HomeMy WebLinkAbout#16 Wildflower 2nd Addn Final Plat and PUD 12.6.16MAYOR AND COUNCIL COMMUNICATION DATE: 12/6/2016 REGULAR ITEM #: 16 AGENDA ITEM: Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plans SUBMITTED BY: Stephen Wensman, Planning Director THROUGH: Kristina Handt, City Administrator REVIEWED BY: Sarah Sonsalla, City Attorney Jack Griffin, City Engineer Greg Malmquist, Fire Chief Mike Bent, Building Official BACKGROUND: Robert Engstrom Companies is requesting approval of final plat, final PUD development plans for the second phase of the Wildflower at Lake Elmo PUD development. The final plat includes 20 single family residential lots located to the east of the first phase. The Planning Commission held a public hearing on October 24, 2016 and tabled the request to allow Staff to research perceived stormwater issues related to the Wildflower and Village Preserve Developments and promised conditions of approval related to the Smith property. The Planning Commission resumed discussion of the application on 11/14/16 and recommended approval after reviewing findings by the Valley Branch Watershed District and an understanding of the Smith Property issues. ISSUE BEFORE COUNCIL: The City Council is being requested to adopt Resolution 2016-__ approving the final plat and final PUD plans for Wildflower at Lake Elmo 2nd Addition with ten conditions. PROPOSAL DETAILS/ANALYSIS: On 11/14/16, the Planning Commission reviewed the Valley Branch Watershed District report on the stormwater issues and the agreements between the developer and Mr. Smith regarding access and other improvements promised with the second addition. The Planning Commission determined that that the stormwater issues are understood and will be resolved with the construction process and that the agreements between the developer and Mr. Smith were private agreements and not subject to plat approval. It was determined, however, that two temporary easements that are set to expire with the approval of the second addition need to be replaced with new temporary easements. Originally, a larger second phase was anticipated which would have given the Smith property access and utilities. This will now occur with a later phase. New easements have been made a condition of final plat approval. City Council Meeting 12/6/2016 Regular Agenda Item #16 Page 2 As outlined in the Planning Commission report, the other outstanding issues are as follows: Street Names. Street B on the Final Plat has not been given a proper name. This street should be given a name consistent with the City’s street naming ordinance prior to recording the plat. This has been made a condition of approval. Engineering Review. The City Engineer has reviewed the final plat submittal and has prepared a memorandum for the Commission and Council’s review. The comments in the City Engineer’s review memorandum dated September 29, 2016 should be addressed prior to releasing the plat for recording. This has been made a condition of approval. Landscape Plan. A revised landscape plan has been submitted for review, but has not been approved. Approval of the landscape plan and will be required prior to recording the plat. This has been made condition of approval. Protective Easement. A condition of preliminary plat was to protect all open space with protective easements. A protective easement is being prepared to protect Outlot A from any future development. Execution of the easement agreement is required prior to releasing the plat for recording. This has been made a condition of approval. Preliminary Plat Conditions. The final plat is in conformance with the preliminary plat. The preliminary plat and PUD plans were approved with conditions. Staff has provided comments on the status of each in bold italics in the Planning Commission Report (attached). There are several preliminary plat conditions that have been carried forward to with this approval. • Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements for the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Development Plans with financial guarantees therefore. • All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to the execution of the final plat by City Officials. • A Common Interest Agreement concerning management of the common areas of Wildflower at Lake Elmo 2nd Addition and establishing a homeowner’s association shall be submitted in final form to the Community Development Director before a building permit may be issued for any structure within this subdivision. • The applicant shall also enter into a landscape license/public art agreement and maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping and public art installed in areas outside of land dedicated as public park and open space on the final plat. • Street signs and no parking signs shall be installed on City Streets within the development prior to any building permits being issued. FISCAL IMPACT: TBD – the Council will be asked to review a developer’s agreement concerning the final plat at a future meeting. The agreement will include a detailed accounting of any development costs that will be the responsibility of the City. City Council Meeting 12/6/2016 Regular Agenda Item #16 Page 3 OPTIONS: The City Council must approve the final plat and PUD plans if they are found to be in substantial conformance with the preliminary plat. RECOMMENDATION: Staff and the Planning Commission recommend adopting Resolution 2016-106 granting approval of the Wildflower of Lake Elmo 2nd Addition Final Plat and PUD Plans with the following motion: Move to adopt Resolution No. 2016-106 approving the Wildflower at Lake Elmo 2nd Addition Final Plat and Final Planned Unit Development Plans. ATTACHMENTS: • Resolution 2016-106 approving the Wildflower at Lake Elmo 2nd Addition Final Plat and PUD Plans. • Planning Commission report. 1 Resolution 2016-106 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2016-106 A RESOLUTION APPROVING A FINAL PLAT AND FINAL PLANNED UNIT DEVELOPMENT (PUD) PLAN FOR THE WILDFLOWER AT LAKE ELMO 2ND ADDITION PLANNED RESIDENTIAL DEVELOPMENT WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Robert Engstrom Companies, 4801 West 81st Street, #101, Bloomington, MN has submitted an application to the City of Lake Elmo (“City”) for a Final Plat and Final PUD Plan for the Wildflower at Lake Elmo 2nd Addition planned residential development, a copy of which is on file in the City of Lake Elmo Community Development Department; and WHEREAS, the City approved the Wildflower at Lake Elmo General Concept Plan on June 17, 2014; and WHEREAS, the City approved the Wildflower at Lake Elmo Preliminary Plat and Preliminary PUD Plan on April 7, 2015; and WHEREAS, the proposed Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan includes 20 single family residential lots within a planned development on Outlot O, Wildflower at Lake Elmo; and WHEREAS, the Lake Elmo Planning Commission held public hearing on October 24, 2016 to consider the Final Plat and Final PUD Plan request; and WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending approval of the Final Plat and Final PUD Plan subject to 10 conditions of approval on November 14, 2016; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation concerning the Final Plat and Final PUD Plan as part of a memorandum to the City Council for the December 6, 2016 Council Meeting; and WHEREAS, the City Council reviewed the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan at its meeting held on December 6, 2016 and made the following findings of fact: 1) That all the requirements of City Code Section 153.07 related to the Final Plan and Final Plat have been met by the Applicant, with the exceptions noted in the staff report. 2 Resolution 2016-106 2) That the proposed Wildflower at Lake Elmo 2nd Addition Final Plat consists of the creation of 20 single-family detached residential structures and a courtyard open space area. 3) That the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan is consistent with the Preliminary Plat and Plans as approved by the City of Lake Elmo on April 7, 2014. 4) That the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 5) That the Wildflower at Lake Elmo 2nd Addition Final Plat generally complies with the City’s Urban Medium Density Residential zoning district, with the exceptions as noted in the approved Preliminary PUD Plans. 6) That the Wildflower at Lake Elmo 2nd Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, except as noted in this report or attachment thereof. 7) That the Wildflower at Lake Elmo 2nd Addition Final Plat complies with the City’s subdivision ordinance. 8) That the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan complies with the City’s Planned Unit Development Ordinance. 9) That the Wildflower at Lake Elmo 2nd Addition Final Plat is consistent with the City’s engineering standards with the exceptions noted by the City Engineer in his review comments to the City dated September 29, 2016 and as otherwise identified in future reviews. NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan subject to the following conditions: 1) The comments in the City Engineer’s review memorandum dated September 29, 2016 should be addressed prior to releasing the plat for recording. Final construction plans shall be reviewed and approved by the City Engineer prior to the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in a memorandum dated September 29, 2016 and any future reviews shall be incorporated into these documents before they are approved. 2) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required 3 Resolution 2016-106 improvements for the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Development Plans with financial guarantees therefore. 3) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to the execution of the final plat by City Officials. 4) A Common Interest Agreement concerning management of the common areas of Wildflower at Lake Elmo 2nd Addition and establishing a homeowner’s association shall be submitted in final form to the Community Development Director before a building permit may be issued for any structure within this subdivision. 5) The applicant shall also enter into a landscape license/public art agreement and maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping and public art installed in areas outside of land dedicated as public park and open space on the final plat. 6) The landscape plan shall be reviewed and approved by the City prior to releasing the final plat for recording. 7) Street signs and no parking signs shall be installed on City Streets within the development prior to any building permits being issued. 8) That street segment B, be given a name on the final plat prior to approval of the final plat by the City Council. 9) That new easements be executed between the Developer and the City and the Developer and Mr. Smith that replace the temporary easements that expire with the recording of the Wildflower at Lake Elmo 2nd Addition. 10) That a protective easement be placed over Outlot A to protect the area from future development. Passed and duly adopted this 6th day of December, 2016 by the City Council of the City of Lake Elmo, Minnesota. ___________________________________ Mike Pearson, Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk PUBLIC HEARING ITEM 5a PLANNING COMMISSION DATE: 11/14/2016 AGENDA ITEM: 5A – PUBLIC HEARING CASE # 2016-40 ITEM: Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plans SUBMITTED BY: Stephen Wensman, Planning Director REVIEWED BY: Emily Becker, City Planner Jack Griffin, City Engineer SUMMARY AND ACTION REQUESTED: Robert Engstrom Companies is requesting approval of final plat, final PUD development plans for the second phase of the Wildflower at Lake Elmo PUD development. The final plat includes 20 single family residential lots located to the east of the first phase. Staff is recommending approval of the request subject to compliance with the conditions listed in this report. GENERAL INFORMATION Applicant: Robert Engstrom Companies; 4801 West 81st Street, #101, Bloomington, MN Property Owners: Robert Engstrom Companies; 4801 West 81st Street, #101, Bloomington, MN Location: Outlot O, Wildflower at Lake Elmo 1st Addition, near the intersection of Wildflower Drive and Monarch Lane. Request: Application for lot Final Plat and Final Planned Unit Development (PUD) Plan approval for the second phase of the Wildflower PUD development. The final plat includes 20 single-family residential lots, an outlot (courtyard), and an outlot for future development. Existing Land Use and Zoning: Vacant outlot and MDR/PUD. Surrounding Land Use and Zoning: North – vacant outlot and MDR/PUD zoning –; west – Wildflower 1st Addition and MDR/PUD zoning –; south – offices, business park land – General Business zoning; east – Wildflower outlot and open space/Field of St. Croix II subdivision open space – RR and OP zoning. Comprehensive Plan: Village Medium Density Residential (3-4 units per acre)/Village Open Space Overlay History: The property is within the Village Planning Area boundary and municipal sewer service area. The site was historically been used for faming activities. A large portion of the site is located in a FEMA Flood District. The City approved a Comprehensive Plan Amendment in 2014 that removed portions of the site from the open space land category. The City approved a PUD Concept Plan for the property on June 17, 2014, 2 PUBLIC HEARING ITEM 5a and a preliminary plat and preliminary PUD plans on April 7, 2015. Wildflower 1st Addition received final plat and PUD plan approval on 7/21/15. Deadline for Action: Application Complete – 8/26/16 60 Day Deadline – 10/25/16 Extension Letter Mailed – Yes 120 Day Deadline – 12/24/16 Applicable Regulations: Chapter 153 – Subdivision Regulations Article 10 – Urban Residential Districts (MDR) Article 16 – Planned Unit Development Regulations §150.270 Storm Water, Erosion, and Sediment Control REQUEST DETAILS Robert Engstrom Companies is requesting approval of a final plat and final PUD plan associated with the second phase of the Wildflower Planned Unit Development (PUD). The proposed final plat will replat the Outlot O, Wildflower at Lake Elmo, 19.2074 acres, in 20 single-family residential lots, of which 10 will be the “garden villa” homes while the remaining 10 will be the general single family homes located north of Wildflower Drive. In addition to the 20 single family homes, the final pla t and PUD plans include two outlots. Outlot A is 0.5818 acres in size and will be an HOA owned outlot for the garden villa courtyard. Outlot B is 11.99 acres in size and will be redeveloped into residential lots in the future. The ten garden villa lots average 0.16 aces in size with the smallest lot being 0.1405 acres in size and the largest 0.1774 acres in size; the ten single family lots average 0.29 acres in size, with the smallest being 0.2292 acres in size and largest being 0.3504 the acres in size. The lots sizes and dimensions are consistent with the preliminary plat and PUD Plans. Plat Summary: Development area (Outlot O): 19.2074 acres Total lot area: 4.4962 acres Residential lots: 20 (10 villa, 10 regular) Outlot for future development (Outlot B): 11.9934 acres Outlot for courtyard (Outlot A): 0.5818 acres R/W area: 2.1359 acres Average garden villa lot size: 0.16 acres Average single family lot size: 0.29 acres Gross density (excluding outlots): 2.55 dwelling units per acre Net density (excluding outlots and R/W) 4.0 dwelling units per acre Grading. The site was graded with the first phase development, so no grading plans were included in the final plat submittal. REVIEW AND ANALYSIS: At the October 10, 2016 Planning Commission meeting, Staff discussed the PUD Agreement and a conflict in the interpretation of the setback adjacent a public street in the courtyard areas. Since the meeting, Staff has further researched the issue and discovered that the PUD Agreement Summary document was in conflict with the Preliminary Plat Resolution No. 2015-23 (attached). The resolution and attached 4/14/16 City Council minutes clarify the setback issue, establishing the 3 PUBLIC HEARING ITEM 5a sideyard setback adjacent a public street at 10 feet, rather than 15 feet. That being so, encroachments are allowed into setbacks, but not necessarily drainage and utility easements unless the encroachment is reviewed by the City Engineer and an encroachment agreement is executed. This process will ensure that there will be no more issues similar to the encroachments on Lot 4, Block 4, Wildflower at Lake Elmo 1st Addition. Also at the October 10, 2016 meeting during the public hearing, stormwater from Wildflower and Village Preserve was discussed and the Planning Commission and as a result, the Planning Commission tabled the Wildflower 2nd Addition final plat and final PUD until the potential issues were better understood. John Hanson from the Valley Branch Watershed District has since investigated the storm water issues and has determined that there are some issues with the Wildflower stormwater pond depth and non-functioning infiltration basins in the Village Preserve development that will be corrected as part of the development process. The Village Preserve infiltration basins will be corrected yet this fall. The report attributes the primary reason for the high water levels to the large volume of rain this season. Overall, the report confirms that the planning and design of the stormwater system is adequate for the proposed development and therefore, the system can accommodate the additional stormwater that will be created with the development of the Wildflower 2nd Addition. Also at the public hearing, Rich Smith claimed some conditions of the 1st Addition plat have not been satisfactorily addressed by the developer. The conditions appear to be a private agreement between Mr. Smith and Mr. Engstrom that would have provided connection to municipal sewer, landscaping and other improvements. The issues remaining with the final plat are: Stormwater. (as mentioned above). Street Names. Street B on the Final Plat has not been given a proper name. This street should be named consistent with the City’s street naming ordinance prior to recording the plat. Engineering Review. The City Engineer has reviewed the final plat submittal and has prepared a memorandum for the Commission and Council’s review. The comments in the City Engineer’s review memorandum dated September 29, 2016 should be addressed prior to releasing the plat for recording. Landscape Plan. A revised landscape plan has been submitted for review, but has not been approved. Approval of the landscape plan should be a condition prior to releasing the plat for recording. Protective Easement. A condition of preliminary plat was to protect all open space with protective easements. An protective easement is being prepared to protect Outlot A from any future development. This should be a condition of that needs to be addressed prior to releasing the plat for recording. Temporary Easements. The City Attorney has indicated that with the 2nd Addition Plat, existing temporary easement between the city and Mr. Smith and a temporary access easement between the developer and Mr. Smith will expire with the platting of the 2 nd Addition. New easement agreements are being drafted and the execution of these agreements should be made a condition of the 2nd addition final plat. Preliminary Plat Conditions. The final plat is in conformance with the preliminary plat. The preliminary plat and PUD plans were approved with conditions. Staff has provided comments on the status of each in bold italics: 4 PUBLIC HEARING ITEM 5a Preliminary Plat Conditions – With Staff Update Comments (updated information in bold italics): 1) No lots within a FEMA flood zone shall be approved as part of a final plat until such time that the City’s Floodplain Management Map has been amended to remove these lots. As an alternative to amending this map, the developer must provide documentation that all structures will be built above the regulatory flood protection elevation, that any public infrastructure will also meet Floodplain Ordinance requirements, and that the proposed storm water ponds may be constructed within the floodplain area. Comments: This condition will apply to the final plat and all subsequent stages. The Valley Branch Watershed District has indicated that it will undertake a study to amend the FEMA flood delineations to lower the flood levels in this area to match those identified in the Goetschel Pond study. There are no buildable lots depicted on the final plat that are located in a flood district. 2) Prior to any grading activity, the developer shall submit to the City temporary grading easements from the owner of the lots adjacent to Layton Avenue within the Brookman Addition in order to construct the improvements within this right-of-way as documented in the preliminary construction plans. Comments: These easements have been secured and grading was completed within this area. 3) The developer has requested the inclusion of public art within common areas and public property throughout Wildflower development. Prior to the placement of any art on publicly owned property or public rights-of-way, the developer and City shall enter into an agreement that clarifies the individuals or entities responsible for maintenance, upkeep and removal of any public art. No public art shall be lit in a manner that conflicts with the City’s Lighting Ordinance. Comments: This is a condition that will apply to any placement of public art within the development, including that installed in phase 1, the stamping of poetry into sidewalks and sculpture in the right of way. A landscape license agreement shall be executed to include public art as a landscape element and shall be executed prior to building permits in the second phase. 4) Prior to the submission of a final plat for any portion of the Wildflower PUD, the developer shall work with the City to determine the appropriate park dedication calculations for the entire development area. Comments: The developer agreement for the first phase indicated that all park dedication was satisfied with the first phase of the development. 5) The applicant must enter into a separate grading agreement with the City prior to the commencement of any grading activity in advance of final plat and plan approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document extent of any proposed grading on the site. Comments: The site grading was completed with the first phase of the development 6) The utility construction plans shall be updated to incorporate the recommendations of the City Engineer as described in a February 18, 2015 memorandum to the City concerning the appropriate location and size of sewer services through the PUD planning area, including any requested oversizing of these facilities to service adjacent properties, prior to the submission of a final plat. Comments: The supplemental plans included in the final plat submission address the previous review comments. The City Engineer approved the supplemental plans. This condition has been met. 5 PUBLIC HEARING ITEM 5a 7) The developer shall minimize the number of rain gardens within public rights-of-way consistent with the review comments from the City Engineer. Any such storm water infiltration features shall be subject to review and approval by the City Engineer. Comments: All rain gardens as previously proposed have been eliminated from the plans. 8) The preliminary development plans must be revised to comply with City Street standards as referenced in the City Engineer’s review memorandum dated February 18, 2015. Comments: The plans have been updated to meet City standards and were approved as part of the PUD. 9) The City approves all requests for flexibility from City Zoning and Subdivision requirements with the exception of the street standards noted in the preceding condition. Comments: The revised plans address this condition. 10) The applicant is encouraged to incorporate elements from the Lake Elmo Theming Study into the open space areas within the subdivision. Comments: The final plans do not include any specific references to the City’s theming study. This condition was not a mandatory requirement. 11) The preliminary landscape plan shall be updated to address the review comments from the City’s landscape architecture consultant as noted in a review letter dated February 4, 2015. Comments: The Preliminary Landscape Plans dated 5/28/15 generally meet the City’s requirements for landscaping, however the Landscape Architect’s review comments have not been fully addressed. The developer has since submitted an amended plan for a portion of the first addition landscaping which have been approved, subject to the landscape requirements for the entire site. The first phase landscaping will be evaluated for compliance once the first phase is landscaped and an asbuilt plan has been submitted. A second phase plan has been submitted and approval of the plan shall be required prior to recording the final plat of the 2 nd Addition. 12) All center median planting areas as depicted on the preliminary plat and plans shall be owned by the City of Lake Elmo and maintained by the Homeowners Association. The applicant shall enter into a maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park, trails, or open space on the final plat. The developer has entered into a landscape license agreement that meets this condition for the first phase which will need to be amended to address the public art. A similar agreement will be required with the second addition and will be a condition of approval. The agreement shall be executed prior to issuance of building permits in the second phase. 13) The Final Plat and Plans must address the requested modifications outlined in the City Engineer’s review memorandum dated February 18, 2015. Comments: The final plans have addressed these comments/ 14) Prior to recording the Final Plat for any portion of the area shown in the Preliminary Plat, the Developer shall enter into a Developers Agreement acceptable to the City Attorney that delineates who is responsible for the design, construction, and payment of public improvements. Comments: A developer’s agreement was entered into for the first phase and will be for the second phase. 6 PUBLIC HEARING ITEM 5a 15) The developer shall provide an easement over or dedicate in a separate outlot all trails to be dedicated for public use. Any such trails shall be considered a park land dedication provide said trails are constructed by the developer with other public improvements within the subdivision. Comments: this condition has been met. 16) The City will not approve a final plat for any portion of Wildflower until such time that the City has approved construction plans and received financial security related to the construction of the public improvement project to connect the 39th Street Sewer to the 30th Street lift station. Comments: This condition has been met and no longer applies. 17) The developer must follow all the rules and regulations of the Wetland Conservation Act, and adhere to the conditions of approval for the Valley Branch Watershed District Permit. Comments: The developers plan have been reviewed and approved by the Watershed District and grading work has been completed in accordance with this permit. 18) The developer shall maintain access to the Smith property (11514 Stillwater Boulevard North) during construction of the first development phase. Said access shall, at a minimum, be capable of supporting emergency management vehicles and be consistent with City access driveway standards. The existing driveway easement shall be vacated prior to the recording of the final plat. Comments: The driveway easement from the Smith property providing access to Stillwater Boulevard has been vacated. Easements to the City and Mr. Smith will expire upon the recording of the 2nd Addition Final Plat. These replacement easements are being drafted and should be a condition of final plat. 19) The developer shall establish a legally binding agreement to prevent further residential or commercial development of all outlots that are planned for open space or conservation uses within the preliminary plat. Comments: This condition has been met for the first phase and is being addressed in the second phase to protect Outlot A. Staff is recommending approval of the final plat and PUD plans with conditions intended to address the outstanding issues that will require additional review and/or documentation. RECOMMENDED CONDITIONS OF APPROVAL: Staff is recommending conditions as part of this final plat review to address issues highlighted in this report that include conditions of the preliminary plat that have not been fully addressed by the applicant. The City Engineer’s review memorandum dated September 29, 2016 identifies a number of issues that need to be addressed by the developer in order for the City to deem the final plans complete. Based on the above Staff report and analysis, Staff is recommending approval of the final plat and final PUD development plans for phase two with the following conditions: Recommended Conditions of Approval: 1) The comments in the City Engineer’s review memorandum dated September 29, 2016 should be addressed prior to releasing the plat for recording. Final construction plans shall be reviewed and approved by the City Engineer prior to the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in a memorandum dated September 29, 7 PUBLIC HEARING ITEM 5a 2016 and any future reviews shall be incorporated into these documents before they are approved. 2) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements for the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Development Plans with financial guarantees therefore. 3) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to the execution of the final plat by City Officials. 4) A Common Interest Agreement concerning management of the common areas of Wildflower at Lake Elmo 2nd Addition and establishing a homeowner’s association shall be submitted in final form to the Community Development Director before a building permit may be issued for any structure within this subdivision. 5) The applicant shall also enter into a landscape license/public art agreement and maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping and public art installed in areas outside of land dedicated as public park and open space on the final plat. 6) The landscape plan shall be reviewed and approved by the City prior to releasing the final plat for recording. 7) Street signs and no parking signs shall be installed on City Streets within the development prior to any building permits being issued. 8) That street segment B, be given a name on the final plat prior to approval of the final plat by the City Council. 9) That new easements be executed between the Developer and the City and the Developer and Mr. Smith that replace the temporary easements that expire with the recording of the Wildflower at Lake Elmo 2nd Addition. 10) That a protective easement be placed over Outlot A to protect the area from future development. DRAFT FINDINGS Staff is recommending that the Planning Commission consider the following findings with regards to the proposed Wildflower Final Plat and Final PUD Plans  That all the requirements of City Code Section 153.07 related to the Final Plan and Final Plat have been met by the Applicant.  That the proposed Final Plat for Wildflower at Lake Elmo 2nd Addition consists of the creation of 20 single-family detached residential structures. 8 PUBLIC HEARING ITEM 5a  That the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan is consistent with the Preliminary Plat and Plans as approved by the City of Lake Elmo on April 7, 2014.  That the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area.  That the Wildflower at Lake Elmo 2nd Addition Final Plat generally complies with the City’s Urban Medium Density Residential zoning district, with the exceptions as noted in the approved Preliminary PUD Plans and PUD Agreement.  That the Wildflower at Lake Elmo 2nd Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, except as noted in this report or attachment thereof.  That the Wildflower at Lake Elmo 2nd Addition Final Plat complies with the City’s subdivision ordinance.  That the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan complies with the City’s Planned Unit Development Ordinance.  That the Wildflower at Lake Elmo 2nd Addition Final Plat is consistent with the City’s engineering standards with the exceptions noted by the City Engineer in his review comments to the City dated September 29, 2016 and as otherwise identified in future reviews. RECOMMENDATION: Staff recommends that the Planning Commission recommend approval of the Final Plat and Final Development Plans for Wildflower at Lake Elmo 2nd Addition with the 10 conditions of approval as listed in the Staff report. Suggested motion: “Move to recommend approval of the final plat and PUD development plans for the Wildflower at Lake Elmo 2nd Addition with 10 conditions based on the findings listed in the staff report.” ATTACHMENTS: 1. Application and narrative 2. City Engineer Review Comments – 9/29/2016 3. 10/24/16 Planning Commission packet 4. Final Landscape Plan 5. Resolution 2015-23 – approving the final plat of Wildflower 1st Addn. 6. City Council minutes, 4-14-15, changing the 15’ setback to 10’ 7. Rich Smith correspondence with the developer. BUSINESS ITEM 5A PLANNING COMMISSION DATE: 10/24/2016 AGENDA ITEM: 5A BUSINESS ITEM CASE # 2016-40 ITEM: Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plans SUBMITTED BY: Stephen Wensman, Planning Director REVIEWED BY: Emily Becker, City Planner Jack Griffin, City Engineer SUMMARY AND ACTION REQUESTED: Robert Engstrom Companies is requesting approval of final plat, final PUD development plans for the second phase of the Wildflower at Lake Elmo PUD development. The final plat includes 20 single family residential lots located to the east of the first phase. Staff is recommending approval of the request subject to compliance with the conditions listed in this report. GENERAL INFORMATION Applicant: Robert Engstrom Companies; 4801 West 81st Street, #101, Bloomington, MN Property Owners: Robert Engstrom Companies; 4801 West 81st Street, #101, Bloomington, MN Location: Outlot O, Wildflower at Lake Elmo 1st Addition, near the intersection of Wildflower Drive and Monarch Lane. Request: Application for lot Final Plat and Final Planned Unit Development (PUD) Plan approval for the second phase of the Wildflower PUD development. The final plat includes 20 single-family residential lots, an outlot (courtyard), and an outlot for future development. Existing Land Use and Zoning: Vacant outlot and MDR/PUD. Surrounding Land Use and Zoning: North – vacant outlot and MDR/PUD zoning –; west – Wildflower 1st Addition and MDR/PUD zoning –; south – offices, business park land – General Business zoning; east – Wildflower outlot and open space/Field of St. Croix II subdivision open space – RR and OP zoning. Comprehensive Plan: Village Medium Density Residential (3-4 units per acre)/Village Open Space Overlay History: The property is within the Village Planning Area boundary and municipal sewer service area. The site was historically been used for faming activities. A large portion of the site is located in a FEMA Flood District. The City approved a Comprehensive Plan Amendment in 2014 that removed portions of the site from the open space land category. The City approved a PUD Concept Plan for the property on June 17, 2014, 2 BUSINESS ITEM 5A and a preliminary plat and preliminary PUD plans on April 7, 2015. Wildflower 1st Addition received final plat and PUD plan approval on 7/21/15. Deadline for Action: Application Complete – 8/26/16 60 Day Deadline – 10/25/16 Extension Letter Mailed – No 120 Day Deadline – 12/24/16 Applicable Regulations: Chapter 153 – Subdivision Regulations Article 10 – Urban Residential Districts (MDR) Article 16 – Planned Unit Development Regulations §150.270 Storm Water, Erosion, and Sediment Control REQUEST DETAILS Robert Engstrom Companies is requesting approval of a final plat and final PUD plan associated with the second phase of the Wildflower Planned Unit Development (PUD). The proposed final plat will replat the Outlot O, Wildflower at Lake Elmo, 19.2074 acres, in 20 single-family residential lots, of which 10 will be the “garden villa” homes while the remaining 10 will be the general single family homes located north of Wildflower Drive. In addition to the 20 single family homes, the final plat and PUD plans include two outlots. Outlot A is 0.5818 acres in size and will be an HOA owned outlot for the garden villa courtyard. Outlot B is 11.99 acres in size and will be redeveloped into residential lots in the future. The ten garden villa lots average 0.16 aces in size with the smallest lot being 0.1405 acres in size and the largest 0.1774 acres in size; the ten single family lots average 0.29 acres in size, with the smallest being 0.2292 acres in size and largest being 0.3504 the acres in size. The lots sizes and dimensions are consistent with the preliminary plat and PUD Plans. Plat Summary: Development area (Outlot O): 19.2074 acres Total lot area: 4.4962 acres Residential lots: 20 (10 villa, 10 regular) Outlot for future development (Outlot B): 11.9934 acres Outlot for courtyard (Outlot A): 0.5818 acres R/W area: 2.1359 acres Average garden villa lot size: 0.16 acres Average single family lot size: 0.29 acres Gross density (excluding outlots): 2.55 dwelling units per acre Net density (excluding outlots and R/W) 4.0 dwelling units per acre Grading. The site was graded with the first phase development, so no grading plans were included in the final plat submittal. REVIEW AND ANALYSIS: At the October 10, 2016 Planning Commission meeting, Staff discussed the PUD Agreement and a conflict in the interpretation of the setback adjacent a public street in the courtyard areas. Since the meeting, Staff has further researched the issue and discovered that the PUD Agreement Summary document was in conflict with the Preliminary Plat Resolution No. 2015-23 (attached). The resolution and attached 4/14/16 City Council minutes clarify the setback issue, establishing the 3 BUSINESS ITEM 5A sideyard setback adjacent a public street at 10 feet, rather than 15 feet. That being said, encroachments are allowed into setbacks, but not necessarily drainage and utility easements. Staff will enforce a no encroachment policy for the drainage and utility easements adjacent the public street to ensure that there will be no more similar issues as was illustrated with Lot 4, Block 4, Wildflower at Lake Elmo 1st Addition. Also at the October 10, 2016 meeting, stormwater from Wildflower and Village Preserve was discussed and the Planning Commission tabled the Wildflower 2nd Addition final plat and final PUD until the potential issues were better understood. John Hanson from the Valley Branch Watershed District is looking into the stormwater issues and will issue a report to the Valley Branch Board on 10/21/16, too late for the Planning Commission packet. Planning Staff will have copies of that memo available at the Planning Commission meeting and will email it to Planning Commissioners once it is received. The memo is anticipated to have an explanation of the stormwater issues that will hopefully make sense and will allow Wildflower 2nd Addition to proceed. The Rich Smith issue, comments made by Rich Smith that conditions of the first addition plat have not been complied with, appear to be a private agreement between Mr. Smith and Mr. Engstrom that would have provided connection to municipal sewer, landscaping and other improvements. The issues remaining with the final plat are: Stormwater. (as mentioned above). Street Names. Street B on the Final Plat has not been given a proper name. This street should be named consistent with the City’s street naming ordinance prior to recording the plat. Engineering Review. The City Engineer has reviewed the final plat submittal and has prepared a memorandum for the Commission and Council’s review. The comments in the City Engineer’s review memorandum dated September 29, 2016 should be addressed prior to releasing the plat for recording. Preliminary Plat Conditions. The final plat is in conformance with the preliminary plat. The preliminary plat and PUD plans were approved with conditions. Staff has provided comments on the status of each in bold italics: Preliminary Plat Conditions – With Staff Update Comments (updated information in bold italics): 1) No lots within a FEMA flood zone shall be approved as part of a final plat until such time that the City’s Floodplain Management Map has been amended to remove these lots. As an alternative to amending this map, the developer must provide documentation that all structures will be built above the regulatory flood protection elevation, that any public infrastructure will also meet Floodplain Ordinance requirements, and that the proposed storm water ponds may be constructed within the floodplain area. Comments: This condition will apply to the final plat and all subsequent stages. The Valley Branch Watershed District has indicated that it will undertake a study to amend the FEMA flood delineations to lower the flood levels in this area to match those identified in the Goetschel Pond study. There are no buildable lots depicted on the final plat that are located in a flood district. 2) Prior to any grading activity, the developer shall submit to the City temporary grading easements from the owner of the lots adjacent to Layton Avenue within the Brookman Addition in order to construct the improvements within this right-of-way as documented in the preliminary 4 BUSINESS ITEM 5A construction plans. Comments: These easements have been secured and grading was completed within this area. 3) The developer has requested the inclusion of public art within common areas and public property throughout Wildflower development. Prior to the placement of any art on publicly owned property or public rights-of-way, the developer and City shall enter into an agreement that clarifies the individuals or entities responsible for maintenance, upkeep and removal of any public art. No public art shall be lit in a manner that conflicts with the City’s Lighting Ordinance. Comments: This is a condition that will apply to any placement of public art within the development, including that installed in phase 1, the stamping of poetry into sidewalks and sculpture in the right of way. A landscape license agreement shall be executed to include public art as a landscape element and shall be executed prior to building permits in the second phase. 4) Prior to the submission of a final plat for any portion of the Wildflower PUD, the developer shall work with the City to determine the appropriate park dedication calculations for the entire development area. Comments: The developer agreement for the first phase indicated that all park dedication was satisfied with the first phase of the development. 5) The applicant must enter into a separate grading agreement with the City prior to the commencement of any grading activity in advance of final plat and plan approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document extent of any proposed grading on the site. Comments: The site grading was completed with the first phase of the development 6) The utility construction plans shall be updated to incorporate the recommendations of the City Engineer as described in a February 18, 2015 memorandum to the City concerning the appropriate location and size of sewer services through the PUD planning area, including any requested oversizing of these facilities to service adjacent properties, prior to the submission of a final plat. Comments: The supplemental plans included in the final plat submission address the previous review comments. The City Engineer approved the supplemental plans. This condition has been met. 7) The developer shall minimize the number of rain gardens within public rights-of-way consistent with the review comments from the City Engineer. Any such storm water infiltration features shall be subject to review and approval by the City Engineer. Comments: All rain gardens as previously proposed have been eliminated from the plans. 8) The preliminary development plans must be revised to comply with City Street standards as referenced in the City Engineer’s review memorandum dated February 18, 2015. Comments: The plans have been updated to meet City standards and were approved. 9) The City approves all requests for flexibility from City Zoning and Subdivision requirements with the exception of the street standards noted in the preceding condition. Comments: The revised plans address this condition. 10) The applicant is encouraged to incorporate elements from the Lake Elmo Theming Study into the open space areas within the subdivision. Comments: The final plans do not include any specific references to the City’s theming study. This condition was not a mandatory requirement. 5 BUSINESS ITEM 5A 11) The preliminary landscape plan shall be updated to address the review comments from the City’s landscape architecture consultant as noted in a review letter dated February 4, 2015. Comments: The Preliminary Landscape Plans dated 5/28/15 generally meet the City’s requirements for landscaping, however the Landscape Architect’s review comments have not been fully addressed. The developer has since submitted an amended plan for a portion of the first addition landscaping which have been approved, subject to the landscape requirements for the entire site. The first phase landscaping will be evaluated for compliance once the first phase is landscaped and an asbuilt plan has been submitted. 12) All center median planting areas as depicted on the preliminary plat and plans shall be owned by the City of Lake Elmo and maintained by the Homeowners Association. The applicant shall enter into a maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park, trails, or open space on the final plat. The developer has entered into a landscape license agreement that meets this condition for the first phase which will need to be amended to address the public art. A similar agreement will be required with the second addition and will be a condition of approval. The agreement shall be executed prior to issuance of building permits in the second phase. 13) The Final Plat and Plans must address the requested modifications outlined in the City Engineer’s review memorandum dated February 18, 2015. Comments: The final plans have addressed these comments/ 14) Prior to recording the Final Plat for any portion of the area shown in the Preliminary Plat, the Developer shall enter into a Developers Agreement acceptable to the City Attorney that delineates who is responsible for the design, construction, and payment of public improvements. Comments: A developer’s agreement was entered into for the first phase and will be for the second phase. 15) The developer shall provide an easement over or dedicate in a separate outlot all trails to be dedicated for public use. Any such trails shall be considered a park land dedication provide said trails are constructed by the developer with other public improvements within the subdivision. Comments: this condition has been met. 16) The City will not approve a final plat for any portion of Wildflower until such time that the City has approved construction plans and received financial security related to the construction of the public improvement project to connect the 39th Street Sewer to the 30th Street lift station. Comments: This condition has been met and no longer applies. 17) The developer must follow all the rules and regulations of the Wetland Conservation Act, and adhere to the conditions of approval for the Valley Branch Watershed District Permit. Comments: The developers plan have been reviewed and approved by the Watershed District and grading work has been completed in accordance with this permit. 18) The developer shall maintain access to the Smith property (11514 Stillwater Boulevard North) during construction of the first development phase. Said access shall, at a minimum, be capable of supporting emergency management vehicles and be consistent with City access driveway standards. The existing driveway easement shall be vacated prior to the recording of the final 6 BUSINESS ITEM 5A plat. Comments: The driveway easement from the Smith property providing access to Stillwater Boulevard has been vacated. 19) The developer shall establish a legally binding agreement to prevent further residential o r commercial development of all outlots that are planned for open space or conservation uses within the preliminary plat. Comments: This condition has been met. Staff is recommending approval of the final plat and PUD plans with conditions intended to address the outstanding issues that will require additional review and/or documentation. RECOMMENDED CONDITIONS OF APPROVAL: Staff is recommending conditions as part of this final plat review to address issues highlighted in this report that include conditions of the preliminary plat that have not been fully addressed by the applicant. The City Engineer’s review memorandum dated September 29, 2016 identifies a number of issues that need to be addressed by the developer in order for the City to deem the final plans complete. Based on the above Staff report and analysis, Staff is recommending approval of the final plat and final PUD development plans for phase two with the following conditions: Recommended Conditions of Approval: 1) The comments in the City Engineer’s review memorandum dated September 29, 2016 should be addressed prior to releasing the plat for recording. Final construction plans shall be reviewed and approved by the City Engineer prior to the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in a memorandum dated September 29, 2016 and any future reviews shall be incorporated into these documents before they are approved. 2) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements for the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Development Plans with financial guarantees therefore. 3) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to the execution of the final plat by City Officials. 4) A Common Interest Agreement concerning management of the common areas of Wildflower at Lake Elmo 2nd Addition and establishing a homeowner’s association shall be submitted in final form to the Community Development Director before a building permit may be issued for any structure within this subdivision. 5) The applicant shall also enter into a landscape license/public art agreement and maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping and public art installed in areas outside of land dedicated as public park and open space on the final plat. 7 BUSINESS ITEM 5A 6) Revised landscape plan shall be submitted for review and approval consistent with recommended changes per the City’s Consulting Landscape Architect’s review memo dated February 14, 2015, prior to recording of the final plat. 7) Street signs and no parking signs shall be installed on City Streets within the development prior to any building permits being issued. 8) That street segment B, be given a name on the final plat prior to approval of the final plat by the City Council. DRAFT FINDINGS Staff is recommending that the Planning Commission consider the following findings with regards to the proposed Wildflower Final Plat and Final PUD Plans  That all the requirements of City Code Section 153.07 related to the Final Plan and Final Plat have been met by the Applicant.  That the proposed Final Plat for Wildflower at Lake Elmo 2nd Addition consists of the creation of 20 single-family detached residential structures.  That the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan is consistent with the Preliminary Plat and Plans as approved by the City of Lake Elmo on April 7, 2014.  That the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area.  That the Wildflower at Lake Elmo 2nd Addition Final Plat generally complies with the City’s Urban Medium Density Residential zoning district, with the exceptions as noted in the approved Preliminary PUD Plans and PUD Agreement.  That the Wildflower at Lake Elmo 2nd Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, except as noted in this report or attachment thereof.  That the Wildflower at Lake Elmo 2nd Addition Final Plat complies with the City’s subdivision ordinance.  That the Wildflower at Lake Elmo 2nd Addition Final Plat and Final PUD Plan complies with the City’s Planned Unit Development Ordinance.  That the Wildflower at Lake Elmo 2nd Addition Final Plat is consistent with the City’s engineering standards with the exceptions noted by the City Engineer in his review comments to the City dated September 29, 2016 and as otherwise identified in future reviews. RECOMMENDATION: 8 BUSINESS ITEM 5A Staff recommends that the Planning Commission recommend approval of the Final Plat and Final Development Plans for Wildflower at Lake Elmo 2nd Addition with the 8 conditions of approval as listed in the Staff report. Suggested motion: “Move to recommend approval of the final plat and PUD development plans for the Wildflower at Lake Elmo 2nd Addition based on the findings listed in the staff report.” ATTACHMENTS: 1. Application and narrative 2. City Engineer Review Comments – 9/29/2016 3. Final Plat 4. Final Construction Plans 5. Preliminary Landscape Plan dated 5/28/15 6. Landscape Architect memorandum dated 2/14/15 7. Lot 4, Block 4, Wildflower at Lake Elmo 1st Addition Building Permit Survey 8. Resolution 2015-23 – approving the final plat of Wildflower 1st Addn 9. City Council minutes, 4-14-15, changing the 15’ setback to 10’ Barr Engineering Co. 4300 MarketPointe Drive, Suite 200, Minneapolis, MN 55435 952.832.2600 www.barr.com Memorandum To: Valley Branch Watershed District Board of Managers From: John Hanson Subject: Wildflower at Lake Elmo/Village Preserve/Floodplain Southwest of Goetschel Pond Date: October 19, 2016 Project: 23820020.00 2200 346 and 352 c: Susannah Torseth, Ray Roemmich, Melissa Imse, John Hanson Background and Introduction As the Managers saw during their September 22, 2016, tour, some infiltration basins on the Village Preserve site (see Figure 1) are not functioning and water levels in the floodplain downstream appear high (see Figures 2 and 3). The property owners west of the floodplain are concerned about the high water levels and standing water in the Lake Elmo Avenue ditch. The City of Lake Elmo’s Planning Commission rejected approval of the next construction phase of the Wildflower at Lake Elmo subdivision until stormwater management issues are better understood and asked Valley Branch Watershed District to study the issue and identify potential solutions. To understand the cause of the observed high water levels, we compared 2016 precipitation data to other years and reviewed the development plans and permit application models to determine if construction was done as planned and if stormwater management facilities are functioning as assumed. Based on this review, we have recommendations for corrective actions. This memo summarizes our analysis and findings. Precipitation The area received 32.29 inches of precipitation from April 1–September 30, 2016, making it by far the wettest year over the last 10 years. Between 2007 and 2015, the wettest April–September had been in 2014, with 28.54 inches of precipitation. The average during the 9-year period was 22.76 inches. Table 1 summarizes the precipitation recorded in the area. Requested Manager Action Review memo To: Valley Branch Watershed District Board of Managers From: John Hanson Subject: Wildflower at Lake Elmo/Village Preserve/Floodplain Southw est of Goetschel Pond Date: October 19, 2016 Page: 2 P:\Mpls\23 MN\82\2382016\_MovedFromMpls_P\VBWD\2382016\MEETINGS\2016\10272016\ForDeb\Superseded\Memo_KruegersEtc_fringe.docx Table 1 2007–2016 April–September Precipitation (inches) Year April May June July August September Total 2016 Not Available 2.20 4.290 9.30 10.41 5.82 >32.02 2.47 2.86 4.46 6.69 9.12 6.69 32.29 2015 3.02 3.59 5.29 6.11 3.69 5.32 27.02 1.99 4.16 4.34 7.07 3.07 5.55 26.18 2014 6.90 4.48 9.46 2.16 2.95 2.18 28.13 6.53 4.21 9.93 2.55 2.86 2.46 28.54 2013 5.19 5.15 9.06 2.24 0.57 1.69 23.90 5.46 5.35 9.67 1.57 1.21 1.56 24.82 2012 3.26 7.18 4.26 5.76 1.36 0.59 22.41 3.23 6.99 2.86 5.20 1.44 0.66 20.38 2011 3.58 3.11 5.58 10.6 4.85 0.71 28.43 2.13 4.07 3.40 6.98 5.11 1.02 22.71 2010 2.01 3.36 5.97 5.28 5.21 5.65 27.48 1.64 3.55 4.90 5.10 6.49 6.40 28.08 2009 1.38 0.58 2.94 2.12 7.02 0.64 14.68 0.75 0.60 3.56 2.39 7.25 0.93 15.48 2008 4.41 3.23 3.61 2.39 2.87 2.72 19.23 4.04 2.44 4.23 2.44 3.55 2.44 19.14 2007 1.51 3.62 1.17 1.06 5.75 6.52 19.63 1.85 4.06 1.32 1.32 5.95 5.00 19.50 The first row for each year is the precipitation recorded by VBWD citizen volunteer Charles Taylor at his home on the northwest side of Lake Jane, 2.5 miles west of the site. The second row is the precipitation recorded at the closest reporting station (within 2 miles of the site), accessed from http://climate.umn.edu/HIDradius/radius_new.asp. Historic Water Levels The VBWD has not measured lowland water levels. We reviewed aerial photos, but these were taken in early spring or late fall so were not helpful in determining extreme or typical summer water levels. At Wetland F (see Figure 3 for the location and the following October 18, 2016, photos), cottonwood and oak trees are standing in water. Based on their size, we estimate the trees to be 12–20 years old. While cottonwood trees are flood-resistant, oak trees are not. Therefore, water levels in the wetland have not To: Valley Branch Watershed District Board of Managers From: John Hanson Subject: Wildflower at Lake Elmo/Village Preserve/Floodplain Southw est of Goetschel Pond Date: October 19, 2016 Page: 3 P:\Mpls\23 MN\82\2382016\_MovedFromMpls_P\VBWD\2382016\MEETINGS\2016\10272016\ForDeb\Superseded\Memo_KruegersEtc_fringe.docx likely been sustained at this level for at least 12–20 years. Aerial photos appear to show trees along the wetland fringe in 1996, but not in 1992. This is consistent with precipitation records, which show that 2002, 1993, and 1991 were wet years; it’s probable that the trees came in after one of the wet years during 1990s when water levels in the wetland were high. To: Valley Branch Watershed District Board of Managers From: John Hanson Subject: Wildflower at Lake Elmo/Village Preserve/Floodplain Southw est of Goetschel Pond Date: October 19, 2016 Page: 4 P:\Mpls\23 MN\82\2382016\_MovedFromMpls_P\VBWD\2382016\MEETINGS\2016\10272016\ForDeb\Superseded\Memo_KruegersEtc_fringe.docx To: Valley Branch Watershed District Board of Managers From: John Hanson Subject: Wildflower at Lake Elmo/Village Preserve/Floodplain Southw est of Goetschel Pond Date: October 19, 2016 Page: 5 P:\Mpls\23 MN\82\2382016\_MovedFromMpls_P\VBWD\2382016\MEETINGS\2016\10272016\ForDeb\Superseded\Memo_KruegersEtc_fringe.docx Drainage Patterns Figure 2 shows the pre-development drainage patterns, overflow elevations of lowlands, and the 1%-probability flood level for the area. Figure 3 shows the developed conditions drainage patterns and 1%-probability flood level for the area. Developments and Impacts Areas south of the floodplain are currently under construction. Figure 1 shows the developments in relation to the floodplain. Village Preserve and Arbor Glen Senior Living are on the west side and Wildflower at Lake Elmo is on the east side; a future cul-de-sac extends to the west, separating the floodplain from Village Preserve. Wetland A and Krueger Property The drainage area to Wetland A (see Figure 3) was reduced with development. Within the Village Preserve site, 0.6 acres of the predeveloped 1.6-acre drainage area was diverted from flowing north into Wetland A. Runoff from the remaining 1 acre (38% impervious) in the northwest corner of Village Preserve drains to an infiltration basin with a capacity of 36,800 cubic feet (Infiltration Basin 1, see Figure 3). Soils investigations prior to construction of this basin indicated infiltration rates exceeded 20 inches per hour. It was expected to drain dry within 48 hours of rainstorms with an infiltration rate of at least 2 inches per hour. Basin overflows were anticipated only during storms significantly greater than the 100-year 24-hour design storm (7.3 inches). During site visits in late August and September, Infiltration Basin 1 was found full of water. There were also signs that it had discharged to the north along Lake Elmo Avenue and into Wetland A. The water level in the basin on October 18, 2016, was approximately 1 foot below the overflow (see the following photo, where the orange cone is the overflow). Therefore, this basin is not infiltrating as designed. As noted above, it should drain dry within 48 hours of a rainstorm and should not discharge. To: Valley Branch Watershed District Board of Managers From: John Hanson Subject: Wildflower at Lake Elmo/Village Preserve/Floodplain Southw est of Goetschel Pond Date: October 19, 2016 Page: 6 P:\Mpls\23 MN\82\2382016\_MovedFromMpls_P\VBWD\2382016\MEETINGS\2016\10272016\ForDeb\Superseded\Memo_KruegersEtc_fringe.docx Within the Wildflower at Lake Elmo site (see Figure 1), the developer filled a low area south of Wetland A (see Figure 2). That area now drains to an infiltration basin (Infiltration Basin 300) that overflows to Wetland G (see Figure 3). This change, combined with the Village Preserve drainage change, reduced the drainage area to Wetland A by 5.1 acres. Under pre-developed conditions, runoff from the south would fill that low area; if it were to overflow, it would overflow to Wetland A. Even with the reduction in runoff storage by the elimination of the low area south of Wetland A, less runoff reaches Wetland A because of the development changes. Table 2 summarizes the drainage areas and inflow runoff volumes. To: Valley Branch Watershed District Board of Managers From: John Hanson Subject: Wildflower at Lake Elmo/Village Preserve/Floodplain Southw est of Goetschel Pond Date: October 19, 2016 Page: 7 P:\Mpls\23 MN\82\2382016\_MovedFromMpls_P\VBWD\2382016\MEETINGS\2016\10272016\ForDeb\Superseded\Memo_KruegersEtc_fringe.docx Table 2 Drainage Areas, Inflow Volumes, and High Water Levels of Wetland A Drainage Area from South (acres) 2-Year 2-Hour Storm Inflow Volume (acre-feet) High Water Level (feet) Pre-Development 17.9 0.98 911.9 Post-Development 12.8 0.64 911.6 High water levels were observed in Wetland A in 2014, prior to any development in the area. Given that there has been much more precipitation in 2016, the current high water levels are not surprising. And, they would likely be higher if the development had not made changes to the drainage area. Wetland A overflows to Veronica’s Pond at Elevation 914.7. The 1%-probability flood level of Wetland A is Elevation 916.9. The ground adjacent to an outbuilding on the Krueger property west of Lake Elmo Avenue is approximately Elevation 917.5. While this outbuilding should be safe from flooding, the low area between it and Lake Elmo Avenue will fill with water after large storm events and during wet-weather cycles. Figure 4 shows a close-up view of Wetland A and the Krueger property. Wetland H and G Wetland H and G (see Figure 3) receive runoff from the Arbor Glen Senior Living Facility and Village Preserve sites. Before development, runoff from the Arbor Glen Senior Living Facility and Village Preserve generally drained southeast and eventually to Downs Lake. Once complete, part of the Arbor Glen Senior Living site and all of the Village Preserve site will drain north to the Goetschel Pond watershed. The VBWD allowed this diversion because soils investigations and computer modeling showed that the diversion would not increase the 100-year flood level of the local lowlands or Goetschel Pond. Figures 5 and 6 show the pre- and post-development drainage areas. Runoff diverted from the Downs Lake watershed into the Goetschel Pond watershed drains through a series of stormwater management features before reaching the lowlands southwest of Goetschel Pond. Runoff from the Arbor Glen Senior Living site will drain to a biofiltration basin and then to the Village Preserve wet pond at the southwest corner of that subdivision. Runoff from Village Preserve generally flows in a counterclockwise pattern through wet ponds before reaching a large infiltration basin (Infiltration Basin 2) in the north-central portion of the site. Soils investigations prior to construction indicated infiltration rates at this basin exceeded 20 inches per hour. It was expected to drain dry within 48 hours of rainstorms with infiltration rates of at least 4 inches per hour. Basin overflows were anticipated only during storms significantly greater than the 10-year 24-hour design storm (4.17 inches). During site visits in late August and September, the infiltration basin was found full of water and discharging to the north (Wetland H, see Figure 6.) Therefore, Infiltration Basin 2 is not functioning as designed. If the basin were functioning properly, Wetland H and downstream wetlands on the Wildflower at Lake Elmo site would receive less runoff than they did this summer. To: Valley Branch Watershed District Board of Managers From: John Hanson Subject: Wildflower at Lake Elmo/Village Preserve/Floodplain Southw est of Goetschel Pond Date: October 19, 2016 Page: 8 P:\Mpls\23 MN\82\2382016\_MovedFromMpls_P\VBWD\2382016\MEETINGS\2016\10272016\ForDeb\Superseded\Memo_KruegersEtc_fringe.docx The Lake Elmo City Engineer and I have discussed the problem with the developer of Village Preserve. The developer indicated that the infiltration basin will be cleaned out (sediment removed) before the end of October. According to him, the basin was functioning well in the early part of 2016 and he expects that it will function again once cleaned out. Neither the City nor the VBWD will release surety if it does not. Wetland F Wetland F (and Veronica’s Pond) is downstream of area developments and associated stormwater management facilities under construction. While the current water level in the wetland appears to be approximately Elevation 904, 11 feet below the 1%-probability flood level, it is higher than typical. As previously described, several 8-inch-diameter and smaller oak trees, which are not flood-resistant, are in standing water. The high water level is likely because: • 2016 has been an extremely wet year. During the warm seasons of the last 60 years, only 2002, 1993, 1991, 1986, and 1978 were as wet. • Infiltration Basin 2 on the Village Preserve site discharged water that eventually reached Wetland F. It was designed to discharge only in extreme events; otherwise, no water should discharge to the Wildflower at Lake Elmo site. • Infiltration Basin 300 on the Wildflower at Lake Elmo site was not constructed to store as much runoff as planned and could have sent more runoff downstream and eventually to Wetland F. • Infiltration Basin 200 on the Wildflower at Lake Elmo site is not draining dry within 48 hours and is sending more runoff downstream. Needed Actions at Stormwater Management Facilities The developer’s engineer for the Wildflower at Lake Elmo site submitted as-built drawings. The as-builts show the grading and constructed infrastructure are generally with the appropriate tolerances with two exceptions: (1) the outlet for Infiltration Basin 300 was constructed 0.6 feet lower than planned, and (2) the bottom of Infiltration Basin 300 was constructed 0.1 foot lower than planned. Therefore, less volume is being stored in the basin. This should be corrected or additional volume control needs to be provided. Drainage patterns appear consistent with the as-built drawings and orginal plans, but Wetland G is overflowing into the Wet Pond, rather than Infiltration Basin 200. As previously noted, the infiltration basins on the Village Preserve site are not infiltrating. The developer said they will be cleaned out by the end of October 2016. On the Wildflower at Lake Elmo site, erosion problems should be corrected, builders should be more diligent about installing and maintaining erosion controls, and vegetation should be better established within the floodplain. To: Valley Branch Watershed District Board of Managers From: John Hanson Subject: Wildflower at Lake Elmo/Village Preserve/Floodplain Southw est of Goetschel Pond Date: October 19, 2016 Page: 9 P:\Mpls\23 MN\82\2382016\_MovedFromMpls_P\VBWD\2382016\MEETINGS\2016\10272016\ForDeb\Superseded\Memo_KruegersEtc_fringe.docx Conclusions Higher-than-normal precipitation coupled with non-functioning infiltration basins have created abnormally high water levels in Wetland F. Wetland A, which backs up water onto the Krueger property, also has high water levels. While an infiltration basin draining to the wetland is not functioning properly, the high water levels in Wetland A are due to higher-than-normal precipitation. The 100-year flood level of Wetland A, both before and after development, is Elevation 916.9, which appears to be just below the elevation of an outbuilding on the Krueger’s property. The developer of the Village Preserve project has committed to cleaning the non-functioning infiltration basins on the site. The developer of the Wildflower at Lake Elmo site will be informed that Infiltration Basin 200 is not functioning as designed and Infiltration Basin 300 was not constructed as designed and that corrective actions are needed. Erosion issues also need to be addressed on the Wildflower at Lake Elmo site and vegetation needs to be better established. VBWD should not release any escrow deposit until these corrective actions have been taken and proof is submitted that the projects conform to the VBWD Rules and Regulations, as described in the VBWD permit closeout process. Wildflowerat Lake Elmo VillagePreserve Arbor GlenSenior Living See Floodplainin Figures 2 & 3Veronica's Pond 44th St Stillwa t e r B l v d N Li l y Av e N LittleBlueCir N La k e E l m o A v e N La v e r n e Av e N Little BlueCir N 44 t h S t L a Li l y Av e N L i l y A v e N Lady Slipper La N 43rd St N Li t t l e B l u e S t e m T r N Little Blue Stem La 39th St N 456717 456714 Ba r r F o o t e r : A r c G I S 1 0 . 4 , 2 0 1 6 - 1 0 - 2 1 1 5 : 1 2 F i l e : I : \ C l i e n t \ V B W D \ D i s t r i c t \ W o r k _ O r d e r s \ O u t _ o f _ S c o p e \ S i t e _ O v e r v i e w _ M a p p i n g \ 2 0 1 6 _ S i t e m a p s \ S W _ G o e t s c h e l \ F i g 0 1 _ L o c a l _ D e v e l o p m e n t s . m x d U s e r : m b s 2 Developed Subwatershed Boundary Major Subwatershed Boundary Imagery: USDA NAIP, 2015 I 350 0 350 Feet Figure 1 LOCAL DEVELOPMENTSValley Branch Watershed DistrictWashington County, Minnesota *Vertical Datum: NAVD88 % % % %% % % % % % % % % % % %%% % %% %% % % % % Wetland A Low Area FilledWith Development Veronica's Pond Le a f Av e N LeafAve N 43rd St N La k e E l m o A v e N 456717 922.5 919.9 909.9 920.5 913.4 911.6 923.7 913.6 918.4 921.6 906.1 906.4 909.6904.3 914.7 917 910.8916.3 913.5916.6 921.2 916.7 914.4 913.7 920.5' 915' 916.9' 910 920 94 0 940 930 920 920 950 940 9 4 0 90 0 900 9 3 0 930 920 930 930 9 3 0 9 2 0 930 920 9 1 0 910 922 914 908 906 932 924 916 912 904 926 918 938 936 9 3 4 926 924 9 2 2 928 938936 932 92 8 926 924 922 926 922 918 916928 924 952 948 946 944 942 928926924 922 9 4 2 9 3 8 9 3 6 9 3 4 928 926 924 922 9 2 6 9 2 2 928 926 924 922 926 924 926 924922 9 2 2 9 1 6 916 912 9 0 6 9 0 2 904 92 6 9 2 4 92 2 91 4 9 1 2 902 938 936 93 2 932 924922 92 2 91 6 91 4 914 912 9 4 8 9 4 6 9 2 2 9 1 8 908 906 9 0 8 9 0 6 928 902 934 918 932 932 92 4 924 928 918 91 6 9 1 4 916 904 9 2 2 92 4 91 6 912 914 9 1 2 90 8 9 0 6 954 948 944 9 4 4 944 942 942 932 932 926 926 92 4 924 922 92 2 9 2 2 918 918 918 918 91 8 9 1 8 918 91 6 91 6 914 9 1 4912 906 926 922 Ba r r F o o t e r : A r c G I S 1 0 . 4 , 2 0 1 6 - 1 0 - 2 1 1 5 : 1 6 F i l e : I : \ C l i e n t \ V B W D \ D i s t r i c t \ W o r k _ O r d e r s \ O u t _ o f _ S c o p e \ S i t e _ O v e r v i e w _ M a p p i n g \ 2 0 1 6 _ S i t e m a p s \ S W _ G o e t s c h e l \ F i g 0 2 _ S W _ G o e t s c h e l _ O v e r v i e w _ M a p . m x d U s e r : m b s 2 %Depression Area Low Point Overflow Elevation (ft) Local Depression Boundary Inundation Extents to Local Overflow Point 100-Year Floodplain Labeled with1% Probability Flood Level (ft) Contours (DNR, November 2011) 2-Foot Contour 10-Foot Contour Imagery: Washington County, 2013 I 250 0 250 Feet Figure 2 SOUTHWEST GOETSCHELWATERSHED DETAILValley Branch Watershed DistrictWashington County, Minnesota *Vertical Datum: NAVD88 Veronica's Pond Le a f Av e N LeafAve N 43rd St N La k e E l m o A v e N 456717 910 920 94 0 940 930 920 920 950 940 9 4 0 90 0 900 9 3 0 930 920 930 930 9 3 0 920 930 920 910 910 922 914 908 906 932 924 916 912 904 926 918 938 936 9 3 4 926 924 9 2 2 928 938936 932 92 8 926 924 922 926 922 918 916928 924 952 948 946 944 942 928926924 922 9 4 2 9 3 8 9 3 6 9 3 4 928 926 924 922 9 2 2 91 8 928 926 924 922 926 924 926 924922 9 2 2 9 1 6 916 912 9 0 6 9 0 2 904 92 6 9 2 4 92 2 91 4 9 1 2 902 938 936 93 2 932 924922 92 2 91 6 91 4 914 912 9 4 8 9 4 6 9 2 2 9 1 8 908 906 928 902 934 918 932 932 92 6 92 4 924 928 918 91 6 9 1 4 916 904 9 2 2 92 4 91 6 912 914 9 1 2 90 8 9 0 6 954 948 944 9 4 4 944 942 942 932 932 926 926 92 4 924 922 92 2 9 2 2 918 918 918 918 91 8 918 91 6 91 6 914 9 1 4912 9 0 6 906 926 922 915' 915' 915' 915' 915' 915' 916.9' InfiltrationBasin200 InfiltrationBasin 300 InfiltrationBasin 2 InfiltrationBasin 1 Infiltration Wet Pond 200 Wet Pond 2 Wetland B Wetland C Wetland A Wetland G Wetland H Wetland F Wetland E Wetland D Ba r r F o o t e r : A r c G I S 1 0 . 4 , 2 0 1 6 - 1 0 - 2 0 1 4 : 4 7 F i l e : I : \ C l i e n t \ V B W D \ D i s t r i c t \ W o r k _ O r d e r s \ O u t _ o f _ S c o p e \ S i t e _ O v e r v i e w _ M a p p i n g \ 2 0 1 6 _ S i t e m a p s \ S W _ G o e t s c h e l \ F i g 0 2 _ S W _ G o e t s c h e l _ O v e r v i e w _ M a p _ D e v e l o p e d . m x d U s e r : m b s 2 Primary Overflow Secondary Overflow Wetland Wet Pond Infiltration Basin Developed Inundation Extents Labeledwith 1% Probability Flood Level (ft) Developed Subwatersheds Original Goetschel Pond Subwatershed Contours (DNR, November 2011) 2-Foot Contour 10-Foot Contour Imagery: USDA NAIP, 2015 I 250 0 250 Feet Figure 3 SOUTHWEST GOETSCHELDEVELOPED WATERSHED DETAILValley Branch Watershed DistrictWashington County, Minnesota *Vertical Datum: NAVD88 % % % % % % La k e E l m o A v e N 43rd St N 456717 919.9 914.7 917 916.3 916.6 93 0 92 0 93 0 920 9 1 0 92 0 920 9 4 0 920 Wetland A 9 3 8 9 3 6 9 3 4 93 2 92 8 92 6 92 4 92 2 91 8 91 6 91 4 91 2 92 8 92 6 92 4 92 2 918 932 914 91 6 9 1 4 9 1 2 9 0 8 92 4 92 2 91 6 916 914 922 91 4 91 2 91 6 91 4 91 4 912 91 2 906 918 9 2 2 91 6 90 4 Ba r r F o o t e r : A r c G I S 1 0 . 4 , 2 0 1 6 - 1 0 - 2 1 1 5 : 2 1 F i l e : I : \ C l i e n t \ V B W D \ D i s t r i c t \ W o r k _ O r d e r s \ O u t _ o f _ S c o p e \ S i t e _ O v e r v i e w _ M a p p i n g \ 2 0 1 6 _ S i t e m a p s \ S W _ G o e t s c h e l \ F i g 0 4 _ L a k e _ E l m o _ A v e _ D e t a i l . m x d U s e r : m b s 2 %Depression Area Low Point Overflow Elevation (ft) Inundation to 914.7 Feet(Overflow Elevation) Inundation to 916.9 Feet(100-Year Flood Level) Developed Subwatersheds Original Goetschel Pond Subwatershed Culvert (Approximate Location) Contours (DNR, November 2011) 2-Foot Contour 10-Foot Contour Imagery: Washington County, 2013 I 80 0 80 Feet Figure 4 LAKE ELMO AVENUE DETAILValley Branch Watershed DistrictWashington County, Minnesota *Vertical Datum: NAVD88 ! KruegerOutbuilding Veronica's Pond Li l y Av e N 44th St Lit t l e Blu e Cir N L e a f A v e N Stillwa t e r B l v d N LittleBlueCir N Li l y Av e N La k e E l m o A v e N La v e r n e A v e N 44 t h S t L a L i t t l e B l u e S t e m T r N Li l y A v e N Lady Slipper La N Little B l u e S t e m L a 43rd St N 39th St N 456717 456714 920 94 0 90091 0 94 0 9 5 0 92 0 9 5 0 940 930 930 930 940 93 0 930 940 940 92 0 9 3 0 910 930 910 930 930 9 3 0 930 920 920 90 0 890 9 3 0 930 910 9 0 0 906 904 922 918 916 924 914 926 908 938 92 2 91 2 90 8 9 0 2 8 9 8 8 9 6 8 9 2 904 894 91 4 93 8 9 3 4 9 3 2 926 924 928 922 944 932928 924 92 6 92 2 9 6 2 9 5 8 95 6 9 5 4 9 4 8 94 6 92 8 926 924 922 92 4 9 4 8 9 4 6 952 944 942 946 942 938 936 942 9 3 8 928926 922 924 922 942 938 938 934 932 934 926 922 918 932 928 928 924 9 1 6 914 906 904 942 93 6 9 3 6 934 938 93 6 932928 926 922 922 922 918 914 912 9 3 6 93 4 92 8 92 6 926 9 2 4 9 3 4 92 8 912 9 0 2 91 8 9 1 6 918 952 944 934 924 9 1 2 96 8 934 932 91 2 948 93 2 9 2 8 9 2 2 9 1 8 9 1 6 90 8 902 934 932 928 924 922 9 1 8 91691 6 914 9 1 4 9 1 2 908 904 902 95 4 954 94 6 948 94 6 9 4 4 94 4 944 942 936 9 3 6 936 9 3 2 932 934 93 2 928 928 928 926 924 926 926 9 2 4 92 2 92 4 9 2 4 922 922 922 922 918 916 918 91 8 918 916 91 6 9 1 6 914 9 1 4 91 2 91 2 912 90 8 9 0 8 906 906 9 0 6 9 0 6 9 0 6 Wetland B Wetland C Wetland A Wetland G Wetland H Wetland F Wetland E Wetland D Ba r r F o o t e r : A r c G I S 1 0 . 4 , 2 0 1 6 - 1 0 - 2 0 1 4 : 4 4 F i l e : I : \ C l i e n t \ V B W D \ D i s t r i c t \ W o r k _ O r d e r s \ O u t _ o f _ S c o p e \ S i t e _ O v e r v i e w _ M a p p i n g \ 2 0 1 6 _ S i t e m a p s \ S W _ G o e t s c h e l \ F i g 0 5 _ P r e D e v e l o p m e n t _ D r a i n a g e _ A r e a s . m x d U s e r : m b s 2 Pre-Development Subwatershed Boundary Downs Lake Watershed Goetschel Pond Watershed Contours (DNR, November 2011) 2-Foot Contour 10-Foot Contour Imagery: Washington County, 2013 I 400 0 400 Feet Figure 5 PRE-DEVELOPMENTDRAINAGE AREASValley Branch Watershed DistrictWashington County, Minnesota *Vertical Datum: NAVD88 Veronica's Pond Li l y Av e N 44th St Lit t l e Blu e Cir N L e a f A v e N Stillwa t e r B l v d N LittleBlueCir N Li l y Av e N La k e E l m o A v e N La v e r n e A v e N 44 t h S t L a L i t t l e B l u e S t e m T r N Li l y A v e N Lady Slipper La N Little B l u e S t e m L a 43rd St N 39th St N 456717 456714 InfiltrationBasin 200 InfiltrationBasin 300 InfiltrationBasin 2 InfiltrationBasin 1 InfiltrationBasin 100 Infiltration Infiltration Wet Pond 200 Wet Pond 2 Wet Pond 3 Wet Pond 4 Wet Pond 100 Wetland B Wetland C Wetland A Wetland G Wetland H Wetland F Wetland E Wetland D Ba r r F o o t e r : A r c G I S 1 0 . 4 , 2 0 1 6 - 1 0 - 2 0 1 5 : 1 3 F i l e : I : \ C l i e n t \ V B W D \ D i s t r i c t \ W o r k _ O r d e r s \ O u t _ o f _ S c o p e \ S i t e _ O v e r v i e w _ M a p p i n g \ 2 0 1 6 _ S i t e m a p s \ S W _ G o e t s c h e l \ F i g 0 6 _ P o s t D e v e l o p m e n t _ D r a i n a g e _ A r e a s . m x d U s e r : m b s 2 Wetland Wet Pond Infiltration Basin Developed Subwatershed Boundary Downs Lake Watershed Goetschel Pond Watershed Imagery: UDSA NAIP, 2015 I 400 0 400 Feet Figure 6 POST-DEVELOPMENTDRAINAGE AREASValley Branch Watershed DistrictWashington County, Minnesota *Vertical Datum: NAVD88