Loading...
HomeMy WebLinkAbout2017 Planning Dept Work Plan1 2017 Planning Department Work Plan Prepared by the Lake Elmo Planning Commission:11/28/16 Accepted by the City Council: _______ Key Status C – Complete IP – In Progress PL Priority Level (1-5 with 1 being the highest priority) Project and Description PL Status Zoning Map Amendments • Update Zoning Map to change Village parcels to VMX consistent with the Comprehensive Plan 2 IP Zoning Text Amendments • Codify Zoning Ordinance 1 • Public Facilities ordinance amendments 5 • Home Occupation Ordinance 3 • Update PUD Ordinance to match OP PUD Process 2 • Outdoor Lighting Ordinance Revisions 5 • Wireless Communications Ordinance for Microcell technology 4 • Create new zoning district for Washington County Landfill consistent with the MPCA 3 IP • Create V-LDR V-MDR District and Regulations 1 IP • Repeal Article XIV – OP Alt District 3 IP • Draft a form-based code to supplement the Village Mixed-Use zoning district based on the scope of work (Incorporate design standards from the Design Standards Manual as part of a form-based code) 5 • Obtain DNR approval of revised Shoreland Ordinance 1 C • Adopt final version of Shoreland Ordinance based on DNR approval 1 IP • Resolve zoning conflicts with the Metropolitan Airports Commission, Met Council, MnDOT, and Washington County 4 IP • Implement City airport zoning regulations for the airport safety zones within the Village Planning Area 4 • Solar garden/solar power ordinance 3 • Wind power ordinance 3 Subdivision Ordinance Amendments • Platting for Minor Subdivisions 5 IP • Update subdivision submission requirements 1 IP • Prepare update to incorporate updated engineering standards 4 2 Comprehensive Plan Amendments • 2040 Comprehensive Plan Update 1 IP • Plan for possible density reductions and reguiding land use in the Village and I-94 area to address changes in the 2015 system statement 1 IP • Amend Rural Single Family land use description to allow for sewer service within the MUSA & Amend Village MUSA 1 C • Assist with the creation of a master plan for selected City parks, provide assistance to Parks Commission as needed 3 IP • Prepare CPA to guide RR and A parcels less than 20 acres in size to RE 1 Other Planning Initiatives • Submit application for new Village Parkway railroad crossing 2 • Update Village AUAR 1 C • Develop a policy or ordinance for stormwater reuse. 3 • Update City’s Master Developer Agreement 1 IP • Add/Review Planning Module from Permit Works to track planning and zoning applications 3 • Investigate conservation easement holder options/city policy 1 • Research /develop drone policy or ordinance 5 Ongoing Planning Activities • Update Parks 10-year CIP 2 IP • Planning Commission review of 10-year Capital Improvement Plan for consistency with the Comprehensive Plan 2 C • Provide support to code enforcement program with the Building Inspector as the City’s code enforcement officer 3 IP • Archive older zoning files 4 IP • Streamline & Improve Policies/Procedures for the handling of routine land matters including but not limited to variances, site plan review, setbacks et al; 1 IP