Loading...
HomeMy WebLinkAboutThe Royal Golf Club Residential Development EAW_WCD Comments-signed Supervisors: Louise Smallidge ▫ Bob Rosenquist ▫ George Weyer ▫ John Rheinberger ▫ Jim Levitt November 22, 2016 Stephen Wensman, Planning Director City of Lake Elmo 3800 Laverne Ave N. Lake Elmo, MN 55042 RE: The Royal Golf Club Residential Development EAW Dear Steven, The Washington Conservation District (WCD) has received and reviewed the above-mentioned EAW. The WCD review focuses on wetlands, erosion and sediment control, natural area management, and stormwater management. Based on this review the WCD offers the following comments: Section 7 – Cover Types Use of native vegetation and habitat restoration is encouraged in the open space areas, including native vegetated buffers around stormwater treatment systems. Enhancing the greenway cooridor that connects Lake Elmo to natural areas to the east is encouraged. Section 10 – Geology, Soils and Topography / Land Forms Section b. Soils and Topography • Compliance with NPDES, watershed, and local requirements will minimize adverse impacts of soil erosion and sedimentation. The WCD can provide support to the City to ensure compliance as needed. The WCD recommends phasing the earthwork and grading to the greatest extent possible to limit the scale and duration of exposed soils during construction. • Preserve HSG B soils to the extent possible. Protecting zones of optimum infiltration from compaction is preferred • Minimize soil compaction and provide soil restoration in landscaped areas to enhance infiltration • Deep-rip the soils with a toothed bucket in low or compacted areas to promote infiltration after major construction is complete Section 11 – Water Resources Section iv. Surface Waters • The EAW indicates the site will meet City and VBWD infiltration guidelines, which recommend retaining the 1.1” rain event on-site. WCD encourages the use of bioretention to meet the onsite volume retention standards. Bioretention promotes both infiltration and evapotranspiration which more effectively mimics terrestrial hydrology than pure infiltration systems. These systems are designed to be distributed throughout the site and treat small contributing drainage areas, breaking up larger catchments into smaller, more manageable parts. Minimizing the drainage area provides multiple benefits to stormwater treatment, including the potential for reduced infrastructure conveyance costs. To ensure the long-term effectiveness of volume control, the following design specifications are presented for consideration: • Do not rely on long-term infiltration from unlined stormwater ponds or wet detention basins • Install bioretention/infiltration practices off-line • Include flow-splitter and high-flow bypass • Provide pre-treatment (especially for sediment to prolong the life of a practice) • Keep the max water depth to acceptable levels based on soil types and actual infiltration rates • Refer to the Minnesota Stormwater Manual, 2013 (on MN PCA website) for additional design and implementation considerations The WCD is also serving on the WCA TEP and will provide comments on the wetland permiting through that process. Section 13 – Fish, Wildlife, Plant Communities and Sensitive Ecological Resources (Rare Features) Section d. • Buckthorn removal from entire project area rather than leaving visual barrier along exterior roadways will minimize spread of this restricted noxious weed. Replace visual barrier of removed Buckthorn by replanting native trees and shrubs. Conclusions There are no known impacts that have not already been addressed in this EAW that warrant an Environmental Impact Statement. The Washington Conservation District appreciates the opportunity to review this EAW. Please call me at 651-330-8220, extension 20, if you have any questions about our review. Sincerely, Jay Riggs, District Manager Washington Conservation District Cc: John Hanson, VBWD