Proposal for
City of Lake Elmo
SIow No Wake Assessments on Lakes Olson, De Montreville, Jane, and Elmo
December 1, 2016
i V�(
Special Fishing
a �a lw1
7 I r
❑ � �Al
p,l
w m aq
`I
i
Access Rules ATTENTION
WATER ACCESS
Keep launch area clear PROJECT
=' TZ iw—as
.CamPia9
�.. •sMotla9 �r�RR�
.auikla fire bass. 1��M n.w: ••�w..aa�..�oic.v
Cmsu 'n9 akdwlicRegulationappMNDf=b
-Lake Jane.
Take Trash With You
BO LTO N 2035 County Road D East
& M E N K Maplewood, MN 55109-5314
Ph: [6511 704-9970
Real People. Real Solutions. Fax: [6511 704-9971
Bolton-Menk.com
December 1,2016
Kristina Handt
City Administrator
3800 Laverne Ave,N
Lake Elmo,MN 55042
RE: Proposal for Slow No Wake Zone Assessments on Lakes Olson, De Montreville, Jane, and Elmo
Dear Ms. Handt:
According to your request,Bolton&Menk,Inc.has prepared the following scope of work and associated
fees to address Slow No Wake Zone Assessments of Lakes that include Olson,De Montreville,Jane, and
Elmo in Lake Elmo. With the exception of Lake Elmo, lake-wide no wake restrictions are triggered when
the lakes reach a specific water surface elevation as determined by the Minnesota Department of Natural
Resources(MnDNR).Typically,no wake restrictions are determined based on the likelihood of shoreline
damage when the lakes are elevated due to flooding. Bolton&Menk's experience understanding
shoreline impacts and erosion protection will support the City of Lake Elmo with objective information to
make technical and informed decisions in establishing no wake elevations. Our successful approach
includes:
Unbiased Data —Establishing ordinances that affect lake activities are particularly difficult in
communities that have emotional connections to their lake systems. In order to reduce perceived
emotional impacts,impartial and objective data is required to establish no wake elevations that are
not driven by passionate lake home owners or recreationists.
Comprehensive Decisions —Lake regulations impact many users beyond those that live there.
Therefore,the decisions that impact no wake limitations must include environmental implications,
shoreline property values, and recreational uses.
Public Education —The lake users must be informed as to why these elevations are established
and what the potential impacts are if these limitations are exceeded in order to fully understand their
water resources. Setting the elevation is only a portion of the overall goal; education tells the rest of
the story.
In continued service to the City of Lake Elmo,we are excited at the opportunity to analyze no wake
elevations for several critical lakes. We are flexible in our scope and fees to best suit the City's needs. I
will serve as your Project Manager and lead client contact on this project. Please feel free to contact me at
651-724-0404 or timol@bolton-menk.com if you have any questions regarding our proposal.
Respectfully submitted,
Bolton & Menk, Inc.
Timothy J. Olson,P.E.,CFM
Water Resources Project Manager
Bolton&Menk is an equal opportunity employer.
Project Approach
Project Approach 1.2 Project Milestone Meetings
We anticipate up to two additional meetings with City staff
The City of Lake Elmo is seeking an assessment of the at key milestones to ensure project tasks are completed to
current no wake restrictions on Lakes Olson,De best meet your needs. Consistent communication between
Montreville,Jane, and Elmo and an analysis of the team members will ensure project budgets match the
conditions that could potentially change those elevations. required deliverables.
We understand that an objective approach to
establishing no wake regulations is necessary to bring 1.3 Stakeholder Meetings
solidarity to already sensitive interactions between Bolton&Menk will attend one stakeholder meeting once
stakeholders. the Project Team has reached consent on an established no
wake elevation. It is assumed the City of Lake Elmo will
Restrictions to lake uses under flooding conditions begins provide a list of stakeholders and perform all
at the local level. The City of Lake Elmo is responsible for communication and establish a meeting place and time.
establishing ordinances that protect the shoreline area as
well as educate the general public as to why these OPTIONAL: Public Education and Outreach
restrictions are important.Bolton&Menk intends to We understand significant value can be added to any
provide technical support in establishing those restrictions technical analysis by establishing opportunities for the
and is available to provide additional public engagement general public to become educated about the issues and
services as directed by future goals.Below is our approach provide valuable feedback. Bolton&Menk has decades of
to developing a sustainable assessment of the current no experience working in a public forum to inform citizens on
wake restrictions and technical support for modifications technical issues. If the City deems appropriate,Bolton&
to the minimum no wake elevations that can be supported Menk will attend one community event to facilitate public
by the community and its stakeholders. education and outreach. This includes the following:
• Meeting attendance
• Preparation of meeting/presentation materials
• Meeting minutes
This is an optional task. If the City sees added value in this
_ - task,we will negotiate a fee at your request.
Task 1: Communication
1.1 Kick-off Meeting LL_ -
A kick-off meeting will be scheduled immediately after
Notice-to-Proceed. The meeting will include the
following:
• Introduce key City staff to key consulting staff ,
developing the plan
6d °
• Establish communication protocols associated ,
with the various aspects of the plan. r r. t.
• Formulate a mutually acceptable milestone ' '
schedule '
• Develop cooperation to share available lake
information and practical field experience
Submitted by Bolton&Menk,Inc. Slow No Wake Zone Assessments I Lake Elmo 1
Project Approach
Task 2: Data Collection • Photo collection from lakeside into the shore via
2.1 Geospatial Information boat
Bolton&Menk has access to a robust collection of • 2-Dimensional photo collection via unmanned
publically available geospatial data that will assist in the drone
development of a shoreline assessment. This includes,but o This specific service may provide critical
is not limited to: information at a very high resolution for a
• Light Detection and Ranging(LiDAR) surface relatively low cost. Bolton&Menk
topography currently has federally certified drone
• Hydrography data pilots that are willing to provide
• MnDNR lake level data additional scope and fees related to 2D
• Aerial photography photo collection programs.
Bolton&Menk will rely on the City to provide any This is an optional task. If the City sees added value in this
additional information regarding known lake and shoreline task,we will negotiate a fee at your request.
issues. This information may include the following:
• Septic system locations
• Private well locations
• Lake outlet information(where available)
• Known shoreline erosion issues
• Known lake flooding issues
2.2 Historic Lake Levels
Bolton&Menk will collect historic lake levels for each of
the four lakes over the period of record.
Lake Olson Historic Lake Levels
Task 3: No Wake Analysis
3.1 Analyze Lake Level Data
Utilizing the MnDNR lake level information,Bolton&
i -ON`h 9:3 3
Menk will:
• Establish lake level frequencies using graphical
plotting position
• Determine lake level frequencies for a variety of
return intervals(i.e. 1-year, 5-year, 10-year, etc.)
• Compare DNR OHW elevations to lake level
frequencies
• Assess the number of exceedances for each return
interval to understand how often the wave action
rsr k
will affect shoreline stabilization in a typical year
OPTIONAL: Field Data Collection
In these early analysis stages,it may not be prudent to 3.2 Analyze Potential Wave Impacts
collect any field survey data or other specific site Wave affects can come from boat and wave sources and
information. However,Bolton&Menk is fully capable of each has their potential impact to routine shoreline erosion
and
facilitating the following field data collection procedures: wake implications. The following items will
• Resident/recreationist surveys require analysis:
• Topographic survey of erosion areas, low floor • Use literature to determine wave heights from
elevations,low home openings, septic systems, typical boats at varying distances from the shore
• Analyze wave heights from potential wind loads
wells,beaches, etc.
Submitted by Bolton&Menk,Inc. Slow No Wake Zone Assessments I Lake Elmo 2
Project Approach
• Compare and contrast the severity of erosion from
boat and wind loading
3.3 Geospatial Evaluation
Bolton&Menk will utilize GIS to develop several
deliverable products that help convey this technical
information in a graphical format. We will perform the s
following tasks:
• Plot specific lake levels to determine property and NO
shoreline impacts without wake61.
~.
• Identify shoreline areas that would be affected by
wake under a variety of return intervals r
WAKE
• Identify and quantify risks to shoreline, septic
systems,wells,homes, and other structures Y BEFORE
• Outline no wake ordinance measures and plan
trigger elevations that may be implemented to NOON
6 1
reduce wave-related risks
Y
Task 4: Summary Report
4.1 Develop Technical Summary Report
In a brief report,Bolton&Menk will summarize the
technical information collected and substantiate a
recommendation for no wake elevations on Lakes Olson,
De Montreville,Jane, and Elmo.
Submitted by Bolton&Menk,Inc. Slow No Wake Zone Assessments I Lake Elmo 3
Estimated Project Fees
Estimated Project Fees
Bolton&Menk understands the importance of delivering a project on time and within budget. We closely monitor our
time and budget to ensure efficiency of our staff and value to our clients.Any issues relating to requested scope
modifications and potential budget impacts will be communicated in a timely manner.
The Estimated Project Fee schedule below does not include the OPTIONAL tasks listed in the Project Approach.
However,we are prepared to provide those fees to the City as directed by your specific needs.Bolton&Menk is also
willing to negotiate our anticipated scope and fees to ensure your direct budgetary and deliverable needs are met with the
utmost attention.
Detailed Cost Estimate
Project: Slow No Wake Zone Assessments
Client: City of Lake Elmo
Task No. Work Task Description c LU Total Total
U L c Hours Cost
N G/ W bb
41
O M N
a � C
1.0 Communication 20 6 4 30 $3,840
2.0 Data Collection 4 8 8 20 $2,580
3.0 No Wake Analysis 20 28 38 86 $10,880
4.0 Summary Report 8 30 20 58 $7,700
Total Hours 52 AW 70 194
Average Hourly Rate $125 $150 $110
Subtotal $6,500 $10,800 $7,700
TotalFee $25,000
Submitted by Bolton&Menk,Inc. Slow No Wake Zone Assessments I Lake Elmo 4
Project Team
Project Team design,preparation of plans and specifications, and cost
and quantity take-off estimates.
Bolton&Menk has assembled a highly motivated and Brent Johnson, P.E., CFM
experienced group of professionals for the Slow No Wake Water Resources Engineer
Zone Assessments on Lakes Olson,De Montreville,Jane, Brent will serve as the lead Water
and Elmo. Our team has experience evaluating and Resources Engineer and will oversee
developing successful solutions to meet the needs of our data collection and technical analysis
clients. We value and understand the importance of of critical shoreline protection. He will
ultimately achieving an assessment that can be supported utilize his experience in establishing
by stakeholders and implemented efficiently. no wake regulations and analyzing wave action on
shoreline erosion to ensure the recommended actions are
The Bolton&Menk team is intended to be an extension of accurate and provide a solid foundation for lake regulation.
the Lake Elmo City staff,with close coordination between
the City's project coordinator and the project team Brent is a Senior Water Resources Engineer who began his
maintained at all times. The proposed team provides the career in 1995. He has extensive experience in water
optimum combination of accessibility, local knowledge of resources engineering as a consultant and watershed
the community, and specialized expertise. Our team will district engineer. Brent has provided engineering services
be led by our Project Manager, Tim Olson,who will be for projects involving stormwater management, floodplain
supported by key individuals and support staff. Our team mapping, flood damage reduction,bridge and culvert
members will work interdependently to build synergy for a sizing, dams, drainage, erosion protection, sediment
sustainable solution. control, and lake and stream restorations. Projects have
included detailed hydrology and hydraulics modeling and
Tint Olson, P.E., CFM analysis using XPSWMM,as well as preparing
Project Manager engineering studies,reports,plans, and specifications.
Tim will serve as Project Manager for Brent has presented reports at meetings,public hearings,
the Slow No Wake Zone Assessment. and conferences. He has supervised and trained engineers
He will provide close coordination and other staff assigned to project teams.
with the City and their partners. He
will serve as the primary contact for Dustin deFelice, EIT
the City and provide overall management of the project Design Engineer
team and schedule, cost, quality, and scope management Dustin will provide effective data
processes. collection and geospatial analysis
required to establish no wake
Tim is a Water Resources Project Manager who began his elevations.
career in 2006. He has worked on the design and
development of Comprehensive Stormwater Management Dustin began his water resources career in 2012.His
Plans,hydrologic and hydraulic studies, and hydrologic primary responsibilities include the development of
plan reviews. His responsibilities include identification hydrologic and hydraulic modeling for preliminary project
and discussion of NPDES Phase I&II requirements, layouts.Dustin has extensive experience in HEC-RAS and
hydrologic and hydraulic modeling, and identification of HEC-HMS programs. He also has experience in Autodesk
alternatives for proposed improvements. He has also Civil 3D software and hydraulic design experience using
prepared a multitude of Stormwater Pollution Prevention HydroCAD and Autodesk Storm and Sanitary Analysis.
Plans (SWPPP) and submitted associated NPDES Phase 11 Dustin has extensive experience using a variety of
Construction Stormwater Permits. Tim has additional hydraulic and water quality software to analyze and design
experience with a variety of engineering tasks including stormwater management systems.
design computations,preliminary layout and design,
research and preparation of preliminary engineering
reports,and feasibility studies. He also assists with project
Submitted by Bolton&Menk,Inc. Slow No Wake Zone Assessments I Lake Elmo 5