Loading...
HomeMy WebLinkAbout#05 Inwood Trunk WM - CCO#2 AGENDA ITEM MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: December 6, 2016 CONSENT ITEM # 5 AGENDA ITEM: Inwood Trunk Watermain Improvements – Compensating Change Order No. 2 SUBMITTED BY: Chad Isakson, Project Engineer THROUGH: Kristina Handt, City Administrator REVIEWED BY: Jack Griffin, City Engineer Cathy Bendel, Finance Director SUGGESTED ORDER OF BUSINESS (if removed from the Consent Agenda): - Questions from Council to Staff ............................................. Mayor Facilitates - Public Input, if Appropriate………………………………….Mayor Facilitates - Call for Motion ............................................................... Mayor & City Council - Discussion ....................................................................... Mayor & City Council - Action on Motion .................................................................... Mayor Facilitates POLICY RECOMMENDER: Engineering. FISCAL IMPACT: $4,079.86 increase to the final construction contract amount. This change order reconciles the estimated and actual quantities installed on the project and increases the final contract amount by $4,079.86. The final construction contract amount is $1,418,017.17 or 0.5% over the original construction contract award amount of $1,411,737.31. SUMMARY AND ACTION REQUESTED: The City Council is respectfully requested to consider approving, as part of the consent agenda, Compensating Change Order No. 2 for the Inwood Trunk Watermain Improvements to reconcile the estimated and actual quantities installed on the project. LEGISLATIVE HISTORY/BACKGROUND INFORMATION: Northdale Construction Company, Inc. was awarded a construction contract on March 2, 2016 to complete the Inwood Trunk Watermain Improvements. The contractor has completed the work in accordance with the contract, plans and specifications; and with approval of this change order the contract amount will be adjusted to reflect quantities actually installed as a part of the project. City Council Meeting [Consent Agenda Item 5] December 6, 2016 -- page 2 -- The overall increase in the contract amount for this change order is $4,079.86 as detailed on the attached itemization. An increase in the contract amount is largely due to the amount of watermain fittings actually installed as compared to estimated amount in the contract. The final construction contract amount is $1,418,017.17. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Compensating Change Order No. 2 for the Inwood Trunk Watermain Improvements project thereby increasing the final contract amount by $4,079.86. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Compensating Change Order No. 2 for the Inwood Trunk Watermain Improvements, thereby increasing the final contract amount by $4,079.86”. ATTACHMENT(S): 1. Compensating Change Order No. 2. CHANGE ORDER NO. 2 INWOOD AVENUE TRUNK WATERMAIN IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2014.130 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT NET CHANGE AMOUNT 1 LS 1                     $64,800.00 $64,800.00 1.00 $64,800.00 0.00 $0.00 2 LS 1                     $22,945.00 $22,945.00 1.00 $22,945.00 0.00 $0.00 3 LF 600                 $4.13 $2,478.00 200.00 $826.00 ‐400.00 ‐$1,652.00 4 EA 6                     $750.00 $4,500.00 0.00 $0.00 ‐6.00 ‐$4,500.00 5 EA 10                   $104.50 $1,045.00 0.00 $0.00 ‐10.00 ‐$1,045.00 $95,768.00 $88,571.00 ‐$7,197.00 1 EA 1                     $7,483.75 $7,483.75 0.00 $0.00 ‐1.00 ‐$7,483.75 2 EA 2                     $13,187.61 $26,375.22 2.00 $26,375.22 0.00 $0.00 3 EA 11                   $4,431.40 $48,745.40 10.00 $44,314.00 ‐1.00 ‐$4,431.40 4 LF 6                     $1,628.80 $9,772.80 3.50 $5,700.80 ‐2.50 ‐$4,072.00 5 EA 10                   $2,476.08 $24,760.80 10.00 $24,760.80 0.00 $0.00 6 EA 3                     $2,920.05 $8,760.15 2.00 $5,840.10 ‐1.00 ‐$2,920.05 7 EA 2                  $4,117.60 $8,235.20 2.00 $8,235.20 0.00 $0.00 8 EA 19                   $10,711.98 $203,527.62 19.00 $203,527.62 0.00 $0.00 9 EA 3                  $709.63 $2,128.89 3.00 $2,128.89 0.00 $0.00 10 EA 3                     $775.20 $2,325.60 3.00 $2,325.60 0.00 $0.00 11 LF 100                 $50.97 $5,097.00 81.00 $4,128.57 ‐19.00 ‐$968.43 12 LF 75                   $63.87 $4,790.25 141.00 $9,005.67 66.00 $4,215.42 13 LF 96                   $70.32 $6,750.72 42.00 $2,953.44 ‐54.00 ‐$3,797.28 14 LF 28                   $108.70 $3,043.60 25.75 $2,799.03 ‐2.25 ‐$244.57 15 LF 25                   $126.98 $3,174.50 55.00 $6,983.90 30.00 $3,809.40 16 LF 11,015           $74.75 $823,371.25 10,985.00 $821,128.75 ‐30.00 ‐$2,242.50 17 LB 5,810             $10.74 $62,399.40 9,034.00 $97,025.16 3,224.00 $34,625.76 18 LS 1                     $49,462.20 $49,462.20 1.00 $49,462.20 0.00 $0.00 19 LS 1                     $7,000.00 $7,000.00 1.00 $7,000.00 0.00 $0.00 20 EA 18                   $156.02 $2,808.36 17.00 $2,652.34 ‐1.00 ‐$156.02 $1,310,012.71 $1,326,347.29 $16,334.58 1 LF 60                   $15.00 $900.00 14.00 $210.00 ‐46.00 ‐$690.00 2 LF 60                   $31.11 $1,866.60 8.00 $248.88 ‐52.00 ‐$1,617.72 $2,766.60 $458.88 ‐$2,307.72 1 EA 2                  $165.00 $330.00 0 $0.00 ‐2.0 ‐$330.00 2 EA 13                   $220.00 $2,860.00 2 $440.00 ‐11.0 ‐$2,420.00 $3,190.00 $440.00 ‐$2,750.00 TOTALS ‐ BASE CONTRACT $1,411,737.31 $1,415,817.17 $4,079.86 CHANGE ORDER NO. 1 CO1‐1 EA 2 $500.00 $1,000.00 2 $1,000.00 ‐                    $0.00 CO1‐2 EA 1 $1,200.00 $1,200.00 1 $1,200.00 ‐                    $0.00 TOTALS ‐ CHANGE ORDER NO. 1 $2,200.00 $2,200.00 $0.00 TOTALS ‐ DIFFERENCE IN CONTRACT AND ACTUAL WORK COMPLETE $1,413,937.31 $1,418,017.17 $4,079.86 HYDRANT OFFSET SUBTOTAL ‐ DIVISION 4 DIVISION 4 ‐ STREET CONSTRUCTION DIVISION 3 ‐ STORM SEWER SALVAGE CONCRETE PIPE CULVERT INSTALL SALVAGED PIPE CULVERT SALVAGE AND REINSTALL SIGN SUBTOTAL ‐ DIVISION 3 DUCTILE IRON FITTINGS HORIZONTAL DIRECTIONAL DRILLING BORE PITS WATER SERVICE CONNECTION PITS TRIVIEW TEST STATION MARKER SUBTOTAL ‐ DIVISION 2 6" DUCTILE IRON WATERMAIN PIPE, CLASS 52 8" DUCTILE IRON WATERMAIN PIPE, CLASS 52 12" DUCTILE IRON WATERMAIN PIPE, CLASS 52 16" DUCTILE IRON WATERMAIN PIPE, CLASS 52 16" HDPE DIPS DR11 WATERMAIN, DIRECTIONAL DRILL DIVISION 1 ‐ GENERAL MOBILIZATION TRAFFIC CONTROL SILT FENCE, MACHINE SLICED HYDRANT EXTENSION ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT TOTAL TO DATE 1" CURB STOP AND CURB BOX CLEAR AND GRUB TREE DITCH CHECK SUBTOTAL ‐ DIVISION 1 DIVISION 2 ‐ WATERMAIN CONNECT TO EXISTING 8" WATERMAIN CONNECT TO EXISTING 16" WATERMAIN 12" GATE VALVE AND BOX 1" CORPORATION STOP WITH FUSIBLE SADDLE HYDRANT 6" GATE VALVE AND BOX 8" GATE VALVE AND BOX 16" BUTTERFLY VALVE AND BOX 1" COPPER WATER SERVICE PIPE COMPENSATING CHANGE  ORDER NO. 2 SALVAGE AND REINSTALL MAILBOX 18" FLARED END SECTION