HomeMy WebLinkAbout#10 Inwood Tower No. 4 - Pay Request No 9 STAFF REPORT DATE: March 21, 2017 CONSENT ITEM #: 10 AGENDA ITEM: Inwood Water Tower (No. 4) – Pay Request No. 9 SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Krintina Handt, City Administrator Jack Griffin, City Engineer BACKGROUND: CB&I, Inc. was awarded a construction contract on March 15, 2016 to complete the Inwood Water Tower (No. 4) project. The contractor has submitted Partial Pay Request No. 9. ISSUE BEFORE COUNCIL: Should the City Council approve Pay Request No. 9? PROPOSAL DETAILS/ANALYSIS: CB&I, Inc., has submitted Partial Pay Request No. 9 in the amount of $103,664.95. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $95,125.43. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 9 for the Inwood Water Tower (No. 4) project. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 9 to CB&I, Inc. in the amount of $103,664.95 for the Inwood Water Tower (No. 4)”. ATTACHMENTS: 1. Partial Pay Estimate No. 9 PROJECT PAY FORM PARTIAL PAY ESTIMATE NO. PERIOD OF ESTIMATE TO PROJECT OWNER:CONTRACTOR: 1.Original Contract Amount 2.Net Change Order Sum 3.Revised Contract (1+2) 4. *Work Completed 5. *Stored Materials 6.Subtotal (4+5) 7.Retainage* 8.Previous Payments 9.Amount Due (6‐7‐8) *Detailed Breakdown Attached START DATE:ON SCHEDULE SUBSTANTIAL COMPLETION:X FINAL COMPLETION: ENGINEER'S CERTIFICATION: SEH, Inc. DATE CONTRACTOR'S CERTIFICATION:CONTRACTOR DATE APPROVED BY OWNER:CITY OF LAKE ELMO, MINNESOTA DATE DATE BY BY YES NO The undersigned Contractor certifies that to the best of their  knowledge, information and belief the work covered by this payment  estimate has been completed in accordance with the contract  documents, that all amounts have been paid by the contractor for  work for which previous payment estimates was issued and payments  received from the owner, and that current payment shown herein is  now due. The undersigned certifies that the work has been reviewed and to the  best of their knowledge and belief, the quantities shown in this  estimate are correct and the work has been performed in accordance  with the contract documents. ENGINEER BY 4/7/2016 11/2/2017 REVISED DAYS REMAINING 574 0 264 9/28/2017 ORIGINAL DAYS CONTRACT CHANGE ORDER SUMMARY PAY ESTIMATE SUMMARY 9 2/11/20171/15/2017FROM INWOOD WATER TOWER NO. 4 PROJECT NO. 2015.130 CITY OF LAKE ELMO 3800 LAVERNE AVENUE NORTH LAKE ELMO, MN 55042 ATTN: JACK GRIFFIN, CITY ENGINEER CB&I Inc. 14109 S. ROUTE 59 PLAINFIELD, IL 60544 ATTN: MICHAEL ALLISON CONTRACT TIME TOTALS $8,744.00 $0.00 $103,664.95 NET CHANGE $8,744.00 $95,125.435.0% $1,703,718.13 $0.00 $1,902,508.50 1 5/3/2016 $0.00 $0.00 $2,403,744.00 2 9/20/2016 $8,744.00 $0.00 $1,902,508.50 No.Approval  Date Amount $2,395,000.00 Additions Deductions $8,744.00 3/3/2017 FOCUS Engineering, inc.PROJECT PAYMENT FORM 3/3/17 PARTIAL PAY ESTIMATE NO. 9 INWOOD WATER TOWER NO. 4 8 CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2015.130 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1                    $16,000.00 $16,000.00 $0.00 1.00 $16,000.00 2 EA 1                    $3,822.00 $3,822.00 $0.00 1.00 $3,822.00 3 LS 1                    $2,068.00 $2,068.00 $0.00 0.50 $1,034.00 4 CY 120                $10.00 $1,200.00 $0.00 60.00 $600.00 5 SY 200                $6.00 $1,200.00 150.00 $900.00 150.00 $900.00 6 CY 100                $30.00 $3,000.00 $0.00 0.00 $0.00 7 CY 150                $16.00 $2,400.00 $0.00 0.00 $0.00 8 TON 1,250            $22.00 $27,500.00 625.00 $13,750.00 625.00 $13,750.00 9 TON 65                  $99.00 $6,435.00 $0.00 0.00 $0.00 10 TON 65                  $99.00 $6,435.00 $0.00 0.00 $0.00 11 GAL 35                  $10.00 $350.00 $0.00 0.00 $0.00 12 SF 350                $25.00 $8,750.00 $0.00 0.00 $0.00 13 SF 100                $20.00 $2,000.00 $0.00 0.00 $0.00 14 EA 1                    $2,300.00 $2,300.00 $0.00 0.00 $0.00 15 LF 10                  $110.00 $1,100.00 $0.00 0.00 $0.00 16 LF 120                $140.00 $16,800.00 $0.00 0.00 $0.00 17 EA 1                    $1,980.00 $1,980.00 $0.00 0.00 $0.00 18 EA 1                    $4,864.00 $4,864.00 $0.00 0.00 $0.00 19 LB 700                $2.50 $1,750.00 $0.00 0.00 $0.00 20 LF 140                $2.00 $280.00 $0.00 0.00 $0.00 21 EA 1                    $2,618.00 $2,618.00 $0.00 0.00 $0.00 22 CY 16                  $76.00 $1,216.00 $0.00 0.00 $0.00 23 SY 30                  $6.00 $180.00 $0.00 0.00 $0.00 24 LF 90                  $68.00 $6,120.00 $0.00 0.00 $0.00 25 EA 1                    $1,700.00 $1,700.00 $0.00 0.00 $0.00 26 CY 10                  $92.00 $920.00 $0.00 0.00 $0.00 27 SY 37                  $3.00 $111.00 $0.00 0.00 $0.00 28 LF 500                $2.25 $1,125.00 $0.00 250.00 $562.50 29 LF 1,000            $2.00 $2,000.00 $0.00 0.00 $0.00 30 AC 1.5                 $4,000.00 $6,000.00 $0.00 0.00 $0.00 31 AC 1.5                 $3,500.00 $5,250.00 $0.00 0.00 $0.00 $137,474.00 $14,650.00 $36,668.50 1 LS 1                  $47,900.00 $47,900.00 $0.00 1.00 $47,900.00 2 LS 1                  $239,500.00 $239,500.00 $0.00 0.98 $234,710.00 3 LS 1                  $316,100.00 $316,100.00 $0.00 1.00 $316,100.00 4 LS 1                  $287,700.00 $287,700.00 0.03 $8,631.00 1.00 $287,700.00 5 LS 1                  $413,400.00 $413,400.00 $0.00 0.95 $392,730.00 6 LS 1                  $372,100.00 $372,100.00 $0.00 1.00 $372,100.00 7 LS 1                  $214,600.00 $214,600.00 0.40 $85,840.00 1.00 $214,600.00 8 LS 1                  $142,300.00 $142,300.00 $0.00 0.00 $0.00 9 LS 1                  $43,450.00 $43,450.00 $0.00 0.00 $0.00 10 LS 1                  $74,200.00 $74,200.00 $0.00 0.00 $0.00 11 LS 1                  $976.00 $976.00 $0.00 0.00 $0.00 12 LS 1                  $89,800.00 $89,800.00 $0.00 0.00 $0.00 13 LS 1                    $15,500.00 $15,500.00 $0.00 0.00 $0.00 $2,257,526.00 $94,471.00 $1,865,840.00 $2,395,000.00 $109,121.00 $1,902,508.50 TOTAL CHANGE ORDER NO.1 0 1                  $0.00 $0.00 $0.00 0.00 $0.00 TOTAL CHANGE ORDER NO.2 0 1                  $8,744.00 $8,744.00 $0.00 0.00 $0.00 $2,403,744.00 $109,121.00 $1,902,508.50TOTALS ‐ REVISED CONTRACT PREASSEMBLED SILT FENCE STRAW BIOROLL TEMPORARY SEEDING (MIX 22‐111 WITH TYPE I MULCH) SUBTOTAL ‐ DIVISION 2 DIVISION 2 ‐ ELEVATED STORAGE TANK WATER TOWER CONTROL PANEL AND RTU ENGINEERING & APPROVAL TANK MATERIALS TANK FABRICATION & SHIP FOUNDATION CONSTRUCTION CONCRETE SHAFT CONSTRUCTION TANK ERECTION (ON GROUND) TANK PAINT (ON GROUND) HOIST TANK TANK PAINT (IN AIR) GEOTEXTILE FABRIC TYPE I 18" RCP STORM SEWER PIPE, CL. V 18" APRON W/TRASH GUARD HAND PLACED RIP RAP, CL. III GEOTEXTILE FABRIC TYPE IV DIVISION 1 ‐ SITE & UTILITY WORK MOBILIZATION ROCK CONSTRUCTION ENTRANCE TRAFFIC CONTROL POLYETHYLENE ENCASEMENT SUBGRADE EXCAVATION GEOTEXTILE FABRIC TYPE V SELECT GRANULAR BORROW ORGANIC TOPSOIL BORROW ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE SEEDING (MIX 25‐131 WITH FERTILIZER & HYDROMULCH) SUBTOTAL ‐ DIVISION 1 AGGREGATE BASE, CLASS 6 BIT WEARING COURSE MIX (WEA240B) BIT NON‐WEARING COURSE MIX (WEB240B) TACK COAT 16" DIP WATER MAIN PIPE, CL. 52 HYDRANT 8" CONCRETE APRON CONNECT TO EXISTING WATERMAIN 6" DIP WATER MAIN PIPE, CL. 52 6" GATE VALVE & BOX 4" CONCRETE WALK DIP FITTINGS 4' X 4' CATCH BASIN WITH GRATING 1.5" CLEAR TOCK INSURANCE AND BONDS STERILIZE AND TEST ELECTRICAL TOTALS ‐ BASE CONTRACT