Loading...
HomeMy WebLinkAboutBolton and Menk Lake Elmo - No Wake Analysis - 12012016 BOLTON I'l IF CITY OF Real People. • • Proposal for City of Lake Elmo SIow No Wake Assessments on Lakes Olson, De Montreville, Jane, and Elmo December 1, 2016 i V�( Special Fishing a �a lw1 7 I r ❑ � �Al p,l w m aq `I i Access Rules ATTENTION WATER ACCESS Keep launch area clear PROJECT =' TZ iw—as .CamPia9 �.. •sMotla9 �r�RR� .auikla fire bass. 1��M n.w: ••�w..aa�..�oic.v Cmsu 'n9 akdwlicRegulationappMNDf=b -Lake Jane. Take Trash With You BO LTO N 2035 County Road D East & M E N K Maplewood, MN 55109-5314 Ph: [6511 704-9970 Real People. Real Solutions. Fax: [6511 704-9971 Bolton-Menk.com December 1,2016 Kristina Handt City Administrator 3800 Laverne Ave,N Lake Elmo,MN 55042 RE: Proposal for Slow No Wake Zone Assessments on Lakes Olson, De Montreville, Jane, and Elmo Dear Ms. Handt: According to your request,Bolton&Menk,Inc.has prepared the following scope of work and associated fees to address Slow No Wake Zone Assessments of Lakes that include Olson,De Montreville,Jane, and Elmo in Lake Elmo. With the exception of Lake Elmo, lake-wide no wake restrictions are triggered when the lakes reach a specific water surface elevation as determined by the Minnesota Department of Natural Resources(MnDNR).Typically,no wake restrictions are determined based on the likelihood of shoreline damage when the lakes are elevated due to flooding. Bolton&Menk's experience understanding shoreline impacts and erosion protection will support the City of Lake Elmo with objective information to make technical and informed decisions in establishing no wake elevations. Our successful approach includes: Unbiased Data —Establishing ordinances that affect lake activities are particularly difficult in communities that have emotional connections to their lake systems. In order to reduce perceived emotional impacts,impartial and objective data is required to establish no wake elevations that are not driven by passionate lake home owners or recreationists. Comprehensive Decisions —Lake regulations impact many users beyond those that live there. Therefore,the decisions that impact no wake limitations must include environmental implications, shoreline property values, and recreational uses. Public Education —The lake users must be informed as to why these elevations are established and what the potential impacts are if these limitations are exceeded in order to fully understand their water resources. Setting the elevation is only a portion of the overall goal; education tells the rest of the story. In continued service to the City of Lake Elmo,we are excited at the opportunity to analyze no wake elevations for several critical lakes. We are flexible in our scope and fees to best suit the City's needs. I will serve as your Project Manager and lead client contact on this project. Please feel free to contact me at 651-724-0404 or timol@bolton-menk.com if you have any questions regarding our proposal. Respectfully submitted, Bolton & Menk, Inc. Timothy J. Olson,P.E.,CFM Water Resources Project Manager Bolton&Menk is an equal opportunity employer. Project Approach Project Approach 1.2 Project Milestone Meetings We anticipate up to two additional meetings with City staff The City of Lake Elmo is seeking an assessment of the at key milestones to ensure project tasks are completed to current no wake restrictions on Lakes Olson,De best meet your needs. Consistent communication between Montreville,Jane, and Elmo and an analysis of the team members will ensure project budgets match the conditions that could potentially change those elevations. required deliverables. We understand that an objective approach to establishing no wake regulations is necessary to bring 1.3 Stakeholder Meetings solidarity to already sensitive interactions between Bolton&Menk will attend one stakeholder meeting once stakeholders. the Project Team has reached consent on an established no wake elevation. It is assumed the City of Lake Elmo will Restrictions to lake uses under flooding conditions begins provide a list of stakeholders and perform all at the local level. The City of Lake Elmo is responsible for communication and establish a meeting place and time. establishing ordinances that protect the shoreline area as well as educate the general public as to why these OPTIONAL: Public Education and Outreach restrictions are important.Bolton&Menk intends to We understand significant value can be added to any provide technical support in establishing those restrictions technical analysis by establishing opportunities for the and is available to provide additional public engagement general public to become educated about the issues and services as directed by future goals.Below is our approach provide valuable feedback. Bolton&Menk has decades of to developing a sustainable assessment of the current no experience working in a public forum to inform citizens on wake restrictions and technical support for modifications technical issues. If the City deems appropriate,Bolton& to the minimum no wake elevations that can be supported Menk will attend one community event to facilitate public by the community and its stakeholders. education and outreach. This includes the following: • Meeting attendance • Preparation of meeting/presentation materials • Meeting minutes This is an optional task. If the City sees added value in this _ - task,we will negotiate a fee at your request. Task 1: Communication 1.1 Kick-off Meeting LL_ - A kick-off meeting will be scheduled immediately after Notice-to-Proceed. The meeting will include the following: • Introduce key City staff to key consulting staff , developing the plan 6d ° • Establish communication protocols associated , with the various aspects of the plan. r r. t. • Formulate a mutually acceptable milestone ' ' schedule ' • Develop cooperation to share available lake information and practical field experience Submitted by Bolton&Menk,Inc. Slow No Wake Zone Assessments I Lake Elmo 1 Project Approach Task 2: Data Collection • Photo collection from lakeside into the shore via 2.1 Geospatial Information boat Bolton&Menk has access to a robust collection of • 2-Dimensional photo collection via unmanned publically available geospatial data that will assist in the drone development of a shoreline assessment. This includes,but o This specific service may provide critical is not limited to: information at a very high resolution for a • Light Detection and Ranging(LiDAR) surface relatively low cost. Bolton&Menk topography currently has federally certified drone • Hydrography data pilots that are willing to provide • MnDNR lake level data additional scope and fees related to 2D • Aerial photography photo collection programs. Bolton&Menk will rely on the City to provide any This is an optional task. If the City sees added value in this additional information regarding known lake and shoreline task,we will negotiate a fee at your request. issues. This information may include the following: • Septic system locations • Private well locations • Lake outlet information(where available) • Known shoreline erosion issues • Known lake flooding issues 2.2 Historic Lake Levels Bolton&Menk will collect historic lake levels for each of the four lakes over the period of record. Lake Olson Historic Lake Levels Task 3: No Wake Analysis 3.1 Analyze Lake Level Data Utilizing the MnDNR lake level information,Bolton& i -ON`h 9:3 3 Menk will: • Establish lake level frequencies using graphical plotting position • Determine lake level frequencies for a variety of return intervals(i.e. 1-year, 5-year, 10-year, etc.) • Compare DNR OHW elevations to lake level frequencies • Assess the number of exceedances for each return interval to understand how often the wave action rsr k will affect shoreline stabilization in a typical year OPTIONAL: Field Data Collection In these early analysis stages,it may not be prudent to 3.2 Analyze Potential Wave Impacts collect any field survey data or other specific site Wave affects can come from boat and wave sources and information. However,Bolton&Menk is fully capable of each has their potential impact to routine shoreline erosion and facilitating the following field data collection procedures: wake implications. The following items will • Resident/recreationist surveys require analysis: • Topographic survey of erosion areas, low floor • Use literature to determine wave heights from elevations,low home openings, septic systems, typical boats at varying distances from the shore • Analyze wave heights from potential wind loads wells,beaches, etc. Submitted by Bolton&Menk,Inc. Slow No Wake Zone Assessments I Lake Elmo 2 Project Approach • Compare and contrast the severity of erosion from boat and wind loading 3.3 Geospatial Evaluation Bolton&Menk will utilize GIS to develop several deliverable products that help convey this technical information in a graphical format. We will perform the s following tasks: • Plot specific lake levels to determine property and NO shoreline impacts without wake61. ~. • Identify shoreline areas that would be affected by wake under a variety of return intervals r WAKE • Identify and quantify risks to shoreline, septic systems,wells,homes, and other structures Y BEFORE • Outline no wake ordinance measures and plan trigger elevations that may be implemented to NOON 6 1 reduce wave-related risks Y Task 4: Summary Report 4.1 Develop Technical Summary Report In a brief report,Bolton&Menk will summarize the technical information collected and substantiate a recommendation for no wake elevations on Lakes Olson, De Montreville,Jane, and Elmo. Submitted by Bolton&Menk,Inc. Slow No Wake Zone Assessments I Lake Elmo 3 Estimated Project Fees Estimated Project Fees Bolton&Menk understands the importance of delivering a project on time and within budget. We closely monitor our time and budget to ensure efficiency of our staff and value to our clients.Any issues relating to requested scope modifications and potential budget impacts will be communicated in a timely manner. The Estimated Project Fee schedule below does not include the OPTIONAL tasks listed in the Project Approach. However,we are prepared to provide those fees to the City as directed by your specific needs.Bolton&Menk is also willing to negotiate our anticipated scope and fees to ensure your direct budgetary and deliverable needs are met with the utmost attention. Detailed Cost Estimate Project: Slow No Wake Zone Assessments Client: City of Lake Elmo Task No. Work Task Description c LU Total Total U L c Hours Cost N G/ W bb 41 O M N a � C 1.0 Communication 20 6 4 30 $3,840 2.0 Data Collection 4 8 8 20 $2,580 3.0 No Wake Analysis 20 28 38 86 $10,880 4.0 Summary Report 8 30 20 58 $7,700 Total Hours 52 AW 70 194 Average Hourly Rate $125 $150 $110 Subtotal $6,500 $10,800 $7,700 TotalFee $25,000 Submitted by Bolton&Menk,Inc. Slow No Wake Zone Assessments I Lake Elmo 4 Project Team Project Team design,preparation of plans and specifications, and cost and quantity take-off estimates. Bolton&Menk has assembled a highly motivated and Brent Johnson, P.E., CFM experienced group of professionals for the Slow No Wake Water Resources Engineer Zone Assessments on Lakes Olson,De Montreville,Jane, Brent will serve as the lead Water and Elmo. Our team has experience evaluating and Resources Engineer and will oversee developing successful solutions to meet the needs of our data collection and technical analysis clients. We value and understand the importance of of critical shoreline protection. He will ultimately achieving an assessment that can be supported utilize his experience in establishing by stakeholders and implemented efficiently. no wake regulations and analyzing wave action on shoreline erosion to ensure the recommended actions are The Bolton&Menk team is intended to be an extension of accurate and provide a solid foundation for lake regulation. the Lake Elmo City staff,with close coordination between the City's project coordinator and the project team Brent is a Senior Water Resources Engineer who began his maintained at all times. The proposed team provides the career in 1995. He has extensive experience in water optimum combination of accessibility, local knowledge of resources engineering as a consultant and watershed the community, and specialized expertise. Our team will district engineer. Brent has provided engineering services be led by our Project Manager, Tim Olson,who will be for projects involving stormwater management, floodplain supported by key individuals and support staff. Our team mapping, flood damage reduction,bridge and culvert members will work interdependently to build synergy for a sizing, dams, drainage, erosion protection, sediment sustainable solution. control, and lake and stream restorations. Projects have included detailed hydrology and hydraulics modeling and Tint Olson, P.E., CFM analysis using XPSWMM,as well as preparing Project Manager engineering studies,reports,plans, and specifications. Tim will serve as Project Manager for Brent has presented reports at meetings,public hearings, the Slow No Wake Zone Assessment. and conferences. He has supervised and trained engineers He will provide close coordination and other staff assigned to project teams. with the City and their partners. He will serve as the primary contact for Dustin deFelice, EIT the City and provide overall management of the project Design Engineer team and schedule, cost, quality, and scope management Dustin will provide effective data processes. collection and geospatial analysis required to establish no wake Tim is a Water Resources Project Manager who began his elevations. career in 2006. He has worked on the design and development of Comprehensive Stormwater Management Dustin began his water resources career in 2012.His Plans,hydrologic and hydraulic studies, and hydrologic primary responsibilities include the development of plan reviews. His responsibilities include identification hydrologic and hydraulic modeling for preliminary project and discussion of NPDES Phase I&II requirements, layouts.Dustin has extensive experience in HEC-RAS and hydrologic and hydraulic modeling, and identification of HEC-HMS programs. He also has experience in Autodesk alternatives for proposed improvements. He has also Civil 3D software and hydraulic design experience using prepared a multitude of Stormwater Pollution Prevention HydroCAD and Autodesk Storm and Sanitary Analysis. Plans (SWPPP) and submitted associated NPDES Phase 11 Dustin has extensive experience using a variety of Construction Stormwater Permits. Tim has additional hydraulic and water quality software to analyze and design experience with a variety of engineering tasks including stormwater management systems. design computations,preliminary layout and design, research and preparation of preliminary engineering reports,and feasibility studies. He also assists with project Submitted by Bolton&Menk,Inc. Slow No Wake Zone Assessments I Lake Elmo 5