Loading...
HomeMy WebLinkAbout#12 Inwood Tower No 4 - Pay Request No 4 AGENDA ITEM MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: September 20, 2016 CONSENT ITEM # 12 AGENDA ITEM: Inwood Water Tower (No. 4) – Pay Request No. 4 SUBMITTED BY: Chad Isakson, Project Engineer THROUGH: Kristina Handt, City Administrator REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS (if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving Pay Request No. 4 for the Inwood Water Tower (No. 4) project. LEGISLATIVE HISTORY/BACKGROUND INFORMATION: CB&I, Inc., the Contractor for the project, has submitted Partial Pay Estimate No. 4 in the amount of $176,905.20. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $32,818.30. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 4 for the Inwood Water Tower (No. 4) project. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 4 to CB&I, Inc. in the amount of $176,905.20 for the Inwood Water Tower (No. 4) Project”. City Council Meeting [Consent Agenda Item 12] September 20, 2016 -- page 2 -- ATTACHMENT(S): 1. Partial Pay Estimate No. 4. PROJECTPAYFORM PARTIALPAYESTIMATENO. PERIODOFESTIMATE TO PROJECTOWNER:CONTRACTOR: 1.OriginalContractAmount 2.NetChangeOrderSum 3.RevisedContract(1+2) 4.*WorkCompleted 5.*StoredMaterials 6.Subtotal(4+5) 7.Retainage* 8.PreviousPayments 9.AmountDue(6Ͳ7Ͳ8) *DetailedBreakdownAttached STARTDATE:ONSCHEDULE SUBSTANTIALCOMPLETION:X FINALCOMPLETION: ENGINEER'SCERTIFICATION: SEH,Inc. DATE CONTRACTOR'SCERTIFICATION:CONTRACTOR DATE APPROVEDBYOWNER:CITYOFLAKEELMO,MINNESOTA DATE DATE BY BY YES NO TheundersignedContractorcertifiesthattothebestoftheir knowledge,informationandbelieftheworkcoveredbythispayment estimatehasbeencompletedinaccordancewiththecontract documents,thatallamountshavebeenpaidbythecontractorfor workforwhichpreviouspaymentestimateswasissuedandpayments receivedfromtheowner,andthatcurrentpaymentshownhereinis nowdue. Theundersignedcertifiesthattheworkhasbeenreviewedandtothe bestoftheirknowledgeandbelief,thequantitiesshowninthis estimatearecorrectandtheworkhasbeenperformedinaccordance withthecontractdocuments. ENGINEER BY 4/7/2016 11/2/2017 REVISEDDAYS REMAINING 574 0 439 9/28/2017 ORIGINALDAYS CONTRACTCHANGEORDERSUMMARY PAYESTIMATESUMMARY 4 8/20/20167/30/2016FROM INWOODWATERTOWERNO.4 PROJECTNO.2015.130 CITYOFLAKEELMO 3800LAVERNEAVENUENORTH LAKEELMO,MN55042 ATTN:JACKGRIFFIN,CITYENGINEER CB&IInc. 14109S.ROUTE59 PLAINFIELD,IL60544 ATTN:MICHAELALLISON CONTRACTTIME TOTALS $0.00 $0.00 $176,905.20 NETCHANGE $0.00 $32,818.305.0% $446,642.50 $0.00 $656,366.00 1 5/3/2016 $0.00 $0.00 $2,395,000.00 $656,366.00 No.Approval Date Amount $2,395,000.00 Additions Deductions $0.00 8/30/2016 FOCUSEngineering,inc.PROJECTPAYMENTFORM nc.. EEREEEEEEEE 9/1/2016 PARTIAL PAY ESTIMATE NO. 4 INWOOD WATER TOWER NO. 4 CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2015.130 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1                    $16,000.00 $16,000.00 1.00 $16,000.00 1.00 $16,000.00 2 EA 1                    $3,822.00 $3,822.00 1.00 $3,822.00 1.00 $3,822.00 3 LS 1                    $2,068.00 $2,068.00 0.50 $1,034.00 0.50 $1,034.00 4 CY 120                $10.00 $1,200.00 $0.00 0.00 $0.00 5 SY 200                $6.00 $1,200.00 $0.00 0.00 $0.00 6 CY 100                $30.00 $3,000.00 $0.00 0.00 $0.00 7 CY 150                $16.00 $2,400.00 $0.00 0.00 $0.00 8 TON 1,250            $22.00 $27,500.00 $0.00 0.00 $0.00 9 TON 65                  $99.00 $6,435.00 $0.00 0.00 $0.00 10 TON 65                  $99.00 $6,435.00 $0.00 0.00 $0.00 11 GAL 35                  $10.00 $350.00 $0.00 0.00 $0.00 12 SF 350                $25.00 $8,750.00 $0.00 0.00 $0.00 13 SF 100                $20.00 $2,000.00 $0.00 0.00 $0.00 14 EA 1                    $2,300.00 $2,300.00 $0.00 0.00 $0.00 15 LF 10                  $110.00 $1,100.00 $0.00 0.00 $0.00 16 LF 120                $140.00 $16,800.00 $0.00 0.00 $0.00 17 EA 1                    $1,980.00 $1,980.00 $0.00 0.00 $0.00 18 EA 1                    $4,864.00 $4,864.00 $0.00 0.00 $0.00 19 LB 700                $2.50 $1,750.00 $0.00 0.00 $0.00 20 LF 140                $2.00 $280.00 $0.00 0.00 $0.00 21 EA 1                    $2,618.00 $2,618.00 $0.00 0.00 $0.00 22 CY 16                  $76.00 $1,216.00 $0.00 0.00 $0.00 23 SY 30                  $6.00 $180.00 $0.00 0.00 $0.00 24 LF 90                  $68.00 $6,120.00 $0.00 0.00 $0.00 25 EA 1                    $1,700.00 $1,700.00 $0.00 0.00 $0.00 26 CY 10                  $92.00 $920.00 $0.00 0.00 $0.00 27 SY 37                  $3.00 $111.00 $0.00 0.00 $0.00 28 LF 500                $2.25 $1,125.00 $0.00 0.00 $0.00 29 LF 1,000            $2.00 $2,000.00 $0.00 0.00 $0.00 30 AC 1.5                 $4,000.00 $6,000.00 $0.00 0.00 $0.00 31 AC 1.5                 $3,500.00 $5,250.00 $0.00 0.00 $0.00 $137,474.00 $20,856.00 $20,856.00 1 LS 1                  $47,900.00 $47,900.00 $0.00 1.00 $47,900.00 2 LS 1                  $239,500.00 $239,500.00 $0.00 0.90 $215,550.00 3 LS 1                  $316,100.00 $316,100.00 $0.00 0.00 $0.00 4 LS 1                  $287,700.00 $287,700.00 $0.00 0.00 $0.00 5 LS 1                  $413,400.00 $413,400.00 0.40 $165,360.00 0.90 $372,060.00 6 LS 1                  $372,100.00 $372,100.00 $0.00 0.00 $0.00 7 LS 1                  $214,600.00 $214,600.00 $0.00 0.00 $0.00 8 LS 1                  $142,300.00 $142,300.00 $0.00 0.00 $0.00 9 LS 1                  $43,450.00 $43,450.00 $0.00 0.00 $0.00 10 LS 1                  $74,200.00 $74,200.00 $0.00 0.00 $0.00 11 LS 1                  $976.00 $976.00 $0.00 0.00 $0.00 12 LS 1                  $89,800.00 $89,800.00 $0.00 0.00 $0.00 13 LS 1                    $15,500.00 $15,500.00 $0.00 0.00 $0.00 $2,257,526.00 $165,360.00 $635,510.00 TOTALS $2,395,000.00 $186,216.00 $656,366.00 INSURANCE AND BONDS STERILIZE AND TEST ELECTRICAL SEEDING (MIX 25‐131 WITH FERTILIZER & HYDROMULCH) SUBTOTAL ‐ DIVISION 1 AGGREGATE BASE, CLASS 6 BIT WEARING COURSE MIX (WEA240B) BIT NON‐WEARING COURSE MIX (WEB240B) TACK COAT 16" DIP WATER MAIN PIPE, CL. 52 HYDRANT 8" CONCRETE APRON CONNECT TO EXISTING WATERMAIN 6" DIP WATER MAIN PIPE, CL. 52 6" GATE VALVE & BOX 4" CONCRETE WALK DIP FITTINGS 4' X 4' CATCH BASIN WITH GRATING 1.5" CLEAR TOCK ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE DIVISION 1 ‐ SITE & UTILITY WORK MOBILIZATION ROCK CONSTRUCTION ENTRANCE TRAFFIC CONTROL POLYETHYLENE ENCASEMENT SUBGRADE EXCAVATION GEOTEXTILE FABRIC TYPE V SELECT GRANULAR BORROW ORGANIC TOPSOIL BORROW GEOTEXTILE FABRIC TYPE I 18" RCP STORM SEWER PIPE, CL. V 18" APRON W/TRASH GUARD HAND PLACED RIP RAP, CL. III GEOTEXTILE FABRIC TYPE IV PREASSEMBLED SILT FENCE STRAW BIOROLL TEMPORARY SEEDING (MIX 22‐111 WITH TYPE I MULCH) SUBTOTAL ‐ DIVISION 2 DIVISION 2 ‐ ELEVATED STORAGE TANK WATER TOWER CONTROL PANEL AND RTU ENGINEERING & APPROVAL TANK MATERIALS TANK FABRICATION & SHIP FOUNDATION CONSTRUCTION CONCRETE SHAFT CONSTRUCTION TANK ERECTION (ON GROUND) TANK PAINT (ON GROUND) HOIST TANK TANK PAINT (IN AIR)