HomeMy WebLinkAboutLIONS PARK CONCEPT PLAN-Miller Architecture OPTION ONE: FIELD IMPROVEMENTS OPTION TWO: ALL UPGRADES
RE-GRADE FIELD..........................................................$16,500 RE-GRADE FIELD..........................................................$16,500
HYDRO-SEED OUTFIELD..............................................$12,100 NEW INFIELD, ETC........................................................$13,200
NEW DUGOUTS.............................................................$24,750 HYDRO-SEED OUTFIELD..............................................$12,100
PERIMETER FENCE INFILL..........................................$5,000 SOD INFIELD PERIMETER............................................$5,500
$58,350 NEW DUGOUTS.............................................................$24,750
PERIMETER FENCE......................................................$22,000
BATTING CAGES...........................................................$5,500
;� • r
IRRIGATION....................................................................$6,600
BLEACHERS..................................................................$19,800
ANNOUNCER BOOTH...................................................$11,000
Rage°ctiEaX sty CONCESSION STAND...................................................$1,000
----------------
I'---;---- ----
I I
I
NEW PERIMETER FENCE i a
(745 LF 6'CHAINLINK FENCE,155'LF 18'CHAINLINK FENCE W/BACKSTOP]
$22,000 j \
I
NEW HYDRO-SEED OUTFIELD
r � �
[36,000 S.F.HYRDO-SEED TURF] 1 I -♦ Z�jO \�\ ��'1
NEW SOD
$12,100
—# ------------ ----;I—
I
11000 S.F.NEW SOD @ INFIELD PERIMETER] --------- I - RE-GRADE FIELD
I \ F-------------L-}---------------------------------------------- [RE-GRADE ENTIRE FIELD AND SURROUNDING PERIMETER
$5,500 FOR PROPER DRAINAGE-72,000+/-S.F.]
$16,500
I \ 1
2 NEW DUGOUTS i9sPw �� ���
[CONCRETE BLOCK CMU WALLS W/CONCRETE --------------------------.�- I I,ra,
FLOOR,WOOD SHELVES,AND WOOD BENCH. _ 1 I xm NEW INFIELD, WARNING TRACK,
WOOD FRAME&METAL ROOF 8X36] Z I m o
$24,750 ram. 1— BATTING CAGE GRAVEL/DIRT
I I'�m�' [20,000 S.F.GRAVELIDIRT MIXTURE]
01 I x, $13,200
3 NEW BLEACHERS j
[81 LF 5-ROW ALUMINUM]
$19,800
,a,a3z�ar II I I I� I I
NEW ANNOUNCER(PIA)BOOTH _
[CONCRETE BLOCK(CMU)WALLS W/CONCRETE ____________________ BATTING CAGES
FLOOR,WOOD FRAMED 2ND FLOOR STRUCTURE AND STAIRS. ------- - v�� -----------__ I
F
METAL ROLL-TOP SHUTTER W/WINDOW, mo° oy % ]
(STRUCTURE AND NETS
WOOD FRAME&METAL ROOF 10'X20] $5,500
BLEACHER;L DUGDUTT _-
i I
L_J L__J IRRIGATION SYSTEM
EXISTING CONCESSION STAND
--------------------------
[UPDATE EX.EXTERIOR FINISHES AND INTERIOR FINISHES-PAINT] _
.III
N,..o_ M ;
*****COST ESTIMATES BASED ON SIMILAR PROJECT
COMPLETED IN CENTRAL MINNESOTA. ACTUAL COSTS
MAY VARY BASED ON LOCATION. ENGINEERING &
CONSULTATION FEES NOT INCLUDED*****
C1O"NCEPTUAL SITE PLAN
=30' o ao� fio'
Miller
LIONS PARK BASEBALL FIELD ARCHITECTURE, INC.
FIELD RENOVATION & UPGRADES
LAKE ELMO, MN 323335Wn`=tlbelmai�stme
PO Box 1228
SHEET NO,
51 Cloud,MN 56301
P-101 07.28.2016
63-PRESENTATION:Plotted on 7128116 at 11:04 AM-IOsorslb,hlPublic/MiIIo,P,ojoc 1Sl hema[iclLake Elmo Lions P,,klLake Elmo P,eIim ph 0 ova.Miflu n cni1-a Builders,Inc.