HomeMy WebLinkAbout#9 2016 Street Imp - CO#2 AGENDA ITEM MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: September 20, 2016 CONSENT ITEM # 9 AGENDA ITEM: 2016 Street, Drainage, and Utility Improvements – Change Order No. 2 SUBMITTED BY: Chad Isakson, Project Engineer THROUGH: Kristina Handt, City Administrator REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering. FISCAL IMPACT: $22,187.40. This change order increases the contract amount for the project by $22,157.40 bringing the revised construction contract to $1,244,774.28. With these change order items the project remains within the authorized project budget and contingenc y amount. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving Change Order No. 2 for the 2016 Street, Drainage, and Utility Improvements project. LEGISLATIVE HISTORY/BACKGROUND INFORMATION: This change order is being processed at the request of the City to address additional construction items needing to be completed as part of the street and drainage improvements to maintain the integrity of the infrastructure being built. 1. Additional costs in the amount of $11,445 was needed to replace three catch basin structures along Highland Trail that were discovered in the field to be structurally City Council Meeting [Consent Agenda Item 9] September 20, 2016 -- page 2 -- damaged. If they had not been replaced they would have eventually failed structurally which would have resulted in early pavement failure to the newly constructed street. 2. Additional costs in the amount of $9,303.50 was needed to install 155 linear feet of draintile to address subsurface water that was discovered upon excavation of the street in several locations in the Stonegate neighborhood. The saturated conditions needed to be drained to prevent undermining of the street subgrade. 3. A 6%-unit price deduct was accepted for the installation of material meeting Class 5 aggregate base specifications instead of Class 6 aggregate base specifications. This resulted in a contract deduct in the amount of $1,061.10 for the Kirkwood Avenue neighborhood. 4. Additional costs in the amount of $2,500 was needed to complete a full depth patch to a section of roadway along Jamley Avenue to replace poor subgrade material that was causing pavement to breakup and crack. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 2 for the 2016 Street, Drainage, and Utility Improvements project. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 2 for the 2016 Street, Drainage, and Utility Improvements thereby increasing the contract amount by $22,187.40.” ATTACHMENT(S): 1. Change Order No. 2. CONTRACT CHANGE ORDER FORM CHANGE ORDER NO. DATE: TO: UNIT Amount of Original Contract $ Sum of Additions/Deductions approved to date (CO Nos.  1    ) $ Contract Amount to date $ Amount of this Change Order   (ADD)   (DEDUCT)   (NO CHANGE)$ Revised Contract Amount $ The Contract Period for Completion will be   (UNCHANGED)  (INCREASED)  (DECREASED)days APPROVED BY ENGINEER:  FOCUS Engineering, inc. APPROVED BY CONTRACTOR DATE DATE APPROVED BY OWNER:  CITY OF LAKE ELMO, MINNESOTA DATE DATE 0 This Document will become a supplement to the Contract and all provisions will apply hereto. The Contract Documents are  modified as follows upon execution of this Change Order.  BYENGINEER 1,189,610.33 32,976.55 1,222,586.88 22,187.40 1,244,774.28 INCREASE/(DECREASE) HARDRIVES, INC. 14475 QUIRAM DRIVE ROGERS, MN 55374 2016 STREET, DRAINAGE AND UTILITY IMPROVEMENTS PROJECT NO. 2015.129 2 September 12, 2016 ITEM $22,187.40 NET CONTRACT CHANGE $22,187.40 CITY OF LAKE ELMO, MINNESOTA BYBY CHANGE ORDER DESCRIPTION / JUSTIFICATION: This change order is being processed to amend the Contract for the following reasons:   1) Items CO2‐1 and CO2‐2: Replacement of three catch basins on Highlands Trail that were discovered to be damaged and would cause future  pavement failure if left in place. 2) Items CO2‐3 to CO2‐8: Installation of draintile, cleanouts, and connection of the draintile to existing storm sewer to drain a saturated  subgrade between storm sewer structures 111 and 108 on Jasmine Avenue.   3)  Items CO2‐9 to CO2‐10):  6% unit price deduct for the installation of material meeting Class 5 gravel specifications instead of Class 6 along  Kirkwood Avenue.   4) Item CO2‐11: Complete a full depth patch on Jamley Avenue due to poor subgrade material causing pavement to breakup and crack. Attachments  (list documents supporting change):Itemization of Materials DESCRIPTION OF PAY ITEM QTY UNIT PRICE **See attached itemization 9/12/2016 FOCUS Engineering, inc.CHANGE ORDER FORM CHANGE ORDER NO. 2 2016 STREET, DRAINAGE AND UTILITY IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2015.129 QUANTITY UNIT PRICE AMOUNT CO2‐1 EA 3.0 $715.00 $2,145.00 CO2‐2 EA 3.0 $3,100.00 $9,300.00 CO2‐3 LF 155.0 $22.50 $3,487.50 CO2‐4 TN 13.0 $125.00 $1,625.00 CO2‐5 EA 2.0 $825.00 $1,650.00 CO2‐6 LS 1.0 $1,200.00 $1,200.00 CO2‐7 HR 3.0 $245.00 $735.00 CO2‐8 HR 6.0 $101.00 $606.00 CO2‐9 CY ‐655.0 $27.03 ‐$17,704.65 CO2‐10 CY 655.0 $25.41 $16,643.55 CO2‐11 LS 1.0 $2,500.00 $2,500.00 TOTALS ‐ CHANGE ORDER NO. 2 $22,187.40 ITEM DESCRIPTION OF PAY ITEM UNIT CHANGE ORDER TYPE SP 9.5 BITUMINOUS WEAR COURSE FOR PATCHING REMOVE EXISTING CATCH BASIN 2'X3' CATCH BASIN WITH INVERTS 4" PVC PERFORATED EDGE DRAIN WITH BACKFILL & WRAP EXPLORATORY DIGGING (STROM SEWER STRUCTURE 111) CLASS 5 AGGREGATE BASE (CV) (P) CLASS 6 AGGREGATE BASE (CV) (P) This change order is being processed to amend the Contract for the  following reasons:   1) Items CO2‐1 and CO2‐2: Replacement of three catch basins on  Highlands Trail that were discovered to be damaged and would cause  future pavement failure if left in place. 2) Items CO2‐3 to CO2‐8: Installation of draintile, cleanouts, and  connection of the draintile to existing storm sewer to drain a saturated  subgrade between storm sewer structures 111 and 108 on Jasmine  Avenue.   3)  Items CO2‐9 to CO2‐10):  6% unit price deduct for the installation of  material meeting Class 5 gravel specifications instead of Class 6 along  Kirkwood Avenue.   4) Item CO2‐11: Complete a full depth patch on Jamley Avenue due to  poor subgrade material causing pavement to breakup and crack. DESCRIPTION / JUSTIFICATION YARD GRADING FULL DEPTH PATCH CONNECT TO EXISTING STORM SEWER STRUCTURE MOBILIZATION