reports N. Staff Reports and Announcements O. Adjourn Our Mission is to Provide Quality Public Services in a Fiscally Responsible Manner While Preserving the City’s Open Space Character CITY OF LAKE ELMO CITY COUNCIL MINUTES AUGUST 2, 2016 CALL TO ORDER/PLEDGE OF ALLEGIANCE Mayor Pearson called the meeting to order at 7:00 pm. PRESENT: Mayor Mike Pearson and Councilmembers Julie Fliflet, Anne Smith, Justin Bloyer, and Jill Lundgren. Staff present: Administrator Handt, City Attorney Sonsalla, Public Works Director Weldon and City Clerk Johnson. APPROVAL OF AGENDA Councilmember Fliflet, seconded by Councilmember Smith, moved TO REMOVE ITEM 4, “APPROVE SERVICE CONTRACT WITH YOUTH SERVICES BUREAU FOR 2017” TO A FUTURE MEETING. Motion passed 5 – 0. Item 9, “Downtown Phase 2 Street, Drainage and Utility Improvements – Approve Change Order No. 2 – Replacement of the 57” Storm Sewer Arch Pipe” was removed from the Agenda by Councilmember Fliflet. Agenda approved as amended by unanimous consensus. ACCEPT MINUTES Minutes of the July 19, 2016 Regular Meeting were accepted by unanimous consensus with a correction in the date in the header. PUBLIC COMMENTS/INQUIRIES Virginia Pleban, 8245 59th Street North, spoke about a grassroots movement in the city working on civility, reminded fellow residents to vote and stated public transit in the city would be useful. PRESENTATIONS None CONSENT AGENDA 2. Approve Payment of Disbursements 3. Approve Hunting Ordinance 5. CSAH 15 & 10th Street Intersection – Approve Cooperative Agreement Payment No. 2 6. Boulder Ponds 1st Addition – Approve Reduction of Security #2 7. Village Preserve 1st Addition – Approve Reduction of Security #2 8. Easton Village 1st Addition – Approve Reduction of Security #1 10. Approve Purchase and Installation of 1 New Warning Siren and Monitoring Upgrades to Original 6 Sirens 11. Approve Temporary On-Sale Liquor License for MN Glamourama-Red Hat Club LAKE ELMO CITY COUNCIL MINUTES AUGUST 2, 2016 Page 2 of 4 Councilmember Lundgren, seconded by Councilmember Fliflet, moved TO APPROVE THE CONSENT AGENDA AS PRESENTED. MOTION PASSED 5-0. ITEM 12: Censure of Council Member Bloyer Councilmember Fliflet proposed a revised Resolution censuring Councilmember Bloyer, stating that the restrictions in the current Resolution are not legally enforceable and are not being followed. Councilmember Fliflet, seconded by Councilmember Smith, moved TO RESCIND THE PREVIOUS MOTION AND RESOLUTION CENSURING COUNCILMEMBER BLOYER AND REPLACE IT WITH THE CURRENT RESOLUTION. Councilmember Fliflet, seconded by Councilmember Smith, moved TO AMEND THE PRIMARY MOTION TO REMOVE #4 IN THE TOP SECTION OF THE RESOLUTION. Motion passed 5 – 0. Councilmember Lundgren, seconded by Councilmember Smith, moved TO AMEND THE PRIMARY MOTION TO REMOVE SECTION 2B UNDER THE “NOW THEREFORE” CLAUSE. Motion failed 2 – 2- 1. (Fliflet, Smith – nay; Bloyer – abstain) Mayor Pearson summarized an email received by resident Nadine Obermueller supporting the removal of the censure of Councilmember Bloyer. Councilmember Fliflet read the proposed Resolution. City Attorney Sonsalla recommended the addition of language stating that the Resolution supersedes the previous censure. Primary motion passed 3 – 1- 1. (Pearson – nay; Bloyer – abstain) ITEM 13: Special Event Permit, Lake Elmo Jaycees, Huff N’ Puff Days, August 11-14, 2016 City Administrator Handt reviewed the request for the closing of Laverne Avenue North for Huff N’ Puff Days and the staff recommendation for additional Sheriff’s Department Deputies to be on hand during the event. Councilmember Lundgren moved THAT THE CITY CONTRIBUTE 100% OF THE COST FOR DEPUTIES WITH HOURS ADJUSTED. Motion failed; no second. Councilmember Fliflet moved THAT THE CITY COVER THE COST OF DEPUTIES DURING HUFF N’ PUFF DAYS WITH WASHINGTON COUNTY SHERIFF’S DEPARTMENT DETERMINING THE HOURS. Motion failed; no second. Councilmember Smith moved TO REDUCE THE REQUIREMENT FOR DEPUTIES TO 8:30 PM TO 12:30 PM FRIDAY AND SATURDAY AND THE CITY NOT COVERING THE COST. Motion failed; no second. LAKE ELMO CITY COUNCIL MINUTES AUGUST 2, 2016 Page 3 of 4 Councilmember Bloyer, seconded by Mayor Pearson, moved TO APPROVE THE SPECIAL EVENT PERMIT FOR HUFF N’ PUFF DAYS WITH THE CONDITIONS OUTLINED IN THE STAFF REPORT. Councilmember Lundgren, seconded by Councilmember Fliflet, moved TO AMEND THE PRIMARY MOTION TO ADD THAT THE CITY WILL PAY FOR THE COST OF SHERIFF DEPUTIES FOR HUFF N’ PUFF DAYS. Motion passed 3 – 2. (Pearson, Bloyer – nay). Primary motion passed as amended 3 – 2. (Pearson, Bloyer – nay) ITEM 9: Downtown Phase 2 Street, Drainage and Utility Improvements – Approve Change Order No. 2 – Replacement of the 57” Storm Sewer Arch Pipe Councilmember Fliflet stated that the Library Board was not aware of this project and has plans for work to be done in this area. Councilmember Fliflet added that the Library Board would be interested in coordinating with the City project to look for cost savings. Councilmember Fliflet, seconded by Councilmember Smith, moved TO APPROVE THE CHANGE ORDER AND ADD CONDITIONS THAT THE LIBRARY BOARD BE NOTIFIED AND STAFF WORK WITH THE LIBRARY DIRECTOR AND CONTRACTOR TO ATTEMPT TO COORDINATE PROJECTS FOR COST SAVING OPPORTUNITIES. Motion passed 5 – 0. COUNCIL REPORTS Mayor Pearson: Asked residents watching the meeting to support downtown businesses and reported on attending a meeting with Met Council and legislators. Councilmember Fliflet: Attended picnic at the Gun Club, individual meetings with residents and attended other meetings. Councilmember Smith: Attended Oakdale Gun Club dinner and encouraged the public to visit the facility. Councilmember Lundgren: Asked the public to support the Lake Elmo Farmers Market on Saturday mornings, 8:00 – 11:30 a.m. Councilmember Bloyer: No report. STAFF REPORTS AND ANNOUNCEMENTS Administrator Handt: Thanked the public for their support and donations for the military family coordinated by Beyond the Yellow Ribbon. Attended the Lake Elmo swim pond ribbon cutting, working on the Sunfish Lake Park nature center, attended Washington County Administrators meeting and noted that the City will need to update its septic ordinance, met with Local 49ers representatives. LAKE ELMO CITY COUNCIL MINUTES AUGUST 2, 2016 Page 4 of 4 City Clerk Johnson: Reported that the Primary Election will be held on August 2nd and all preparations have been made. City Attorney Sonsalla: Reported on information received from Dan Greensweig that LMCIT Board will discuss the City’s insurance at the September board meeting. Meeting adjourned at 8:55 pm. LAKE ELMO CITY COUNCIL ATTEST: ______________________________ Mike Pearson, Mayor _______________________________ Julie Johnson, City Clerk MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM – PRESENTATIONS MOTION - YES AGENDA ITEM: Promotion of 2 Probationary Members Jeremy Penman and Brandan Peltier to Firefighter status SUBMITTED BY: Greg Malmquist, Fire Chief THROUGH: City Administrator, Kristina Handt REVIEWED BY: City Administrator, Kristina Handt SUGGESTED ORDER OF BUSINESS: - Introduction of Item ............................................................................ Fire Chief - Report/Presentation…………………………………………………..Fire Chief - Questions from Council to Staff ............................................. Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECCOMENDER: Hiring process of fire department. FISCAL IMPACT: Additional members on the payroll at full pay rates. Back pay to eligibility date. SUMMARY AND ACTION REQUESTED: Probationary members, Jeremy Penman and Brandan Peltier have successfully completed the requirements of Probation as follows: State Certified Firefighter I & II, State Certified Haz Mat Operations, First Responder and CPR. Approximately 200 hours of training. All the while maintaining their response requirements of Duty Crews, All Calls and Training. Request motion to promote from Probationary Status to Firefighter. Following Motion and Approval we will administer their Oath of Office and present them wit h their badge and helmet. City Council Meeting [PRESENTATION] April 17, 2016 -- page 2 -- LEGISLATIVE HISTORY: Established hiring process of the fire department. BACKGROUND INFORMATION (SWOT): Strengths Addition of 2 fully trained Firefighters to the Department Weaknesses Opportunities Long term Firefighter to serve the community. Threats Retention RECOMMENDATION: MOTION to approve promotion of Jeremy Penman and Brandan Peltier from Probationary status to Firefighter with back pay to eligibility date. Following approval we will administer the Oath of Office and present the new Firefighters with their helmets and badges. MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM #3 MOTION AGENDA ITEM: Approve Disbursements in the amount of $1,508,777.70 SUBMITTED BY: Patty Baker, Accountant THROUGH: Cathy Bendel, Finance Director REVIEWED BY: Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS: - Introduction of Item .............................................................. City Administrator - Report/Presentation…………………………………………City Administrator - Questions from Council to Staff ............................................. Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Finance FISCAL IMPACT: $1,508,777.70 SUMMARY AND ACTION REQUESTED: As part of its Consent Agenda, the City Council is asked to approve disbursements in the amount of $1,508,777.70. No specific motion is needed as this is recommended to be part of the Consent Agenda. LEGISLATIVE HISTORY: NA City Council Meeting [Consent Agenda Item 3] August 16, 2016 -- page 2 -- BACKGROUND INFORMATION/STAFF REPORT: The City of Lake Elmo has the fiduciary responsibility to conduct normal business operations. Below is a summary of current claims to be disbursed and paid in accordance with State law and City policies and procedures. Claim # Amount Description ACH $ 15,868.60 Payroll Taxes to IRS & MN Dept of Revenue 08/04/16 ACH $ 7,354.66 Payroll Retirement to PERA 08/04/16 ACH $ 1,200.00 Payroll Retirement to ICMA 08/04/16 DD7329-DD7379 $ 41,550.21 Payroll (Direct Deposits) 08/04/16 44673-44680 $ 2,430.00 Accounts Payable 08/09/16 44681-44743 $ 1,440,374.23 Accounts Payable 08/16/16 TOTAL $ 1,508,777.70 RECOMMENDATION: Based on the aforementioned, the staff recommends the City Council approve as part of the Consent Agenda the aforementioned disbursements in the amount of $1,508,777.70. ATTACHMENTS: 1. Accounts Payable – check registers MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM #4 MOTION AGENDA ITEM: July 2016 Financial Reporting SUBMITTED BY: Cathy Bendel, Finance Director THROUGH: Cathy Bendel, Finance Director REVIEWED BY: Kristina Handt, City Administrator SUGGESTED ORDER OF BUSINESS: - Introduction of Item………………………………………...City Administrator - Report/Presentation…………………………………………City Administrator - Questions from Council to Staff ............................................. Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Finance FISCAL IMPACT: NA SUMMARY AND ACTION REQUESTED: As part of its Consent Agenda, the City Council is asked to accept the July 2016 Financial Reporting Packet. No specific motion is needed as this is recommended to be part of the overall approval of the Consent Agenda. BACKGROUND INFORMATION: The City of Lake Elmo has fiduciary authority and responsibility to conduct normal business operations and report the financial (unaudited) statement to the City Council. City guidelines suggest the Council be updated on a regular basis. STAFF REPORT: Attached please find the comparative financial statements for the month of July 2016 reflecting the monthly and year to date detail, comparing the actual results to the 2016 Budget. City Council Meeting [Consent Agenda Item #4] August 16, 2016 -- page 2 -- GENERAL FUND: Revenues: Total revenue for the month was 14.3% above budget for the month of July bringing the year to date to 37.3% better than budget. The most significant budget to actual revenue variances are as follows:  The first installment of the annual levy proceeds were received in July and were slightly above the budgeted amount. This is typically related to the timing of collections.  Building permits were $62.4k better than budget for the month bringing the year to date to $190.3k better than budget. This is due to $70k in building permit revenue in the month of July for ISD 916. This permit revenue was not budgeted in 2016 due to the prior Building Official not having the certifications necessary to do the work.  The MSA maintenance proceeds were received in July that were budgeted in June so this variance is a timing issue. Expenses: Total expenses for the month were 151.7% above budget for July bringing the year to date expenses to 15.4% lower than budget. The following summarizes variances of note: General:  General Government expenses were 33.3% higher than budget for the month bringing the year to date expenses to 27.6% higher than budget. This was due to legal expenses far exceeding budget and the 3M litigation costs represented the majority.  Total Public Safety expenses were 480% higher than budget for the month bringing the year to date expenses to 11.9% lower than budget. This was primarily due to receiving the bill from WA Cty for Policing Services for the first half of the year which was mentioned last month.  Public Works – The total Public Works expenses were 33.4% higher than budget for the month bringing year to date expenses to 49.7% better than budget. This is primarily due to the Seal Coating and Cracking filling having been budgeted in June but the progress billings have not been received as early as anticipated in the budget. The project is on schedule and costs will be within the budgeted amounts. This is just a timing issue. City Council Meeting [Consent Agenda Item #4] August 16, 2016 -- page 3 -- In summary, the July revenues were 14.3% better than budget and the expenses were 151.7% lower than budget resulting in a net income of 9.9% better than budget. On a year to date basis, the revenues are 27.3% above budget and the expenses were 14.7% less than budget resulting in a net income of 250.5% better than budget year to date. LIBRARY FUND: The net income for the Library Fund for the month of July was identical to budget bringing the year to date to $54.9 better than budget. The levy proceeds were received in July as budgeted. The ending cash balance as of the end of July is $253.4k. RECOMMENDATION: Based on the aforementioned, the staff recommends the City Council accept the attached July Financial Report. ATTACHMENT: 1. July Financial Reports MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM #5 AGENDA ITEM: Monthly Assessor Report SUBMITTED BY: Dan Raboin, City Assessor THROUGH: Cathy Bendel, Finance Director REVIEWED BY: Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS: - Introduction of Item .............................................................. City Administrator - Report/Presentation…………………………………………City Administrator - Questions from Council to Staff .............................................. Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion ..................................................................... Mayor Facilitates SUMMARY AND ACTION REQUESTED: As part of its Consent Agenda, the City Council is asked to accept the monthly assessor report for through July 2016 outlining work performed on behalf of the City of Lake Elmo. No specific motion is needed as this is recommended as part of the Consent Agenda. LEGISLATIVE HISTORY/BACKGROUND INFORMATION: Property splits/plats – 1 Sales collected and viewed – 8 Taxpayer inquiries – 13 Miscellaneous inquiries - 2 Inspections – Residential – 122; Commercial – 3 Building permit reviews – 41 Pictures taken – 131 Other work performed included:  Monthly meeting with County residential and commercial supervisors  Input of all inspection and permit work City Council Meeting [Consent Agenda Item #5] August 16, 2016 -- page 2 --  Perform sales verifications and land value analysis using MLS and other resources  Field telephone inquiries RECOMMENDATION: Based on the aforementioned, the staff recommends the City Council accept the July 2016 monthly assessor report. MAYOR AND COUNCIL COMMUNICATION DATE: 08/16/2016 CONSENT ITEM #: 6 AGENDA ITEM: Building Department Report SUBMITTED BY: Mike Bent, Building Official THROUGH: Mike Bent, Building Official REVIEWED BY: Cathy Bendel, Finance Director SUMMARY AND ACTION REQUESTED: As part of its Consent Agenda, the City Council is asked to accept the monthly building department report. No specific motion is needed, as this is recommended to be part of the overall approval of the Consent Agenda. STAFF REPORT: Below is a snapshot of the year to date statistics through July 2016. Comparison data is also include from prior years for new home single family construction and total permitting activity. Attached are the system summary reports breaking out this information further, including the statistics related to the inspection activity. 2016 2015* 2014 New homes 129 59 16 Total valuation $41,733,774 $20,089,534 $9,561,282 Average home value $321,412 $340,501 $597,580 Total Permit Valuation YTD $70,728,763** $24,523,197 $12,843,123 *Includes one home rebuild due to fire **Includes ISD 916; $10M valuation RECOMMENDATION: Based on the aforementioned, the staff recommends the City Council accept the July 2016 monthly building permit report. ATTACHMENTS: 1. Valuation Report 2. Permits Issued & Fees Report 3. Inspection statistic report for July 2016 MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM #7 MOTION AGENDA ITEM: Monthly Fire Department Update SUBMITTED BY: Greg Malmquist, Fire Chief THROUGH: City Administrator SUMMARY AND ACTION REQUESTED: Review monthly activity update from fire department. Advise on any additional information requested. STAFF REPORT: 28 calls for the month of July. Fire – 3 EMS – 15 Hazardous (Gas line struck) - 1 Good intent Call – 1 Accident with Injury - 5 False Alarm -1 Search and Rescue – 1 Special incident call – 1 10 of the 28 calls had 3 or less responders on apparatus from the stations. Our monthly average response time was 7 minutes. Department drills for the month were: #1 - Officer meeting. #2 - Electrical and Gas Emergency response. #3 – Wildland Search and Rescue in Sunfish Park 3 staff attended a CEU make-up class for Flammable liquid response. POINTS OF INTEREST: On July 4th, we brought a truck and participated in the Annual Kid’s parade. City Council Meeting [Consent Agenda Item #7) August 16, 2016 -- page 2 -- We were on a nearly 4 hour Search and Rescue call this month in the Park Reserve involving a coordinated search with Law Enforcement; Park Staff; and a State Patrol Helicopter. One member completed and is now a Nationally Registered EMT bringing our total up to 3. Time Diff : Alarm - Arrival Fire Incident Type Incident Arrival Time (FD1.27) Incident Date (FD1.3) Apparatus Personnel Number of People Apparatus ID Incident Number (FD1.5): 000214 00:10 Building fire 16:40:00 7/1/16 3 3170 00:10 Building fire 16:40:00 7/1/16 4 3175 00:10 Building fire 16:40:00 7/1/16 2 3186 00:10 Building fire 16:40:00 7/1/16 1 CV1 00:10 Building fire 16:40:00 7/1/16 1 CV2 Incident Number (FD1.5): 000215 00:09 EMS call, excluding vehicle accident with injury 20:35:00 7/2/16 1 3170 00:09 EMS call, excluding vehicle accident with injury 20:35:00 7/2/16 1 3173 00:09 EMS call, excluding vehicle accident with injury 20:35:00 7/2/16 2 3183 Incident Number (FD1.5): 000216 00:16 Alarm system activation, no fire - unintentional 22:34:00 7/4/16 1 3170 00:16 Alarm system activation, no fire - unintentional 22:34:00 7/4/16 2 3175 00:16 Alarm system activation, no fire - unintentional 22:34:00 7/4/16 2 3186 Incident Number (FD1.5): 000217 00:06 Motor vehicle accident with injuries 23:18:00 7/4/16 2 3170 00:06 Motor vehicle accident with injuries 23:18:00 7/4/16 3 3173 00:06 Motor vehicle accident with injuries 23:18:00 7/4/16 1 3180 00:06 Motor vehicle accident with injuries 23:18:00 7/4/16 2 3186 Incident Number (FD1.5): 000218 00:06 Building fire 18:42:00 7/5/16 3 3170 00:06 Building fire 18:42:00 7/5/16 4 3175 00:06 Building fire 18:42:00 7/5/16 1 3180 00:06 Building fire 18:42:00 7/5/16 3 3186 00:06 Building fire 18:42:00 7/5/16 1 CV1 00:06 Building fire 18:42:00 7/5/16 1 CV2 Incident Number (FD1.5): 000219 00:08 EMS call, excluding vehicle accident with injury 04:12:00 7/6/16 2 3173 00:08 EMS call, excluding vehicle accident with injury 04:12:00 7/6/16 2 3180 00:08 EMS call, excluding vehicle accident with injury 04:12:00 7/6/16 1 CV2 Incident Number (FD1.5): 000220 00:03 EMS call, excluding vehicle accident with injury 05:01:00 7/6/16 2 3170 00:03 EMS call, excluding vehicle accident with injury 05:01:00 7/6/16 2 3180 00:03 EMS call, excluding vehicle accident with injury 05:01:00 7/6/16 1 CV2 Incident Number (FD1.5): 000221 00:01 Good intent call, other 11:26:00 7/7/16 1 3170 00:01 Good intent call, other 11:26:00 7/7/16 1 3180 00:01 Good intent call, other 11:26:00 7/7/16 1 CV1 1 of 5 Printed On: 08/03/2016 01:39:14 PM LEFD monthly recap   00:01 Good intent call, other 11:26:00 7/7/16 1 CV2 Incident Number (FD1.5): 000222 00:04 Motor vehicle accident with injuries 08:33:00 7/8/16 2 3173 00:04 Motor vehicle accident with injuries 08:33:00 7/8/16 1 3180 00:04 Motor vehicle accident with injuries 08:33:00 7/8/16 1 CV1 Incident Number (FD1.5): 000223 00:00 Gas leak (natural gas or LPG) 14:48:00 7/8/16 1 3170 00:00 Gas leak (natural gas or LPG) 14:48:00 7/8/16 1 3175 00:00 Gas leak (natural gas or LPG) 14:48:00 7/8/16 1 3180 00:00 Gas leak (natural gas or LPG) 14:48:00 7/8/16 1 3186 00:00 Gas leak (natural gas or LPG) 14:48:00 7/8/16 1 CV1 Incident Number (FD1.5): 000224 00:05 EMS call, excluding vehicle accident with injury 13:50:00 7/9/16 2 3170 00:05 EMS call, excluding vehicle accident with injury 13:50:00 7/9/16 2 3173 00:05 EMS call, excluding vehicle accident with injury 13:50:00 7/9/16 4 3180 00:05 EMS call, excluding vehicle accident with injury 13:50:00 7/9/16 1 CV1 00:05 EMS call, excluding vehicle accident with injury 13:50:00 7/9/16 1 CV2 Incident Number (FD1.5): 000225 00:06 Search for person on land 22:18:00 7/10/16 1 3170 00:06 Search for person on land 22:18:00 7/10/16 1 3175 00:06 Search for person on land 22:18:00 7/10/16 2 3178 00:06 Search for person on land 22:18:00 7/10/16 1 3180 00:06 Search for person on land 22:18:00 7/10/16 2 3187 00:06 Search for person on land 22:18:00 7/10/16 2 3188 00:06 Search for person on land 22:18:00 7/10/16 1 CV1 00:06 Search for person on land 22:18:00 7/10/16 1 CV2 Incident Number (FD1.5): 000226 00:07 EMS call, excluding vehicle accident with injury 12:27:00 7/11/16 2 3173 00:07 EMS call, excluding vehicle accident with injury 12:27:00 7/11/16 1 CV1 00:07 EMS call, excluding vehicle accident with injury 12:27:00 7/11/16 1 CV2 Incident Number (FD1.5): 000227 00:13 EMS call, excluding vehicle accident with injury 19:17:00 7/12/16 1 3170 00:13 EMS call, excluding vehicle accident with injury 19:17:00 7/12/16 2 3173 00:13 EMS call, excluding vehicle accident with injury 19:17:00 7/12/16 2 3180 00:13 EMS call, excluding vehicle accident with injury 19:17:00 7/12/16 2 3183 Incident Number (FD1.5): 000228 00:02 Special type of incident, other 10:55:00 7/13/16 3 3175 00:02 Special type of incident, other 10:55:00 7/13/16 1 CV1 00:02 Special type of incident, other 10:55:00 7/13/16 1 CV2 Incident Number (FD1.5): 000229 00:07 Motor vehicle accident with injuries 03:30:00 7/16/16 1 3170 2 of 5 Printed On: 08/03/2016 01:39:14 PM Time Diff : Alarm - Arrival Fire Incident Type Incident Arrival Time (FD1.27) Incident Date (FD1.3) Apparatus Personnel Number of People Apparatus ID 00:07 Motor vehicle accident with injuries 03:30:00 7/16/16 3 3173 00:07 Motor vehicle accident with injuries 03:30:00 7/16/16 4 3180 00:07 Motor vehicle accident with injuries 03:30:00 7/16/16 1 CV2 Incident Number (FD1.5): 000230 00:09 EMS call, excluding vehicle accident with injury 06:32:00 7/19/16 3 3173 00:09 EMS call, excluding vehicle accident with injury 06:32:00 7/19/16 1 3180 00:09 EMS call, excluding vehicle accident with injury 06:32:00 7/19/16 1 3183 00:09 EMS call, excluding vehicle accident with injury 06:32:00 7/19/16 1 CV1 Incident Number (FD1.5): 000231 00:05 EMS call, excluding vehicle accident with injury 14:11:00 7/19/16 1 3173 00:05 EMS call, excluding vehicle accident with injury 14:11:00 7/19/16 1 CV1 Incident Number (FD1.5): 000232 00:07 EMS call, excluding vehicle accident with injury 18:16:00 7/19/16 1 3170 00:07 EMS call, excluding vehicle accident with injury 18:16:00 7/19/16 2 3173 00:07 EMS call, excluding vehicle accident with injury 18:16:00 7/19/16 1 3180 00:07 EMS call, excluding vehicle accident with injury 18:16:00 7/19/16 2 3183 00:07 EMS call, excluding vehicle accident with injury 18:16:00 7/19/16 1 CV2 Incident Number (FD1.5): 000233 00:10 Motor vehicle accident with injuries 00:15:00 7/21/16 2 3173 00:10 Motor vehicle accident with injuries 00:15:00 7/21/16 2 3186 00:10 Motor vehicle accident with injuries 00:15:00 7/21/16 1 CV2 Incident Number (FD1.5): 000234 00:08 EMS call, excluding vehicle accident with injury 07:18:00 7/23/16 1 3170 00:08 EMS call, excluding vehicle accident with injury 07:18:00 7/23/16 3 3173 00:08 EMS call, excluding vehicle accident with injury 07:18:00 7/23/16 1 3180 00:08 EMS call, excluding vehicle accident with injury 07:18:00 7/23/16 3 3183 00:08 EMS call, excluding vehicle accident with injury 07:18:00 7/23/16 1 CV1 Incident Number (FD1.5): 000235 00:13 Motor vehicle accident with injuries 09:32:00 7/23/16 1 3170 00:13 Motor vehicle accident with injuries 09:32:00 7/23/16 3 3173 00:13 Motor vehicle accident with injuries 09:32:00 7/23/16 1 3180 00:13 Motor vehicle accident with injuries 09:32:00 7/23/16 2 3186 Incident Number (FD1.5): 000236 3 of 5 Printed On: 08/03/2016 01:39:14 PM Time Diff : Alarm - Arrival Fire Incident Type Incident Arrival Time (FD1.27) Incident Date (FD1.3) Apparatus Personnel Number of People Apparatus ID 00:09 EMS call, excluding vehicle accident with injury 22:31:00 7/24/16 1 3170 00:09 EMS call, excluding vehicle accident with injury 22:31:00 7/24/16 2 3173 00:09 EMS call, excluding vehicle accident with injury 22:31:00 7/24/16 2 3183 00:09 EMS call, excluding vehicle accident with injury 22:31:00 7/24/16 1 CV2 Incident Number (FD1.5): 000237 00:10 EMS call, excluding vehicle accident with injury 00:12:00 7/27/16 2 3170 00:10 EMS call, excluding vehicle accident with injury 00:12:00 7/27/16 2 3180 00:10 EMS call, excluding vehicle accident with injury 00:12:00 7/27/16 1 CV2 Incident Number (FD1.5): 000239 00:10 EMS call, excluding vehicle accident with injury 21:17:00 7/30/16 3 3173 00:10 EMS call, excluding vehicle accident with injury 21:17:00 7/30/16 3 3183 00:10 EMS call, excluding vehicle accident with injury 21:17:00 7/30/16 1 CV2 Incident Number (FD1.5): 000240 00:09 EMS call, excluding vehicle accident with injury 23:59:00 7/30/16 2 3170 00:09 EMS call, excluding vehicle accident with injury 23:59:00 7/30/16 2 3173 00:09 EMS call, excluding vehicle accident with injury 23:59:00 7/30/16 1 3183 00:09 EMS call, excluding vehicle accident with injury 23:59:00 7/30/16 1 CV2 Incident Number (FD1.5): 000241 00:07 EMS call, excluding vehicle accident with injury 12:08:00 7/31/16 2 3170 00:07 EMS call, excluding vehicle accident with injury 12:08:00 7/31/16 2 3173 00:07 EMS call, excluding vehicle accident with injury 12:08:00 7/31/16 2 3180 00:07 EMS call, excluding vehicle accident with injury 12:08:00 7/31/16 4 3183 00:07 EMS call, excluding vehicle accident with injury 12:08:00 7/31/16 1 CV1 00:07 EMS call, excluding vehicle accident with injury 12:08:00 7/31/16 1 CV2 Incident Number (FD1.5): 0241 00:14 Building fire 02:55:00 7/28/16 1 3170 00:14 Building fire 02:55:00 7/28/16 4 3173 00:14 Building fire 02:55:00 7/28/16 1 3180 00:14 Building fire 02:55:00 7/28/16 1 CV2 Report Filters is between '07/01/2016' and '07/31/2016' Description Response Time - LEFD alarm to arrival by apparatus Incident Date: 4 of 5 Printed On: 08/03/2016 01:39:14 PM Time Diff : Alarm - Arrival Fire Incident Type Incident Arrival Time (FD1.27) Incident Date (FD1.3) Apparatus Personnel Number of People Apparatus ID 5 of 5 Printed On: 08/03/2016 01:39:14 PM Time Diff : Alarm - Arrival Fire Incident Type Incident Arrival Time (FD1.27) Incident Date (FD1.3) Apparatus Personnel Number of People Apparatus ID City of Lake Elmo Public Works Department Monthly Report July 2016 Below is a brief list of activities taking place over the past month within the Public Works Dept.  Utility walk through inspection in Village Preserve  300 tons of road salt (carry over from 80% min. order 2015-2016 winter)  Repairs made to chemical feed addition control unit at Lisbon Ave. Lift Station  63 tons of asphalt applied to potholes/patches. o Lake Elmo Heights o Old Village Streets o 31st St between CSAH 14 and CSAH 6 o Fox Fire Estates  Upgrade to Water Tower #2 communication system after July 19th system failure.  Upgraded 94 Lift Station (Hudson Blvd.) controls to work with existing SCADA system  Equipment repairs to: o 2000 Chevy Pick-up = repair holes in cab floor (4-new tires still needed) o 2004 John Deere Ditch Mower = new speed sensor and solenoid o 1998 GMC Pick-up = new radiator o Small misc. repairs to lawn mowers  Meetings w/ Wash. Co. and Focus Eng. regarding Traffic Signal and Roundabout Maint.  Bid requests for = City Hall Sidewalk Replacement, PW Roof leaks, Tree Removal on Hill Trial Drain Field., Spring Clean-up Day  Work with Planning Dept. on Irrigation Standards  Continuous items = Mowing, Ditch Mowing, Ball Field Maint., Submitted by: Rob Weldon Public Works Director MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM# 9 AGENDA ITEM: Approve Special Assessment Abatement Requested by WA Cty SUBMITTED BY: Cathy Bendel, Finance Director THROUGH: Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS: - Introduction of Item .............................................................. City Administrator - Report/Presentation……………………………………....…City Administrator - Questions from Council to Staff ............................................. Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Washington County/Finance FISCAL IMPACT: $140.50 SUMMARY AND ACTION REQUESTED: As part of the Consent Agenda, the City Council is respectfully requested to consider approval to remove the delinquent utility amounts assessed to parcel 01.029.21.11.0008 from the 2016 assessment roll with Washington County. BACKGROUND INFORMATION/STAFF REPORT: Washington County recently notified the Finance Director that delinquent utility assessments were allowed to post to a tax foreited parcel in their system. Historically these would not have been processed and would have rejected from their system. Once posted to their system, an abatement form is required to correct. RECOMMENDATION: Approve the attached Resolution 2016-66 approving an abatement of the delinquent utility assessments posted to a tax forfeited parcel. ATTACHMENTS: 1. Resolution 2016-66 2. WA Cty abatement form for 01.029.21.11.0008 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2016-66 A RESOLUTION RELATED TO 2016 ASSESSMENTS TO WASHINGTON COUNTY BE IT RESOLVED, by the City Council of the City of Lake Elmo, Minnesota, that the 2016 assessments certified to PID #01.029.21.11.0008 may be removed from the 2016 assessment roll due per the attached Washington County abatement forms. APPROVED by the Lake Elmo City Council on this 16th day of August, 2016. . By: __________________________ Mike Pearson Mayor ATTEST: ________________________________ Julie Johnson City Clerk MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM # 10 AGENDA ITEM: 2016 Seal Coat Project – Pay Request No. 1 (Final) SUBMITTED BY: Ryan Stempski, Project Engineer THROUGH: Kristina Handt, City Administrator REVIEWED BY: Cathy Bendel, Finance Director Rob Weldon, Public Works Director Jack Griffin, City Engineer SUGGESTED ORDER OF BUSINESS if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering. FISCAL IMPACT: Decrease of $2,125.00. Final payment is proposed in accordance with the Contract for the project. Final payment is $2,125.00 less than the original contract amount of $152,875.00 for Lake Elmo’s portion of the work (joint project with West Lakeland Township). In addition, the project at completion remains within the authorized total project budget of $158,375.00 which includes engineering. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving Pay Request No. 1 (Final) for the 2016 Seal Coat Project. LEGISLATIVE HISTORY/BACKGROUND INFORMATION: The 2016 Seal Project has been fully completed. The Project Engineer has prepared a Certificate of Completion and is recommending acceptance of the improvements and release of the final retainage. The one year warranty period will begin on August 16, 2016, and will extend to August 16, 2017. Final payment in the amount of $207,368.44 has been requested by the Contractor, Pearson Brothers, Inc., based upon the work completed. The original Contract amount was $208,903.00; including $152,875.00 for work in Lake Elmo and $56,028.00 for work in West Lakeland City Council Meeting [Consent Agenda Item 10] August 16, 2016 -- page 2 -- Township. The work actually completed for Lake Elmo streets was $150,750.00, or $2,125.00 (1.4%) less than the original Contract amount. Per the Joint Services Agreement, West Lakeland Township will be invoiced $56,618.44 for their portion of the construction costs. The final total project cost for the Lake Elmo portion of the project, including construction and engineering was $154,750.00; $150,750.00 in construction and $4,000 ($7,000 total - $3,000 reimbursed by West Lakeland) for design and construction engineering services. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 1 (Final) for the 2016 Seal Coat project. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 1 (Final) to Pearson Brothers, Inc., in the amount of $207,368.44, for the 2016 Seal Coat Project; which includes $150,750.00 for work completed in the City of Lake Elmo; and $56,618.44 for work completed in West Lakeland Township.” ATTACHMENT(S): 1. Partial Pay Estimate No. 1 (Final). 2. Engineer’s Certification of Completion. PAY ESTIMATE NO. 1 (FINAL) 2016 SEAL COAT PROJECT CITY OF LAKE ELMO & WEST LAKELAND TOWNSHIP FOCUS PROJECT NO. 2016.118 CONTRACT DATED MAY 17, 2016 ITEM CONTRACT ACTUAL UNIT TOTAL NO. QUANTITY QUANTITY UNIT PRICE AMOUNT 1 122,300 120,600 SY 1.25$           150,750.00$     2 48,300 48,809 SY 1.16$           56,618.44$       TOTAL 207,368.44$    AND CRS‐2P EMULSIFIED ASPHALT CITY OF LAKE ELMO CITY OF WEST LAKELAND BITUMINOUS SEAL COAT WITH 1/8" DRESSER TRAP ROCK BITUMINOUS SEAL COAT WITH 1/8" DRESSER TRAP ROCK DESCRIPTION AND CRS‐2P EMULSIFIED ASPHALT MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM # 11 AGENDA ITEM: 2016 Street, Drainage, and Utility Improvements – Pay Request No. 3 SUBMITTED BY: Chad Isakson, Project Engineer THROUGH: Kristina Handt, City Administrator REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving Pay Request No. 3 for the 2016 Street, Drainage, and Utility Improvements project. LEGISLATIVE HISTORY/BACKGROUND INFORMATION: Hardrives, Inc., the Contractor for the project, has submitted Partial Pay Estimate No. 3 in the amount of $138,652.43. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is 38,957.25. RECOMMENDATION: Staff is recommending that the City Council consider approving, as part of the Consent Agenda, Pay Request No. 3 for the 2016 Street, Drainage, and Utility Improvements project. If removed from the consent agenda, the recommended motion for the action is as follows: City Council Meeting [Consent Agenda Item 11] August 16, 2016 -- page 2 -- “Move to approve Pay Request No. 3 to Hardrives, Inc. in the amount of $138,652.43 for the 2016 Street, Drainage, and Utility Improvements”. ATTACHMENT(S): 1. Partial Pay Estimate No. 3. PROJECT PAY FORM PARTIAL PAY ESTIMATE NO. PERIOD OF ESTIMATE TO PROJECT OWNER: CONTRACTOR: 1. Original Contract Amount 2. Net Change Order Sum 3. Revised Contract (1+2) 4. *Work Completed 5. *Stored Materials 6. Subtotal (4+5) 7. Retainage* 8. Previous Payments 9. Amount Due (6‐7‐8) *Detailed Breakdown Attached START DATE:ON SCHEDULE SUBSTANTIAL COMPLETION:X FINAL COMPLETION: ENGINEER'S CERTIFICATION: FOCUS Engineering, inc. DATE CONTRACTOR'S CERTIFICATION: CONTRACTOR DATE APPROVED BY OWNER:CITY OF LAKE ELMO, MINNESOTA DATE DATE No.Approval  Date Amount $1,189,610.33 Additions Deductions $32,976.55 $779,145.08 1 7/5/2016 $32,976.55 $1,222,586.88 $779,145.08 $0.00 $601,535.39 $38,957.255.0% CONTRACT TIME TOTALS $32,976.55 $0.00 $138,652.43 NET CHANGE $32,976.55 CONTRACT CHANGE ORDER SUMMARY PAY ESTIMATE SUMMARY 3 7/29/20167/1/2016FROM 2016 STREET, DRAINAGE AND UTILITY IMPROVEMENTS PROJECT NO. 2015.129 CITY OF LAKE ELMO 3800 LAVERNE AVENUE NORTH LAKE ELMO, MN 55042 ATTN: JACK GRIFFIN, CITY ENGINEER HARDRIVES, INC. 14475 QUIRAM DRIVE ROGERS, MN 55374 ATTN: MICHAEL LEUER, PROJECT MANAGER 4/18/2016 9/30/2016 REVISED DAYS REMAINING 165 0 63 8/12/2016 ORIGINAL DAYS BY BY YES NO The undersigned Contractor certifies that to the best of their  knowledge, information and belief the work covered by this payment  estimate has been completed in accordance with the contract  documents, that all amounts have been paid by the contractor for  work for which previous payment estimates was issued and payments  received from the owner, and that current payment shown herein is  now due. The undersigned certifies that the work has been reviewed and to the  best of their knowledge and belief, the quantities shown in this  estimate are correct and the work has been performed in accordance  with the contract documents. ENGINEER BY 8/5/2016 FOCUS Engineering, inc.PROJECT PAYMENT FORM PARTIAL PAY ESTIMATE NO. 3 2016 STREET, DRAINAGE AND UTILITY IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2015.129 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $9,000.00 $9,000.00 0.50 $4,500.00 0.50 $4,500.00 2 LS 1 $1,284.36 $1,284.36 0.50 $642.18 0.50 $642.18 3 LF 4,428 $1.00 $4,428.00 0.00 $0.00 3,825.00 $3,825.00 4 EA 20 $64.22 $1,284.40 0.00 $0.00 0.00 $0.00 5 EA 11 $26.76 $294.36 7.00 $187.32 7.00 $187.32 6 EA 3 $16.05 $48.15 0.00 $0.00 0.00 $0.00 7 LF 97 $3.48 $337.56 0.00 $0.00 0.00 $0.00 8 SY 29 $3.24 $93.96 0.00 $0.00 0.00 $0.00 9 CY 2,854 $13.73 $39,185.42 0.00 $0.00 0.00 $0.00 10 CY 400 $7.57 $3,028.00 0.00 $0.00 0.00 $0.00 11 RS 19 $54.06 $1,027.14 0.00 $0.00 0.00 $0.00 12 CY 2,035 $14.60 $29,711.00 0.00 $0.00 0.00 $0.00 13 CY 400 $14.60 $5,840.00 0.00 $0.00 0.00 $0.00 14 CY 655 $27.03 $17,704.65 0.00 $0.00 0.00 $0.00 15 TN 53 $19.46 $1,031.38 0.00 $0.00 0.00 $0.00 16 TN 164 $22.49 $3,688.36 0.00 $0.00 0.00 $0.00 17 TN 511 $52.65 $26,904.15 0.00 $0.00 0.00 $0.00 18 TN 680 $47.40 $32,232.00 588.41 $27,890.63 588.41 $27,890.63 19 GAL 301 $1.96 $589.96 0.00 $0.00 0.00 $0.00 20 SY 29 $15.00 $435.00 0.00 $0.00 0.00 $0.00 21 LF 1,265 $2.48 $3,137.20 0.00 $0.00 0.00 $0.00 22 HR 15 $0.01 $0.15 3.00 $0.03 3.00 $0.03 23 EA 1 $540.55 $540.55 0.00 $0.00 0.00 $0.00 24 EA 5 $324.33 $1,621.65 0.00 $0.00 0.00 $0.00 25 LF 1,025 $7.57 $7,759.25 0.00 $0.00 0.00 $0.00 26 EA 10 $216.22 $2,162.20 0.00 $0.00 0.00 $0.00 27 EA 6 $216.22 $1,297.32 0.00 $0.00 0.00 $0.00 28 LF 196 $5.41 $1,060.36 0.00 $0.00 0.00 $0.00 29 CY 543 $15.00 $8,145.00 0.00 $0.00 0.00 $0.00 30 SY 3,163 $1.55 $4,902.65 0.00 $0.00 0.00 $0.00 31 EA 11 $42.81 $470.91 0.00 $0.00 0.00 $0.00 32 EA 3 $32.11 $96.33 0.00 $0.00 0.00 $0.00 $209,341.42 $33,220.16 $37,045.16 33 LS 1 $9,000.00 $9,000.00 0.00 $0.00 1.00 $9,000.00 34 LS 1 $1,284.36 $1,284.36 0.50 $642.18 1.00 $1,284.36 35 LF 4,775 $1.00 $4,775.00 0.00 $0.00 3,019.00 $3,019.00 36 EA 7 $64.22 $449.54 0.00 $0.00 0.00 $0.00 37 EA 3 $324.33 $972.99 0.00 $0.00 4.00 $1,297.32 38 EA 3 $259.47 $778.41 0.00 $0.00 6.00 $1,556.82 39 EA 18 $26.76 $481.68 0.00 $0.00 21.00 $561.96 40 EA 10 $16.05 $160.50 0.00 $0.00 2.00 $32.10 41 LF 30 $12.97 $389.10 0.00 $0.00 20.00 $259.40 42 SF 124 $2.16 $267.84 0.00 $0.00 245.00 $529.20 43 LF 305 $1.84 $561.20 0.00 $0.00 210.00 $386.40 44 LF 97 $2.32 $225.04 0.00 $0.00 62.00 $143.84 45 LF 480 $3.24 $1,555.20 0.00 $0.00 480.00 $1,555.20 46 SY 5,224 $1.62 $8,462.88 1,224.00 $1,982.88 5,224.00 $8,462.88 47 SY 230 $2.16 $496.80 0.00 $0.00 230.00 $496.80 48 SY 47 $5.41 $254.27 0.00 $0.00 47.00 $254.27 49 CY 3,074 $13.73 $42,206.02 1,074.00 $14,746.02 3,074.00 $42,206.02 50 CY 375 $7.57 $2,838.75 82.00 $620.74 216.00 $1,635.12 51 RS 19 $54.06 $1,027.14 0.00 $0.00 19.00 $1,027.14 52 CY 1,962 $14.87 $29,174.94 0.00 $0.00 1,962.00 $29,174.94 53 CY 375 $14.87 $5,576.25 82.00 $1,219.34 216.00 $3,211.92 54 CY 630 $27.03 $17,028.90 0.00 $0.00 630.00 $17,028.90 55 TN 490 $52.65 $25,798.50 0.00 $0.00 0.00 $0.00 56 TN 653 $47.40 $30,952.20 0.00 $0.00 567.90 $26,918.46 57 GAL 290 $1.96 $568.40 0.00 $0.00 70.00 $137.20 58 SY 230 $15.00 $3,450.00 0.00 $0.00 297.00 $4,455.00 59 LF 1,150 $2.48 $2,852.00 0.00 $0.00 0.00 $0.00 60 SY 62 $46.02 $2,853.24 0.00 $0.00 68.00 $3,129.36 61 LF 3,240 $6.64 $21,513.60 0.00 $0.00 3,150.00 $20,916.00 62 LF 345 $10.17 $3,508.65 0.00 $0.00 333.00 $3,386.61 SALVAGE WOODEN FENCE SALVAGE BRICK PAVERS SAWCUT BITUMINOUS PAVEMENT SAWCUT CONCRETE PAVEMENT REMOVE & DISPOSE OF EXIST. CONCRETE CURB AND GUTTER REMOVE & DISPOSE OF EXIST. BITUMINOUS PAVEMENT  REMOVE & DISPOSE OF EXIST. BITUMINOUS PAVEMENT (DRIVEWAYS) SUBGRADE PREPARATION SELECT GRANULAR BORROW (STREETS) (CV) (P) SELECT GRANULAR BORROW (STREETS) (CV) (P) TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) BITUMINOUS MATERIAL FOR TACK COAT SELECT GRANULAR BORROW (SUBGRADE EXCAV.) (CV) PATCH GRAVEL DRIVEWAY AGGREGATE SHOULDERING TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,B) ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE DIVISION 1 ‐ KIRKWOOD AVENUE NORTH MOBILIZATION SILT FENCE BIOROLL DITCH CHECK CLEARING GRUBBING SALVAGE MAILBOX SALVAGE SIGN TRAFFIC CONTROL SILT FENCE CLASS 6 AGGREGATE BASE (CV) (P) SAW & SEAL STREET (40' INTERVALS) STREET SWEEPING TEMPORARY ROCK CONSTRUCTION ENTRANCE CLEAN CULVERT 4" PVC PERF EDGE DRAIN W/ BACKFILL & WRAP DRAINTILE CLEANOUT TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) (DRIVEWAY) BIOROLL DITCH CHECK SALVAGE MAILBOX SALVAGE SIGN SAWCUT BITUMINOUS PAVEMENT REMOVE & DISPOSE OF EXIST. BITUMINOUS PAVEMENT (DRIVEWAYS) COMMON EXCAVATION (EV) (P) SUBGRADE EXCAVATION (RECONSTRUCT AREAS) (EV) SUBGRADE PREPARATION PRECAST CONCRETE HEADWALL (DRAIN TILE) DITCH GRADING IMPORT AND PLACE TOPSOIL (LV) SEEDING, FERTILIZER AND WOOD FIBER BLANKET INSTALL SALVAGED MAILBOX INSTALL SALVAGED SIGN DIVISION 2 ‐ KELVIN AVENUE NORTH ‐ STREETS MOBILIZATION TRAFFIC CONTROL SUBTOTAL ‐ DIVISION 1 REMOVE & DISPOSE OF EXIST. CONCRETE PAVEMENT (DRIVEWAYS) COMMON EXCAVATION (EV) (P) SUBGRADE EXCAVATION (RECONSTRUCT AREAS) (EV) SELECT GRANULAR BORROW (SUBGRADE EXCAV.) (CV) CLASS 6 AGGREGATE BASE (CV) (P) TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,B) BITUMINOUS MATERIAL FOR TACK COAT TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) (DRIVEWAY) SAW & SEAL STREET (40' INTERVALS) 6" CONCRETE DRIVEWAY PAVEMENT CONCRETE RIBBON CURB SURMOUNTABLE CONCRETE CURB & GUTTER QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE 63 LF 56 $12.84 $719.04 0.00 $0.00 108.00 $1,386.72 64 HR 20 $0.01 $0.20 0.00 $0.00 0.00 $0.00 65 EA 2 $540.56 $1,081.12 0.00 $0.00 0.00 $0.00 66 EA 1 $324.33 $324.33 0.00 $0.00 1.00 $324.33 67 LF 861 $7.57 $6,517.77 850.00 $6,434.50 850.00 $6,434.50 68 LF 36 $28.11 $1,011.96 0.00 $0.00 36.00 $1,011.96 69 EA 2 $259.47 $518.94 0.00 $0.00 2.00 $518.94 70 EA 8 $216.22 $1,729.76 8.00 $1,729.76 8.00 $1,729.76 71 EA 4 $270.28 $1,081.12 4.00 $1,081.12 4.00 $1,081.12 72 LF 12 $5.41 $64.92 12.00 $64.92 12.00 $64.92 73 CY 702 $15.00 $10,530.00 308.00 $4,620.00 308.00 $4,620.00 74 SY 929 $1.55 $1,439.95 0.00 $0.00 0.00 $0.00 75 SY 2,300 $3.00 $6,900.00 0.00 $0.00 0.00 $0.00 76 EA 18 $42.81 $770.58 14.00 $599.34 14.00 $599.34 77 EA 10 $32.11 $321.10 2.00 $64.22 2.00 $64.22 78 LF 10 $82.25 $822.50 0.00 $0.00 0.00 $0.00 79 SF 124 $4.42 $548.08 0.00 $0.00 0.00 $0.00 $253,844.77 $33,805.02 $199,902.03 80 EA 1 $1,059.49 $1,059.49 0.00 $0.00 1.00 $1,059.49 81 LF 3 $1,097.33 $3,291.99 0.00 $0.00 0.00 $0.00 82 LF 892 $53.42 $47,650.64 0.00 $0.00 874.50 $46,715.79 83 LF 53 $53.95 $2,859.35 0.00 $0.00 47.50 $2,562.63 84 LF 221 $42.54 $9,401.34 0.00 $0.00 136.00 $5,785.44 85 EA 5 $265.95 $1,329.75 0.00 $0.00 5.00 $1,329.75 86 EA 5 $344.87 $1,724.35 0.00 $0.00 5.00 $1,724.35 87 EA 2 $4,492.02 $8,984.04 0.00 $0.00 2.00 $8,984.04 88 EA 2 $1,291.93 $2,583.86 0.00 $0.00 2.00 $2,583.86 89 EA 2 $3,027.12 $6,054.24 0.00 $0.00 2.00 $6,054.24 90 LB 1,104 $3.68 $4,062.72 0.00 $0.00 842.00 $3,098.56 $89,001.77 $0.00 $79,898.15 91 EA 1 $3,481.18 $3,481.18 0.00 $0.00 1.00 $3,481.18 92 LF 3 $1,189.22 $3,567.66 0.00 $0.00 0.00 $0.00 93 LF 535 $38.06 $20,362.10 0.00 $0.00 535.00 $20,362.10 94 LF 20 $53.95 $1,079.00 0.00 $0.00 20.00 $1,079.00 95 LF 266 $42.54 $11,315.64 0.00 $0.00 216.00 $9,188.64 96 EA 6 $265.95 $1,595.70 0.00 $0.00 6.00 $1,595.70 97 EA 6 $344.87 $2,069.22 0.00 $0.00 6.00 $2,069.22 98 EA 1 $4,492.02 $4,492.02 0.00 $0.00 1.00 $4,492.02 99 EA 1 $1,291.93 $1,291.93 0.00 $0.00 1.00 $1,291.93 100 LB 315 $4.32 $1,360.80 0.00 $0.00 172.00 $743.04 $50,615.25 $0.00 $44,302.83 101 LS 1 $15,000.00 $15,000.00 0.00 $0.00 0.50 $7,500.00 102 LS 1 $1,926.54 $1,926.54 1.00 $1,926.54 1.00 $1,926.54 103 LF 207 $1.00 $207.00 0.00 $0.00 0.00 $0.00 104 EA 23 $90.98 $2,092.54 0.00 $0.00 0.00 $0.00 105 EA 1 $324.33 $324.33 0.00 $0.00 1.00 $324.33 106 EA 1 $259.46 $259.46 0.00 $0.00 1.00 $259.46 107 EA 31 $26.76 $829.56 0.00 $0.00 31.00 $829.56 108 EA 5 $16.05 $80.25 0.00 $0.00 0.00 $0.00 109 LF 750 $0.29 $217.50 0.00 $0.00 0.00 $0.00 110 LF 435 $2.07 $900.45 0.00 $0.00 452.50 $936.68 111 LF 152 $2.22 $337.44 0.00 $0.00 150.00 $333.00 112 EA 27 $162.46 $4,386.42 0.00 $0.00 27.00 $4,386.42 113 SY 377 $5.55 $2,092.35 0.00 $0.00 357.19 $1,982.40 114 SY 137 $7.70 $1,054.90 0.00 $0.00 127.39 $980.90 115 CY 500 $7.00 $3,500.00 0.00 $0.00 25.00 $175.00 116 SY 18,800 $2.89 $54,332.00 0.00 $0.00 18,800.00 $54,332.00 117 CY 909 $5.65 $5,135.85 0.00 $0.00 909.00 $5,135.85 118 RS 55 $310.00 $17,050.00 0.00 $0.00 55.00 $17,050.00 119 TN 1,611 $50.07 $80,662.77 1,368.94 $68,542.83 1,368.94 $68,542.83 120 TN 1,611 $45.98 $74,073.78 0.00 $0.00 1,411.00 $64,877.78 121 GAL 951 $1.96 $1,863.96 250.00 $490.00 350.00 $686.00 122 SY 367 $15.00 $5,505.00 32.00 $480.00 363.00 $5,445.00 123 SY 91 $46.02 $4,187.82 0.00 $0.00 108.00 $4,970.16 STREET SWEEPING TEMPORARY ROCK CONSTRUCTION ENTRANCE SODDING INSTALL SALVAGED MAILBOX INSTALL SALVAGED SIGN CLEAN CULVERT 4" PVC PERF EDGE DRAIN W/ BACKFILL & WRAP 12" CORRUGATED STEEL PIPE CULVERT 12" CORRUGATED STEEL PIPE APRON DRAINTILE CLEANOUT PRECAST CONCRETE HEADWALL (DRAIN TILE) DITCH GRADING IMPORT AND PLACE TOPSOIL (LV) SEEDING, FERTILIZER AND WOOD FIBER BLANKET TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) (DRIVEWAY) 6" CONCRETE DRIVEWAY PAVEMENT REMOVE & DISPOSE OF EXIST. CONCRETE PAVEMENT (DRIVEWAYS) SUBGRADE EXCAVATION (RECLAIM AREAS) (EV) REMOVE & DISPOSE OF EXIST. BITUMINOUS PAVEMENT (DRIVEWAYS) REMOVE MANHOLE OR CATCH BASIN CASTING 12"X8" WET TAP 8" DIP, CL. 52 WATERMAIN 6" DIP, CL. 52 WATERMAIN 6" HYDRANT ASSEMBLY (8'‐6" BURY) 1" CORPORATION STOP INLET PROTECTION CLEARING GRUBBING SALVAGE MAILBOX SALVAGE SIGN SALVAGE LANDSCAPE ROCK (ISLANDS) (P) SAWCUT BITUMINOUS PAVEMENT HYDRANT EXTENSION 12" DIP, CL. 52 WATERMAIN INSTALL SALVAGED BRICK PAVERS SUBTOTAL ‐ DIVISION 2 6" DIP, CL. 52 WATERMAIN 1" TYPE "K" COPPER WATER SERVICE DIVISION 3 ‐ KELVIN AVENUE NORTH ‐ TRUNK WATER MAIN CONNECT TO EXISTING WATERMAIN INSTALL WOODEN FENCE B618 CONCRETE CURB & GUTTER 1" CORPORATION STOP 1" CURB STOP WITH BOX HYDRANT EXTENSION SUBTOTAL ‐ DIVISION 3 6" HYDRANT ASSEMBLY (8'‐6" BURY) 6" RES. SEAT GATE VALVE & BOX 12" RES. SEAT GATE VALVE & BOX MJ DIP COMPACT FITTINGS DIVISION 4 ‐ KELVIN AVENUE NORTH ‐ LATERAL WATER MAIN SILT FENCE 1" TYPE "K" COPPER WATER SERVICE 6" RES. SEAT GATE VALVE & BOX MJ DIP COMPACT FITTINGS SUBTOTAL ‐ DIVISION 4 1" CURB STOP WITH BOX RECLAIM EX. BIT. AND BASE MATERIALS, 8" DEPTH (P) HAUL OUT EXCESS RECLAIMED MATERIAL (LV) (P) SUBGRADE PREPARATION OF RECLAIMED SURFACE SAWCUT CONCRETE PAVEMENT DIVISION 5 ‐ STONEGATE 1ST ADDITION ‐ STREETS MOBILIZATION TRAFFIC CONTROL TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,B) BITUMINOUS MATERIAL FOR TACK COAT QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE 124 LF 4,025 $2.48 $9,982.00 0.00 $0.00 0.00 $0.00 125 CY 15 $86.49 $1,297.35 0.00 $0.00 13.50 $1,167.62 126 CY 57 $27.03 $1,540.71 0.00 $0.00 28.00 $756.84 127 LS 1 $3,546.04 $3,546.04 0.00 $0.00 1.00 $3,546.04 128 EA 23 $627.69 $14,436.87 0.00 $0.00 0.00 $0.00 129 EA 4 $474.07 $1,896.28 4.00 $1,896.28 4.00 $1,896.28 130 EA 8 $560.15 $4,481.20 2.00 $1,120.30 2.00 $1,120.30 131 EA 15 $172.81 $2,592.15 0.00 $0.00 0.00 $0.00 132 LF 10 $0.01 $0.10 0.00 $0.00 0.00 $0.00 133 LF 12,140 $10.65 $129,291.00 0.00 $0.00 11,547.00 $122,975.55 134 HR 30 $0.01 $0.30 3.00 $0.03 6.00 $0.06 135 CY 1,466 $15.00 $21,990.00 106.00 $1,590.00 667.00 $10,005.00 136 SY 7,007 $3.00 $21,021.00 0.00 $0.00 0.00 $0.00 137 EA 31 $42.81 $1,327.11 30.00 $1,284.30 30.00 $1,284.30 138 EA 5 $32.11 $160.55 0.00 $0.00 0.00 $0.00 139 LF 750 $1.58 $1,185.00 0.00 $0.00 0.00 $0.00 $490,767.58 $77,330.28 $383,425.89 140 LS 1 $3,500.00 $3,500.00 0.25 $875.00 0.25 $875.00 141 LS 1 $1,070.30 $1,070.30 0.25 $267.58 0.25 $267.58 142 EA 8 $90.98 $727.84 0.00 $0.00 0.00 $0.00 143 LF 80 $4.55 $364.00 24.00 $109.20 24.00 $109.20 144 EA 6 $114.23 $685.38 3.00 $342.69 3.00 $342.69 145 SY 4,900 $1.60 $7,840.00 0.00 $0.00 0.00 $0.00 146 LS 1 $1,214.34 $1,214.34 0.00 $0.00 0.00 $0.00 147 LF 136 $10.48 $1,425.28 0.00 $0.00 0.00 $0.00 148 TN 637 $51.01 $32,493.37 0.00 $0.00 0.00 $0.00 149 GAL 282 $1.96 $552.72 0.00 $0.00 0.00 $0.00 150 EA 1 $627.69 $627.69 0.00 $0.00 0.00 $0.00 151 EA 4 $760.91 $3,043.64 0.00 $0.00 0.00 $0.00 152 EA 1 $740.51 $740.51 0.00 $0.00 0.00 $0.00 153 HR 4 $0.01 $0.04 0.00 $0.00 0.00 $0.00 154 CY 30 $24.65 $739.50 0.00 $0.00 0.00 $0.00 155 SY 138 $5.30 $731.40 0.00 $0.00 0.00 $0.00 $55,756.01 $1,594.47 $1,594.47 156 LS 1 $3,500.00 $3,500.00 0.00 $0.00 0.00 $0.00 157 LS 1 $1,070.30 $1,070.30 0.00 $0.00 0.00 $0.00 158 SY 4,090 $1.60 $6,544.00 0.00 $0.00 0.00 $0.00 159 EA 5 $274.15 $1,370.75 0.00 $0.00 0.00 $0.00 160 TN 531 $51.48 $27,335.88 0.00 $0.00 0.00 $0.00 161 GAL 236 $1.96 $462.56 0.00 $0.00 0.00 $0.00 162 HR 4 $0.01 $0.04 0.00 $0.00 0.00 $0.00 $40,283.53 $0.00 $0.00 TOTALS ‐ BASE CONTRACT $1,189,610.33 $145,949.92 $746,168.53 CHANGE ORDER NO. 1 CO1‐2 LS 1.0 $1,000.00 $1,000.00 0.00 $0.00 1.0 $1,000.00 CO1‐2 LF 1,179.0 $19.45 $22,931.55 0.00 $0.00 1,179.0 $22,931.55 CO1‐3 EA 11.0 $330.00 $3,630.00 0.00 $0.00 11.0 $3,630.00 CO1‐4 EA 2.0 $295.00 $590.00 0.00 $0.00 2.0 $590.00 CO1‐5 EA 5.0 $825.00 $4,125.00 0.00 $0.00 5.0 $4,125.00 CO1‐6 EA 2.0 $350.00 $700.00 0.00 $0.00 2.0 $700.00 TOTALS ‐ CHANGE ORDER NO. 1 $32,976.55 $0.00 $32,976.55 TOTALS ‐ REVISED CONTRACT $1,222,586.88 $145,949.92 $779,145.08 SUBTOTAL ‐ DIVISION 7 DRAINTILE CLEANOUT PRECAST CONCRETE HEADWALL CORE DRILL INTO EXISTING STORM SEWER CONNECT TO EXISTING DRAINTILE MILL 2" OF EXISTING BITUMINOUS PAVEMENT (P) ADJUST VALVE BOX (WATER) TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) BITUMINOUS MATERIAL FOR TACK COAT STREET SWEEPING SUBTOTAL ‐ DIVISION 6 DIVISION 7 ‐ JAMELY AVENUE NORTH ‐ STREETS MOBILIZATION TRAFFIC CONTROL CATCH BASIN CASTING R‐3250‐1 CATCH BASIN CASTING R‐3501‐TR STREET SWEEPING IMPORT AND PLACE TOPSOIL (LV) SODDING REMOVE & REPAVE BITUMINOUS FLUME SPOT BITUMINOUS CURB REPLACEMENT TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) BITUMINOUS MATERIAL FOR TACK COAT CATCH BASIN CASTING R‐3067‐V TRAFFIC CONTROL INLET PROTECTION REMOVE & DISPOSE OF EXIST. CONCRETE CURB AND GUTTER REMOVE MANHOLE OR CATCH BASIN CASTING MILL 2" OF EXISTING BITUMINOUS PAVEMENT (P) INSTALL SALVAGED LANDSCAPE ROCK (ISLANDS) (P) SUBTOTAL ‐ DIVISION 5 DIVISION 6 ‐ HIGHLAND TRAIL NORTH ‐ STREETS MOBILIZATION STREET SWEEPING IMPORT AND PLACE TOPSOIL (LV) SODDING INSTALL SALVAGED MAILBOX INSTALL SALVAGED SIGN MANHOLE CASTING R‐1642‐B SOLID (2'X3'X1.0' HT) CONCRETE CB SECTION MINOR STRUCTURE REPAIR RECONSTRUCT DRAINAGE STRUCTURE B418 CONCRETE CURB & GUTTER REMOBILIZATION 4" PERFORATED EDGE DRAIN WITH BACKFILL & WRAP SAW & SEAL STREET (40' INTERVALS) RIPRAP SEDIMENT REMOVAL (LV) MODIFY STORM STRUCTURE 104 CATCH BASIN CASTING R‐3067‐V MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM # 12 AGENDA ITEM: Inwood Trunk Watermain Improvements – Pay Request No. 4 SUBMITTED BY: Chad Isakson, Project Engineer THROUGH: Kristina Handt, City Administrator REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving Pay Request No. 4 for the Inwood Trunk Watermain Improvements project. LEGISLATIVE HISTORY/BACKGROUND INFORMATION: Northdale Construction Company, Inc., the Contractor for the project, has submitted Partial Pay Estimate No. 4 in the amount of $248,363.65. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $69,479.95. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 4 for the Inwood Trunk Watermain Improvements project. If removed from the consent agenda, the recommended motion for the action is as follows: City Council Meeting [Consent Agenda Item 12] August 16, 2016 -- page 2 -- “Move to approve Pay Request No. 4 to Northdale Construction Company, Inc. in the amount of $248,363.65 for the Inwood Trunk Watermain Improvements”. ATTACHMENT(S): 1. Partial Pay Estimate No. 4. PARTIAL PAY ESTIMATE NO. 4 INWOOD AVENUE TRUNK WATERMAIN IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2014.130 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1                    $64,800.00 $64,800.00 0.00 $0.00 1.00 $64,800.00 2 LS 1                    $22,945.00 $22,945.00 0.20 $4,589.00 0.95 $21,797.75 3 LF 600                $4.13 $2,478.00 0.00 $0.00 200 $826.00 4 EA 6                    $750.00 $4,500.00 0.00 $0.00 0 $0.00 5 EA 10                  $104.50 $1,045.00 0.00 $0.00 0 $0.00 $95,768.00 $4,589.00 $87,423.75 1 EA 1                    $7,483.75 $7,483.75 0 $0.00 0 $0.00 2 EA 2                    $13,187.61 $26,375.22 0 $0.00 1 $13,187.61 3 EA 11                  $4,431.40 $48,745.40 1 $4,431.40 10 $44,314.00 4 LF 6                    $1,628.80 $9,772.80 0 $0.00 3.5 $5,700.80 5 EA 10                  $2,476.08 $24,760.80 1 $2,476.08 10 $24,760.80 6 EA 3                    $2,920.05 $8,760.15 0 $0.00 2 $5,840.10 7 EA 2                  $4,117.60 $8,235.20 0 $0.00 2 $8,235.20 8 EA 19                  $10,711.98 $203,527.62 5 $53,559.90 19 $203,527.62 9 EA 3                  $709.63 $2,128.89 0 $0.00 3 $2,128.89 10 EA 3                    $775.20 $2,325.60 0 $0.00 3 $2,325.60 11 LF 100                $50.97 $5,097.00 0 $0.00 81 $4,128.57 12 LF 75                  $63.87 $4,790.25 19 $1,181.60 141.0 $9,005.67 13 LF 96                  $70.32 $6,750.72 0 $0.00 42 $2,953.44 14 LF 28                  $108.70 $3,043.60 0 $0.00 25.75 $2,799.03 15 LF 25                  $126.98 $3,174.50 20 $2,539.60 55 $6,983.90 16 LF 11,015          $74.75 $823,371.25 2,214 $165,496.50 10,940 $817,765.00 17 LB 5,810            $10.74 $62,399.40 1,773 $19,042.02 8,776 $94,254.24 18 LS 1                    $49,462.20 $49,462.20 0 $7,419.33 0.90 $44,515.98 19 LS 1                    $7,000.00 $7,000.00 0 $700.00 0.95 $6,650.00 20 EA 18                  $156.02 $2,808.36 0 $0.00 0 $0.00 $1,310,012.71 $256,846.43 $1,299,076.45 1 LF 60                  $15.00 $900.00 0 $0.00 14 $210.00 2 LF 60                  $31.11 $1,866.60 0 $0.00 8 $248.88 $2,766.60 $0.00 $458.88 1 EA 2                  $165.00 $330.00 0 $0.00 0 $0.00 2 EA 13                  $220.00 $2,860.00 0 $0.00 2 $440.00 $3,190.00 $0.00 $440.00 TOTALS ‐ BASE CONTRACT $1,411,737.31 $261,435.43 $1,387,399.08 CHANGE ORDER NO. 1 CO1‐1 EA 2 $500.00 $1,000.00 0 $0.00 2 $1,000.00 CO1‐2 EA 1 $1,200.00 $1,200.00 0 $0.00 1 $1,200.00 TOTALS ‐ CHANGE ORDER NO. 1 $2,200.00 $0.00 $2,200.00 TOTALS ‐ REVISED CONTRACT $1,413,937.31 $261,435.43 $1,389,599.08 SALVAGE AND REINSTALL MAILBOX 18" FLARED END SECTION 1" CURB STOP AND CURB BOX CLEAR AND GRUB TREE DITCH CHECK SUBTOTAL ‐ DIVISION 1 DIVISION 2 ‐ WATERMAIN CONNECT TO EXISTING 8" WATERMAIN CONNECT TO EXISTING 16" WATERMAIN 12" GATE VALVE AND BOX 1" CORPORATION STOP WITH FUSIBLE SADDLE HYDRANT 6" GATE VALVE AND BOX 8" GATE VALVE AND BOX 16" BUTTERFLY VALVE AND BOX ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE DIVISION 1 ‐ GENERAL MOBILIZATION TRAFFIC CONTROL SILT FENCE, MACHINE SLICED HYDRANT EXTENSION 1" COPPER WATER SERVICE PIPE 6" DUCTILE IRON WATERMAIN PIPE, CLASS 52 8" DUCTILE IRON WATERMAIN PIPE, CLASS 52 12" DUCTILE IRON WATERMAIN PIPE, CLASS 52 16" DUCTILE IRON WATERMAIN PIPE, CLASS 52 16" HDPE DIPS DR11 WATERMAIN, DIRECTIONAL DRILL DUCTILE IRON FITTINGS HORIZONTAL DIRECTIONAL DRILLING BORE PITS WATER SERVICE CONNECTION PITS TRIVIEW TEST STATION MARKER SUBTOTAL ‐ DIVISION 2 SUBTOTAL ‐ DIVISION 4 DIVISION 4 ‐ STREET CONSTRUCTION DIVISION 3 ‐ STORM SEWER SALVAGE CONCRETE PIPE CULVERT INSTALL SALVAGED PIPE CULVERT SALVAGE AND REINSTALL SIGN SUBTOTAL ‐ DIVISION 3 HYDRANT OFFSET MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM # 13 AGENDA ITEM: Inwood Booster Station Improvements – Pay Request No. 3 SUBMITTED BY: Chad Isakson, Project Engineer THROUGH: Kristina Handt, City Administrator REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving Pay Request No. 3 for the Inwood Booster Station Improvements project. LEGISLATIVE HISTORY/BACKGROUND INFORMATION: Magney Construction, Inc., the Contractor for the project, has submitted Partial Pay Estimate No. 3 in the amount of $92,094.66. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $14,047.29. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 3 for the Inwood Booster Station Improvements project. If removed from the consent agenda, the recommended motion for the action is as follows: City Council Meeting [Consent Agenda Item 13] August 16, 2016 -- page 2 -- “Move to approve Pay Request No. 3 to Magney Construction, Inc. in the amount of $92,094.66 for the Inwood Booster Station Improvements”. ATTACHMENT(S): 1. Partial Pay Estimate No. 3 PARTIAL PAY ESTIMATE NO.3 INWOOD BOOSTER STATION IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2014.129 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $55,000.00 $55,000.00 0.00 $0.00 1.00 $55,000.00 2 LS 1 $700.00 $700.00 0.20 $140.00 0.80 $560.00 3 LF 240 $3.00 $720.00 120.00 $360.00 240 $720.00 4 LS 1 $2,000.00 $2,000.00 0.00 $0.00 1 $2,000.00 5 EA 1 $1,000.00 $1,000.00 0.00 $0.00 1 $1,000.00 6 HR 10 $105.00 $1,050.00 0.00 $0.00 0 $0.00 7 LS 1 $4,800.00 $4,800.00 0.00 $0.00 0 $0.00 $65,270.00 $500.00 $59,280.00 8 EA 3 $1,500.00 $4,500.00 0.00 $0.00 3 $4,500.00 9 LF 65 $50.00 $3,250.00 0.00 $0.00 65 $3,250.00 10 LF 100 $120.00 $12,000.00 0.00 $0.00 100 $12,000.00 11 LB 344 $16.00 $5,504.00 0.00 $0.00 344 $5,504.00 $25,254.00 $0.00 $25,254.00 12 LF 15 $50.00 $750.00 0.00 $0.00 0 $0.00 13 LF 130 $50.00 $6,500.00 121.00 $6,050.00 121 $6,050.00 14 EA 1 $1,500.00 $1,500.00 1.00 $1,500.00 1 $1,500.00 15 EA 2 $3,000.00 $6,000.00 2.00 $6,000.00 2 $6,000.00 16 CY 10 $160.00 $1,600.00 0.00 $0.00 0 $0.00 $16,350.00 $13,550.00 $13,550.00 17 CY 690 $20.00 $13,800.00 0.00 $0.00 690 $13,800.00 18 SELECT GRANULAR BORROW (P)CY 110 $25.00 $2,750.00 0.00 $0.00 0 $0.00 19 SUBGRADE PREPARATION LS 1 $1,400.00 $1,400.00 0.00 $0.00 0.00 $0.00 20 AGGREGATE BASE CLASS 5 TON 140 $22.00 $3,080.00 0.00 $0.00 0 $0.00 21 TYPE SP 9.5 WEAR COURSE MIX (2,B)TON 50 $95.00 $4,750.00 0.00 $0.00 0 $0.00 22 4" CONCRETE SIDEWALK SY 41 $70.00 $2,870.00 0.00 $0.00 0 $0.00 23 SEGMENTAL RETAINING WALL FF 480 $23.00 $11,040.00 0.00 $0.00 0 $0.00 24 SPLIT RAIL FENCE LF 120 $17.00 $2,040.00 0.00 $0.00 0 $0.00 25 GUARD POST EA 3 $350.00 $1,050.00 0.00 $0.00 0 $0.00 26 6" PERFORATED PVC DRAIN LF 140 $40.00 $5,600.00 60.00 $2,400.00 60 $2,400.00 27 8" INLINE DRAIN EA 5 $900.00 $4,500.00 4.00 $3,600.00 4 $3,600.00 28 ROOF DRAIN COLLECTION EA 5 $900.00 $4,500.00 0.00 $0.00 0 $0.00 29 EA 1 $900.00 $900.00 0.00 $0.00 0 $0.00 $58,280.00 $6,000.00 $19,800.00 30 31 LS 1 $18,550.00 $18,550.00 0.10 $1,855.00 0.40 $7,420.00 32 LS 1 $19,620.00 $19,620.00 0.00 $0.00 1.00 $19,620.00 31000 LS 1 $58,760.00 $58,760.00 0.25 $14,690.00 0.75 $44,070.00 32000 LS 1 $5,100.00 $5,100.00 0.25 $1,275.00 0.75 $3,825.00 33516 LS 1 $1,860.00 $1,860.00 0.00 $0.00 0.00 $0.00 42000 LS 1 $70,480.00 $70,480.00 0.55 $38,764.00 0.55 $38,764.00 55000 LS 1 $3,350.00 $3,350.00 1.00 $3,350.00 1.00 $3,350.00 61000 LS 1 $25,500.00 $25,500.00 0.00 $0.00 0.00 $0.00 62210 LS 1 $1,170.00 $1,170.00 0.00 $0.00 0.00 $0.00 71113 LS 1 $670.00 $670.00 0.00 $0.00 0.00 $0.00 72113 LS 1 $1,250.00 $1,250.00 1.00 $1,250.00 1.00 $1,250.00 72126 LS 1 $2,700.00 $2,700.00 0.00 $0.00 0.00 $0.00 72726 LS 1 $4,000.00 $4,000.00 0.00 $0.00 0.00 $0.00 73113 LS 1 $6,600.00 $6,600.00 0.00 $0.00 0.00 $0.00 74618 LS 1 $6,550.00 $6,550.00 0.00 $0.00 0.00 $0.00 74646 LS 1 $10,600.00 $10,600.00 0.00 $0.00 0.00 $0.00 79200 LS 1 $3,210.00 $3,210.00 0.00 $0.00 0.00 $0.00 81600 LS 1 $11,950.00 $11,950.00 0.00 $0.00 0.00 $0.00 88100 LS 1 $500.00 $500.00 0.00 $0.00 0.00 $0.00 88410 LS 1 $9,960.00 $9,960.00 0.00 $0.00 0.00 $0.00 97750 LS 1 $9,640.00 $9,640.00 0.00 $0.00 0.00 $0.00 99600 LS 1 $13,400.00 $13,400.00 0.00 $0.00 0.00 $0.00 101469 LS 1 $200.00 $200.00 0.00 $0.00 0.00 $0.00 18" RCP FLARED END SECTION STREET SWEEPING SITE RESTORATION SUBTOTAL - DIVISION 1 DIVISION 2 - WATER MAIN CONNECT TO EXISTING WATERMAIN AND SERVICE 1.5" COPPER WATER SERVICE PIPE DIVISION 3 - STORM SEWER 18" RCP STORM SEWER PIPE, CLASS 5 12" DUCTILE IRON WATERMAIN PIPE, CLASS 52 SUBTOTAL - DIVISION 2 10" PVC DRAIN Supervision Bond & Insurance Plastic Trism Bituminous Damproofing Insulation (below grade) Blown Fiberglass Insulation Fluid Applied Membrane Air Barrier DIVISION 1 - GENERAL MOBILIZATION TRAFFIC CONTROL SILT FENCE DUCTILE IRON FITTINGS CLEARING AND GRUBBING TEMPORARY ROCK CONSTRUCTION ENTRANCE ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE CATCH BASIN/MANHOLE RANDOM RIPRAP CLASS III (CV) SUBTOTAL - DIVISION 3 Rough Carpentry DIVISION 5 - BOOSTER FACILITY DIVISION 4 - DRIVEWAY CONSTRUCTION COMMON EXCAVATION (P) DRAINTILE CLEANOUT Misc. Metals SUBTOTAL - DIVISION 4 Concrete Work Rebar Heavy Duty Concrete Floor Finish Masonry Work Glass & Glazing Translucent Windows FRP Surface laminated panels High performance Coating Warning Signs Asphalt Shingles Metal Soffit & Fascia, gutters & downspouts Mineral Fiber Siding Joint Sealants FRP Doors QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE 104416 LS 1 $350.00 $350.00 0.00 $0.00 0.00 $0.00 220000 LS 1 $22,500.00 $22,500.00 0.30 $6,750.00 0.35 $7,875.00 230000 LS 1 $46,400.00 $46,400.00 0.00 $0.00 0.00 $0.00 260500 LS 1 $79,800.00 $79,800.00 0.10 $7,980.00 0.15 $11,970.00 312305 LS 1 $7,880.00 $7,880.00 0.10 $788.00 0.60 $4,728.00 331300 LS 1 $950.00 $950.00 0.00 $0.00 0.00 $0.00 402323 LS 1 $111,400.00 $111,400.00 0.00 $0.00 0.00 $0.00 412223 LS 1 $1,200.00 $1,200.00 0.00 $0.00 0.00 $0.00 444200 LS 1 $26,200.00 $26,200.00 0.00 $0.00 0.00 $0.00 444256 LS 1 $78,200.00 $78,200.00 0.00 $0.00 0.00 $0.00 444416 LS 1 $101,500.00 $101,500.00 0.00 $0.00 0.00 $0.00 33 LS 1 $30,000.00 $30,000.00 0.00 $0.00 0.00 $0.00 34 LS 1 $215,000.00 $215,000.00 0.00 $0.00 0.00 $0.00 35 LS 1 $105,000.00 $105,000.00 0.00 $0.00 0.00 $0.00 36 LS 1 $10,000.00 $10,000.00 0.02 $189.75 0.02 $189.75 37 LS 1 $20,000.00 $20,000.00 0.00 $0.00 1.00 $20,000.00 38 SY 625 $2.00 $1,250.00 0.00 $0.00 0.00 $0.00 $1,143,250.00 $76,891.75 $163,061.75 TOTALS $1,308,404.00 $96,941.75 $280,945.75 Disinfection of Water Storage Structures Process Piping Portable Hand Chain Hoist & Trolley Water System Storage Tanks Vertical Split Case Booster Pumps Fire Extinguishers Plumbing HVAC Electircal Earthwork HOLDING TANK AND ASSOCIATED PIPING EROSION CONTROL BLANKET SUBTOTAL - DIVISION 5 Gas Chlorination Sytem SCADA INTEGRATION AND SYSTEM IMPROVEMENTS (SCADA CONTRACTOR) ALLOWANCE PROCESS INSTRUMENTATION AND CONTROL (SYSTEM INTEGRATOR) 230 KW GENERATOR SET UTILITY ALLOWANCE (ELECTRIC, NATURAL GAS, TELECOMMUNICATION/DATA) MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM # 14 AGENDA ITEM: Inwood Booster Station Improvements – Change Order No. 1 SUBMITTED BY: Chad Isakson, Project Engineer THROUGH: Kristina Handt, City Administrator REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering. FISCAL IMPACT: Contract decrease in the amount of $5,048.49. This change order decreases the contract amount for the project by $5,048.49 bringing the revised construction contract to $1,303,355.51. With this change order the project remains within the authorized project budget and contingencies. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving Change Order No. 1 for the Inwood Booster Station Improvements project. LEGISLATIVE HISTORY/BACKGROUND INFORMATION: This change order is being processed at the request of the City for project revisions with a net contract change in a deduct amount of $5,048.49. Each item was reviewed closely with the City, Engineer of Record, and Contractor as construction progresses on the Booster Station project. The various project revisions are as itemized below: 1. Common Excavation: $3,700 ADD. Additional excavation was required for driveway entrance revisions needed to respond to Washington County R/W permit requirements. City Council Meeting [Consent Agenda Item 14] August 16, 2016 -- page 2 -- 2. Chemical Pump Relocation: $255.78 ADD. The chemical booster pump was installed outside of the Chlorine Room as required by the MN Department of Health permit conditions. 3. Main Circuit Breaker and Variable Frequency Drive (VFD) substitute: $3,082.56 DEDUCT. In working with the contractor a substitute circuit breaker and VFD was identified for use on the project at a lower cost. 4. Booster Pump substitute: $3,500 DEDUCT. In working with the contractor a substitute booster pump was identified for use on the project at a lower cost. 5. Water Service Connections. $5,666.18 ADD. The water service was upsized and relocated to correct for a plan discrepancy and to coordinate between the trunk watermain and booster station contracts. 6. Building Insulation: $1,047.11 ADD. Additional insulation was installed under the siding as required by the MN Department of Labor and Industry. 7. Remove Chlorination Actuators: $9,135.00 DEDUCT. The emergency gas shut-off actuators were removed from the scope of work after being determined to be redundant. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 1 for the Inwood Booster Station Improvements project. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 1 for the Inwood Booster Station Improvements thereby decreasing the contract amount by $5,048.49”. ATTACHMENT(S): 1. Change Order No. 1. CHANGE ORDER NO.1 INWOOD BOOSTER STATION IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2014.129 QUANTITY UNIT PRICE AMOUNT CO1-1 CY 185 $20.00 $3,700.00 CO1-2 LS 1 $255.78 $255.78 CO1-3 LS 1 -$3,082.56 -$3,082.56 CO1-4 LS 1 -$3,500.00 -$3,500.00 CO1-5 LS 1 $5,666.18 $5,666.18 CO1-6 LS 1 $1,047.11 $1,047.11 CO1-7 LS 1 -$9,135.00 -$9,135.00 TOTALS - CHANGE ORDER NO. 1 -$5,048.49 PR3: Remove Chlorination Actuators Value engineering and space considerations Adjust plans per Washington Co. comments Sub2: Substitute Booster Pump Manufacturers Value engineering and lead time considerations PR2: Additional Building Insulation DESCRIPTION / JUSTIFICATION FC2: Water Service & Watermain Connections Sub1: Substitute Main Circuit Breaker & Variable Frequency Drives PR1: Relocate Chemical Pump & Remove Chemical Room Floor Drain Adjust plans per MN Department of Labor & Industry comments Upsize & relocate water service, deeper watermain connection Value engineering and size considerations Adjust plans per MN Department of Health comments ITEM DESCRIPTION OF PAY ITEM UNIT CHANGE ORDER FC1: Additional Common Excavation @ driveway & ditch Proposal SEND TO Company name From Peter Aldritt Attention Date 7/18/2016 Fax Phone Proposal # Urgent Please comment X Please review For your information Total pages, including cover:1 COMMENTS RE: MCC Modifications Lucas, Material: -$ -$ (3,037.00)$ Subtotal (3,037.00)$ General Contractor's Overhead -$ Bond & Insurance premiums (45.56)$ Total (3,082.56)$ Thank you, Peter Aldritt Project Manager Accepted By Date Please review this proposal and feel free to contact me with any questions, comments or concerns. We are offering the following price quotation in regards to the MCC modifications and substituting the electronic main circuit breaker for the thermal mag breaker. Subcontractor: TPC/Taylor Electric - MCC Modifications Labor: MSA Lucas Jones MC-P2 Revised Page 1 of 1 COST PROPOSAL DATE: WORKSHEET COR NO: P.R. NO: R.F.I. NO: St. Croix Lift Station DESCRIPTION OF WORK: LABOR MAT'L SUB DESCRIPTION QUANTITY UNIT UNIT PRICE LABOR UNIT PRICE MATERIAL EQUIPMENT CONTRACTS MAGNEY LABOR Laborer - 14 Hr 76.23$ $1,067.22 Carpenter - 10 Hr 83.02$ $830.20 Operator Hr 85.93$ $0.00 Plumber / Pipe Fitter Hr 91.50$ $0.00 Foreman Hr 86.72$ $0.00 Superintendant 12 Hr 93.00$ $1,116.00 General Superintedant Hr 126.87$ $0.00 Project Manager Hr 100.00$ $0.00 Overtime - Add $30.00 / Hr Hr 30.00$ $0.00 Sunday & Holidays - Add $48.00 / Hr Hr 48.00$ $0.00 MAGNEY Material 1.5" Copper $210.00 1.5" Curbstop $297.00 MAGNEY Equipment Trench Box $350.00 Kamatsu 360 $0.00 Mileage 76 Miles $0.65 $49.40 Pick Up Truck 0 day $90.00 $0.00 SUBCONTRACTORS / SUPPLIERS Fobbe Contracting - Wet Tap $800.00 SUBTOTAL MAGNEY LABOR, MATERIALS, SUBCONTRACTORS $3,013.42 $556.40 $800.00 MAT. HANDLING LABOR: 4% OF MAT. $22.26 SMALL TOOLS MAT.: 6% OF LABOR $180.81 SUBTOTAL $3,035.68 $737.21 $350.00 $800.00 MAGNEY OVERHEAD/FEE 15% $455.35 $110.58 $0.00 $40.00 SUBTOTAL MAGNEY LABOR $3,491.03 SUBTOTAL EQUIPMENT $350.00 $350.00 SUBTOTAL MATERIAL $847.79 $847.79 SUBTOTAL SUBCONTRACT $840.00 $840.00 SUBTOTAL $5,528.81 MATERIAL SALES TAX - 7.275% $53.63 BOND / INSURANCE - 0.015 $83.74 BUILDERS RISK INSURANCE N/A TOTAL THIS COST PROPOSAL $5,666.18 ESTIMATED ADDITIONAL CALENDAR DAYS REQUIRED: 2 days June 6, 2016 Furnish and install 1.5" copper water service, curbstop and wet tap from existing water main. This includes the additional 4' of excavation for the 12" Tie-Ins. Existing 12" was at 994.5' Page 1 Proposal PR-2 SEND TO Company name From Peter Aldritt Attention Date 6/28/2016 Fax Phone Proposal # Urgent Please comment Please review X For your information Total pages, including cover:1 COMMENTS RE: Lake Elmo Booster Station PR-2 Lucas, 415.00$ 554.39$ -$ Subtotal 969.39$ General Contractor's Overhead 62.25$ Bond & Insurance premiums 15.47$ Total 1,047.11$ Additional Working Days Required for this Change:0.0 Thank you, Peter Aldritt Project Manager Accepted By Date Material: Please review this proposal and feel free to contact me with any questions, comments or concerns. We are offering the following price quotation to add a continuous layer of 1/2" Rigid Insulation under the siding. Tools & Equipment: MSA Lucas Jones Labor: PR-2 Page 1 of 1 Proposal SEND TO Company name From Peter Aldritt Attention Date 7/12/2016 Fax Phone Proposal # Urgent Please comment X Please review For your information Total pages, including cover:1 COMMENTS RE: Removing Motorized Gas Shut off Actuators Lucas, Material: -$ -$ (9,000.00)$ Subtotal (9,000.00)$ General Contractor's Overhead -$ Bond & Insurance premiums (135.00)$ Total (9,135.00)$ Thank you, Peter Aldritt Project Manager Accepted By Date Please review this proposal and feel free to contact me with any questions, comments or concerns. We are affering the following price quotation in regards to removing the Emergency Gas Shut off Actuators. Subcontractor: Vessco - Removing Actuators Labor: MSA Lucas Jones MC-P3 Page 1 of 1 MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: August 16, 2016 CONSENT ITEM # 15 AGENDA ITEM: Inwood Water Tower (No. 4) – Pay Request No. 3 SUBMITTED BY: Chad Isakson, Project Engineer THROUGH: Kristina Handt, City Administrator REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving Pay Request No. 3 for the Inwood Water Tower (No. 4) project. LEGISLATIVE HISTORY/BACKGROUND INFORMATION: CB&I, Inc., the Contractor for the project, has submitted Partial Pay Estimate No. 3 in the amount of $225,349.50. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $23,507.50. City Council Meeting [Consent Agenda Item 15] August 16, 2016 -- page 2 -- RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 3 for the Inwood Water Tower (No. 4) project. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 3 to CB&I, Inc. in the amount of $225,349.50 for the Inwood Water Tower (No. 4) Project”. ATTACHMENT(S): 1. Partial Pay Estimate No. 3 PARTIAL PAY ESTIMATE NO. 3 INWOOD WATER TOWER NO. 4 CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2015.130 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1                    $16,000.00 $16,000.00 $0.00 0.00 $0.00 2 EA 1                    $3,822.00 $3,822.00 $0.00 0.00 $0.00 3 LS 1                    $2,068.00 $2,068.00 $0.00 0 $0.00 4 CY 120                $10.00 $1,200.00 $0.00 0 $0.00 5 SY 200                $6.00 $1,200.00 $0.00 0 $0.00 6 CY 100                $30.00 $3,000.00 $0.00 0 $0.00 7 CY 150                $16.00 $2,400.00 $0.00 0 $0.00 8 TON 1,250            $22.00 $27,500.00 $0.00 0 $0.00 9 TON 65                  $99.00 $6,435.00 $0.00 0 $0.00 10 TON 65                  $99.00 $6,435.00 $0.00 0 $0.00 11 GAL 35                  $10.00 $350.00 $0.00 0 $0.00 12 SF 350                $25.00 $8,750.00 $0.00 0 $0.00 13 SF 100                $20.00 $2,000.00 $0.00 0 $0.00 14 EA 1                    $2,300.00 $2,300.00 $0.00 0 $0.00 15 LF 10                  $110.00 $1,100.00 $0.00 0 $0.00 16 LF 120                $140.00 $16,800.00 $0.00 0 $0.00 17 EA 1                    $1,980.00 $1,980.00 $0.00 0 $0.00 18 EA 1                    $4,864.00 $4,864.00 $0.00 0 $0.00 19 LB 700                $2.50 $1,750.00 $0.00 0 $0.00 20 LF 140                $2.00 $280.00 $0.00 0 $0.00 21 EA 1                    $2,618.00 $2,618.00 $0.00 0 $0.00 22 CY 16                  $76.00 $1,216.00 $0.00 0 $0.00 23 SY 30                  $6.00 $180.00 $0.00 0 $0.00 24 LF 90                  $68.00 $6,120.00 $0.00 0 $0.00 25 EA 1                    $1,700.00 $1,700.00 $0.00 0 $0.00 26 CY 10                  $92.00 $920.00 $0.00 0 $0.00 27 SY 37                  $3.00 $111.00 $0.00 0 $0.00 28 LF 500                $2.25 $1,125.00 $0.00 0 $0.00 29 LF 1,000            $2.00 $2,000.00 $0.00 0 $0.00 30 AC 1.5                 $4,000.00 $6,000.00 $0.00 0 $0.00 31 AC 1.5                 $3,500.00 $5,250.00 $0.00 0 $0.00 $137,474.00 $0.00 $0.00 1 LS 1                  $47,900.00 $47,900.00 $0.00 1 $47,900.00 2 LS 1                  $239,500.00 $239,500.00 0.30 $71,850.00 1 $215,550.00 3 LS 1                  $316,100.00 $316,100.00 $0.00 0 $0.00 4 LS 1                  $287,700.00 $287,700.00 $0.00 0 $0.00 5 LS 1                  $413,400.00 $413,400.00 0.40 $165,360.00 1 $206,700.00 6 LS 1                  $372,100.00 $372,100.00 $0.00 0 $0.00 7 LS 1                  $214,600.00 $214,600.00 $0.00 0 $0.00 8 LS 1                  $142,300.00 $142,300.00 $0.00 0 $0.00 9 LS 1                  $43,450.00 $43,450.00 $0.00 0 $0.00 10 LS 1                  $74,200.00 $74,200.00 $0.00 0 $0.00 11 LS 1                  $976.00 $976.00 $0.00 0 $0.00 12 LS 1                  $89,800.00 $89,800.00 $0.00 0 $0.00 13 LS 1                    $15,500.00 $15,500.00 $0.00 0 $0.00 $2,257,526.00 $237,210.00 $470,150.00 TOTALS $2,395,000.00 $237,210.00 $470,150.00 INSURANCE AND BONDS STERILIZE AND TEST ELECTRICAL SEEDING (MIX 25‐131 WITH FERTILIZER & HYDROMULCH) SUBTOTAL ‐ DIVISION 1 AGGREGATE BASE, CLASS 6 BIT WEARING COURSE MIX (WEA240B) BIT NON‐WEARING COURSE MIX (WEB240B) TACK COAT 16" DIP WATER MAIN PIPE, CL. 52 HYDRANT 8" CONCRETE APRON CONNECT TO EXISTING WATERMAIN 6" DIP WATER MAIN PIPE, CL. 52 6" GATE VALVE & BOX 4" CONCRETE WALK DIP FITTINGS 4' X 4' CATCH BASIN WITH GRATING 1.5" CLEAR TOCK ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE DIVISION 1 ‐ SITE & UTILITY WORK MOBILIZATION ROCK CONSTRUCTION ENTRANCE TRAFFIC CONTROL POLYETHYLENE ENCASEMENT SUBGRADE EXCAVATION GEOTEXTILE FABRIC TYPE V SELECT GRANULAR BORROW ORGANIC TOPSOIL BORROW GEOTEXTILE FABRIC TYPE I 18" RCP STORM SEWER PIPE, CL. V 18" APRON W/TRASH GUARD HAND PLACED RIP RAP, CL. III GEOTEXTILE FABRIC TYPE IV PREASSEMBLED SILT FENCE STRAW BIOROLL TEMPORARY SEEDING (MIX 22‐111 WITH TYPE I MULCH) SUBTOTAL ‐ DIVISION 2 DIVISION 2 ‐ ELEVATED STORAGE TANK WATER TOWER CONTROL PANEL AND RTU ENGINEERING & APPROVAL TANK MATERIALS TANK FABRICATION & SHIP FOUNDATION CONSTRUCTION CONCRETE SHAFT CONSTRUCTION TANK ERECTION (ON GROUND) TANK PAINT (ON GROUND) HOIST TANK TANK PAINT (IN AIR)