HomeMy WebLinkAbout#20 Hammes 2nd Addition Final PlatMAYOR AND COUNCIL COMMUNICATION DATE: 1/3/2016 REGULAR ITEM #: 20 AGENDA ITEM: Hammes 2nd Addition Final Plat SUBMITTED BY: Stephen Wensman, Planning Director THROUGH: Kristina Handt, City Administrator REVIEWED BY: Emily Becker, City Planner Jack Griffin, City Engineer Mike Bent, Building Official Sarah Sonsalla, City Attorney Greg Malmquist, Fire Chief BACKGROUND: Racheal Development, Inc. is requesting final plat approval for the second phase of the Hammes Estates (renamed Lake Ridge Crossing) planned 163-unit single family residential development to be located on 78.1 acres of land west of Keats Avenue and within Stage 1 of the City’s I-94 Corridor Planning Area. The second addition plat includes 37 new single-family lot residential subdivision. The first addition included 57 single family residential lots. ISSUE BEFORE COUNCIL: Adoption of Resolution 2017-003 approving the final plat of Hammes Estates 2nd Addition PROPOSAL DETAILS/ANALYSIS: Staff has reviewed the final plat and found that it is consistent with the preliminary plat that was approved by the City. The developer has recently updated the preliminary plan submissions with the first phase to comply with the conditions of approval, and the final plat application incorporates these updates as well. The second phase will provide a connection to the Savona development and a secondary access to the Hammes Estates development, a condition of preliminary plat. The final plat street name has been corrected since the Planning Commission, so the related condition of approval was removed from the resolution attached to this report. Although there are some additional revisions and additions necessary for the final construction plans that need to be addressed by the applicant, the majority of these revisions can be made before the City releases the final plat for recording. FISCAL IMPACT: City Council Meeting 01/03/2017 Regular Agenda Item #20 Page 2 The Developer Agreement will be prepared by Staff and presented in a subsequent meeting for approval by the City Council. Staff has been updating the Developer Agreement template and should have all changes complete for incorporation into the Hammes Estates 2nd Developer Agreement. The Developer Agreement will include a detailed accounting of any development costs that will be the responsibility of the City. OPTIONS: The City Council must approve the final plat if it is found to be in substantial conformance with the preliminary plat. PLANNING COMMISSION: The Planning Commission reviewed the final plat on 12/12/2016 and recommended approval with a 7-0 vote. RECOMMENDATION: Staff and the Planning Commission recommend that the City Council approve the Hammes Estates 2nd Addition final plat with the following motion: “Move to adopt Resolution 2017-003 approving the Hammes Estates 2nd Addition final plat.” ATTACHMENTS: • Resolution 2017-003 approving the Hammes Estates 2nd Addition final plat • Planning Commission Report packet. 1 Resolution 2017-003 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2017-003 A RESOLUTION APPROVING A FINAL PLAT FOR HAMMES ESTATES 2ND ADDITION WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Rachel Development Inc, 4125 Napier Ct NE, St. Michael, MN 55376 (Applicant) has submitted an application to the City of Lake Elmo (City) for a Final Plat for Hammes Estates 2nd Addition, a copy of which is on file in the City of Lake Elmo Planning Department; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on May 12, 2014 to consider the Hammes Estates Preliminary Plat and continued discussion on the Preliminary Plat until its June 23, 2014 meeting; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation concerning the Preliminary Plat as part of a memorandum to the City Council for the July 1, 2014 City Council Meeting; and WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending approval of the Preliminary Plat; and WHEREAS, the City Council reviewed the Preliminary Plat request at its July 1, 2014 meeting and adopted Resolution No. 2014-55 approving the Preliminary Plat; and WHEREAS, the Lake Elmo Planning Commission met on December 12, 2016 to review the Final Plat for Hammes Estates consisting of 37 single-family residential lots; and WHEREAS, on December 12, 2016 the Lake Elmo Planning Commission adopted a motion to recommend that the City Council approve the Final Plat for Hammes Estates 2nd Addition with conditions; and WHEREAS, the City Council reviewed the recommendation of the Planning Commission and the Final Plat for Hammes Estates 2nd Addition at a meeting held on January 3, 2017; and NOW, THEREFORE, based upon the testimony elicited and information received, the City Council makes the following: 2 Resolution 2017-003 FINDINGS 1) That the Hammes Estates 2nd Addition Final Plat is consistent with the Preliminary Plat and Plans as approved by the City of Lake Elmo on July 1, 2013 and revised on September 19, 2016. 2) That the Hammes Estates 2nd Addition Final Plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 3) That the Hammes Estates 2nd Addition Final Plat complies with the City’s Urban Low Density Residential zoning district. 4) That the Hammes Estates 2nd Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, except as noted in this report or attachment thereof. 5) That the Hammes Estates 2nd Addition Final Plat complies with the City’s subdivision ordinance. 6) That the Hammes Estates 2nd Addition Final Plat is consistent with the City’s engineering standards with the exceptions noted by the City Engineer in his review comments to the City dated November 17, 2016. CONCLUSIONS AND DECISION NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the Final Plat for Hammes Estates 2nd Addition subject to the following conditions: 1) Final grading, drainage, and erosion control plans, utility plans, sanitary and storm water management plans, and street and utility construction plans shall be reviewed and approved by the City Engineer prior to the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in the Hammes Estates 2nd Addition – Final Plat Engineering Review Comments and Hammes Estates 2nd Addition Construction Plan Review memos dated 11/17/2016 shall be incorporated into these documents before they are approved. The Final Plat shall not be recorded until final construction plan approval is granted. 2) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements with financial guarantees therefore. 3) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to the execution of the Final Plat by City Officials. This must include additional or expanded drainage and utility easements as outlined in the City Engineer’s Memorandum dated November 17, 2016. 4) The plat shall be incorporated into the Hammes Estates Common Interest Agreement concerning management of the common areas of Hammes Estates and establishing a homeowner’s association shall be submitted in final form to the Planning Director before a building permit may be issued for any structure within this subdivision. Said agreement shall 3 Resolution 2017-003 comply with Minnesota Statues 515B-103, and specifically the provisions concerning the transfer of control to the future property owners. The HOA documents shall be amended to require maintenance of the wetland buffers. 5) The applicant shall enter into a landscape license and maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park and open space on the Final Plat. 6) The Final Landscape Plan shall be revised per the requested modifications and shall be approved by the Planning Director prior to the release of Final Plat for recording. 7) The applicant must provide written authorization from Xcel Energy to perform any work in the Electrical Transmission easement areas prior to the release of the Final Plat for recording. 8) The applicant shall abide by all conditions of the MN DNR Public Waters Work Permit #2015- 0193. 9) Prior to the issuance of building permits, for Hammes Estates 2nd Addition, all wetland buffers shall be delineated and identified via staking or signage that is acceptable to the City. Passed and duly adopted this 3rd day of January 2017 by the City Council of the City of Lake Elmo, Minnesota. __________________________________ Mike Pearson, Mayor ATTEST: ________________________________ Julie Johnson, City Clerk BUSINESS ITEM 5A PLANNING COMMISSION DATE: 12/12/2016 AGENDA ITEM: 5A – BUSINESS ITEM CASE # 2016-52 ITEM: Hammes Estates 2nd Addition Final Plat (Phase 2) SUBMITTED BY: Stephen Wensman, Planning Director REVIEWED BY: Emily Becker, City Planner Jack Griffin, City Engineer Greg Malmquist, Fire Chief Mike Bent, Building Official SUMMARY AND ACTION REQUESTED: The Planning Commission is being asked to consider a Final Plat request from Rachel Development for the second phase of the a planned 163-unit residential development to be located on 78.1 acres of land west of Keats Avenue and within Stage 1 of the City’s I-94 MUSA area. The final plat will include 37 single-family lots, all of which will be accessed off of Keats Avenue. The second phase will connect the Hammes Estates development to the Savona development. Staff is recommending approval of the request subject to compliance with a series of conditions as listed in this report. GENERAL INFORMATION Applicant and Owner: Rachel Development, Inc., 4125 Napier Ct NE, St. Michael, MN 55376 Location: Part of Section 34 in Lake Elmo, immediately west of Keats Avenue (CSAH 19), approximately 1,300 feet south of 10th Street (CSAH 10), and south of Goose Lake. Outlot E Hammes Estates. PID# 34.029.21.13.0001. Request: Application for final plat approval of 37 residential lots, constituting the second phase of Hammes Estates. Land Use: Vacant outlot Current Zoning: LDR - Urban Low Density Residential Surrounding North –Goose Lake and Stonegate Residential Estates (RE) subdivision; Land Use and West – Stonegate RE subdivision; South – Lennar Savona Urban Low Density Zoning: Residential (LDR) subdivision; East: Rural Development Transitional. Comp. Plan: Urban Low Density Residential (2.5 – 4 units per acre) History: The site was previously utilized as an active mining and gravel operation. The site has since been reclaimed. The property was rezoned from Rural Development Transitional District (RT) to Urban Low Density Residential (LDR) on 7/22/2014. Preliminary Plat approved on 7/1/2014 (public hearing on 5/12/14). 2 BUSINESS ITEM 5A Final plat of 1st phase was approved on October 7, 2014. The final plat was granted an extension to October 7, 2016 by Council on November 4, 2015. Rachael Development purchased the project in 2016 and the Developer Agreement and Final Construction plans for the first phase were approved on August 16, 2016. Action Deadline: Application Complete – 11/10/2016 60 Day Deadline – 1/9/2017 Applicable Chapter 153 – Subdivision Regulations Regulations: Article 10 – Urban Residential Districts (LDR) §150.270 Storm Water, Erosion, and Sediment Control REQUEST DETAILS The City of Lake Elmo has received a request from Rachael Development for final plat approval of the second phase of the Hammes Estates residential development to be called Lake Ridge Crossing. The second addition final plat is the replat of Outlot E Hammes Estates 1st Addition and includes 37 single family residential lots and associated infrastructure on 12.65 acres. The City Council approved the Hammes Estates Preliminary Plat on July 1, 2013, which platted 163 single family lots over approximately 78 acres of land within the I-94 MUSA Area. The first phase of the development created 57 single family lots out of the 163 planned for the entire subdivision. PLANNING/ZONING ISSUES Final Plat Approval Procedure. The City’s subdivision ordinance establishes the procedure for obtaining final subdivision approval, in which case a final plat may only be reviewed after the City takes action on a preliminary plat. As long as the final plat is consistent with the preliminary approval, it must be approved by the City. The City’s approval of the Hammes Estates Preliminary Plat included a series of conditions that must be met by the applicant, which are addressed in the “Review and Analysis” section below. There are no public hearing requirements for a final plat. Consistency with Preliminary Plat. Staff has reviewed the final plat and found that it is consistent with the preliminary plat that was approved by the City. The developer has recently updated the preliminary plan submissions to comply with the conditions of approval, and the final plat application incorporates these updates as well. Street Naming. Street names have been reviewed and have been found to be mostly consistent with the City’s new street naming ordinance, though the plat should include the directional suffix ‘North’ after ‘Lower 8th Street’. Landscaping. Staff has reviewed the Final Landscape Plan for Hammes 2nd Addition and has provided comments in the attached email memorandum. These plans will need to be modified to show relocation of trees to accommodate drainage and utilities along with other comments provided in the memo. Construction Plans. The applicant has submitted detailed construction plans related to sanitary sewer, water main, storm sewer, grading, drainage, landscaping, and other details that have been reviewed by the City. These must be revised in accordance with the Construction Plan engineering review memorandum dated November 17, 2016, attached. Staff is recommending that all revisions 3 BUSINESS ITEM 5A and modifications noted within the City Engineer’s review memorandum be completed prior to the release of Final Plat for recording as a condition of approval. Infrastructure Improvements and Phasing. The infrastructure improvements will tie in with the improvements completed in the 1st phase. Drainage and Utility Easements. Additional drainage and utility easements are required for various lots per the City Engineer’s Memorandum dated November 17, 2016. Shoreland District. While the proposed 2nd Addition Final Plat is in the Shoreland Overlay District, none of the lots are riparian, and there are no wetlands in the 2nd Addition. Parkland Dedication. No dedicated park or public open space is proposed with the 2nd Addition. There is a 550’ public trail to be constructed along Keats Avenue and connecting to Lower 8th Street. The developer will not receive parkland dedication credit for the 2nd Addition. Density. The entire portion of the approved Hammes Preliminary Plat is zoned Limited Density Residential (2.5-4 units per acre). The property’s gross density is 2.9 units per acre with a net density of 3.6 units/acre (37 units / (12.65 total acres – 2.393 acres right-of-way=10.257 developable acres) = 3.6). Lot Size. The average lot size of the lots in the 2nd Addition is .28 acres. The smallest lot is .227 acres, and the largest lot is .533 acres. This meets minimum lot size requirements of the LDR zoning district and consistent with Preliminary Plat. The lot widths and depths are all consistent with those of the approved Preliminary Plat. Neighboring Property Issues. The impact on the Stonegate development to the north and west was addressed during Preliminary Plat through the provision of a buffer. The 2nd Addition should not affect the Stonegate development due to its location within the development. REVIEW AND ANALYSIS The preliminary plat for Hammes Estates was approved with several conditions, which are indicated below along with Staff’s comments on the status of each. Preliminary Plat Conditions – With Staff Update Comments (updated information in bold italics): 1) Within six months of preliminary plat approval, the applicant shall complete the following: a) The applicant shall provide adequate title evidence satisfactory to the City Attorney; and b) The applicant shall submit a revised Preliminary Plat and plans meeting all conditions of approval. All of the above conditions shall be met prior to the City accepting an application for Final Plat and prior to the commencement of any grading activity on the site. Comment: a) all title work was submitted and reviewed by the City Attorney with the first phase of the development b) revised preliminary plat were approved with the approval of the first phase of the development. 2) The City Engineer shall review and approve all revised Preliminary Plans that are submitted to the City in advance of Final Plat to satisfy Condition #1. Comments: This has been completed (See Condition #1 response). 4 BUSINESS ITEM 5A 3) The Preliminary Plat approval is conditioned upon the applicant meeting all minimum City standards and design requirements. Comments: The preliminary plat was approved with the first phase of the development. 4) All required modifications to the plans as requested by the City Engineer in a review letter dated June 16, 2014 shall be incorporated into the plans prior to consideration of a Final Plat. Comments: This condition has been met. 5) Prior to the acceptance of the public improvements for the Hammes Estates plat, all wetland buffers shall be delineated and identified via staking or signage that is acceptable to the City. Comments: The final construction plans (Grading, Drainage and Erosion Control) include wetland buffer monuments to identify the locations of all wetland buffers. The applicants are aware of this condition and it will be a condition of final plat for all phases. 6) The landscape plan shall be updated per the recommendations of the City’s landscape consultant in a review memo dated 5/7/14. Comments: The City’s Landscape Consultant approved the Preliminary Landscape Plan and a review of the second addition landscape plans are in conformance with the preliminary plans and City requirements. 7) The applicant shall be responsible for the construction of all improvements within the Keats Avenue (CSAH 19) right-of-way as required by Washington County and further described in the review letter received from the County dated May 6, 2014. The required improvements shall include, but not be limited to: construction of a modified median crossing, construction of a trail/sidewalk to the south side of the median, turn lanes, and other improvements as required by the County. Comments: The Keats Avenue access is presently under construction as part of the first addition project. 8) The developer shall follow all of the rules and regulations spelled out in the Wetland Conservation Act, and shall acquire the needed permits from Valley Branch Watershed District prior to the commencement of any grading or development activity on the site. Comments: The site has been graded and VBWD permits were approved. 9) Landscape islands shall be platted as part of the right-of-way and shall be maintained by the Home Owners Association. The applicant shall enter into a maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park and open space on the final plat. Comments: A landscape license agreement was executed as part of the first addition plat and will be executed as part of the second addition plat. A condition of final plat will be that no building permits will be issued until the agreement is executed. 10) With an eligible parkland dedication of 5.7 acres provided, the applicant is responsible to pay a fee in lieu of land dedication for the equal market value amount of 2.1 acres of land at the time of the Final Developers Agreement. The City will work with the developer to clarify any and all park fee payments at the time of the Final Developers Agreement. Comments: Parkland dedication was addressed with the first addition final plat. The city will have the opportunity to review the park amenities prior to construction and the tot lot will be constructed in a future phase of the development. 5 BUSINESS ITEM 5A 11) No more than 100 units may be approved as part of a final plat until secondary access is provided to the subdivision via a connection to 5th Street through the Savona subdivision. Comments: The second phase development makes this connection. The construction plans must be updated to show existing conditions of 150 feet outside of the construction limit and must show plan and profile construction details to facilitate this connection as outlined in the City Engineer Review Memo. 12) For trails proposed to be located in any wetland buffer, the applicant must present a suitable design or material that is acceptable to the City and Valley Branch Watershed District. Comments: The applicants have presented a boardwalk design to the watershed district and the VBWD was agreeable to a boardwalk design through a small portion of the buffer area. The construction details of the proposed limited boardwalk section within the wetland buffer must be provided to the City as part of the Final Construction Plans for the pertinent future phase of the Hammes Estates subdivision. This condition does not pertain to the second phase of the development. 13) The applicant must enter into a separate grading agreement with the City prior to the commencement of any grading activity in advance of final plat and plan approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document extent of any proposed grading on the site. Comments: The project was graded with the first addition. 14) The applicant must incorporate a play structure into the proposed park at Goose Lake per the request of the Lake Elmo Park Commission. Furthermore, the applicant must submit an updated design of the park property that meets City approval in advance of Final Plat. Comments: An HOA owned and maintained tot lot play structure will be developed with a future phase of the development. The design of the Goose Lake Park amenities will require City approval prior to installation and must maintain the required 25-foot setback from the OHWL as specified in the Valley Branch Watershed District Permit. The applicant will be required to obtain the necessary watershed district permit for the improvements to Goose Lake Park. 15) The applicant shall work with the Planning Staff to name all streets in the subdivision prior to submission of a Final Plat. Comments: This condition has been met. 16) Lots 1-6, Block 10 and Lots 1-5 and 11-12, Block 9 shall not be platted until the southern channel of Goose Lake is closed off from the lake, or the shoreland issue around the channel is resolved in some other manner that is acceptable to the DNR. Comments: The applicants have received MN DNR approval to restore the southern shore of Goose Lake back to its original state, closing off the southern channel and Wetland G. The applicant is responsible for following all requirements and conditions of the DNR permit, including the 5-year invasive species monitoring. The monitoring is required as part of the first phase Landscape License Agreement. 17) The applicant shall work to relocate segments of the northern buffer trail further to the south of the Stonegate subdivision wherever it is feasible as long as the trail does not encroach on any required wetland buffers. Comments: The trail alignment has been staked as part of the 6 BUSINESS ITEM 5A first phase, but further refinements are ongoing based on feedback from Stonegate residents. Based on the above Staff report and analysis, Staff is recommending approval of the Final Plat with conditions intended to address the outstanding issues noted above and to further clarify the City’s expectations in order for the developer to proceed with the recording of the Final Plat. The recommended conditions are as follows: Recommended Conditions of Approval: 1) Final grading, drainage, and erosion control plans, utility plans, sanitary and storm water management plans, and street and utility construction plans shall be reviewed and approved by the City Engineer prior to the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in the Hammes Estates 2nd Addition – Final Plat Engineering Review Comments and Hammes Estates 2nd Addition Construction Plan Review memos dated 11/17/2016 shall be incorporated into these documents before they are approved. The Final Plat shall not be recorded until final construction plan approval is granted. 2) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements with financial guarantees therefore. 3) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to the execution of the Final Plat by City Officials. This must include additional or expanded drainage and utility easements as outlined in the City Engineer’s Memorandum dated November 17, 2016. 4) The plat shall be incorporated into the Hamme Estates Common Interest Agreement concerning management of the common areas of Hammes Estates and establishing a homeowner’s association shall be submitted in final form to the Planning Director before a building permit may be issued for any structure within this subdivision. Said agreement shall comply with Minnesota Statues 515B-103, and specifically the provisions concerning the transfer of control to the future property owners. 5) The applicant shall enter into a landscape license and maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park and open space on the Final Plat. 6) The Final Landscape Plan shall be revised per the requested modifications and shall be approved prior to the release of Final Plat for recording. 7) The applicant must provide written authorization to perform any work in the Electrical Transmission easement areas prior to the release of the Final Plat for recording. 8) The applicant shall abide by all conditions of the MN DNR Public Waters Work Permit dated 8/27/14. 7 BUSINESS ITEM 5A 9) Prior to the issuance of building permits, for Hammes Estates 2nd Addition, all wetland buffers shall be delineated and identified via staking or signage that is acceptable to the City. 10) The street name of Lower 8th Street shall be changed to Lower 8th Street North before recording the Final Plat. DRAFT FINDINGS Staff is recommending that the Planning Commission consider the following findings with regards to the proposed Hammes Estates 2nd Addition Final Plat: 1) That the Hammes Estates 2nd Addition Final Plat is consistent with the Preliminary Plat and Plans as approved by the City of Lake Elmo on July 1, 2013 and revised on September 19, 2016. 2) That the Hammes Estates 2nd Addition Final Plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 3) That the Hammes Estates 2nd Addition Final Plat complies with the City’s Urban Low Density Residential zoning district. 4) That the Hammes Estates 2nd Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, except as noted in this report or attachment thereof. 5) That the Hammes Estates 2nd Addition Final Plat complies with the City’s subdivision ordinance. 6) That the Hammes Estates 2nd Addition Final Plat is consistent with the City’s engineering standards with the exceptions noted by the City Engineer in his review comments to the City dated November 17, 2016. RECCOMENDATION: Staff recommends that the Planning Commission recommend approval of the Final Plat for Hammes Estates 2nd Addition with the 10 conditions of approval as listed in the Staff report. Suggested motion: “Move to recommend approval of the Hammes Estates 2nd Addition Final Plat with the 10 conditions of approval based on the findings of fact listed in the Staff Report.” ATTACHMENTS: 1. Application 2. Final Plat 3. Final Landscape Plans 4. City Engineer Review Memorandum, dated 11/17/2016 5. Landscape Review Comments 8 BUSINESS ITEM 5A ORDER OF BUSINESS: - Introduction ........................................................................................ Planning Staff - Report by Staff ................................................................................... Planning Staff - Questions from the Commission ............................ Chair & Commission Members - Discussion by the Commission .............................. Chair & Commission Members - Action by the Commission ..................................... Chair & Commission Members 7699 Anagram Drive Eden Prairie, MN 55344 PHONE 952-937-5150 FAX 952-937-5822 TOLL FREE 1-888-937-5150 x x x 7699 Anagram Drive Eden Prairie, MN 55344 PHONE 952-937-5150 FAX 952-937-5822 TOLL FREE 1-888-937-5150          PAGE 1 of 2  MEMORANDUM         Date:  November 17, 2016      To:  John Bender, P.E., Westwood Professional Services  Re:  Hammes Estates 2nd Addition  Cc:  Stephen Wensman, Planning Director  Chad Isakson, P.E., Assistant City Engineer    Construction Plan Review  From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Hammes Estates 2nd Addition Construction Plans consisting of  the following documentation prepared by Westwood Professional Services:     Hammes Estates 2nd Addition Final Plat, not dated.   Hammes Estates 2nd Addition Construction Plans dated November 1, 2016.   Hammes Estates 2nd Final Plat Application and Narrative dated November 1, 2016.      STATUS/FINDINGS:  The following comments have been provided in addition to the Final Plat comment memo to  direct  plan  corrections  necessary  for  final  construction  plan  approval.    When  submitting  revised  plans  and  specifications, please provide a point by point response letter that details all changes made to the plans.      FINAL CONSTRUCTION PLAN REVIEW COMMENTS    Specifications. Specifications for the Hammes 2nd Addition must be submitted for review by the City.   All Plan Sheets: Update the Block numbers to be consist with the proposed Plat.    Utility conduit crossing locations must be shown on all plans.   Sheet 2: Revise Street name for Juniper Avenue. The street name is listed correctly in one location and  listed incorrectly as Lower 8th Street in a second location.    Sheet 2: Revise plans to show the proposed residential street light locations and add plan note to identify  street light fixture/pole type and color specifications.   Sheet 3: Lower sanitary MH36 to avoid conflict between service pipe and storm sewer pipe.   Sheet 3: Add a mid‐block 8" gate valve along Lower 8th Street, near lots 6/7 and 10/11. The water system  must be designed to allow mains to be taken out of service with no more than 20 properties impacted.   Sheet 4: Add stationing for the watermain and sanitary sewer along the rear lot lines for Lots 1‐2, Block 3,  First Addition and Lots 1‐2, Block 1, Second Addition.    Sheet 4: Add a temporary hydrant at the end of the watermain stub to Block 2A.   Sheet 4: Adjust the vertical alignment of the watermain between sanitary sewer MH28 and MH40 to  remove the high point.   Sheet 4: Relocate the 8‐inch GV from approx. STA 2+50 on Juniper Avenue to the watermain connection  point at Savona to isolate the new watermain.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261 Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283           PAGE 2 of 2   Sheet 5: The plan and profile view must be on the plans to the full edge of plat and include existing  conditions. The utilities along the rear lot lines for Lots 1‐4, Block 3 must be shown to facilitate city staff  plan review.   Sheet 5: Show the catch basin and storm pipe in the rear lot of Lot 1, Block 3 to review easement needs.    Sheet 5: The plan view must include the trail construction and corresponding construction details between  Lots 3‐4, Block 3. Add plan notes and add pedestrian ramp as the trail connects to Lower 8th Street.   Sheet 5: Add a CB on the north curb line of Lower 8th Street across (NW) from CBMH123. Extend draintile  and cleanout 100 feet west from the new CB.   Sheet 5: Remove draintile and cleanout running at negative grade east/north from CBMH123.   Sheet 5: Revise CBMH126 in plan view to read CB126.   Sheet 5: Extend draintile and cleanout 100 feet west from CBMH125 and CB126.   Sheet 5: Add a CB on the north curb line of Lower 8th Street across from CBMH129. Curb runs cannot  exceed 350 feet without a catch basin.   Sheet 5: Remove draintile and cleanout running at negative grade east from CBMH132.   Sheet 5 and 6: Add draintile elevations to structures in profile view.   Sheet 5: Add street sign on the corner of June Avenue and Lower 8th Street.   Sheet 5 & 6: Add proposed residential street light locations to the plan view.   Sheet 6: Juniper Avenue North must be constructed to connect into the Savona development.   Existing conditions must be shown on the plans up to the necessary construction limits plus 150  feet minimum and include plan and profile based on actual field survey.   The construction plans must be updated showing both plan and profile construction details to  facilitate this connection including the removal of the temporary turnaround. Curb and centerline  match point elevations must be identified.   Sheet 6: The sidewalk along Juniper Avenue in the Savona development is located on the east side of the  street. The Hammes development shows the sidewalk on the west side of the street. The plans should be  revised to relocate the sidewalk to the east side of Juniper Avenue North.   The sidewalk relocation to the east side of the street must also be revised along Juniper Avenue North for  the Hammes 1st Addition.   Sheet 6: Extend draintile and cleanout 100 feet south from CBMH135 and CBMH136.   Sheet 7: Install bituminous trail from 8th Street, along the rear property lines for Lots 1‐2, Block 3, First  Addition and Lots 1‐2, Block 1, Second Addition. Extend trail to the limits of the sanitary and watermain  construction.    LANDSCAPE PLAN:   This review does not cover the Landscape Plan or Irrigation Plan. Plan review to be completed by other City  representatives.    Landscape Plan must include a Plan Note that tree locations must be field located and inspected by City  prior to install.         PAGE 1 of 1  MEMORANDUM         Date:  November 17, 2016      To:  Stephen Wensman, Planning Director  Re:  Hammes Estates 2 nd Addition – Final Plat  Cc:  Chad Isakson, P.E., Assistant City Engineer    Engineering Review Comments  From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Hammes Estates 2nd Addition development. Final Plat/Final  Construction Plans were received on November 2, 2016. The submittal consisted of the following documentation  prepared by Westwood Professional Services, or as noted:   Hammes Estates 2nd Addition Final Plat, not dated.   Hammes Estates 2nd Addition Construction Plans dated November 1, 2016.   Hammes Estates 2nd Final Plat Application and Narrative dated November 1, 2016.      STATUS/FINDINGS:   Engineering review comments have been provided in two separate memos; one for Final Plat  approval, and one to assist with the completion of the final Construction Plans.  Please see the following review  comments relating to the Final Plat application.      FINAL PLAT: HAMMES ESTATES 2ND ADDITION   Final  Construction  Plans  and  Specifications  must  be  revised  in accordance  with  the  Construction  Plan  engineering review memorandum dated November 17, 2016.    Final Construction Plans and Specifications must be prepared in accordance with the City Engineering Design  Standards  Manual  using  City  details,  plan  notes  and  specifications  and  meeting  City  Engineering  Design  Guidelines.   All easements as requested by the City Engineer and Public Works department shall be documented on the  Final Plat prior to the release of the Final Plat for recording.   Additional  drainage  and  utility  easement  is  required  for  Lot  4,  Block  1  to  provide  a  minimum  15  feet  separation from the catch basin located at the northwest corner of the lot.   A minimum 15 foot side lot drainage and utility easement is required along the south property line of Lot 1,  Block 2 to provide a minimum 15 foot separation from the existing storm sewer pipe.   Additional drainage and utility easements are required for Lots 14‐17, Block 3, to cover the rear lot drainage  swales.  Lots  11‐13,  Block  3  should  also  be  carefully  reviewed  to  ensure  adequate  drainage  and  utility  easement for the proposed lot grading.    FINAL CONSTRUCTION PLANS & SPECIFICATIONS   No construction for Hammes Estates 2nd Addition may begin until the applicant has received City Engineer  approval for the Final Construction Plans and Specifications; the applicant has obtained and submitted to the  City all applicable permits, easements and permissions needed for the project; and a preconstruction meeting  has been held by the City’s engineering department.   The Final Plat shall not be recorded until final construction plan approval is granted.   A separate memorandum will be provided to direct additional plan corrections necessary for final construction  plan approval.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261 Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283