Introduction
Whatis a CIP? .................................................................................................................I
Scopeof the Draft CIP.....................................................................................................I
FundingSources...............................................................................................................2
ProjectPriorities...............................................................................................................2
2017-2021 CIP Overview
StreetProjects ..................................................................................................................4
Vehicle Replacement Fund..............................................................................................4
Project Highlights by Department ...................................................................................5
CIP Reports (Appendix)
Projects Listing by Department...................................................................9
Projectsby Year...................................................................................12
Funding Source Summary........................................................................15
Projects by Funding Source......................................................................16
Projects & Funding Sources by Department...................................................20
ProjectDetail.......................................................................................24
INTRODUCTION
What is a CIP?
A Capital Improvement Program, or CIP, is a multi-year(typically 5 years) capital expenditure
plan for a City's infrastructure (such as streets,parks and utility systems), vehicles, equipment
and public buildings. It identifies the major projects needed and desired by the community, their
potential costs and how they would be financed. Including a project in a CIP does not commit
the city to that project. The City Council must specifically authorize each one, and the
associated funding,before any project may proceed. When the CIP is reviewed(ideally annually,
in conjunction with the budgeting process)projects may go forward as planned, advance ahead
of schedule, be removed entirely, or new projects may be added, depending upon changes in
circumstances and priorities.
The Minnesota Land Planning Act requires that the implementation plan portion of the
Comprehensive Plan include a CIP for major infrastructure needs (transportation,wastewater,
water supply,parks and open space) for a five-year time period. Cities often expand the scope of
their CIPs to include other capital needs (major equipment replacements, for example) and
sometimes look beyond the five-year time period, up to 20 years in the future for some projects.
Such projects represent more of a"wish-list"that can be evaluated each time the plan is updated.
As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes
Chapter 473.865 provides that"a local governmental unit shall not adopt any official control or
fiscal device which is in conflict with its comprehensive plan." A fiscal device includes a budget
or bond issue; so it is important that the plan and CIP be kept up to date and in synch with city
budgets.
The primary benefit of a CIP is as a financial planning tool,to help the city plan for the impact of
capital needs on future budgets and property taxes, and to help forecast the need for borrowing to
undertake major projects. The information developed as part of the capital planning process can
help document the need for various projects and help the City Council sort out competing
priorities.
Scope of the CIP
Lake Elmo's CIP includes all capital projects that cost at least$25,000 and have a useful life
span of five years or longer. Projects include all capital needs including major repairs to
buildings and equipment purchases and replacements. Any projects not meeting these
parameters would be reviewed as part of the annual operating budget,but would not be included
in the CIP.
Funding Sources
The CIP identifies a possible funding source(s) for each project listed. The various funding
sources are as follows:
Debt Service Fund Projects financed by borrowing, later to be repaid with
property taxes, and potentially special assessments
depending upon the characteristics of the project.
Vehicle Replacement Fund Internal service fund used to segregate funds set aside for
planned replacements of existing major equipment.
Funds are transferred from operating budgets (primarily
property tax revenues.) The find may also receive funds
realized through debt financing.
General Fund Annual operating budget,primarily funded by property
tax revenues.
Park Improvement Fund Existing City fund, receipts from cash-in-lieu of land park
dedication fees paid by developers and others who
subdivide their land.
Stormwater Fund Funds come from fees paid by users of the system
Wastewater Fund Funds come from fees paid by users on the Wastewater
System
Water Fund Funds come from fees paid by users on the Water System
Municipal State Aid(MSA) State aid funds allocated to the City each year; annual
allocation grows as the City grows.
In addition to these sources, it is possible that future projects could be funded from donations,
grants,user fees or other sources not listed. The City also has a City Facility Fund that was
created during the building of the public works barn. There is no plan to continue contributing to
the fund however there is$272,000 in the fund that could be transferred back to the General
Fund to be used for some of the projects in the CIP.
Project Priorities
Capital improvement projects should be prioritized in some way so that limited funding can be
allocated to those which are most important. This is difficult because the varying nature of the
projects and their benefits and objectives are so disparate as to be essentially not comparable. Some
public agencies have developed elaborate rating and ranking systems to try to set priorities.
Complicated scoring systems may have some disadvantages because they may give a false sense of
objectivity or precision to the priority setting process. Others use simpler systems,or simply do not
try to compare projects that are like"apples and oranges." There is no accepted system or"industry
standard"for prioritizing projects.
The following system has been utilized by staff-
1 Critical or urgent,high-priority projects that should be done if at all
possible; a special effort should be made to find sufficient funding for all
of the projects in this group.
2 Very important,high-priority projects that should be done as funding
becomes available.
3 Important and worthwhile projects to be considered if funding is
available;may be deferred to a subsequent year.
4 Less important,low-priority projects;desirable but not essential.
5 Future Consideration
POLICY/DECISIONS NEEDED
In reviewing the City Assets and the 2017 CIP, the following policies were identified as being
needed:
Lease vs Buy—Leasing vehicles was researched and the leasing programs available were
reviewed. The programs available are such that the entire cost of the vehicle is paid in lease
payments and there is no residual value. Since the City vehicles are well maintained and the
residual value is high, staff does not recommend leasing vehicles as analysis showed the vehicle
cost was 40-50% above current cost with the current low interest rates.
Vehicle Replacement Schedule—The City needs to pass a policy related to all vehicle
replacements. Currently the Fire Department vehicle replacement policy is to replace all
vehicles within 5 years (vehicle warranty period). However the Public Works department keeps
vehicles well beyond their useful lives.
2017-2021 CIP OVERVIEW
For 2017 through 2021, the draft CIP includes 75 separate projects with a total estimated cost of
$33,943,267. All cost estimates are preliminary and based on current dollars. No assumptions
have been made about inflation. It will be important to refine and update costs when the plan is
reviewed, especially for projects in the first year or two of the plan.
Some projects beyond the five-year planning period are also included in the CIP. Most of these
projects are replacements for equipment and vehicles (such as fire trucks) which may have a life
span of 10, 15 to 20 years or even more. The plan may include"pending"projects for which
timelines(and in most cases, cost estimates) have not yet been identified. As more information
is developed about the need for, cost and possible funding sources for these projects, they will be
included in future CIP updates.
Street Projects
The draft update includes the following street projects in the CIP:
• PW-007,North Tri Lakes area streets are planned for reconstruction in 2017. Also, streets
included in Phase Three of the downtown area are programmed for 2017. Total project
costs are$2,320,000.
• PW-009, Manning Trail Reconstruction, for$23,730 in 2017. This is a joint project with
Washington County completed in 2016.
• PW-011, 38`h, 39th, Innsdale and Phase Four of the downtown area are planned for
reconstruction in 2018 for an estimated cost of$1,560,000
• PW-013, 36", 37ih, Irwin streets, south Tri Lakes, and Phase Five of the downtown area
are planned for reconstruction in 2019 at an estimated cost of$1,750,000.
• PW-026, Reclaim roads in Heritage Farms, Stonegate 2"a and Phase Six of downtown
area for$2,030,000 in 2020
• PW-027, Reconstruction of roads in Fields of St Croix, Tamarack Farms, and Hamlet on
Sunfish Lake for$1,159,000 in 2021.
• PW-033, CSAH 13 (Ideal Ave) Phase One reconstruction is planned for 2017 at an
estimated cost of$300,000.
• PW-034, 15" St N(MSA Street) for$950,000 in 2018 (new)
• PW-035, UP RR Crossing-Village Parkway for$500,000 in 2018 (new)
• PW-036, UP RR-Crossing-Private Drive Closure for$100,000 in 2018 (new)
• PW-037, UP RR Crossing-Klondike Ave for$250,000 in 2018 (new)
Vehicle Replacement Fund
City staff recommended consideration of a Vehicle Replacement Fund to set aside funds on an
annual basis for planned replacement of vehicles and major pieces of operating equipment. The
fund receives transfers from the operating budget of each department depending on its equipment
needs. This allows the departmental budgets for each major function to accurately show the
costs of funding that function, including equipment,while segregating the funds from the
operating budgets. Any revenues from the sale of old equipment being replaced are also
deposited into the fund.
The Finance Committee did not recommend this method of funding vehicles. Their preference is
to fund them as necessary or consider a leasing alternative.
Project Highlights by Department
Administration/Finance:
➢ AF-001,New City Hall, is the only request in this department. The CIP proposes
completing a space needs study in 2017 to begin the planning process. Finance
Committee and Council should discuss if a new fire station and/or public works barn
expansion should also be included in this study. A$5 million cost for a new facility has
been included merely as a place holder until the space needs study is completed and the
date of construction is To Be Determined at this point.
Building Department:
➢ B-001, Replacement of the Inspection Vehicle for $25,000 in 2017.
Fire:
➢ F-001, Rescue Engine E2 replacement at a cost of$550,000 in 2017
➢ F-002, Purchase of land for a combined fire station for$350,000 in 2017 (moved to
pending by Finance Cmte on 5/10/16)
➢ F-003, Replace the Tahoe CV2 for$55,000 in 2017
➢ F-004, Replace Tender 1 for$450,000 in 2018
➢ F-005, Replacement of the parking lot at Station 2 for$87,560 in 2018. This is
dependent upon the plans for future use of the building.
➢ F-006, Replacement of U2 Truck for$75,000 in 2019
➢ F-007, Self-Contained Breathing Apparatus(SCBA)replacements for$207,000 in 2019
➢ F-008, Construction of a New Combine Fire station for$3,000,000 in 2020 (moved to
pending by FC on 5/10/16)
➢ F-009, Replace Tahoe CV1 for$55,000 in 2020.
➢ F-010, Replace B1 for$70,000 in 2021.
Parks and Recreation:
➢ PR-001, Manning Trail Updates for$13,200 in 2017. This is a joint project with
Washington County that is being completed in 2016. Payment to County in 2017.
➢ PR-002, 50th Street Trail. (Parks Commission recommended deleting this until more
information about the trail and development occurs along 50th St)
➢ PR-003, Demontreville Park Improvements for$75,000 in 2017 (improvements and
addition of baseball field, fencing, etc) and$30,000 in 2018 (pavilion). (moved to
pending by FC on 8/23/16)
➢ PR-004, Lions Park Renovation for$150,000 in 2017. The RFP results were received
but only one was initially complete. Staff has received additional RFP submissions which
are within the$150k estimated amount(moved to pending by FC on 8/23/16).
➢ PR-005,Pebble Park Improvements for$55,738 in 2017 (paving parking area and two
volleyball courts) and $80,000 in 2018 (restrooms, lighting and security features).
(moved to pending by FC on 8/23/16)
➢ PR-006, Reid Park Improvements for$50,000 in 2018 (this would be a grant or in-kind
donation for mountain bike trails) and $134,250 in 2019 (restrooms, tot lot, outdoor gyro
stations,bleachers (to be donated), extending fencing, and elimination of basketball court
(Phase II) (moved to pending by FC on 8/23/16)
➢ PR-007, Sunfish Lake Park Improvements for$2,000 in 2017 (benches) and $148,873 in
2019 (parking lot paving and improve trails to ADA standards). (moved to pending by
FC on 8/23/16)
➢ PR-009, Lake Elmo Regional Trail for$827,316 in 2020 and $765,600 in 2021. This
project would be 75% grant funded and is dependent upon County participation. The
City share is estimated at$398k.
➢ PR-010, Pickup Truck for$30,000 in 2017. This would be a new pickup dedicated to
Parks and Rec functions. Funding would come from the general fiend.
Public Works:
➢ Street Projects were mentioned above
➢ PW-002,Dump Truck with Plow Wing and Sander, for$225,000 in 2017
➢ PW-004. Loader, for$185,000 in 2019
➢ PW-006,Tractor, for$80,000 in 2018
➢ PW-010, Hunters Crossing Turn Lane, for$50,000 in 2017. The developer will pay
$25,000 of the cost.
➢ PW-014, Pickup Replacement, for$30,000 in 2017
➢ PW-016, Pickup Replacement, for$30,000 in 2018
➢ PW-017, Expansion of Salt Shed, for$50,000 in 2019
➢ PW-018, Barn Expansion, for$700,000 in 2019
➢ PW-019, Pickup Replacement, for$30,000 in 2020
➢ PW-020, Pickup Replacement, for$30,000 in 2021
➢ PW-021. 1 Ton Replacement, for$70,000 in 2019
➢ PW-022, Dump Truck with Plow Wing and Sander, for$225,000 in 2019
➢ PW-023, Vac Trailer, for$45,000 in 2018
➢ PW-028, CSAH 15/501h Street Temp Signal Imp, for$60,000 in 2017
➢ PW-029, CSAH 19/Hudson Blvd Signal and Turn Lane for$500,000 in 2019
➢ PW-030, CSAH 15/301h St Signal(Manning) for$100,000 in 2020
Sewer System:
➢ S-001, Hudson Blvd Lift Station, for$500,000 in 2017
➢ S-002, Olson Lake Trail Sewer Phase 2, for$260,000 in 2017
➢ S-003, Sunfish Lake Sewer(Includes Hamlet), for$240,000 in 2018. This is per an
agreement with MPCA
➢ S-004, Old Village Sewer Extension Phase Four, for$350,000 in 2018
➢ S-005, Old Village Sewer Extension Phase Five, for$450,000 in 2019
➢ S-007, Utility Vehicle, cost split between water and sewer funds in 2018. Sewer portion
is $12,000
➢ S-008, Lift Station#1 add permanent generator, for$80,000 in 2018
➢ S-011, Old Village Sewer Extension Phase Three for$400,000 in 2017
➢ S-012, Section 36 Trunk Sewer for$1,500,000 in 2021
➢ S-013, Sewer Oversizing for$129,000 in 2017 and$35,000 in 2018
Storm Water System:
➢ SW-001, Phase 2 Regional Drainage Improvements for$1,200,000 in 2018 and $800,000
in 2019;NOTE: Less urgent due to Downtown Improvements.
➢ SW-002,Phase 3 Regional Drainage Improvements for$500,000 in 2020 (new);NOTE:
Less urgent due to Downtown improvements.
➢ SW-004, Surface Water Management Plan (Comp Plan)update for$40,000 in 2018
➢ SW-005, Storm Sewer System Improvements for$50,000 each of the next five years
(moved to pending by Finance Committee since no specifics available)
Water System:
➢ W-001, 361h, 37 b and Irwin water main for$300,000 in 2019
➢ W-002, 38t", 30 and Innsdale water main for$600,000 in 2018
➢ W-003, Old Village water extension Phase Four, for$350,000 in 2018
➢ W-005, Old Village water main Phase Five, for$450,000 in 2019
➢ W-006, Elevated Storage Tank#3, for$200,000 in 2019 and 2,800,000 in 2020
➢ W-007, Hammes Estates Bypass, for$120,000 in 2017
➢ W-008, Village East Trunk Water main, for$120,000 in 2018
➢ W-009, Utility Vehicle, shared with sewer fund. Water fund portion is $48,000
➢ W-011, Well#2 Pull and rebuild pump for$25,000 in 2017
➢ W-013,Water main Oversizing for$201,000 in 2017, $215,000 in 2018 and $42,000 in
2019. (new)
➢ W-015, Old Village Phase Three, for$400,000 in 2017
➢ W-016, Hidden Meadows Trunk Water Main Connection for$350,000 in 2020.
➢ W-017, Water Main replacement consistent with 2020 Street Replacement for$50,000 in
2020
➢ W-018, Water Main replacement consistent with 2021 Street Replacement for$50,000 in
2021.
➢ W-019, SCADA System Upgrade for$30,000 in 2022
City of Lake Elmo
Capital Improvement Program
2017-2021
Appendix
City of Lake Elmo, Minnesota
Capital Improvement Plan - 2017 - 2021
PROJECT LISTING
Admin/Finance Department
Status Project# Project Name
New Recommendation AF-001 New City Hall Facility
Building Department
Status Project# Project Name
New Recommendation B-001 Replacement Inspection Truck
Fire Department
Status Proiect# Project Name
Pending F-002 Purchase Land for Combined Station
Pending F-008 New Combined Fire Station
Completed F-003 CV 2(Tahoe)
Active F-001 Rescue Engine E2
Active F-004 Tender 1
Active F-005 Replacement of Parking Lot at Station#2
Active F-006 Replacement of U2 truck
Active F-007 SCBA Replacements
New Recommendation F-010 B 1
New Recommendation F-011 E1 Engine
New Recommendation F-012 B 2
New Recommendation F-013 T2 Tender/Engine
New Recommendation F-014 Boat and Trailer
New Recommendation F-015 Ranger
New Recommendation F-016 L1 Ladder Truck
Parks and Recreation
Status Proiect# Proiect Name
Pending PR-003 Demontreville Park Improvements
Pending PR-004 Lions Park Renovations
Pending PR-005 Pebble Park Improvements
Pending PR-006 Reid Park Improvements
Pending PR-007 Sunfish Lake Park Improvements
Active PR-001 Manning Trail Updates
Active PR-002 50th Street Trail
New Recommendation PR-008 Tablyn Park Improvements
New Recommendation PR-009 Lake Elmo Regional Trail
New Recommendation PR-010 Pickup Truck
New Recommendation PR-011 Savona Park
jPublic Works Department
Status Proiect# Proiect Name
Active PW-002 Dump Truck/Plow wing/Sander
Active PW-004 Loader
Active PW-006 Tractor
Active PW-007 2017 Street Improvements
Active PW-009 Manning Trail Reconstruction CSAH 15
Active PW-010 Hunters Crossing Turn Lane
Active PW-011 2018 Street Improvements
Produced[.'sing the Plan-It Capital PlanningSofhrare Page I Tluirsday,December 01,2016
Active PW-013 2019 Street Improvements
New Recommendation PW-014 Pickup Truck
New Recommendation PW-016 Pickup Truck
New Recommendation PW-017 Expansion of Salt Shed
New Recommendation PW-018 Bam Expansion
New Recommendation PW-019 PickupTruck
New Recommendation PW-020 Pickup Truck
New Recommendation PW-021 1 Ton Truck
New Recommendation PW-022 Dump Truck/Plow/Sander
New Recommendation PW-023 Vac Trailer
New Recommendation PW-026 2020 Street Improvements
New Recommendation PW-027 2021 Street Improvements
New Recommendation PW-028 CSAH15/50th Street Temp Signal Imp.
New Recommendation PW-029 CSAH19/Hudson Blvd Signal&Turn Lane
New Recommendation PW-030 CSAH 15130th Street Signal
New Recommendation PW-031 CSAH 6/Inwood Signal
New Recommendation PW-033 CSAH13-Ideal Avenue Improvements
New Recommendation PW-034 15th Street North(MSA Street)
New Recommendation PW-035 UP RR Crossing-Village Parkway
New Recommendation PW-036 UP RR Crossing-Private Drive Closure
New Recommendation PW-037 UP RR Crossing:Klondike Ave
New Recommendation PW-038 2022 Street Improvements
New Recommendation PW-039 2023 Street Improvements
New Recommendation PW-040 2024 Street Improvements
New Recommendation PW-041 2025 Street Irmprovements
New Recommendation PW-042 2026 Street Improvements
Sewer Department
Status Project# Project Name
Active S-001 Hudson Blvd Lift Station
Active S-002 Olson Lake Trail Sewer Phase 2
Active S-003 Sunfish Lake Sewer Extension&Lift Station
Active 5-004 Old Village Sewer Extension Phase 4
Active S-005 Old Village Sewer Extension Phase 5
New Recommendation S-007 Utility Vehicle
New Recommendation S-008 Lift Station 1-Add permanent generator
New Recommendation S-011 Old Village Sewer Extension Phase 3
New Recommendation S-012 Section 36 Trunk Sewer Main
New Recommendation S-013 Sewer Oversizing
Storm Water Department
Status Project# Project Name
Pending SW-005 Storm Sewer System Improvements
New Recommendation SW-001 Phase 2 Regional Drainage Improvements
New Recommendation SW-002 Phase 3 Regional Drainage Improvements
New Recommendation SWO03 Kramer Lake Floodplain Study
New Recommendation SW-004 Surface Water Management Plan(Comp Plan)update
Water Department
Status Project# Project Name
Pending W-006 Elevated Storage Tank#3
Active W-001 2019 Street Improvement Project-water component
Active W-002 2018 Street Improvement Project-water component
Active W-003 OV sewer extension phase 4;water component
Active W-004 Pressure Reduction Station-Connection to WT#3
Active W-005 OV Sewer Extension;Phase 5;water component
Active W-007 Hammes Estates 12"bypass
Produced Using the Plan-It Capital Planning Safh+,are Pane 2 Thursday,December 01,2016
Active W-008 Village East Trunk Watermain
New Recommendation W-009 Utility Vehicle
New Recommendation W-010 Paint Water Tank at PW
New Recommendation W-011 Well#2 Pull and rebuild pump
New Recommendation W-012 Well#4 Pump-Pull and Rebuild
New Recommendation W-013 Watermain Oversizing
New Recommendation W-014 Well&Pumphouse#5
New Recommendation W-015 OV Sewer Extension Phase 3;water component
New Recommendation W-016 Hidden Meadows Trunk Watermain Connection
New Recommendation W-017 2020 Street&Utility Improvements-Water
New Recommendation W-018 2021 Street&Utility Improvements-Water
New Recommendation W-019 SCADA Upgrade
Produced Clsing the Plan-It Capital Planning SgftIvare Page 3 Thra•sdar.December 01.2016
City of Lake Elmo, Minnesota
Capital Improvement Plan - 2017 - 2021
2017 thru 2021
PROJECTS BY YEAR
Project Name Department Project# Priority Project Cost
2017
New City Hall Facility Admin/Finance Department AF-001 3 15,000
Replacement Inspection Truck Building Department 8-001 2 25,000
Purchase Land for Combined Station Fire Department F-002 1 350,000
CV 2(Tahoe) Fire Department F-003 3 42,000
Manning Trail Updates Parks and Recreation PR-001 2 13,200
50th Street Trail Parks and Recreation PR-002 2 140,000
Demontreville Park Improvements Parks and Recreation PR-003 2 75,000
Lions Park Renovations Parks and Recreation PR-004 1 150,000
Pebble Park Improvements Parks and Recreation PR-005 3 55,738
Sunfish Lake Park Improvements Parks and Recreation PR-007 3 2,000
Pickup Truck Parks and Recreation PR-010 1 30,000
Savona Park Parks and Recreation PR-011 1 150,000
Dump Truck/Plow wing/Sander Public Works Department PW-002 1 225,000
2017 Street Improvements Public Works Department PW-007 3 2,320,000
Manning Trail Reconstruction CSAH 15 Public Works Department PW-009 3 23,730
Hunters Crossing Turn Lane Public Works Department PW-010 3 50,000
Pickup Truck Public Works Department PW-014 1 30,000
CSAH15/50th Street Temp Signal Imp. Public Works Department PW-028 3 60,000
CSAH13-Ideal Avenue Improvements Public Works Department PW-033 3 300,000
Hudson Bivd Lift Station Sewer Department S-001 2 500,000
Olson Lake Trail Sewer Phase 2 Sewer Department S-002 3 260,000
Old Village Sewer Extension Phase 3 Sewer Department S-011 3 400,000
Sewer Oversizing Sewer Department S-013 3 129,000
Storm Sewer System Improvements Storm Water Department SW-005 3 50,000
Hammes Estates 12"bypass Water Department W-007 4 120,000
Well#2 Pull and rebuild pump Water Department W-011 3 25,000
Watermain Oversizing Water Department W-013 3 201,000
OV Sewer Extension Phase 3;water component Water Department W-015 3 400,000
Total for 2017 6,141,668
2018
Rescue Engine E2 Fire Department F-001 1 550,000
Tender 1 Fire Department F-004 1 450,000
Replacement of Parking Lot at Station#2 Fire Department F-005 4 87,560
Demontreville Park Improvements Parks and Recreation PR-003 2 30,000
Pebble Park Improvements Parks and Recreation PR-005 3 80,000
Reid Park Improvements Parks and Recreation PR-006 3 50,000
Tractor Public Works Department PW-006 2 80,000
2018 Street Improvements Public Works Department PW-011 3 1,560,000
Pickup Truck Public Works Department PW-016 2 30,000
Vac Trailer Public Works Department PW-023 3 45,000
15th Street North(MSA Street) Public Works Department PW-034 3 950,000
UP RR Crossing-Village Parkway Public Works Department PW-035 3 500,000
UP RR Crossing-Private Drive Closure Public Works Department PW-036 3 100,000
Produced Using the Plan-11 Capital Planning Sojnrarc Page I Thursday,December 01.2016
Project Name Department Project# Priority Project Cost
UP RR Crossing:Klondike Ave Public Works Department PW-037 3 250,000
Sunfish Lake Sewer Extension&Lift Station Sewer Department S-003 3 240,000
Old Village Sewer Extension Phase 4 Sewer Department S-004 3 350,000
Utility Vehicle Sewer Department S-007 2 12,000
Lift Station 1-Add permanent generator Sewer Department S-008 2 80,000
Sewer Oversizing Sewer Department S-013 3 35,000
Phase 2 Regional Drainage Improvements Storm Water Department SW-001 3 1,200,000
Surface Water Management Plan(Comp Plan)update Storm Water Department SW-004 3 40,000
Storm Sewer System Improvements Storm Water Department SW-005 3 50,000
2018 Street Improvement Project-water component Water Department W-002 3 600,000
OV sewer extension phase 4;water component Water Department W-003 3 350,000
Village East Trunk Watermain Water Department W-008 2 120,000
Utility Vehicle Water Department W-009 2 48,000
Watermain Oversizing Water Department W-013 3 215,000
Total for 2018 8,102,560
2019
Replacement of U2 truck Fire Department F-006 1 75,000
SCBA Replacements Fire Department F-007 1 207,000
Reid Park Improvements Parks and Recreation PR-006 3 134,250
Sunfish Lake Park Improvements Parks and Recreation PR-007 3 148,873
Loader Public Works Department PW-004 2 185,000
2019 Street Improvements Public Works Department PW-013 3 1,750,000
Expansion of Salt Shed Public Works Department PW-017 4 50,000
Bam Expansion Public Works Department PW-018 4 700,000
1 Ton Truck Public Works Department PW-021 3 70,000
Dump Truck/Plow/Sander Public Works Department PW-022 2 225,000
CSAH191Hudson Blvd Signal&Turn Lane Public Works Department PW-029 3 500,000
Old Village Sewer Extension Phase 5 Sewer Department S-005 3 450,000
Phase 2 Regional Drainage Improvements Storm Water Department SW-001 3 800,000
Storm Sewer System Improvements Storm Water Department SW-005 3 50,000
2019 Street Improvement Project-water component Water Department W-001 3 300,000
OV Sewer Extension;Phase 5;water component Water Department W-005 3 450,000
Elevated Storage Tank#3 Water Department W-006 3 200,000
Watermain Oversizing Water Department W-013 3 42,000
Total for 2019 6,337,123
2020
New Combined Fire Station Fire Department F-008 1 3,000,000
Lake Elmo Regional Trail Parks and Recreation PR-009 3 827,316
PickupTruck Public Works Department PW-019 4 30,000
2020 Street Improvements Public Works Department PW-026 3 2,030,000
CSAH 15130th Street Signal Public Works Department PW-030 3 100,000
Phase 3 Regional Drainage Improvements Storm Water Department SW-002 3 500,000
Stomi Sewer System Improvements Storm Water Department SW-005 3 50,000
Elevated Storage Tank#3 Water Department W-006 3 2,800,000
Hidden Meadows Trunk Watermain Connection Water Department W-016 3 350,000
2020 Street&Utility Improvements-Water Water Department W-017 3 50,000
Total for 2020 9,737,316
� 2021
B 1 Fire Department F-010 3 70,000
Lake Elmo Regional Trail Parks and Recreation PR-009 3 765,600
Pickup Truck Public Works Department PW-020 4 30,000
Produced Using the Plan-It Capilal Planning Softivare Page 2 ThursdaY,December 01.2016
Project Name Department Project# PrioritNI Project Cost
2021 Street Improvements Public Works Department PW-027 3 1,159,000
Section 36 Trunk Sewer Main Sewer Department S-012 3 1,500,000
Storm Sewer System Improvements Storm Water Department SW-005 3 50,000
2021 Street&Utility Improvements-Water Water Department W-018 3 50,000
Total for 2021 3,624,600
GRAND TOTAL 33.943,267
Produced Using the Plan-11 Capital Planning Software Page 3 l hursdav, December 01,2016
City of Lake Elmo, Minnesota
Capital Improvement Plan - 2017 - 2021
2017 thru 2021
FUNDING SOURCE SUMMARY
Source 2017 2018 2019 2020 2021 Total
Debt Service 3,297,000 6,797,560 4,827,000 8,430,000 2,729,000 26,080,560
General Fund 118,730 30,000 50,000 30,000 30,000 258,730
Grants/Donation 27,000 50,000 620,487 574,200 1,271,687
Park Dedication Fund 613,938 110,000 283,123 206,829 191,400 1,405,290
Sewer Fund 1,289,000 477,000 450,000 2,216,000
Storm Water Fund 50,000 90,000 50,000 50,000 50,000 290,000
Water Fund 746,000 733,000 492,000 400,000 50,000 2,421,000
GRAND TOTAL 6,141,668 8,287,560 6,152,123 9,737,316 3,624,600 33,943,267
Produced Using the Plan-11 Capilal Planning Sofnrare Pa.-e 1 Thursday.December 01.2016
City of Lake Elmo, Minnesota
Capital Improvement Plan - 2017 - 2021
2017 thr u 2021
FUNDING SOURCE SUMMARY
Source 2017 2018 2019 2020 2021 Total
Debt Service 3,297,000 6,797,560 4,827,000 8,430,000 2,729,000 26,080,560
General Fund 118,730 30,000 50,000 30,000 30,000 258,730
Grants/Donation 27,000 50,000 620,487 574,200 1,271,687
Park Dedication Fund 613,938 110,000 283,123 206,829 191,400 1,405,290
Sewer Fund 1,289,000 477,000 450,000 2,216,000
Storm Water Fund 50,000 90,000 50,000 50,000 50,000 290,000
Water Fund 346,000 733,000 492,000 400,000 50,000 2,021,000
CRAND TOTAL 5,741,668 8,287,560 6,152,123 9,737,316 3,624.600 33,543,267
Produced Using the Plan-It Capital Planning Softirare Paee I Thursdav,December 01,2016
_ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08 0 0 0 0 08 0 0 0 0 0
0 0 0 o co 0 0 0 C. 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0
R O o O c Lo O o 0 0 0 c O o O O o o O O O O O o O O o 0 o O C
w+ O O N O r wi r- O O Lo cri O O O O O O h L6 O of O O O O c O O O -�
F Lo Q O O O N O co N c0 h O N V c") CO co O O O cry O O Lo
47 c7 R cV O cV C") W r\ N O Lo e- c") m Lo N C
M cV e- .� cy e-
i
v
J
o o
N o C
N L Q
3
� h
t�
N o 0 0
C c o
N o o Op
c) N
O O O O cD C) O O
W O O O O O O O O
O el Lo f` O tO O O- N Lo O
U N t- I-- N u'7
N a
4� 1
0 0 0 0 0 0 c) 0 0 0 0
O o co 0 0 0 0 0 0 0 0
rn -� o o Lq o C 0 cz 0 (:: 0 0
(/� N o o r- V) C. o u-i o 0 0 0
rr y rn o 0o ao aD co .:I- rn o o rn
V) V' U7 m lf) N
F cy �-
Q ~ t- Cl 0 o O 00 O
A o0 0 0 0 c
CD C14 0.' N Z N M N `No' co coo''
N G�II
m -�r — i- i- M N M m m r M N m M m m m m m m m M M
a N
O k
i O O O O O O ~ O N N N N N N N nOj C`�3 M Co M M
c) Cn c0 � O O O O O 0 0 O O O O O O O 0 0 O O 0 0
� O v o 0 0 0 0 0 0 0
Li Li Li ci li Li ui U- Li CL a a a a- a a d a a a a a a a a a a a a y
sz
v a
N (U
C
o C a J j ti
E E m N
m :° = E T o 4
N a) co U
@ rn o y ? :�
cn 6
J o m w rn ` rn a m e E T d �
C E c N c E E
E rn m m a) o a) a) a) m rn o
o C .�� n E E E m E E C o Q w > c C
6) N U (O N C �+ j ? 0) ? > N m N j U y
W o a o ii 3 0 0 0 3 0 0 > a`
o -o 0 o E 'o o n n n c o n a o Q rn rn o)
c c w a) d E E E 2 a E E Y No ami o c E c
c0 C N N N h
U lL J L N N O_ U N N N m U U N N � m m . Z O O O
a) E E w E E E a) d n E E a`� a) m a)
w : N N m O f- x F 'Cp } O) N U U U
c=i L a) _N m Q v n N O to Cn fn W c n r F- co Cn
COO6� N 2 N C n d m ?i E f� v O) E O E U N
Q' m U Z m 0 J F- ON N N m �i N ON 0 U U U
_ O O O O O O O O O O O O O O O O O Cl O O O A C. O O O tb C.
O O O O O O O tp O C) tti O O O O O O t") O O ap O tq O O O O M to 1�
CC O O O O O O O tt) O O O O O O O O n O O t0 O tc N O O O I- IV Ic
y O O O O O O O O M1 to m to O O O O O cc O CV V. LO — ^ O to O w V oo
01
e{ O O O O O ClO tb N N N tti ty to tti Cry to to to N ^ O ^ ^ ^ -
N � O O tti co O O N N C
N t7 to
N C
U
_ p O O O p O N
N O O O c N N ti
Q O N OM CO) tl
N to t` to Ln 3
N
tom.
Q
N o 0 = 0 o v v
CD p O o o p O
N to pm I Cl) M m m
N m
~ O O O C O O N a�q
Q
0o M CV aG
w
O O Cl co O O C C O O
Q C) C) p A Cl O p C> c) p
N N N t pp a) M m to to M a0
� t0
O p p p p p O p O O c) C) O p
P C. Cl c) M p p m p p O p p p p Cl)
^I O p p r- p p � Ci p O N p p p tl
Q ti to to M to p co N to � M p to c) to f 1
N N N N N M N N .- r 'o y
OA
M ti
M Cl) M Cl) M M M M N M M , N d- V V m Cl) Cl) cl) N N N M M M
'L
_O
L
a.
yNO N tp 00 O_ 'I*- O � tT N to o, N M It*- w) tp -
(J C> N O O O O O c? O O O O O C) O O O O O O O O O O O
C+ Cl oy o 0 0 LL
o a a 3 a a a
o 6 c6 c/) to s S 3 ¢ ai a a a a a s a Cl- Q Q a a a Q a a a s
L
Cr 3
C
c c O O O
0 o O T2 C
o_ o_ C O
c o o > 7
O N M U U L Li •LQ
N m Ln 0 C
cn A
_ i > 3 3 �n = aL+
J Q
oa o- o- a�oi a�oi G v
o c E E -o o L) c a) i O E a)
m m m a a C, ~ two ., — @ �" o c > o
c c
c c at c 2 -' o -m 3 C to m o
w 3 E E c m E a) d a H E O " o c E c o. C
0 0 > > r aoi o cLi) r E E m w Y > E
3 O O C '� n (D w, ^, a) Y c v o a) s
Y c c a c. m � c m to C p to rn m U - n o co CC
2 g o E E m LL — 'N a
a) r tT tT O O C O U U O Y U ^ O N H Y E d y
u M E E U 2 2 0 2 2 i Y J o U A m y m Y m
N CO a m tT .. E tT E as d
Ln o a) a) in ° :� v c-) S o a o a d a w 5 c a a) a N
C U t6 t0 m c w 3 0_ C C Y Y d Y Y L C Y
O a) L L p p U' a) a) t6 O U U x U U r F, d O m O t6 p a) O a) a) 7
to cn a a N N W Z w = d a- W d a- N d Cn J 2 o J d Q Cn Z.
_ m C) 0 Cl O O O O O O O O M. O O o O C. C, O O CI O O o 0 0 �_
N O O to O O O CDO CD O CI O O O CD O O C) C) 0 C. O O O O O
C; N O O N O O O O O O O O O O O O O O O O O O O O O O O C
�'•� W O O try O O O O c14 C, O �f tD O O O' O O O O co Ld co 0 0 O
O M U'� O (Z> to to U') O O to a In CT to LC] ^ ^ V N LO LO LO KJ tV -
[^ N M V' V' N CV N M V'
r N N
ILI
N
U
r O O O O O O
N v v o 0 C C
h
CD CD
LO Ln LO LO
CA 4
O
NO allo aN0 Cl C 0 = 0
to t0 O O O C) O
N CD N N LOC)OLo
<
M O O O O C) O O
•- O O O O CDO Cl
O
N co LO voi to uoi L v rn
N V --t a
O Cl O C. O O CD CD C:- CD O CD O C).�I O O O O CDO O O O O O O O O
O O O O O O O O O C C O O O
O O O N O W) I- O O O O Cl m
a0 M 1- V LO to LO CN V M
Cl) R m N 1-
O O to O O O O Cl O O O O O O
I� O O M O O O O O O O O O O O
rH O O Q) O O O O O O O O O O O
Q O O m O O O m to O O O LO to M
N co tD LO N VO co' N u7 .N- N N Cary 'L
a)
� c
M N M C) Cl) N CV M M Cl) Cl) M M V N N M M M M Cl)
L
O
'L
a
O O A N !t LO 1� M Cl C, M to � 00 O) �- r t0 qj
V O O O O O O O O O O O O O O O O O O O
'p• a a a cif C6 v6 to cis tip C6 Co to v>
4
a r =
Ft F o. F F
C C c C a) c g C
Gi fi a fy o o .� LZ
n
n c- E c
0 o d E d o o m m y 4
u 3 a E w 3
:D N L L m L m cu 3 E a)CO c rQ
a) a s m a a E
Q M C C G C > L Y O N C O" +' a) a)
t O O a) O 'v„ Oi O N m FmF j m > >
++ to m n C n O O
a�ci co a aEi E t o ,o w v n n
I- R x x x L:. m n _ m m
w w a w c aa)) o o m n F2
o O a`� a`� v a`� a i m N 'C 'N .N w c r' N - bc
-
N Jlb N a) Q N N R (n = Xig
F > p
as o Q m L6 a) a) a) �' c a a�i co 3 Lz, axi w w N `-' �c ami a) a)
i E H a 00 m m m aLi m O �' °) i a`) a`) W w W a "ta
'3 W n cO J - _ > �o = y 3 aa)i a) > N E c (J) Cn .0
O a) Y o + co > > > a`) y m E R h CO E rn Z- � a) o
c aa, r o > > m 1° - a) m y k
J a U) x O O O M J O to to to O O = > _ N N -
C
N C
F � C
M
U
^) b
O a
N m
c+S
O �
N r>
O ti
N ti
Oi
O\ en
O N
N
ro
O �
O c
N co
co
t� co
to
ti c0
C1 � rt
N n
ui -
�L
O
C
U
U
•O_ u
Q
0 �
V
fi
Cl.
t
L �2
vl
O �
� c
i
City of Lake Elmo, Minnesota
Capital Improvement Plan - 2017 - 2021
2017 ti ru 2021
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Total
Admin/Finance Department
New City Hall Facility AF-001 3 15,000 15,000
General Fund 15,000 15,000
Admin/Finance Department Total 15,000 15,000
Building Department
Replacement Inspection Truck B-001 2 25,000 25,000
General Fund 25,000 25,000
Building Department Total 25,000 25,000
Fire Department
Rescue Engine E2 F-001 1 550,000 550,000
Debt Service 550,000 550,000
Purchase Land for Combined Station F-002 1 350,000 350,000
Debt Service 350,000 350,000
Tender 1 F-004 1 450,000 450,000
Debt Service 450,000 450,000
Replacement of Parking Lot at Station#2 F-005 4 87,560 87,560
Debt Service 87,560 87,560
Replacement of U2 truck F-006 1 75,000 75,000
Debt Service 76,000 75,000
SCBA Replacements F-007 1 207,000 207,000
Debt Service 207,000 207,000
New Combined Fire Station F-008 1 3,000,000 3,000,000
Debt Service 3,000,000 3,000,000
B 1 F-010 3 70,000 70,000
Debt Service 70,000 70,000
Fire Department Total 350,000 1,087,560 282,000 3,000,000 70,000 4,789,560
Parks and Recreation
Manning Trail Updates PR-001 2 13,200 13,200
Park Dedication Fund 13,200 13,200
50th Street Trail PR-002 2 140,000 140,000
Park Dedication Fund 140,000 140,000
Demontreville Park Improvements PR-003 2 75,000 30,000 105,000
Park Dedication Fund 75,000 30,000 105,000
Lions Park Renovations PR-004 1 150,000 150,000
Park Dedication Fund 150,000 160,000
Pebble Park Improvements PR-005 3 55,738 80,000 135,738
Park Dedication Fund 65,738 80,000 135,738
Reid Park Improvements PR-006 3 50,000 134,250 184,250
Produced Using the Plan-11 Capital Planning Software Page I 77iursdar.Decemher 1,2016
Department Project# Priority 2017 2018 2019 2020 2021 Total
Grants/Donation 50,000 50,000
Park Dedication Fund 134,250 134,250
Sunfish Lake Park Improvements PR-007 3 2,000 148,873 150,873
Grants/Donation 2,000 2,000
Park Dedication Fund 148,873 148,873
Lake Elmo Regional Trail PR-009 3 827,316 765,600 1,592,916
GrantstDonation 620,487 574,200 1,194,687
Park Dedication Fund 206,829 191,400 398,229
Pickup Truck PR-010 1 30,000 30,000
Park Dedication Fund 30,000 30,000
Savona Park PR-011 1 150,000 150,000
Park Dedication Fund 150,000 150.000
Parks and Recreation Total 615,938 160,000 283,123 827,316 765,600 2,651,977
Public Works Department
Dump Truck/Plow wing/Sander PW-002 1 225,000 225,000
Debt Service 225,000 225,000
Loader PW-004 2 185,000 185,000
Debt Service 185,000 185,000
Tractor PW-006 2 80,000 80,000
Debt Service 80,000 80,000
2017 Street Improvements PW-007 3 2,320,000 2,320,000
Debt Service 2,320,000 2,320,000
Manning Trail Reconstruction CSAH 15 PW-009 3 23,730 23,730
General Fund 23,730 23,730
Hunters Crossing Turn Lane PW-010 3 50,000 50,000
General Fund 25,000 25,000
Grants/Donation 25,000 25,000
2018 Street Improvements PW-011 3 1,560,000 1,560,000
Debt Service 1,560,000 1,560,000
2019 Street Improvements PW-013 3 1,750,000 1,750,000
Debt Service 1,750,000 1,750,000
Pickup Truck PW-014 1 30,000 30,000
General Fund 30,000 30,000
Pickup Truck PW-016 2 30,000 30,000
General Fund 30,000 30,000
Expansion of Salt Shed PW-017 4 50,000 50,000
General Fund 50,000 50,000
Barn Expansion PW-018 4 700,000 700,000
Debt Service 700,000 700,000
PickupTruck PW-019 4 30,000 30,000
General Fund 30,000 30,000
Pickup Truck PW-020 4 30,000 30,000
General Fund 30,000 30,000
1 Ton Truck PW-021 3 70,000 70,000
Debt Service 70,000 70,000
Dump Truck/Plow/Sander PW-022 2 225,000 225,000
Debt Service 225,000 225,000
Vac Trailer PW-023 3 45,000 45,000
Debt Service 45,000 45,000
2020 Street Improvements PW-026 3 2,030,000 2,030,000
Debt Service 2,030,000 2,030,000
2021 Street Improvements PW-027 3 1,159,000 1,159,000
Debt Service 1,159,000 1,159,000
Produced Using the Plan-It Capital Planning Sofnvore Page 2 Thursdav,December 1,2016
Department Project# Priority, 2017 2018 2019 2020 2021 Total
CSAH15/50th Street Temp Signal Imp. PW-028 3 60,000 60,000
Debt Service 60,000 60,000
CSAH19/Hudson Blvd Signal&Turn Lane PW-029 3 500,000 500,000
Debt Service 500,000 500,000
CSAH 15/30th Street Signal PW-030 3 100,000 100,000
Debt Service 100,000 100,000
CSAH13-Ideal Avenue Improvements PW-033 3 300,000 300,000
Debt Service 300,000 300,000
15th Street North(MSA Street) PW-034 3 950,000 950,000
Debt Service 950,000 950,000
UP RR Crossing-Village Parkway PW-035 3 500,000 500,000
Debt Service 500,W0 500,000
UP RR Crossing-Private Drive Closure PW-036 3 100,000 100,000
Debt Service 100,000 1W,000
UP RR Crossing:Klondike Ave PW-037 3 250,000 250,000
Debt Service 250,000 250,000
Public Works Department Total 3,008,730 3,515,000 3,480,000 2,160,000 1,189,000 13,352,730
Sewer Department
Hudson Blvd Lift Station S-001 2 500,000 500,000
Sewer Fund 500,000 5W,000
Olson Lake Trail Sewer Phase 2 S-002 3 260,000 260,000
Sewer Fund 260,000 260,000
Sunfish Lake Sewer Extension&Lift Station S-003 3 240,000 240,000
Debt Service 240,000 240,000
Old Village Sewer Extension Phase 4 S-004 3 350,000 350,000
Sewer Fund 350,000 350,000
Old Village Sewer Extension Phase 5 S-005 3 450,000 450,000
Sewer Fund 450,000 450.000
Utility Vehicle S-007 2 12,000 12,000
Sewer Fund 12,000 12,000
Lift Station 1-Add permanent generator S-008 2 80,000 80,000
Sewer Fund 80,000 80.000
Old Village Sewer Extension Phase 3 S-011 3 400,000 400,000
Sewer Fund 4W OW 400,000
Section 36 Trunk Sewer Main S-012 3 1,500,000 1,500,000
Debt Service 1,500,000 1,500,000
Sewer Oversizing S-013 3 129,000 35,000 164,000
Sewer Fund 129,000 35,000 164,000
Sewer Department Total 1,289,000 717,000 450,000 1,500,000 3,956,000
Storm Water Department
Phase 2 Regional Drainage Improvements SW-001 3 1,200,000 800,000 2,000,000
Debt Service 1,2W OW 80010W 2,000,OW
Phase 3 Regional Drainage Improvements SW-002 3 500,000 500,000
Debt Service 5W,000 500,0W
Surface Water Management Plan(Comp Plan)update SW-004 3 40,000 40,000
Storm Water Fund 40,000 40,000
Storm Sewer System Improvements SW-005 3 50,000 50,000 50,000 50,000 50,000 250,000
Storm Water Fund 50,000 50,000 50,000 50,000 50,000 250,000
Storm Water Department Total 50,000 1,290,000 850,000 550,000 50,000 2,790,000
Produced Using the Plan-It Capital Planning Software Page 3 Thursday,December 1.2016
Department Project# Priority 2017 2018 2019 2020 2021 Total
Water Department
2019 Street Improvement Project-water component W-001 3 300,000 300,000
Debt Service 300,000 300,000
2018 Street Improvement Project-water component W-002 3 600,000 600,000
Debt Service 600,000 600,000
OV sewer extension phase 4;water component W-003 3 350,000 350,000
Water Fund 350,00 350,000
OV Sewer Extension;Phase 5;water component W-005 3 450,000 450,000
Water Fund 450,000 450,000
Elevated Storage Tank#3 W-006 3 200,000 2,800,000 3,000,000
Debt Service 200,000 2,8001000 3,000,000
Hammes Estates 12"bypass W-007 4 120,000 120,000
Water Fund 120,000 120,000
Village East Trunk Watermain W-008 2 120,000 120,000
Water Fund 120,000 120,000
Utility Vehicle W-009 2 48,000 48,000
Water Fund 48,000 46,000
Well#2 Pull and rebuild pump W-011 3 25,000 25,000
Water Fund 25,000 25,000
Watermain Oversizing W-013 3 201,000 215,000 42,000 458,000
Water Fund 201,000 215,000 42,000 458,000
OV Sewer Extension Phase 3;water component W-015 3 400,000 400,000
Hidden Meadows Trunk Watermain Connection W-016 3 350,000 350,000
Water Fund 350,000 350,000
2020 Street&Utility Improvements-Water W-017 3 50,000 50,000
Water Fund 50,000 50,000
2021 Street&Utility Improvements-Water W-018 3 50,000 50,000
Water Fund 50,000 50,000
Water Department Total 746,000 1,333,000 992,000 3,200,000 50,000 6,321,000
GRAND TOTAL 6,099,668 8,102,560 6,3379123 9,737,316 3,624,600 33,901,267
Produced Using the Plan-It Capital Planning Software Page 4 77iursday,December 1,2016
Capital Improvement Plan 2017 ,/„-„2021
City of Lake Elmo, Minnesota
Project# AF-001 Department Admin/Finance Department
Contact City Administrator
Project Name New City Hall Facility Type Improvement
Useful Life 40 years
Category Buildings
Description Total Project Cost: $5,015,000 Priority 3 Important
New City Hall Facility
1. Space Needs Study in 2017
2.Construction in 2020 or later(cost estimates of$200 per sq ft)
Justification
Would allow all staff(except fire and public works)to be in one building,community meeting rooms,updated council chambers
Department Building Department
Project# I3-��1 Contact Building Official
Project Name Replacement Inspection Truck Type Equipment
Useful Life 10 years
Category Equipment:Miscellaneous
Description Total Project Cost: $25,000 Priority 2 Very Important
New Building Inspection Vehicle;S-10
To upgrade the existing 2004 SIO Colorado
Justification
Current 2004 vehicle is nearing the end of its useful life
Department Fire Department
Project# F-001 Contact Fire Chief
Project Name Rescue Engine E2 Type Equipment
Useful Life 15 years
Category Vehicles
Description Total Project Cost: $550,000 Priority, 1 Critical
Replacement of Rescue Engine purchased in 1990. Moved to station#2 in reserve status in 2014.
LED lights upgraded in 2011 for$17k.
Justification
End of Useful Life
Replaces 1990 Engine w/combination vehicle(Engine 2 and Utiltiy 2).Maintenance costs continue to rise
Procbtced Using the Plan-lt Capital Planting Software Pagel Tuesday,November 29,2016
Capital Improvement Plan 2017 ,n,„2021
City of Lake Elmo, Minnesota
Department Fire Department
Project# F-002 Contact Fire Chief
Project Name Purchase Land for Combined Station Type Improvement
Useful Life 0
Category Land
Description Total Project Cost: $350,000 Priority I Critical
Purcbase land for a combined fire station.
Justification
Fire Station#1 and#2 are in need of upgrades,some of which could not be made at the current building locations. Combining to one station will
require less paid part time staff when duty shifts are implemented.Difficult to staff two stations with paid on call volunteers firefighters.A
central location is critical to optimize response time.
Project# )(''-004
Department Fire Department
Contact Fire Chief
Project Name Tender 1
Type Equipment
Useful Life 20 years
Category Vehicles
Description Total Project Cost: $450,000 Priority 1 Critical
Replacement of 1987 Tender that was refurbished in 2004.
Justification
End of Useful Life
Priority for providing service in non-hydrant areas
Department Fire Department
Project# F-005 Contact Fire Chief
Project Name Replacement of Parking Lot at Station#2 Type Maintenance
Useful Life 0
Category Unassigned
Description Total Project Cost: $87,560 pr-iorit) 4 Less Important
Replacement of parking lot at Fire Station#2
Justification
Dependent upon future use of building
Project a F-006 Department Fire Department
Contact Fire Chief
Project Name Replacement of U2 truck Type Equipment
Useful Life 15 years
Category Buildings
Description Total Project Cost: $75,000 Priority 1 Critical
Replacement of 1994 U2 truck
Justification
End of Useful Life
Possibly could be combined with the rescue engine replacement
Produced Using the Plan-h Capital Planning Software Page 2 Tuesdav,November 29,2016
Capital Improvement Plan 2017 ,/ „ 2021
City of Lake Elmo, Minnesota
Department Fire Department
Project# F-��� Contact Fire Chief
Project Name SCBA Replacements Type Equipment
Useful Life 15 years
Category Equipment:Fire Equip
Description Total Project Cost: $207,000 Priority 1 Critical
Replacement of Self Contained Breathing Apparatus(SCBA)
Repairs done in Sept 2014 to extend the life of the SCBA's by 5 years.
lOnly option now is to replace.
Justification
End of Useful Life,NFPA requirement
Department Fire Department
Project# F-QOg Contact Fire Chief
Project Name New Combined Fire Station Type Improvement
Useful Life 40 years
Category Buildings
Description Total Project Cost: $3,000,000 Priority 1 Critical
Justification
Fire Station#1 and#2 are in need of upgrades,some of which could not be made at the current building locations. Combining to one station will
require less paid part time staff when duty shifts are implemented.Difficult to staff two stations with paid on call volunteers firefighters.
Department Fire Department
Project# F-�10 Contact Fire Chief
Project Name B 1 Type Equipment
Useful Life 15 years
Category Vehicles
Description Total Project Cost: $70,000 Priority 3 Imnportant
Replace 2001 B1
Justification
End of Useful Life
Replaces 2001 F-350
Produced Using the Plan-It Capital Planning Software Page 3 Tuesday.November 29,2016
Capital Improvement Plan 2017 thru 2021
City of Lake Elmo, Minnesota
Project# PR-001 Department Parks and Recreation
Contact
Project Name Manning Trail Updates Type Improvement
Useful Life 40 years
Category Park Improvements
Description Total Project Cost: $13,200 Priorith 2 Very Important
New trail installed along Manning Trail near Oak Land Jr High.Completed in conjunction with new roadway.
Justification
Part of city/county's efforts to connect trails
Department Parks and Recreation
Project# PR-002 Contact Public Works Director
Project Name 50th Street Trail Type Improvement
Useful Life 40 years
Category Unassigned
Description Total Project Cost: $140,000 Priority 2 Very Important
Trail along north side of 50th St
Staff estimate based on the need to acquire ROW and need to build up sections of the road
Justification
Due to potential increase in traffic from Cemetery and Wedding Venue
PC recommended deleting project on 6/8/16 until further information is given and development occurs
Project# PR-003 Department Parks and Recreation
Contact City Administrator
Project Name Demontreville Park Improvements Type Improvement
Useful Life 25 years
Category Park Improvements
Description Total Project Cost: $105,000 Priority 2 Very Important
Addition of a field and bathroom at DemontreviI Ic Park
Cost estimates:
2017:
$75,000 for new field and regrading/updating Current babseball field and fencing/tipped backstop
2018:
$30,000 for pavillion
Justification
Feedback from residents during 2013 Park Survey,park commission site visits and Mahtomedi Baseball Association
Produced Using the Plan-It Capital Planning Software Page 4 Tuesday,November 29,2016
Capital Improvement Plan 2017 ,/„„ 2021
City of Lake Elmo, Minnesota
Project# PR-004 Department Parks and Recreation
Contact City Administrator
Project Name Lions Park Renovations Type Improvement
Useful Life
Category Park Improvements
Description Total Project Cbst: $150,000 Priority I Critical
Renovation of the Lions Park Ballfield.
Ideally this project will provide for a safe natural grass field of play and full fencing. It will also contain concession/public bathroom areas,
storage,scoreboard,backstop,dugouts,and fan bleachers at a minimum.Other possible improvements may include a ticket booth,batting and
practice areas,team meeting area,warning tracks,brick/veneer detailing for fences,announcers booth,parking and year round uses such as ice
skatin /hockey rink,prep kitchen and wanning house.
Justification
Field is in need of grading. Major draw to downtown and updating facilties would accommodate those users.
Project# PR-005 Department Parks and Recreation
Contact City Administrator
Project Name Pebble Park Improvements Type Improvement
Useful Life
Category Park Improvements
Description Total Project Cost: $135,738 Priority 3 Important
Phase I Improvements were completed in 2016 which included a new shelter.
Phase 2(2017)Improvements would include paving the parking area and development of two volleyball courts
Cost estimates:
Parking area is 0.3 acres(13,068sq ft)and asphalt paving is$3.50/sq ft($45,738)
Volleyball Courts estimate is$10,000
Phase 3(2018)would be restrooms,lighting and security features
Cost estimate:
Restrooms(Vault Toilets with running water to sinks):$65,000
Fighting and Security Features:$15,000
Justification
Feedback from park user survey in 2013
Produced Using the Plan-It Capital Planning Sofncare Page 5 Tuesday,November 29.2016
Capital Improvement Plan 2017 tl„„ 2021
City of Lake Elmo, Minnesota
Project# PR-006 Department Parks and Recreation
Contact City Administrator
Project Name Reid Park Improvements Type Improvement
Useful Life
Category Park Improvements
Description Total Project Cost: $184,250 Priority 3 Important
Improve trails to be suitable for mountain biking while also having options for walking and snowshoeing,add playground equipment for younger
age groups(resident request),eliminate basketball court,addition of bathrooms,outdoor gym stations.Bleacher seats and extending fencing.
Phase 1 (2018)
Mountain biking Trail
$50,000 assumes grant/donation from MORK/Stillwater High School Team
Phase 2(2019)
Restooms:$100,000
Tot Lot:$12,500
Detno Court:Staff Time
Outdoor Gym Stations:$15,000
Bleacher Seats:4,750
,Extending fence to prevent fly balls:$2,000
Justification
Result of resident input during site visit
Department Parks and Recreation
Project# PR-007 Contact City Administrator
Project Name Sunfish Lake Park Improvements Type Improvement
Useful Life
Category Park Improvements
Description Total Project Cost: $150,873 Priority 3 Important
Phase 1 (2017)
Additional benches:$2,000(could be donation or Eagel Scout project
Phase 2(2019)
Paving of parking lot
Cost estimate:
Parking lot:$60,984(17,424 sq ft at$3.50/sq ft)
Improve trails to ADA standards ain Area 2(prairie area):$87,889 for 6 foot wide asphalt 1 mile trail
Justification
Produced Using the Plan-A Capital Planning Software Page 6 Tuesday,November 29.2016
Capital Improvement Plan 2017 ,/„t, 2021
City of Lake Elmo, Minnesota
Project# PR-009
Department Parks and Recreation
Contact City Administrator
Project Name Lake Elmo Regional Trail Type Improvement
Useful Life
Category Park Improvements
Description Total Project Cost: $1,592,916 Priority 3 Important
Regional east west trail through Lake Elmo
Phase 1:($827,316-construction only,no land
Connect to existing Oakdale trail at Stillwater Blvd and Helmo/ldeal Ave
Travel through Tablyn Park to Lake Elmo Park Reseerve(LEPR)
Pass through LEPR-provide exit point to Sunfish Lake Park
Continue down Hwy5/CSAH 14 righ tof way to Gorman's-connect to exisitng trail
Phase 2:($765,600-construction only,no land)
Lake Elmo to Stillwater Senior High
Justification
Trail would address the following community needs:
-Deliver students safely to school
-Bring people to our downtown
-Bring people to our parks
-Provide safe recreation
-Trail Diversity-Provide feel of Lake Elmo
-Omit need to bike down Hwy 5/CSAH 14
-Compatibility with public grant opportunities
-Compatibility with private funding opportunities
,Feasibility of land acquisition
Department Parks and Recreation
Project# PR-01� Contact Public Works Director
Project Name pickup Truck Type Equipment
Useful Life 7 years
Category Vehicles
Description Total Project Cost: $30,000 Priority I Critical
F250 Truck
Justification
New truck dedicated to Parks and Rec functions
Project# PR-011 Department Parks and Recreation
Contact Public Works Director
Project Name Savona Park Type Improvement
Useful Life
Category Park Improvements
Description Total Project Cost: $150,000 Priority I Critical
Playground,half basketball court-Phase 1
Half basketball court,bocce ball court,tables,benches,etc-Phase 2
Justification
Recreational opportunity in new neighborhood
Produced Using the Plan-11 Capital Planning Software Page 7 Tuesdav,November 29,2016
Capital Improvement Plan 2017 ,r„„ 2021
City of Lake Elmo, Minnesota
Department Public Works Department
Project# PW-�OZ Contact Public Works Director
Project Name Dump Truck/Plow wing/Sander Type Equipment
Useful Life 10 years
Category Vehicles
Description Total Project Cost: $225,000 Priority I Critical
Fleet add for staff add. Updated from budget amounts due to current costs.
1 year build out time on dump trucks and needs to be factored into the process.
Justification
Add to fleet due to increase in staffing
Department Public Works Department
Project# PW-004 Contact Public Works Director
Project Name Loader Type Equipment
Useful Life 15 years
Category Vehicles
Description Total Project Cost: $185,000 Priority 2 Very Important
Replace 1999 loader
Justification
End of Useful Life
Department Public Works Department
Project# PW-006 Contact Public Works Director
Project Name Tractor Type Equipment
Useful Life 15 years
Category Vehicles
Description Total Project Cost: $80,000 Priority 2 Very Important
Replace 2004 Tractor
Cost include all ditch and mowing attachments
Justification
End of Useful Life
Department Public Works Department
Project# PW-007 Contact Engineer
Project Name 2017 Street Improvements Type Improvement
Useful Life 25 years
Category Street Reconstruction
Description Total Project Cost: $2,320,000 Priority 3 Important
North Tri-Lakes Area and OV Phase 3 streets
Justification
Annual street repairs/improvements necessary
Produced Using the Plan-lt Capital Planning Sofnvare Page 8 Tuesday,November 29,2016
Capital Improvement Plan 2017 ,/,,„ 2021
City of Lake Elmo, Minnesota
Department Public Works Department
Project# PW-009 Contact Public Works Director
Project Name Manning Trail Reconstruction CSAH 15 Type Improvement
Useful Life 25 years
Category Street Reconstruction
Description Total Project Cost: $23,730 Priority 3 Important
County reconstructing Manning Trail(CSAH 15)near Oak Land Jr High
Justification
Project requires city cost share
Department Public Works Department
Project# PW-010 Contact Public Works Director
Project Name Hunters Crossing Turn Lane Type Improvement
Useful Life 25 years
Category Street Construction
Description Total Project Cost: $50,000 Priority 3 Important
Turn Lane by Hunters Crossing.Jointly funded with developer.
Justification
Department Public Works Department
Project# PW-Ol l Contact Public Works Director
Project Name 2018 Street Improvements Type Improvement
Useful Life 25 years
Category Street Reconstruction
Description Total Project Cost: $1,560,000 Priority 3Important
Sheet reconstuction on 38th,39th,Innsdale and OV Phase 4
Justification
Department Public Works DepartmentProject# PW-013 Contact Engineer
Project Name 2019 Street Improvements Type Improvement
Useful Life 25 years
Category Street Construction
Description Total Project Cost: $1,750,000 Priority 3Important
36th,37th St,Irwin,South Tri-Lakes,OV Phase 5
Justification
Annual street impvovements per Engineering program/recommendation
Produced Using the Plan-It Capital Planning Software Pape 9 Tuesday,November 29,10I6
Capital Improvement Plan 2017 ,1„„ 2021
City of Lake Elmo, Minnesota
Department Public Works Department
Project# PW-014 Contact Public Works Director
Project Name Pickup Truck Type Equipment
Useful Life T years
Category Vehicles
Description Total Project Cost: $30,000 Priority I Critical
Ford 250
Justification
Replaces 1991 Dodge pickup and 1998 GMC smaller trucks. Trucks being replaced will be retained as summer runner trucks to be used by
summer help due to little to no residual/resale value.
End of Useful Life
Department Public Works Department
Project# PW-016 Contact Public Works Director
Project Name Pickup Truck Type Equipment
Useful Life 7 years
Category Vehicles
Description Total Project Cost: $30,000 Priority 2 Very Important
Ford 250
Justification
Replaces 2000 Chevy pickup
End of Useful Life
Department Public Works Department
Project# PW-017 Contact Public Works Director
Project Name Expansion of Salt Shed Type Improvement
Useful Life 40 years
Category Buildings
Description Total Project Cost: $50,000 Priority 4 Less Important
Expansion of existing salt shed
Justification
Would prevent the need to have multiple salt deliveries and allow for a larger inventory on hand. With the City expansion and the number of
new developments and street miles,the volumes are anticipated to increase significantly by 2019
Produced Using the Plan-It Capital Planning Software Page 10 Tuesday,November 29,2016
Capital Improvement Plan 2017 ,1„„ 2021
City of Lake Elmo, Minnesota
Department Public Works Department
Project# PW-018 Contact Public Works Director
Project Name Barn Expansion Type Improvement
Useful Life 40 years
Category Land
Description Total Project Cost: $700,000 Priority 4 Less Important
Purchase of land from 3M for barn expansion
Then expansion of barn for meeting rooms and offices
Justification
No current meeting room in the barn and shared office area. Not enough space for workstations for all employees.
Department Public Works Department
Project# PW-U19 Contact Public Works Director
Project Name PickupTruck Type Equipment
Useful Life 7 years
Category Vehicles
Description Total Project Cost: $30,000 Priority 4 Less Important
Replacement for 2012 F250
End of usefull life 7 ears)
Justification
Replacement for 2012 F250
End of useful life
Department Public Works Department
Project# PW-�2� Contact Public Works Director
Project Name Pickup Truck Type Equipment
Useful Life 7 years
Category Vehicles
Description Total Project Cost: $30,000 Priority 4 Less Important
Ford 250
Justification
Replacement for 2014 F250
End of useful life(7 ears)
Produced Using the Plan-It Capital Planning Software Page I I Tuesday,November 29.2016
Capital Improvement Plan 2017 ,l 2021
City of Lake Elmo, Minnesota
Department Public Works Department
Project# PW-�21 Contact Public Works Director
Project Name 1 Ton Trucli Type Equipment
Useful Life 10 years
Category Vehicles
Description Total Project Cost: $70,000 Priority 3 Important
Replacement for 2003 1 Ton Truck
Justification
Replaces 2003 1 Ton Truck
Beyond end of use useful life(10 yrs)
Project# PTV-022 Department Public Works Department
Contact Public Works Director
Project Name Dump Trucli/Plow/Sander Type Equipment
Useful Life 10 years
Category Velucles
Description Total Project Cost: $225,000 Priority 2 Very Important
Replace 1998 plow truck
One year build out lead time on large trucks needs to be factored into the timing.
Justification
End of Useful Life
Department Public Works Department
Project# PW-023 Contact Public Works Director
Project Name Vac Trailer Type Equipment
Useful Life 7 years
Category Vehicles
Description Total Project Cost: $45,000 Priority 3 Important
Pull behind unit used for water main breaks and storm sewer clean outs.
Justification
Replacement for 2006 unit which does not have the hot water component which is critical for water main breaks.
Current unit at end of useful life(7 years)
Produced Using the Plan-It Capita!Planning Sofhvare Page 12 Tuesday,November 29.20 6
Capital Improvement Plan 2017 r/„„ 2021
City of Lake Elmo, Minnesota
Project# 1'W-026
Department Public Works Department
Contact Engineer
Project Name 2020 Street inlprovenlents Type Improvement
Useful Life 25 yews
Category Street Reconstruction
Description Total Project Cost: $2,030,000 Priority 3 Important
Reconstruction of roads in Heritage Farms,Stonegate 2nd,and Old Village Phase 6
Justification
Department Public Works Department
Project# PW-027 Contact Engineer
Project Name 2021 Street Improvements Type Improvement
Useful Life 25 years
Category Street Reconstruction
Description Total Project Cost: $1,159,000 Priority 3 Important
Fields of St.Croix,Tamarack Fanns&Hamlet on Sunfish Lake Street Improvements.
Justification
Project# PW-028 Department Public Works Department
Contact Engineer
Project Name CSA1115/50th Street Temp Signal Imp. Type Improvement
Useful Life 25 years
Category Street Reconstruction
Description Total Project Cost: $60,000 Priority 3 Important
CSAH/50th Street Temporary Signal Improvements
Justification
Department Public Works Department
Project# PW-029 Contact Engineer
Project Name CSAH19/Hudson Blvd Signal&Turn Lane Type Improvement
Useful Life 25 yews
Category Street Reconstruction
Description Total Project Cost: $500,000 Priority 3 Important
CSAH 19/Hudson Blvd Signal and Turn Lane Improvements
Justification
Produced Using the Plan-It Capiml Planning Software Page 13 Tuesdai,.Norenr6er-29.2016
Capital Improvement Plan 2017 << 2021
City of Lake Elmo, Minnesota
Department Public Works Department
Project# PTV-030 Contact Engineer
Project Name CSAH 15/30th Street Signal Type Maintenance
Useful Life 25 years
Category Street Construction
Description Total Project Cost: $100,000 Priority 3 Important
CSAH 15/30th Street signal improvements. May be stand alone project or with CSAH 15 Phase 3
Justification
Department Public Works Department
Project# PW-033 Contact Engineer
Project Name CSAH13-Ideal Avenue Improvements Type Improvement
Useful Life 25 years
Category Street Construction
Description Total Project Cost: $300,000 Priority 3 Important
CSAH13-Ideal Avenue Improvements-Phase 1
Justification
Department Public Works Department
Project# PW-034 Contact Engineer
Project Name 15th Street North(MSA Street) Type Improvement
Useful Life 40 years
Category Street Reconstruction
Description Total Project Cost: $950,000 priority 3 Important
15th Street reconstruction
Justification
Project PW-035
Department Public Works Department
#
Contact Engineer
Project Name UP RR Crossing-Village Parkway Ty
pe Improvement
Useful Life 40 years
Category Unassigned
Description Total Project Cost: $500,000 Priority 3 Important
UP RR Crossing-Village Parkway
Justification
Produced Using d:e Plan-It Capital Planning So(tuare Page 14 Tuesday.November 29,2016
Capital Improvement Plan 2017 ,f„„ 2021
City of Lake Elmo, Minnesota
Project# PW-036 Department Public Works Department
Contact Engineer
Project Name UP RR Crossing-Private Drive Closure Type Improvement
Useful Life 40 years
Category Unassigned
Description Total Project Cost: $100,000 Priority 3 Important
UP RR Crossing-Private driveway closure required for Village Parkway Crossing
Justification
Department Public Works Department
Project# PW-037 Contact Engineer
Project Name UP RR Crossing: Klondike Ave Type Unassigned
Useful Life 40 years
Category Unassigned
Description Total Project Cost: $250,000 Priority 3 Important
UP RR Crossing-Klondike-upgraded crossing to inlcude light and gates
Justification
Department Sewer Department
Project# 5-001 Contact Public Works Director
Project Name Hudson Blvd Lift Station Type Equipment
Useful Life 40 years
Category Wastewater
Description Total Project Cost: $500,0()0 Priority 2 Very Important
Replace and upsize lift station
Justification
End of Useful Life;increased usage due to development
Department Sewer Department
Project# S-OU2 Contact Engineer
Project Name Olson Lake Trail Sewer Phase 2 Type Improvement
Useful Life 40 years
Category Wastewater
Description rota) Project('opt: $260,000 Priority 3 Important
Justification
Producer!Using the Plan-It Capital Planning Software Page 15 Tuesday,November 29,2016
Capital Improvement Plan 2017 „„ 2021
City of Lake Elmo, Minnesota
Department Sewer Department
Project# 5-0�3 Contact Public Works Director
Project Name Sunfish Lake Sewer Extension & Lift Station Type Improvement
Useful Life 40 years
Category Wastewater
Description Total Project Cost: $240,000 Priority 3 Important
Sewer Extension to Sunfish Lake Park
Justification
Per 2016 MPCA agreement
100%assessed
Department Sewer Department
Project# S-U04 Contact Engineer
Project Name Old Village Sewer Extension Phase 4 Type Improvement
Useful Life 40 years
Category Storm Sewer/Drainage
Description Total Project Cost: $350,000 Priority 3 Important
Exentions of sewer in Old Village Phase 4
Justification
OV Sewer extension Phase 4;323nd St W,Layton/36th St
100%Assessed
Department Sewer Department
Project# S-O�5 Contact Engineer
Project Name Old Village Sewer Extension Phase 5 Type Improvement
Useful Life 40 years
Category Wastewater
Description Total Project Cost: $450,000 Priority 3 Important
Sewer extension in the Old Village Phase 5
Justification
OV Sewer extension Phase 5;33rd st,34th and 36th St.
100%Assessed
Produced Using the Plan-lt Capital Planning Software Page 16 Tuesday,November 29,2016
Capital Improvement Plan 2017 ,/„„ 2021
City of Lake Elmo, Minnesota
Department Sewer Department
Project# 5-007 Contact Public Works Director
Project Name Utility Vehicle Type Equipment
Useful Life
Category Vehicles
Description Total Project Cost: $12,000 Priority 2 Very Important
Utility Vehicle shared between water and sewer
Justification
A second vehicle is needed due to the addition of City sewer as well as the number of new homes and additional water related service calls.
Department Sewer Department
Project# S-��8 Contact Public Works Director
Project Name Lift Station 1-Add permanent generator Type Equipment
Useful Life 15 years
Category Wastewater
Description Total Project Cost: $80,000 Priority 2 Very Important
Update Lift Station#1 by adding a permanent generator
Justification
Recommendation by Bernie
Department Sewer Department
Project# S-011 Contact Engineer
Project Name Old Village Sewer Extension Phase 3 Type Improvement
Useful Life 40 years
Category Wastewater
Description Total Project Cost: $400,000 priorit' 3lmportant
OV Sewer Extension Phase 3
Justification
OV Sewer Extension Phase 3;Elem School,31st St,&32nd St
100%Assessed
Department Sewer Department
Project# 5-�12 Contact Engineer
Project Name Section 36 Trunk Sewer Main Type Improvement
Useful Life 40 years
Category Wastewater
Description Total Project Cost: $1,500,000 Priority 3 Important
Section 36 Trunk Sewer Main
Justification
Section 36 Trunk Sewer Main to Cimarron and Oakland Jr. High
Produced Using the Plan-It Capital Planning Software Page 17 Tuesday,November 29,2016
Capital Improvement Plan 2017 fl,,,, 2021
City of Lake Elmo, Minnesota
Department Sewer Department
Project# 5-013 Contact Engineer
Project Name Sewer Oversizing Type Improvement
Useful Life 40 years
Category Wastewater
Description tOial Project('osu $164,000 Priority 3 Important
Sewer Oversizing
Justification
Sewer oversizing based on developer pace and phasing
Department Storm Water Department
Project# SW-�Q1 Contact Engineer
Project Name Phase 2 Regional Drainage Improvements Type Improvement
Useful Life 40 years
Category Storm Sewer/Drainage
Description Total Project Cost: $2,000,000 Priority, 3Important
Land acquistion(Schiltgen)and diversion to Sunfish Lake Park
Justification
2nd Phase to improving the regional drainage issues
Project SW-�U2
Department Storm Water Department
#
Contact Engineer
Project Name Phase 3 Regional Drainage Improvements Type Improvement
Useful Life 40 years
Category Storm Sewer/Drainage
Description Total Project Cost: $500,000 priority 3 Important
Phase 3 of Regional Drainage Improvements(Lions Park)
Justification
3rd Phase of Regional Drainage Improvements(Lions Park)
Project# SW-004 Department Storm Water Department
Contact Engineer
Project Name Surface Water Management Plan(Comp Plan) update Type Improvement
Useful Life 10 years
Category Stonn Sewer/Drainage
Description Total Project Cost: $40,000 Priority 3 Important
Surface Water Management Plan(Comp Plan)update
Justification
Part of the Comprehensive Comp Plan Update Requirement
Produced Using the Plan-11 Capital Planning Sgfnvare Page 18 Tuesday,November 29,2016
Capital Improvement Plan 2017 ai n12021
City of Lake Elmo, Minnesota
Department Stone Water Department
Project# Sw-�OrJ Contact Engineer
Project Name Storm Sewer System Improvements Type Improvement
Useful Life 40 years
Category Storm Sewer/Drainage
Description Total Project Cost: $300,000 prioritN 3 Important
Stone Sewer System Improvements
Justification
With the expansion of the stone sewer system,it is anticipated that annual enhancements will be identified as necessary for continous
enhancement of the system.
This will include the annual pond clean outs to prevent build up of hazardous waste.
The City is required to report upon the pond clean outs every four years.
Department Water Department
Project# w-U01 Contact Engineer
Project Name 2019 Street Improvement Project-water component Type Improvement
Useful Life 40 years
Category Water
Description Total Project Cost: $300,000 Priority 3 Important
Water component of2019 Street Improvement Projects
37th,38th and Irwin
Justification
Need to upgrade the water services as street improvments are done
Department Water Department
Project# w-002 Contact Engineer
Project Name 2018 Street Improvement Project-water component Type Improvement
Useful Life 25 years
Category Water
Description Total Project Cost: $600,000 Priority 3 Important
.Water component of the 2018 Street Improvement projects.
38th,39th and Innsdale
Justification
As street improvments projects occur,the City needs to upgrade water lines
Produced Using the Plan-11 Capital Planning Softtivare Page 19 Tuesday.November 29,2016
Capital Improvement Plan 2017 2021
City of Lake Elmo, Minnesota
Department Water Department
Project# W-��3 Contact Engineer
Project Name OV sewer extension phase 4; water component Type Improvement
Useful Life 40 years
Category Water
Description Total Project Cost: $350,000 Priority 3 Important
Justification
100%assessed
Department Water Department
Project# w-UU5 Contact Engineer
Project Name OV Sewer Extension; Phase 5; water component Type Improvement
Useful Life 40 years
Category Water
Description Total Project Cost: $450,000 Priority 3 Important
Replace waterman in Old Village phase 5;Upper 33rd,Lower 33r. 34/36th St.W
Justification
100%assessed
Department Water Department
Project# w-006 Contact Engineer
Project Name Elevated Storage Tank#3 Type Equipment
Useful Life 40 years
Category Water
Description Total Project Cost: $3,000,000 Priority 3 Important
Justification
Department Water Department
Project# W-0�7 Contact Engineer
Project Name Hammes Estates 12" bypass Type Improvement
Useful Life 40 years
Category Water
Description Total Project Cost: $120,000 Priority 4 Less Important
12"water main bypass in Hammes
Justification
Needed to reduce water pressure and make flows
Contingent upon whether a developer comes forward on the project
Produced Using the Plan-It Capital Planning S'oflxar•e Page 20 Tuesday,November 29,2016
Capital Improvement Plan 2017 ,/,,,, 2021
City of Lake Elmo, Minnesota
Department Water Department
Project# W-��g Contact Engineer
Project Name Village East Trunk Watern1aiI1 Type Improvement
Useful Life 40 years
Category Wad
Description Total Project Cost: $120,000 Priority 2 Very Important
12"water main bypass
Justification
need to reduce pressure and accommodate water flows
Department Water Department
Project# W-��9 Contact
Project Name Utility Vehicle Type Unassigned
Useful Life 7 years
Category Unassigned
Description Total Project Cost: $48,000 Priority 2 Very Important
Utility Vehcile shared between water and sewer(S-007)
Justification
A second vehicle is needed due to the addition of sewer and the number of new homes and related service calls
Department Water Department
Project# W-011 Contact Public Works Director
Project Name Well#2 Pull and rebuild pump Type Equipment
Useful Life 7 years
Category Water
Description Total Project Cost: $25,000 Priority 3 Important
Pull and Rebuild Well#2 pump
Justification
Recommended by Bernie
Department Water Department
Project# W-013 Contact Engineer
Project Name Watermain Oversizing Type Improvement
Useful Life 40 years
Category Water
Description Total Project Cost: $577,000 Priority 3 Important
Oversizing cost of watetmain pipe installed by developers.
Justification
Ensures all pipe in the City will have flow capacity necessary for water system
Produced Using the Plan-It Capital Planning Software Page 21 Tuesday,November 29,2016
Capital Improvement Plan 2017 1hrit 2021
City of Lake Elmo, Minnesota
Department Water Department
Project# W-015 Contact Engineer
Project Name OV Sewer Extension Phase 3; Water component Type Improvement
Useful Life 40 years
Category Water
Description Total Project Cost: $400,000 Priority 3 Important
OV Sewer extions Phase 3;water component
Justification 71
Elementary school,31st Street and 32nd Street
100%assessed
Department Water Department
Project# W-016 Contact Engineer
Project Name Hidden Meadows Trunk Watermain Connection Type Improvement
Useful Life 40 years
Category Water
Description Total Project Cost: $350,000 Priority 3 Important
Hidden Meadows Trunk Watermain Connection
Justification
Watermain connection necessary for development
Department Water Department
Project# W-017 Contact Engineer
Project Name 2020 Street& Utility Improvements-Water Type Improvement
Useful Life 40 years
Category Water
Description Total Project Cost: $50,000 Priority 3 Important
2020 street improvement project-water component
Justification
watermain for Heritage Farms
Produced Using the Plan-It Capital Planning Software Page 22 Tuesday,November 29,2016
Capital Improvement Plan 2017 th,-t,2021
City of Lake Elmo, Minnesota
Project# W-018 Department Water Department
Contact Engineer
Project Name 2021 Street&Utility Improvements-Water Type Improvement
Useful Life 40 years
Category Water
Description Total Project Cost: $50,000 Priority 3 Important
2021 Street&Utility Improvements-water component
Justification
City needs to upgrade water infrastructure when doing street improvement projects
Fields of St.Croix and Tamarack Farms
100%assessed