Loading...
HomeMy WebLinkAbout#08 - Inwood Booster Station Change Order 5 & 6 STAFF REPORT DATE: December 5, 2017 CONSENT ITEM #: AGENDA ITEM: Inwood Booster Station Improvements - Change Order No. 5 and Compensating Change Order No. 6 SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Rob Weldon, Public Works Director Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Change Order No. 5 and Compensating Change Order No. 6 for the Inwood Booster Station Improvements? BACKGROUND: Magney Construction, Inc. was awarded a construction contract to complete the Inwood Booster Station Improvements on April 5, 2016. The booster station construction work is now complete. PROPOSAL DETAILS/ANALYSIS: Magney Construction, Inc. has submitted Change Order No. 5 to decrease the contract by $1,285.50 as a credit for not providing the chlorine breathing apparatus included in the contract. City Staff reviewed the equipment needs and response procedure and determined this equipment was not necessary. Compensating Change Order No. 6 is also included to revise the estimated quantities for each work item listed in the bid schedule to the actual quantities installed on the project at the unit bid prices. This change order reflects a net decrease to the contract amount by $14,135.20. This decrease is due to payment on actual quantities installed and a lower cost to install utility services to the building than originally planned. FISCAL IMPACT: Change Order No. 5 will decrease the contract in the amount of $1,285.50 bringing the revised construction contract to $1,314,148.95. Compensating Change Order No. 6 will decrease the contract in the amount of $14,135.20 bringing the revised construction contract to $1,300,013.75. With approval of these change orders the project remains within the authorized project budget and contingencies. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 5 and Compensating Change Order No. 6 for the Inwood Booster Station Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 5, thereby decreasing the contract amount by $1,285.50, and Compensating Change Order No. 6, thereby decreasing the contract amount by $14,135.20 for the Inwood Booster Station Improvements” ATTACHMENTS: 1. Change Order No. 5. 2. Compensating Change Order No. 6. CHANGE ORDER NO.5 INWOOD BOOSTER STATION IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2014.129 QUANTITY UNIT PRICE AMOUNT CO4-1 LS 1 -$ -$ CO4-2 LS 1 -$1,285.50 -$1,285.50 TOTALS - CHANGE ORDER NO. 1 -$1,285.50 See attached submittal Extend substantial completion from 6/30/17 to 8/23/17 to minimize punchlist items and better coincide with tower schedule Start-up Extention until 6/30/17 DESCRIPTION / JUSTIFICATIONITEMDESCRIPTION OF PAY ITEM UNIT CHANGE ORDER Chlorine Breathing Apparatus (Emergency eqp.) removal Proposal SEND TO Company name FromPeter Aldritt Attention Date 3/1/2017 Fax Phone Proposal # Urgent Please comment X Please review For your information Total pages, including cover:2 COMMENTS RE: Credit for Returned Breathing Apparatus Lucas, Material:Vessco Breathing Unit (1,285.50)$ -$ Subtotal -$ General Contractor's Overhead -$ Bond & Insurance premiums Total (1,285.50)$ Thank you, Peter Aldritt Project Manager Accepted By Date Please review this proposal and feel free to contact me with any questions, comments or concerns. We are offering the following deduct for the Chlorine Breathing Apparatus. Subcontractor: Labor: MSA Lucas Jones MC-P6 Page 1 of 1 Ordered (952) 474-1674 Cust Account # Cust PO # Terms Ship Via Ship Info. FOB Order # Rep Customer Phone 04/15/16 011588 491-11240 43977 150 BEST SHIPPING POINT MAGNEY CONSTRUCTION, INC.1401 PARK ROADCHANHASSEN, MN 55317 GARY DISCH (612)801-3416MAGNEY CONSTRUCTION, INC.INWOOD BOOSTER STATION2576 INWOOD AVE. NLAKE ELMO, MN 55042 Net 30 Bill To: Ship To: 68855 03/01/17Date TAX ID MNT Job # 201629 8217 Upland CircleChanhassen, MN 55317 (952) 941-2678FAX (952) 941-0796 Shipped 2/28/2017 Accounts Payable Item Num Description Order Ship Unit Price Ext PriceB/O 243838 Airhawk w/ hd Case AA2LA01A00C11AA1 -1 1,200.00 -1,200.00-1 0 CR-Tax CR-Freight (85.50) 0.00 (1,285.50)Credit Total (1,200.00)CREDIT FOR RETURNED BREATHING APPARATUS FROM LAKE ELMO PROJECT.Credit CHANGE ORDER NO.6 INWOOD BOOSTER STATION IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2014.129 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT NET CHANGE AMOUNT 1 LS 1 55,000.00$ $55,000.00 1.00 $55,000.00 0 $0.00 2 LS 1 700.00$ $700.00 1.00 $700.00 0 $0.00 3 LF 240 3.00$ $720.00 240 $720.00 0 $0.00 4 LS 1 2,000.00$ $2,000.00 1 $2,000.00 0 $0.00 5 EA 1 1,000.00$ $1,000.00 1 $1,000.00 0 $0.00 6 HR 10 105.00$ $1,050.00 0 $0.00 -10 -$1,050.00 7 LS 1 4,800.00$ $4,800.00 1 $4,800.00 0 $0.00 $65,270.00 $64,220.00 -$1,050.00 8 EA 3 1,500.00$ $4,500.00 3 $4,500.00 0 $0.00 9 LF 65 50.00$ $3,250.00 65 $3,250.00 0 $0.00 10 LF 100 120.00$ $12,000.00 100 $12,000.00 0 $0.00 11 LB 344 16.00$ $5,504.00 344 $5,504.00 0 $0.00 $25,254.00 $25,254.00 $0.00 12 LF 15 50.00$ $750.00 0 $0.00 -15 -$750.00 13 LF 130 50.00$ $6,500.00 121 $6,050.00 -9 -$450.00 14 EA 1 1,500.00$ $1,500.00 1 $1,500.00 0 $0.00 15 EA 2 3,000.00$ $6,000.00 2 $6,000.00 0 $0.00 16 CY 10 160.00$ $1,600.00 10 $1,600.00 0 $0.00 $16,350.00 $15,150.00 -$1,200.00 17 CY 690 20.00$ $13,800.00 690 $13,800.00 0 $0.00 18 SELECT GRANULAR BORROW (P)CY 110 25.00$ $2,750.00 110 $2,750.00 0 $0.00 19 SUBGRADE PREPARATION LS 1 1,400.00$ $1,400.00 1.00 $1,400.00 0 $0.00 20 AGGREGATE BASE CLASS 5 TON 140 22.00$ $3,080.00 118 $2,596.00 -22 -$484.00 21 TYPE SP 9.5 WEAR COURSE MIX (2,B)TON 50 95.00$ $4,750.00 51 $4,825.05 1 $75.05 22 4" CONCRETE SIDEWALK SY 41 70.00$ $2,870.00 31 $2,170.00 -10 -$700.00 23 SEGMENTAL RETAINING WALL FF 480 23.00$ $11,040.00 438 $10,074.00 -42 -$966.00 24 SPLIT RAIL FENCE LF 120 17.00$ $2,040.00 120 $2,040.00 0 $0.00 25 GUARD POST EA 3 350.00$ $1,050.00 3 $1,050.00 0 $0.00 26 6" PERFORATED PVC DRAIN LF 140 40.00$ $5,600.00 140 $5,600.00 0 $0.00 27 8" INLINE DRAIN EA 5 900.00$ $4,500.00 5 $4,500.00 0 $0.00 28 ROOF DRAIN COLLECTION EA 5 900.00$ $4,500.00 5 $4,500.00 0 $0.00 29 EA 1 900.00$ $900.00 1 $900.00 0 $0.00 $58,280.00 $56,205.05 -$2,074.95 30 31 LS 1 18,550.00$ $18,550.00 1.00 $18,550.00 0.00 $0.00 32 LS 1 19,620.00$ $19,620.00 1.00 $19,620.00 0.00 $0.00 31000 LS 1 58,760.00$ $58,760.00 1.00 $58,760.00 0.00 $0.00 32000 LS 1 5,100.00$ $5,100.00 1.00 $5,100.00 0.00 $0.00 33516 LS 1 1,860.00$ $1,860.00 1.00 $1,860.00 0.00 $0.00 42000 LS 1 70,480.00$ $70,480.00 1.00 $70,480.00 0.00 $0.00 55000 LS 1 3,350.00$ $3,350.00 1.00 $3,350.00 0.00 $0.00 61000 LS 1 25,500.00$ $25,500.00 1.00 $25,500.00 0.00 $0.00 62210 LS 1 1,170.00$ $1,170.00 1.00 $1,170.00 0.00 $0.00 71113 LS 1 670.00$ $670.00 1.00 $670.00 0.00 $0.00 72113 LS 1 1,250.00$ $1,250.00 1.00 $1,250.00 0.00 $0.00 72126 LS 1 2,700.00$ $2,700.00 1.00 $2,700.00 0.00 $0.00 72726 LS 1 4,000.00$ $4,000.00 1.00 $4,000.00 0.00 $0.00 DIVISION 1 - GENERAL TRAFFIC CONTROL COMPENSATING CHANGE ORDER NO. 6ITEMDESCRIPTION OF PAY ITEM UNIT MOBILIZATION SILT FENCE CLEARING AND GRUBBING TEMPORARY ROCK CONSTRUCTION ENTRANCE STREET SWEEPING SITE RESTORATION SUBTOTAL - DIVISION 1 DIVISION 2 - WATER MAIN CONNECT TO EXISTING WATERMAIN AND SERVICE 1.5" COPPER WATER SERVICE PIPE 12" DUCTILE IRON WATERMAIN PIPE, CLASS 52 DUCTILE IRON FITTINGS SUBTOTAL - DIVISION 2 DIVISION 3 - STORM SEWER 10" PVC DRAIN 18" RCP STORM SEWER PIPE, CLASS 5 18" RCP FLARED END SECTION CATCH BASIN/MANHOLE RANDOM RIPRAP CLASS III (CV) SUBTOTAL - DIVISION 3 DIVISION 4 - DRIVEWAY CONSTRUCTION COMMON EXCAVATION (P) DRAINTILE CLEANOUT SUBTOTAL - DIVISION 4 DIVISION 5 - BOOSTER FACILITY Supervision Bond & Insurance Concrete Work Rebar Heavy Duty Concrete Floor Finish Masonry Work Misc. Metals Rough Carpentry Plastic Trim Bituminous Damproofing Insulation (below grade) Blown Fiberglass Insulation Fluid Applied Membrane Air Barrier CONTRACT TOTAL TO DATE 73113 LS 1 6,600.00$ $6,600.00 1.00 $6,600.00 0.00 $0.00 74618 LS 1 6,550.00$ $6,550.00 1.00 $6,550.00 0.00 $0.00 74646 LS 1 10,600.00$ $10,600.00 1.00 $10,600.00 0.00 $0.00 79200 LS 1 3,210.00$ $3,210.00 1.00 $3,210.00 0.00 $0.00 81600 LS 1 11,950.00$ $11,950.00 1.00 $11,950.00 0.00 $0.00 88100 LS 1 500.00$ $500.00 1.00 $500.00 0.00 $0.00 88410 LS 1 9,960.00$ $9,960.00 1.00 $9,960.00 0.00 $0.00 97750 LS 1 9,640.00$ $9,640.00 1.00 $9,640.00 0.00 $0.00 99600 LS 1 13,400.00$ $13,400.00 1.00 $13,400.00 0.00 $0.00 101469 LS 1 200.00$ $200.00 1.00 $200.00 0.00 $0.00 104416 LS 1 350.00$ $350.00 1.00 $350.00 0.00 $0.00 220000 LS 1 22,500.00$ $22,500.00 1.00 $22,500.00 0.00 $0.00 230000 LS 1 46,400.00$ $46,400.00 1.00 $46,400.00 0.00 $0.00 260500 LS 1 79,800.00$ $79,800.00 1.00 $79,800.00 0.00 $0.00 312305 LS 1 7,880.00$ $7,880.00 1.00 $7,880.00 0.00 $0.00 331300 LS 1 950.00$ $950.00 1.00 $950.00 0.00 $0.00 402323 LS 1 111,400.00$ $111,400.00 1.00 $111,400.00 0.00 $0.00 412223 LS 1 1,200.00$ $1,200.00 1.00 $1,200.00 0.00 $0.00 444200 LS 1 26,200.00$ $26,200.00 1.00 $26,200.00 0.00 $0.00 444256 LS 1 78,200.00$ $78,200.00 1.00 $78,200.00 0.00 $0.00 444416 LS 1 101,500.00$ $101,500.00 1.00 $101,500.00 0.00 $0.00 33 LS 1 30,000.00$ $30,000.00 1.00 $30,000.00 0.00 $0.00 34 LS 1 215,000.00$ $215,000.00 1.00 $215,000.00 0.00 $0.00 35 LS 1 105,000.00$ $105,000.00 1.00 $105,000.00 0.00 $0.00 36 LS 1 10,000.00$ $10,000.00 0.02 $189.75 -0.98 -$9,810.25 37 LS 1 20,000.00$ $20,000.00 1.00 $20,000.00 0.00 $0.00 38 SY 625 2.00$ $1,250.00 625.00 $1,250.00 0.00 $0.00 $1,143,250.00 $1,133,439.75 -$9,810.25 TOTALS - BASE CONTRACT $1,308,404.00 $1,294,268.80 -$14,135.20 CO1 LS 1 (5,048.49)$ -$5,048.49 1.00 -$5,048.49 0.00 $0.00 CO2 LS 1 2,754.96$ $2,754.96 1.00 $2,754.96 0.00 $0.00 CO3 LS 1 6,236.98$ $6,236.98 1.00 $6,236.98 0.00 $0.00 CO4 LS 1 3,087.00$ $3,087.00 1.00 $3,087.00 0.00 $0.00 CO5 LS 1 (1,285.50)$ -$1,285.50 1.00 -$1,285.50 0.00 $0.00 $5,744.95 $5,744.95 $0.00 TOTALS - DIFFERENCE IN CONTRACT AND ACTUAL WORK COMPLETED $1,314,148.95 $1,300,013.75 -$14,135.20 Asphalt Shingles Metal Soffit & Fascia, gutters & downspouts Mineral Fiber Siding Joint Sealants FRP Doors Glass & Glazing Translucent Windows FRP Surface laminated panels High performance Coating Warning Signs Fire Extinguishers Plumbing HVAC Electircal PROCESS INSTRUMENTATION AND CONTROL (SYSTEM INTEGRATOR) 230 KW GENERATOR SET Earthwork Disinfection of Water Storage Structures Process Piping Portable Hand Chain Hoist & Trolley Water System Storage Tanks SUBTOTAL - CHANGE ORDER(S) Change Order #1 (Items 1-7) Change Order #2 (Item 1) Change Order #3 (Item 1) Change Order #4 (Item 1) Change Order #5 (Item 1) UTILITY ALLOWANCE (ELECTRIC, NATURAL GAS, TELECOMMUNICATION/DATA) HOLDING TANK AND ASSOCIATED PIPING EROSION CONTROL BLANKET SUBTOTAL - DIVISION 5 CHANGE ORDER(S) Vertical Split Case Booster Pumps Gas Chlorination Sytem SCADA INTEGRATION AND SYSTEM IMPROVEMENTS (SCADA CONTRACTOR) ALLOWANCE