HomeMy WebLinkAbout#14 Inwood 5th Final Plat496491v1 SJS LA515-30 STAFF REPORT DATE: 4/4/2017 REGULAR ITEM #: 14 MOTION TO: City Council FROM: Stephen Wensman, Planning Director AGENDA ITEM: Inwood 5th Addition Final Plat and Final PUD Plans REVIEWED BY: Stephen Wensman, Planning Director Jack Griffin, City Engineer Kristina Handt, City Administrator Sarah Sonsalla, City Attorney Greg Malmquist, Fire Chief Mike Bent, Building Official Emily Becker, City Planner BACKGROUND: M/I Homes of Minneapolis/St. Paul (f/k/a Hans Hagen Homes) is requesting approval of its final plat and final Planned Unit Development (PUD) plans for the Inwood 5th Addition plat to create 101 single family residential lots, the last phase of the residential PUD for Inwood. The Planning Commission reviewed the final plat and final PUD plans on March 13, 2017 and has recommended approval with 11 conditions. ISSUE BEFORE COUNCIL: The Council is being requested to review the final plat and final PUD plans and to adopt Resolution 2017-029 (a, b, or amended) approving the final plat and PUD plans with 11 (or amended) conditions. PROPOSAL DETAILS/ANALYSIS: Inwood 5th Addition is the final phase of the residential PUD. The City’s subdivision ordinance establishes the procedure for obtaining final plat approval. A final plat can only be approved if it is in substantial conformance with the approved preliminary plat and if in conformance, it must be approved. The final plat and final PUD plans that were submitted by M/I are generally consistent with the preliminary plat and preliminary PUD plans with the exception of the following: •10th Street Right-of-Way. Washington County’s review of the preliminary plat, dated November 17, 2014, required that an additional 32 feet of right-of-way be dedicated by the developer in the plat for future 10th Street improvements. Emails between John Rask of Has Hagen (M/I) and Ann Terwedo, Washington County Transportation Planner in November of 2014 and up to the Council’s approval of the preliminary plat show a dialogue requesting the County review right-of-way dedication on the north City Council Meeting Regular Agenda item # 4/4/2017 Page 2 496491v1 SJS LA515-30 side of 10th Street rather than the 32 feet of dedication from the Inwood plat that was being required. There is no documentation that any agreement was reached. Furthermore, the November 24, 2014 staff report reiterates Washington County’s need and request for right-of-way dedication for 10th Street in the plat. A condition of approval in the Resolution approving the Inwood Preliminary Plat (City Council Resolution 2014-094), states: The applicant shall be responsible for updating the final construction plans to include construction of all improvements within the County rights-of-way as required by Washington County and further described in the review letter received from the County dated November 17, 2014. The signed and recorded Inwood Developer Agreement includes a special provision: The Developer shall observe all other county requirements as specified in the Washington County review letter dated November 17, 2014 or any subsequent direction from the County. Staff believes the requirement for the additional 10th Street right-of-way was well documented and repeatedly conditioned by the City. The developer also agreed to it in the Developer Agreement. The Inwood 5th final plat and PUD plans that have been submitted do not include this additional right-of-way. Staff is recommending that a condition of final plat approval be that the final plat and the PUD plans be changed to include the additional right-of-way. • 10th Street Trail (between Island Trail and Inwood Avenue). When the City Council approved the Inwood preliminary plat, a condition of approval in the resolution (City Council Resolution 2014-094 was as follows: The developer shall install a multi-purpose trail along 10th Street between “Street B” (Island Trail) and Inwood Avenue. The November 24, 2014 Planning Commission Staff Report indicates that Staff at the time was supportive of the applicant’s request to remove this requirement, however, the condition remained in the Planning Commission’s recommendation and the Council’s adopted resolution of approval. The conditions of approval for the Inwood final plat contained in City Council Resolution 2015-40, again, required the trail, although, the Planning Commission Staff Report also indicated that the developer was still requesting that the City and County consider the trail on the north side of 10th Street. The County’s November 17, 2014 letter (referenced above) also references the trail requirement. As discussed above, this letter was incorporated as a special provision into the Developer Agreement which was signed and recorded. Staff believes that the requirement for the trail was well documented and repeatedly conditioned by the City. The developer also agreed to it in the Developer Agreement. The Inwood 5th final plat and PUD plans that were submitted do not include the trail. City Council Meeting Regular Agenda item # 4/4/2017 Page 3 496491v1 SJS LA515-30 Staff is recommending that a condition of final plat approval be that the final plat and the PUD plans be changed to include the trail. The developer has maintained that 60 feet of right-of-way for 10th Street was dedicated in the 1st Addition plat and therefore, the City waived its right to request additional right-of-way. In response, the City acceptance of 60 feet of right-of-way in the plat does not negate the additional need and request for an additional 32 feet that was well documented in the conditions of approval for the preliminary plat and in the Developer Agreement. The developer has contended that because the additional right-of-way for 10th Street requirement was not included as a condition of approval in City Council Resolution 2015-40, which approved the final plat for Inwood and that the 10th Street right-of-way and trail requirements were not conditions of approval in resolutions of subsequent plat additions, these conditions were no longer being required and the City waived its rights to assert these conditions. According to the City Attorney, “it is typical for developers to not dedicate right-of-way and trails within outlots that will later be platted for future development.” The property that includes the trail and the additional 10th Street right-of-way was not located within the 1st, 2nd, 3rd, or 4th additions, so that is why these items were not conditions of approval with respect to those plats. The 5th Addition is the first time that the area being platted abuts 10th Street and includes the area where the trail would be located. The developer has stated that it believes that the County has changed its plans with respect to the 10th Street right-of-way dedication. It is clear from reviewing the correspondence records that the County has been consistent with respect to the additional 32 feet of right-of-way for 10th Street requirement, and although it was willing to consider allowing the additional right-of-way to be dedicated on the property to the north, this additional right-of-way has not been provided and therefore, it remains a requirement with respect to the 5th Addition final plat. The developer has also stated that since the property was graded and an as-built survey of the graded property was submitted and accepted by the City that this means that the right-of-way and trail were not being required. Grading of an area prior to final plat is at the developer’s risk. The City’s approval of the as-built survey is simply a staff review of grading and drainage on the property and their engineering components and does not encompass review of any additional requirements that may be imposed by the City through the approval process. Furthermore, additional grading is usually needed for each addition, so the grading that was initially completed as part of the 1st Addition is not necessarily final with respect to the area that encompasses the 5th Addition as plans change. FISCAL IMPACT: The 10th Street right-of-way issue is of financial concern to the City. If the right-of-way and trail are not dedicated within the Inwood 5th final plat and the County needs additional right-of-way in the future for a future 10th Street widening project, the County will have to purchase the right-of- way. The County has indicated that it will pass these costs on to the City. It is possible that the needed right-of-way may be obtained from the property to the north if and when that property develops, however, if M/I does not provide the right-of-way that is being required with respect to City Council Meeting Regular Agenda item # 4/4/2017 Page 4 496491v1 SJS LA515-30 Inwood 5th Addition now, the landowner to the north would have to dedicate more than its fair share to meet the amount needed for 10th Street. OPTIONS: The City Council has the following options: 1) Adopt Resolution 2017-029 b approving the Inwood 5th Final Plat and Final PUD plans with the conditions recommended by Staff. 2) Adopt Resolution 2017-029 a approving the Inwood 5th Final Plat and Final PUD plans with the conditions recommended by the Planning Commission. 3) Change the conditions and/or findings and adopt an amended Resolution 2017-029 c approving the Inwood 5th Final Plat and Final PUD plans. PLANNING COMMISSION/PUBLIC HEARING: The Planning Commission held a public hearing and reviewed the Inwood 5th Final Plat and PUD Plans on March 13, 2017 and recommended approval with 11 conditions. There was no public testimony during the public hearing. The Planning Commission decided to remove Staff’s recommended condition #11 pertaining to the trail requirement. The Commission also added a new condition that a trail be constructed between Island Trail North and the previously constructed north-south trail adjacent to the Stonegate subdivision. The Planning Commission also recommended the following modifications to the recommended findings for approval: #8 That legal issues related to the 32’ of right-of-way are beyond the scope of the Planning Commission. #9 That if trail between Island Trail and Inwood Avenue is required, the City should credit the developer for the costs of the trail against the park dedication requirements. The Commission’s primary concerns were: • The loss of the landscape berm that is currently located within the right-of-way that would be dedicated for 10th Street if the right-of-way and trail were required. • If the trail is required, the developer should get credit for the trail construction against park dedication paid/granted. • Some members felt the trail was not needed. RECOMMENDATION: Staff recommends the City Council adopt Resolution 2017-029 b approving the Inwood 5th Final Plat and Final PUD Plans with the following motion “Move to adopt Resolution 2017-029 b approving the Inwood 5th Addition Final Plat and Final PUD Plans as recommended by Staff.” City Council Meeting Regular Agenda item # 4/4/2017 Page 5 496491v1 SJS LA515-30 If the Council is in support of the Planning Commission recommendation, then the recommended motion is: “Move to adopt Resolution 2017-029 a approving the Inwood 5th Addition Final Plat and Final PUD Plans as recommended by the Planning Commission.” If the Council changes the conditions and/or findings, then Staff recommends the following motion: “Move to adopt Resolution 2017-029 c with the following changes (list changes to the conditions or findings).” ATTACHMENTS: • Staff Recommended Resolution 2017-029 b • Planning Commission Recommended Resolution 2017-029 a • Planning Commission packet • Draft Planning Commission Minutes dated 3/13/2017 1 Resolution 2017-__ CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2017-029 b A RESOLUTION APPROVING A FINAL PLAT AND FINAL PLANNED UNIT DEVELOPMENT (PUD) PLAN FOR INWOOD 5TH ADDITION PLANNED UNIT DEVELOPMENT WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, M/I Homes of Mpls./St. Paul/Hans Hagen Homes, 941 NE Hillwind Road, Suite 300, Fridley, MN has submitted an application to the City of Lake Elmo (“City”) for a Final Plat and Final PUD Plan for Inwood 5th Addition Planned Unit Development, a copy of which is on file in the City of Lake Elmo Planning Department; and WHEREAS, the City approved the Inwood PUD General Concept Plan on September 16, 2014; and WHEREAS, the City approved the Inwood Preliminary Plat and Preliminary PUD Plan on December 2, 2014 with 19 conditions; and WHEREAS, the proposed Inwood 5th Addition Final Plat and Final PUD Plan includes 101 single family residential lots within the single family residential portion of the 157.2-acre Inwood planned unit development located in Stage 1 of the I-94 Corridor Planning Area; and WHEREAS, the Lake Elmo Planning Commission held public hearing on March 13, 2017 to consider the Final Plat and Final PUD Plan request; and WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending approval of the Final Plat and Final PUD Plan subject to 11 conditions of approval; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation concerning the Final Plat and Final PUD Plan as part of a memorandum to the City Council for the April 4, 2017 Council Meeting; and WHEREAS, the City Council reviewed the Inwood 5th Addition Final Plat and Final PUD Plan at its meeting held on April 4, 2017 and made the following findings: 1. That all the requirements of City Code Section 153.08 related to the Final Plat have been met by the Applicant. 2. That the proposed Final Plat for Inwood 5th Addition consists of the creation of 101 single- family detached residential structures. 2 Resolution 2017-__ 3. That the Inwood 5th Addition Final Plat is generally consistent with the Preliminary Plat and PUD Plans as approved by the City of Lake Elmo on December 2, 2014 with conditions. 4. That the Inwood 5th Addition Final Plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 5. That the Inwood 5th Addition Final Plat generally complies with the City’s Urban Low Density Residential zoning district except as previously approved as part of the Inwood PUD. 6. That the Inwood 5th Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, except as previously approved as part of the Inwood PUD with conditions. 7. That the Inwood 5th Addition Final Plat complies with the City’s subdivision ordinance. NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the InWood 5th Addition Final Plat and Final PUD Plan subject to the following conditions: 1. All easements as requested by the City Engineer or Public Works Department shall be documented on the Final Plat prior to the recording of the final plat. 2. That Final grading, drainage, and erosion control plans, utility plans, sanitary and storm water management plans, street and utility construction plans and agreements shall be reviewed and approved by the City Engineer complying with all conditions/comments from the City Engineer’s review memorandum dated February 15, 2017 prior to the recording of the final plat. 3. That the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements with financial guarantees therefore prior to recording of the final plat. 4. The applicant shall provide evidence that all conditions attached the South Washington Watershed District permit for the final plat have been met prior to the commencement of any grading/construction activity. 5. That the Landscape Plans shall be revised to address the Planning and Engineering review comments prior to recording the final plat. 6. That Outlots A, B, C, and D be dedicated to the City for stormwater purposes with the recording of the final plat. 7. A Common Interest Agreement concerning management of the common areas of Inwood 5th Addition and establishing a homeowner’s association shall be submitted in final form to the Planning Director before a building permit may be issued for any structure within this subdivision. 3 Resolution 2017-__ 8. The developer shall also enter into a landscape license agreement and maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park and open space on the final plat. 9. The Developer shall provide 32 feet of right-of-way for 10th Street and observe all County requirements as specified in the Washington County review letter dated November 17, 2014 or any subsequent direction from the County. 10. The Island Trail/10th Street intersection must be reviewed and approved by Washington County. Improvements required by Washington County at the intersection shall be the responsibility of the developer and shall be incorporated into the final PUD plans. 11. The developer shall construct a multi-purpose trail along 10th Street between Island Trail to Inwood Avenue prior to issuance of building permits and the final PUD plans shall be updated showing the trail prior to recording the final plat. Passed and duly adopted this 4th day of April, 2017 by the City Council of the City of Lake Elmo, Minnesota. ___________________________________ Mike Pearson, Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk 1 Resolution 2017-__ CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2017-029 a A RESOLUTION APPROVING A FINAL PLAT AND FINAL PLANNED UNIT DEVELOPMENT (PUD) PLAN FOR INWOOD 5TH ADDITION PLANNED UNIT DEVELOPMENT WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, M/I Homes of Mpls./St. Paul/Hans Hagen Homes, 941 NE Hillwind Road, Suite 300, Fridley, MN has submitted an application to the City of Lake Elmo (“City”) for a Final Plat and Final PUD Plan for Inwood 5th Addition Planned Unit Development, a copy of which is on file in the City of Lake Elmo Planning Department; and WHEREAS, the City approved the Inwood PUD General Concept Plan on September 16, 2014; and WHEREAS, the City approved the Inwood Preliminary Plat and Preliminary PUD Plan on December 2, 2014 with 19 conditions; and WHEREAS, the proposed Inwood 5th Addition Final Plat and Final PUD Plan includes 101 single family residential lots within the single family residential portion of the 157.2-acre Inwood planned unit development located in Stage 1 of the I-94 Corridor Planning Area; and WHEREAS, the Lake Elmo Planning Commission held public hearing on March 13, 2017 to consider the Final Plat and Final PUD Plan request; and WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending approval of the Final Plat and Final PUD Plan subject to 11 conditions of approval; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation concerning the Final Plat and Final PUD Plan as part of a memorandum to the City Council for the April 4, 2017 Council Meeting; and WHEREAS, the City Council reviewed the Inwood 5th Addition Final Plat and Final PUD Plan at its meeting held on April 4, 2017 and made the following findings: 1. That all the requirements of City Code Section 153.08 related to the Final Plat have been met by the Applicant. 2. That the proposed Final Plat for Inwood 5th Addition consists of the creation of 101 single- family detached residential structures. 2 Resolution 2017-__ 3. That the Inwood 5th Addition Final Plat is generally consistent with the Preliminary Plat and PUD Plans as approved by the City of Lake Elmo on December 2, 2014 with conditions. 4. That the Inwood 5th Addition Final Plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 5. That the Inwood 5th Addition Final Plat generally complies with the City’s Urban Low Density Residential zoning district except as previously approved as part of the Inwood PUD. 6. That the Inwood 5th Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, except as previously approved as part of the Inwood PUD with conditions. 7. That the Inwood 5th Addition Final Plat complies with the City’s subdivision ordinance. 8. That legal issues surrounding the 32’ of right-of-way and the trail are beyond the scope of the Planning Commission. 9. That the Planning Commission finds significant value to the existing berm that the developer built along 10th Street and the County should be requested to retain the berm regardless of the right of way issue. 10. That the City consider any trail required to be implemented by the development from Island Trail to Inwood be credited towards parkland dedication. NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the InWood 5th Addition Final Plat and Final PUD Plan subject to the following conditions: 1. All easements as requested by the City Engineer or Public Works Department shall be documented on the Final Plat prior to the recording of the final plat. 2. That Final grading, drainage, and erosion control plans, utility plans, sanitary and storm water management plans, street and utility construction plans and agreements shall be reviewed and approved by the City Engineer complying with all conditions/comments from the City Engineer’s review memorandum dated February 15, 2017 prior to the recording of the final plat. 3. That the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements with financial guarantees therefore prior to recording of the final plat. 4. The applicant shall provide evidence that all conditions attached the South Washington Watershed District permit for the final plat have been met prior to the commencement of any grading/construction activity. 5. That the Landscape Plans shall be revised to address the Planning and Engineering review comments prior to recording the final plat. 3 Resolution 2017-__ 6. That Outlots A, B, C, and D be dedicated to the City for stormwater purposes with the recording of the final plat. 7. A Common Interest Agreement concerning management of the common areas of Inwood 5th Addition and establishing a homeowner’s association shall be submitted in final form to the Planning Director before a building permit may be issued for any structure within this subdivision. 8. The developer shall also enter into a landscape license agreement and maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park and open space on the final plat. 9. The Developer shall provide 32 feet of right-of-way for 10th Street and observe all County requirements as specified in the Washington County review letter dated November 17, 2014 or any subsequent direction from the County. 10. The Island Trail/10th Street intersection must be reviewed and approved by Washington County. Improvements required by Washington County at the intersection shall be the responsibility of the developer and shall be incorporated into the final PUD plans. 11. That a trail be constructed between Island Trail N. and the previously constructed north- south trail adjacent to the Stonegate subdivision Passed and duly adopted this 4th day of April, 2017 by the City Council of the City of Lake Elmo, Minnesota. ___________________________________ Mike Pearson, Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk PUBLIC HEARING ITEM 4b STAFF REPORT DATE: 03/13/2017 AGENDA ITEM: 4B– PUBLIC HEARING ITEM CASE #2016-57 TO: Planning Commission ITEM: Inwood 5th Addition Final Plat and Final Planned Unit Development Plans SUBMITTED BY: Stephen Wensman, Planning Director REVIEWED BY: Jack Griffin, City Engineer Emily Becker, City Planner Sarah Sonsalla, City Attorney Kristina Handt, City Administrator SUMMARY AND ACTION REQUESTED: M/I Homes of Minneapolis/St. Paul (Hans Hagen Homes) is requesting approval of Final Plat and Final Planned Unit Development (PUD) Plans for Inwood 5th Addition to create 101 single family lots. Staff is recommending the Planning Commission recommend approval with the following motion: “move to recommend approval of the Inwood 5th Addition final plat and PUD plans with 12 conditions based on the findings listed in the Staff report. GENERAL INFORMATION Applicant: M/I Homes/Hans Hagen Homes (John Rask), 941 NE Hillwind Rd. Suite 300, Fridley, MN Property Owners: M/I Homes (John Rask), 941 NE Hillwind Rd. Suite 300, Fridley, MN Location: Outlots A, B, F and G, Inwood 3rd Addition. PID#: 33.029.21.11.0045, 33.029.21.11.0046, 33.029.21.12.0047 and 33.029.21.12.0048 Request: Application for Final Plat and Final PUD approval of a 101 unit residential subdivision to be named Inwood 5th Addition. Existing Land Use and Zoning: undeveloped outlots in Inwood 3rd Final Plat area. Current Zoning: LDR/PUD – Low Density Residential Planned Unit Development. Surrounding Land Use and Zoning: Surrounded by residential lots to the south, parkland to the east, Commercial/PUD zoning to the west and 10th Street N. to the North. Comprehensive Plan: Urban Low Density Residential (2.5 - 4 units per acre) Planning Commission Meeting Page 2 03/13/2017 PUBLIC HEARING ITEM 4b History: The City Council approved the general concept plan for the Inwood on September 16, 2014, the preliminary plat on December 2, 2014 and the Final Plat on May 19, 2015 for phase 1. Inwood 2nd was approved on 9/1/15, Inwood 3rd was approved on 4/19/16. Inwood 4th was approved on 10/18/16. Deadline for Action: Application Complete – 02/10/2017 60 Day Deadline – 04/11/2017 Extension Letter Mailed – No 120 Day Deadline – Applicable Regulations: Chapter 153 – Subdivision Regulations Article 10 – Urban Residential Districts (LDR) Article 16 – Planned Unit Development Regulations §150.270 Storm Water, Erosion, and Sediment Control REQUEST DETAILS This report is based upon a review of the preliminary plat and PUD plans dated 11/28/16 with an additional submittal on 2/10/17. The developer resubmitted plans on 3/6/17 with a plan date of 3/3/17. These plans have not been reviewed by City staff. M/I Homes/Hans Hagen Homes is requesting Final Plat and Final Planned Unit Development (PUD) approval of Inwood 5th Addition, replat of Outlots, A, B, F and G, Inwood 3rd Addition. The final plat will result in 101 single family lots on 27.71 acres. Inwood 5th Addition will be the last phase of the single family development within the Inwood development and will connect Island Trail to 10th Street North. The final plat will have a gross density of 3.65 dwelling units per acre compared to the overall Inwood gross density of 2.7 DUA as there are no ponds, wetlands, collector roads or parkland in the 5th addition. Lot widths vary from just under 38 feet to 234.5 feet and lot sizes vary from 4,940 sq. ft. to 22,869 sq. ft. The preliminary plat and preliminary PUD established 38 feet as the most narrow lot width. There are two lots, Lots 2 and 7, Block 1 that are 38 feet in width. The preliminary plat for the area encompassing the 5th addition identifies 4 more lots than what is proposed for the 5th Addition Final Plat. Plat Summary: Development area 27.70 acres Total lot area: 20.16 acres Residential lots: 101 R/W area: 4.68 acres Average lot size: .20 acres Gross density: 3.65 dwelling units per acre Net density: 3.65 dwelling units per acre There is no parkland dedication in the 5th Addition. All parkland dedicated was addressed with the first phase. The City’s subdivision ordinance establishes the procedure for obtaining final subdivision approval. A final plat can only be approved if it is in substantial conformance with the approved preliminary Planning Commission Meeting Page 3 03/13/2017 PUBLIC HEARING ITEM 4b plat and if in conformance it must be approved. Staff has reviewed the final plat and found that it is generally consistent with the preliminary plat. REVIEW AND ANALYSIS The preliminary plat was approved on December 2, 2014 with conditions. Although the final plat is generally consistent with the preliminary plat, there are a number of conditions of preliminary plat that have not yet been complied with. Staff has reviewed the final plat and final PUD development plans and has identified the following issues: Fewer Lots. Blocks 3 and 4 each have one lot less than shown on the preliminary plat. Block 2 has two less lots than the preliminary plat. The reduction in lots results in slightly larger lots in the 5th Addition. Although the 5th Addition has four fewer lots than on the preliminary plat, Staff believes the change is an improvement and not a significant issue. 10th Street Right-of-Way. Washington County’s preliminary plat review, dated 11/17/14, requests an additional 32 feet of right-of-way from future 10th Street improvements. The 11/24/14 Planning Staff report reiterates Washington County’s need and request for right-of-way dedication for 10th Street. A condition of approval for the Inwood Preliminary Plat, Resolution 2014-094, states, “the applicant shall be responsible for updating the final construction plans to include construction of all improvements within the County rights-of-way as required by Washington County and further described in the review letter received from the County dated November 17, 2014.” In addition, the signed and recorded Inwood Developer Agreement includes a special provision: “The Developer shall observe all other county requirements as specified in the Washington County review letter dated November 17, 2014 or any subsequent direction from the County.” Staff believes the requirement for the additional 10th street right-of-way was repeatedly conditioned and well documented and is a deficiency in the Inwood 5th Final Plat and PUD Plans and as a result has been made a condition of approval. 10th Street Trail. A condition of approval for the Inwood Preliminary Plat, Resolution 2014-094 states, “The developer shall install a multi-purpose trail along 10th Street between “Street B” (Island Trail) and Inwood Avenue.” The 11/24/14 Planning Commission Staff Report indicates that Staff at the time was supportive of the applicant’s request to remove this requirement, however, the condition remained in the Commission’s recommendation and the Councils resolution of approval. The condition of approval for the Inwood final plat contained in Resolution 2015-40, again, required the trail. The preliminary plat plans were never updated to show this trail, and the developer has not shown them on the Inwood 5th Final plat as required. Staff believes this is a significant deficiency in the Inwood 5th Final Plat and PUD Plans and as a result the trail has been made a condition of approval. Landscape Plans. The landscape plans for the development are generally consistent with the preliminary landscape plans for the development. There are a few issues that need to be addressed prior to approval:  The Crabapples in Island Trail median should be removed or replaced with an upright tree that will not encroach into the R/W.  The irrigation service for the landscaping should be shown on the landscape plans and should be coordinated with the utility plans.  Landscaping and berming within the 32 feet to be dedicated for the 10th Street R/W will need to be moved out of the R/W. Planning Commission Meeting Page 4 03/13/2017 PUBLIC HEARING ITEM 4b  The landscape plans shall be updated to match changes to the PUD Plans. Engineering Review. The City Engineer has reviewed the final plat submittal and has prepared a memorandum for the Commission and Council’s review. The comments in the City Engineer’s review memorandum dated February 15, 2017 should be addressed prior to releasing the plat for recording. There are a number of comments that pertain to the final plat which should be amended and resubmitted prior to approval:  Revise and resubmit the Final Plat to provide the required watermain easements and to address the required construction plan changes per the construction plans comments.  Revise the final plat to show the dedication of an additional 32 feet along the south right-of- way of 10th Street per the conditions of preliminary plat approval (further described above).  Provide minimum 30 foot wide watermain utility easement over the pipe over Outlot K.  Add minimum 30 foot wide watermain utility easement centered over the pipe on lots 6 and 7, Block 4 for the 12” watermain pipe.  Revise R/W width or revise street section of Island Trail between 10th Street and Irving Boulevard. The proposed R/W width is insufficient to meet City street and boulevard layout standards.  The minimum one-way street width is 18 feet from face of curb to face of curb, not back of curb to back of curb. The lane width must be increased by 1 foot.  The Island Trail with median typical section on Sheet No. 25 does not allow for boulevard trees meeting minimum safety setbacks.  The end turning radius of 35 feet for each of the one-way loop roads do not meet the City minimum standards of 45 feet. Revise end radius to the minimum 45 ft. or provide additional pavement width to accommodate an equivalent turning radius.  Revise the intersection f Irving Boulevard and island Trail to align the drive lane centerlines. Provide a center median on the west leg of Irving Boulevard.  Revise the intersection of Irving Court to intersect Irving Boulevard at 90-degrees for the first 50 feet. Preliminary Plat Conditions. The Inwood 5th Addition final plat is generally in conformance with the preliminary plat except for as identified in this report. The following are the Inwood preliminary plat and PUD plans conditions of approval, as per Resolution 2014-094, with the status of each listed in bold italics: 1) The applicant shall work with Community Development Director to name all streets in the subdivision in a manner acceptable to the City prior to the submission of final plat. The Planning Department had named all streets within the entire plat and has reviewed them again against the City’s new street naming ordinance and has found them to be in conformance with the ordinance. 2) The City and the applicant shall reach an agreement concerning the location and dedication of land associated with the proposed water necessary to provide adequate water service to the InWood project area prior to the acceptance of a final plat for any portion of the PUD area. The Developer and the City have an agreement and the water tower is presently under construction. 3) The preliminary landscape plan shall be updated to address the review comments from the City’s landscape architecture consultant as noted in a review letter dated November Planning Commission Meeting Page 5 03/13/2017 PUBLIC HEARING ITEM 4b 18, 2014. The review comments were addressed. In addition, the 5th Addition landscape plans are mostly in conformance with City regulations. Landscaping and berming planted within the R/W to be dedicated for 10th Street will need to be moved out of the R/W. Final approval of the landscape plans will be required prior to recording the plat. 4) Prior to the submission of a final plat for any portion of the InWood PUD, the developer shall reach agreement with the City to determine the appropriate park dedication calculations for the entire development area. Park dedication was provided with the 1st Addition. 5) As part of any development agreement that includes improvements to one of the adjacent County State Aid Highways (CSAH 13 and 10th Street), the City and the developer shall determine the appropriate responsibility for the cost of these improvements. The 5th Addition connects Island Trail to 10th Street N. Cost sharing for improvements to CSAH 13 were determined and agreed upon with the 1st Addition. 6) The applicant must enter into a separate grading agreement with the City prior to the commencement of any grading activity in advance of final plat and plan approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document extent of any proposed grading on the site. Grading was completed under a separate grading agreement and was graded according to plans. 7) The applicant shall continue to work with the City on the final design of 5th Street, and in particular, the transition from the InWood PUD to properties located further to the east (including the Boulder Ponds development and land owned by Bremer Financial Services). 5th Street was constructed with prior phases of the development. 8) The utility construction plans shall be updated to incorporate the recommendations of the City Engineer concerning the appropriate location and size of sewer services through the PUD planning area, including any requested oversizing of these facilities to service adjacent properties. This item was completed with prior phases of the development. 9) The proposed public street access to 5th Street from Streets D2 and the southeast park area (Park 1) shall be eliminated from the preliminary development plans in order to bring the proposed spacing into conformance with the City’s access spacing guidelines. The developer shall provide access into the park to the satisfaction of the City Engineer. This change was made to the preliminary plat. 10) All center median planting areas as depicted on the preliminary plat and plans shall be owned by the City of Lake Elmo and maintained by the Home Owners Association. The applicant shall enter into a maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park, trails, or open space on the final plat. The HOA documents address this condition. Additionally, a landscape license agreement will be drafted and executed between the City and Developer that will assign responsibilities for installation and maintenance of landscaping. Planning Commission Meeting Page 6 03/13/2017 PUBLIC HEARING ITEM 4b 11) The applicant must either move the planned north/south tail through Park 1 further to the west around an existing wetland area located approximately 400 feet south of 10th Street or will need to work with the South Washington Watershed District to design a multi-purpose trail through the buffer area that complies with all applicable watershed district’s requirements. The trail was installed with previous phases of the development. 12) The Final Plat and Plans must address the requested modifications outlined in the City Engineer’s review memoranda dated November 16, 2014 and November 24, 2014. The plans were updated with the 1st Addition. 13) The applicant shall be responsible for updating the final construction plans to include the construction of all improvements within County rights-of-way as required by Washington County and further described in the review letter received from the County dated November 17, 2014. The plans were updated to include the required right-of-way improvements, but not the required R/W dedication. The trail within the R/W between Island Trail and Inwood is also missing from the plans. 14) Prior to recording the Final Plat for any portion of the area shown in the Preliminary Plat, the Developer shall enter into a Developers Agreement acceptable to the City Attorney that delineates who is responsible for the design, construction, and payment of public improvements. A developer agreement will be prepared for the 5th Addition with the final plat as it was done in previous phases. 15) The developer must follow all the rules and regulations of the Wetland Conservation Act, and adhere to the conditions of approval for the South Washington Watershed District Permit. There are no wetland impacts in the 5th Addition and all conditions of approval for the South Washington Watershed District Permit have been complied with. 16) The developer shall provide landscape material along the west side of Pond #200 to the satisfaction of the City’s landscape consultant. This condition has been addressed. 17) The developer shall incorporate elements from the Lake Elmo Theming Study at the intersection of 5th Street and Inwood Avenue. This condition was addressed with the design of 5th Street in prior phases of the development. 18) The developer shall install a multi-purpose trail along 10th Street between “Street B” and Inwood Avenue. This condition should be addressed with the 5th Addition development. Street B is now named Island Trail and the current plan submittal shows no trail between island Trail and Inwood Avenue along 10th Street (see issues section above) 19) The multi-purpose trail through the eastern buffer area shall be kept as far west on the applicant’s property as possible, and the final alignment of this trail shall be subject to review by the City’s landscape consultant. This condition has been met. RECOMMENDED CONDITIONS OF APPROVAL: Staff is recommending approval of the final plat and PUD plat with the following conditions: 1) All easements as requested by the City Engineer or Public Works Department shall be documented on the Final Plat prior to the recording of the final plat. Planning Commission Meeting Page 7 03/13/2017 PUBLIC HEARING ITEM 4b 2) That Final grading, drainage, and erosion control plans, utility plans, sanitary and storm water management plans, street and utility construction plans and agreements shall be reviewed and approved by the City Engineer complying with all conditions/comments from the City Engineer’s review memorandum dated February 15, 2017 prior to the recording of the final plat. 3) That the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements with financial guarantees therefore prior to recording of the final plat. 4) The applicant shall provide evidence that all conditions attached the Valley Branch Watershed District permit for the final plat have been met prior to the commencement of any grading/construction activity. 5) That the Landscape Plans shall be revised to address the Planning and Engineering review comments prior to recording the final plat. 6) That Outlots A, B, C, and D be dedicated to the City for stormwater purposes with the recording of the final plat. 7) A Common Interest Agreement concerning management of the common areas of Inwood 5th Addition and establishing a homeowner’s association shall be submitted in final form to the Planning Director before a building permit may be issued for any structure within this subdivision. 8) The developer shall also enter into a landscape license agreement and maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park and open space on the final plat. 9) The Developer shall provide 32 feet of right-of-way for 10th Street and observe all County requirements as specified in the Washington County review letter dated November 17, 2014 or any subsequent direction from the County. 10) The Island Trail/10th Street intersection must be reviewed and approved by Washington County. Improvements required by Washington County at the intersection shall be the responsibility of the developer and shall be incorporated into the final PUD plans. 11) The developer shall construct a multi-purpose trail along 10th Street between Island Trail to Inwood Avenue prior to issuance of building permits and the final PUD plans shall be updated showing the trail prior to recording the final plat. DRAFT FINDINGS Staff is recommending that the Planning Commission consider the following findings with regards to the Inwood 5th Addition Final Plat and PUD Plans: Planning Commission Meeting Page 8 03/13/2017 PUBLIC HEARING ITEM 4b 1. That all the requirements of City Code Section 153.08 related to the Final Plat have been met by the Applicant. 2. That the proposed Final Plat for Inwood 5th Addition consists of the creation of 101 single- family detached residential structures. 3. That the Inwood 5th Addition Final Plat is generally consistent with the Preliminary Plat and PUD Plans as approved by the City of Lake Elmo on December 2, 2014 with conditions. 4. That the Inwood 5th Addition Final Plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 5. That the Inwood 5th Addition Final Plat generally complies with the City’s Urban Low Density Residential zoning district except as previously approved as part of the Inwood PUD. 6. That the Inwood 5th Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, except as previously approved as part of the Inwood PUD with conditions. 7. That the Inwood 5th Addition Final Plat complies with the City’s subdivision ordinance. RECOMENDATION: Staff recommends that the Planning Commission recommend approval of the Inwood 5th Addition Final Plat and Final PUD with 12 conditions based on the findings listed in the Staff report. Suggested motion: “Move to recommend approval of the Inwood 5th Addition Final Plat and Final PUD plans with 12 conditions based on the findings listed in the Staff Report.” ATTACHMENTS: 1. Application Narrative 2. Inwood 5th Addition Final Plat 3. Inwood 5th Addition Final Landscape Plans 4. City Engineer’s report, dated February 15, 2017 5. Resolution 2014-094 approving the Inwood Preliminary Plat 6. Resolution 2015-40 approving Inwood 1st Addition 7. Planning Commission Report, dated 11/24/14 8. Washington County Review letter November 17, 2014 9. Washington County Review letter January 9, 2017 1 Final Plat and PUD Final Plan Narrative Hans Hagen Homes December 22, 2016 2. Written Statements a. List of contact information: Applicant John Rask Hans Hagen Homes 941 NE Hillwind Road, Suite 300 Fridley, MN 55432 763-586-7200 Property Owner Inwood 10 LLC 95 South Owasso Blvd. E St. Paul, MN 55117 651-484-0070 Surveyor Dan Obermiller EG Rud and Sons, Inc. 6776 Lake Drive NE, Suite 110 Lino Lakes, MN 55014 651-361-8200 Civil Engineer Brian Krystofiak, PE Carlson McCain, Inc. 248 Apollo Drive, Suite 100 Lino Lakes, MN 55014 763-489-7905 Wetland Consultant Melissa Barrett Kjolhaug Environmental 26105 Wild Rose Lane Shorewood, MN 55331 952-401-8757 b. A listing of the following site data: Address, current zoning, parcel size in acres and square feet, property identification number(s) (PID), and current legal description(s); 2 See attached. c. Final Subdivision and Lot Information i. InWood 5th Addition ii. Lot Tabulation – see attached plat and table. The 5th addition plat includes a total of 101 lots, which is consistent with the approved preliminary plat for this part of the neighborhood. iii. There is no park land dedicated in this phase. iv. 4.68 acres of public right-of-way. d. An explanation of how issues have been addressed since the Preliminary Plat phase of the development; The final plat for the 5th Addition is consistent with the preliminary plat and conditions of approval as discussed below. Conditions of Preliminary Plat Approval: 1. The applicant shall work with Community Development Director to name all streets in the subdivision in a manner acceptable to the City prior to the submission of final plat. Response: The Community Development Director has supplied street names for the entire plat. 2. The City and the applicant shall reach an agreement concerning the location and dedication of land associated with the proposed water necessary to provide adequate water service to the InWood project area prior to the acceptance of a final plat for any portion of the PUD area. Response: The applicant and City have agreement on the final water system design. The property owner, Inwood 10 LLC, has provided land for a future City water tower. 3. The preliminary landscape plan shall be updated to address the review comments from the City’s landscape architecture consultant as noted in a review letter dated November 18, 2014. Response: The applicant has submitted revised plans to the City addressing the above. Landscaping for the first phase and 5th Street has been installed. 4. Prior to the submission of a final plat for any portion of the InWood PUD, the developer shall work with the City to determine the appropriate park dedication calculations for the entire development area. 3 Response: The Park Dedication requirements were satisfied with the Final Plat for Inwood. Outlot L, Inwood was dedicated to the City for future park. 5. As part of any development agreement that includes improvements to one of the adjacent County State Aid Highways (CSAH 13 and 10th Street), the City and the developer shall determine the appropriate responsibility for the cost of these improvements. Response: The 5th Addition included a future connection to 10th Street. Cost sharing was determined and agreed upon with the Inwood final plat for CSAH 13 and funds were provided by Hans Hagen Homes. No specific cost sharing agreement has been determined for the CSAH 10/10th Street intersection. 6. The applicant must enter into a separate grading agreement with the City prior to the commencement of any grading activity in advance of final plat and plan approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document extent of any proposed grading on the site. Response: The applicant entered into a separate grading agreement with the City and has graded the property consistent with the approval. 7. The applicant shall continue to work with the City on the final design of 5th Street, and in particular, the transition from the InWood PUD to properties located further to the east (including the Boulder Ponds development and land owned by Bremer Financial Services). Response: The applicant worked with the City on the final design and has constructed 5th Street through the project site. 8. The utility construction plans shall be updated to incorporate the recommendations of the City Engineer concerning the appropriate location and size of sewer services through the PUD planning area, including any requested oversizing of these facilities to service adjacent properties. Response: The utility plans were updated and resubmitted to the City Engineer prior to the approval of the Inwood Final Plat. 9. The proposed public street access to 5th Street from Streets D2 and the southwest park area (Park 1) shall be eliminated from the preliminary development plans in order to bring the proposed spacing into conformance with the City’s access spacing guidelines. Staff is requesting that the developer continue working with the City to determine the most appropriate access into and out of the southwest park area. Response: This change was made to the preliminary plat. 10. All center median planting areas as depicted on the preliminary plat and plans shall be owned by the City of Lake Elmo and maintained by the Home Owners Association. The applicant shall enter into a maintenance agreement with the City 4 that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park, trails, or open space on the final plat. Response: The HOA documents for the project were drafted consistent with this condition. The documents are recorded against the property. 11. The applicant must either move the planned north/south tail through Park 1 further to the west around an existing wetland area located approximately 400 feet south of 10th Street or will need to work with the South Washington Watershed District to design a multi-purpose trail through the buffer area that complies with all applicable watershed district’s requirements. Response: The trail was installed with the previous phase of the development and conforms to this condition. 12. The Final Plat and Plans must address the requested modifications outlined in the City Engineer’s review memorandum dated November 16, 2014. Response: The applicant updated the preliminary streets and utility plans to be consistent with the City Engineer’s comments. The update plans were submitted to the City prior to the Final Plat and Final PUD plan for the 1st phase. 13. The applicant shall be responsible for updating the final construction plans to include the construction of all improvements within County rights-of-way as required by Washington County and further described in the review letter received from the County dated November 17, 2014. Response: The plans are updated to include the necessary right-of-way as required by Washington County. 14. Prior to recording the Final Plat for any portion of the area shown in the Preliminary Plat, the Developer shall enter into a Developers Agreement acceptable to the City Attorney that delineates who is responsible for the design, construction, and payment of public improvements. Response: The applicant has entered into a Developers Agreement consistent with this condition. 15. The developer must follow all the rules and regulations of the Wetland Conservation Act, and adhere to the conditions of approval for the South Washington Watershed District Permit. Response: There are no wetlands being impacted as a result of this project and all the conditions of South Washington Watershed District are being met. The applicant has received the necessary development approvals from the Watershed District. 5 e. A statement showing the proposed density of the project with the method of calculating said density shown (Below numbers are based on all the single family lots, and not just this phase); i. Single Family land use area of the overall plat includes 102.9 acres (The 5th additional includes 28 acres) ii. 275 total single family homes (101 lots in 5th Addition). iii. Single Family Net Density of 3.61 units per acre (there is no park land, ponds or collector roads in this phase of the neighborhood.) f. Discuss proposed infrastructure improvements and phasing thereof (i.e. proposed roadways, sewer systems, water systems, sidewalks/trails, parking, etc) necessary to serve the subdivision; The 5th phase will include the construction of the necessary roads, sewer and water for the balance of the neighborhood. The storm water improvements, including ponding and infiltration basins were installed with the first phase of development. g. A narrative addressing concerns/issues raised by neighboring properties (discussing your proposal with the neighboring land owners is recommended to get a sense of what issues may arise as your application is processed); Neighborhood input was provided during the PUD Plan review stage. Comments generally related to concerns over the extension of municipal services in this area of the community and the impacts that come along with changes to land use. The land uses and density of the InWood neighborhood are consistent with the City’s Comprehensive Plan, and no changes are necessary as a result of the Preliminary Plat application. Hans Hagen Homes has also designed the neighborhood to lessen the impacts on adjacent property owners, as well as to enhance the neighborhood for future residents. These design features include: i. A linear park along the eastern edge of the property that exceeds the City’s initial standard of 100 feet. The InWood linear park varies from 100 feet to over 200 feet. ii. The lots and streets were orientated east/west with cul-de-sac lots backing to the linear park. There are only 19 lots that back up to the linear park over a distance of 2,640 feet. Under standard zoning, there could be 40 lots backing up to the buffer. iii. Additional land for a neighborhood park adjacent to the existing Stonegate development. This park will serve the needs of residents living in InWood as well as the neighborhoods to the east. 6 iv. Landscaped berms along 10th Street, 5th Street, and along a portion of the western edge of the neighborhood. h. A description of how conflicts with nearby land uses (livability, value, potential future development, etc.) and/or disturbances to wetlands or natural areas are being avoided or mitigated; The InWood neighborhood is consistent with the City’s Comprehensive Plan which provides for a graduation of land use intensities over the site. North of the 5th Street parkway will be single family homes. Transitioning to the west will be commercial. The neighborhood plan for InWood provides a large pond and berms to help transition between the commercial and single family neighborhood. The InWood neighborhood plan avoids and preserves the three wetland basins found on the site. While these wetlands are currently farmed and significantly degraded, it’s our intent to restore them with native vegetation. i. Provide justification that the proposal will not place an excessive burden on roads (traffic), sewage, water supply, parks, schools, fire, police, or other public facilities/services (including traffic flows) in the area. The City’s Comprehensive Plan provides for the planned and orderly growth of the community by making sure that the necessary infrastructure and services are in place as growth occurs. Because the proposed neighborhood is consistent with the City’s Comprehensive Plan, no impacts or excessive burdens are anticipated to the roads, public utilities, or public services. A detailed traffic study was prepared as part of the EAW, and found no traffic impacts that could not be mitigated. The majority of the homes in the neighborhood will not contain school age children. As such, no impacts are anticipated to the North St. Paul school district. j. If applicable, provide a description of proposed lakeshore access (i.e. shared dock with multiple slips, individual docks for each lot, etc.); Not applicable. k. A description of proposed parks and/or open space. Please include a brief statement on the proposed ownership and maintenance of said areas; The neighborhood includes approximately 14.5 acres of public parkland. Overall, the neighborhood includes approximately 49 acres of open spaces, including public park, trail corridors, landscaped berms, ponding, infiltration 7 areas, wetland preservation areas, and private open space. The private open space and infiltration areas will be maintained by a homeowners association. l. A proposed development schedule indicating the approximate date when construction of the project, or stages of the same, can be expected to begin and be completed (including the proposed phasing of construction of public improvements and recreational and common space areas). Construction of the 5th Addition improvements will commence in March of 2017 and be completed by August 2017.  1( ÄÄ&CVG4GXKUKQPU LNV LNV&GUKIPGF &TCYP .*#05*#)'0*1/'5 *+..9+0&41#&0'57+6' (4+&.';/+00'516# +0911&(+(6*#&&+6+10'PVGTRTKUG&TKXG /GPFQVC*GKIJVU/0  Ä .#-''./1/+00'516# +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF.CPFUECRG#TEJKVGEV WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC %+8+.'0)+0''45 .#0&2.#00'45 .#0&5748';145 .#0&5%#2'#4%*+6'%65 .#0&5%#2'2.#00COG 4GI0Q&CVG ,GPPKHGT.6JQORUQPYYYRKQPGGTGPIEQO(CZÄ  1( ÄÄ&CVG4GXKUKQPU LNV LNV&GUKIPGF &TCYP .*#05*#)'0*1/'5 *+..9+0&41#&0'57+6' (4+&.';/+00'516# +0911&(+(6*#&&+6+10'PVGTRTKUG&TKXG /GPFQVC*GKIJVU/0  Ä .#-''./1/+00'516# +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF.CPFUECRG#TEJKVGEV WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC %+8+.'0)+0''45 .#0&2.#00'45 .#0&5748';145 .#0&5%#2'#4%*+6'%65 .#0&5%#2'2.#00COG 4GI0Q&CVG ,GPPKHGT.6JQORUQPYYYRKQPGGTGPIEQO(CZÄ  1( ÄÄ&CVG4GXKUKQPU LNV LNV&GUKIPGF &TCYP .*#05*#)'0*1/'5 *+..9+0&41#&0'57+6' (4+&.';/+00'516# +0911&(+(6*#&&+6+10'PVGTRTKUG&TKXG /GPFQVC*GKIJVU/0  Ä .#-''./1/+00'516# +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF.CPFUECRG#TEJKVGEV WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC %+8+.'0)+0''45 .#0&2.#00'45 .#0&5748';145 .#0&5%#2'#4%*+6'%65 .#0&5%#2'2.#00COG 4GI0Q&CVG ,GPPKHGT.6JQORUQP E 2KQPGGT'PIKPGGTKPI YYYRKQPGGTGPIEQO(CZÄ  1( ÄÄ&CVG4GXKUKQPU LNV LNV&GUKIPGF &TCYP .*#05*#)'0*1/'5 *+..9+0&41#&0'57+6' (4+&.';/+00'516# +0911&(+(6*#&&+6+10'PVGTRTKUG&TKXG /GPFQVC*GKIJVU/0  Ä .#-''./1/+00'516# +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF.CPFUECRG#TEJKVGEV WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC %+8+.'0)+0''45 .#0&2.#00'45 .#0&5748';145 .#0&5%#2'#4%*+6'%65 .#0&5%#2'2.#00COG 4GI0Q&CVG ,GPPKHGT.6JQORUQP E 2KQPGGT'PIKPGGTKPI YYYRKQPGGTGPIEQO(CZÄ  1( &CVG4GXKUKQPU LNV LNV&GUKIPGF &TCYP .*#05*#)'0*1/'5 *+..9+0&41#&0'57+6' (4+&.';/+00'516# +0911&(+(6*#&&+6+10'PVGTRTKUG&TKXG /GPFQVC*GKIJVU/0  Ä .#-''./1/+00'516# +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF.CPFUECRG#TEJKVGEV WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC %+8+.'0)+0''45 .#0&2.#00'45 .#0&5748';145 .#0&5%#2'#4%*+6'%65 0COG 4GI0Q&CVG ,GPPKHGT.6JQORUQP E 2KQPGGT'PIKPGGTKPI YYYRKQPGGTGPIEQO(CZÄ ÄÄ.#0&5%#2'2.#0  1( &CVG4GXKUKQPU LNV LNV&GUKIPGF &TCYP .*#05*#)'0*1/'5 *+..9+0&41#&0'57+6' (4+&.';/+00'516# +0911&(+(6*#&&+6+10'PVGTRTKUG&TKXG /GPFQVC*GKIJVU/0  Ä .#-''./1/+00'516# +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF.CPFUECRG#TEJKVGEV WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC %+8+.'0)+0''45 .#0&2.#00'45 .#0&5748';145 .#0&5%#2'#4%*+6'%65 0COG 4GI0Q&CVG ,GPPKHGT.6JQORUQP E 2KQPGGT'PIKPGGTKPI YYYRKQPGGTGPIEQO(CZÄ ÄÄ.#0&5%#2'2.#0  1( &CVG4GXKUKQPU LNV LNV&GUKIPGF &TCYP .*#05*#)'0*1/'5 *+..9+0&41#&0'57+6' (4+&.';/+00'516# +0911&(+(6*#&&+6+10'PVGTRTKUG&TKXG /GPFQVC*GKIJVU/0  Ä .#-''./1/+00'516# +JGTGD[EGTVKH[VJCVVJKURNCPYCURTGRCTGFD[ OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+ COCFWN[.KEGPUGF.CPFUECRG#TEJKVGEV WPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC %+8+.'0)+0''45 .#0&2.#00'45 .#0&5748';145 .#0&5%#2'#4%*+6'%65 0COG 4GI0Q&CVG ,GPPKHGT.6JQORUQP E 2KQPGGT'PIKPGGTKPI YYYRKQPGGTGPIEQO(CZÄ ÄÄ.#0&5%#2'2.#0   PAGE 1 of 3  MEMORANDUM         Date:  February 15, 2017      To:  Brian Krystofiak, Carlson McCain  Re:  Inwood 5th Addition – Final Construction Plans   Cc:  Jason Biederwolf, M/I Homes    Engineering Review Comments    Stephen Wensman, City Planner        Chad Isakson, P.E., Municipal Engineer      From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Inwood 5th Addition. Final Plat/Final Construction Plans were  received on December 16, 2016. The submittal consisted of the following documentation prepared by Carlson‐ McCainst, Inc. or as noted:     Inwood 5th Addition Final Plat, dated December 6, 2016.   Inwood 5th Addition Street and Utility Construction Plans dated November 28, 2016.   Inwood 5th Addition Specifications dated November 28, 2016.   Inwood 5th Addition Landscape Plans dated November 28, 2016.   Storm Sewer Design Spreadsheet dated February 16, 2015 and Drainage Area Exhibit dated October 6, 2016.      STATUS/FINDINGS:   Engineering review comments have been provided to assist with the completion of the final  Construction Plans and Final Plat.      INWOOD 5TH ADDITION FINAL PLAT   Revise and resubmit the Final Plat to provide the required wate rmain easements and to address the required  construction plan changes per the construction plan comments below.   Revise the Final Plat to show the dedication of an additional 32 feet along the south right‐of‐way of 10th  Street per the conditions of preliminary plat approval.    FINAL CONSTRUCTION PLANS & SPECIFICATIONS   With Inwood PUD 5th Addition being the last addition covering the preliminary plat, the interim sanitary  sewer routing at the intersection of 5th Street and Ivywood Avenue must be converted to the permanent  routing condition as part of this plan set before the improvements can be considered complete. Add sanitary  sewer plan sheet to address convert the interim sanitary sewer routing to the permanent sewer routing  condition by diverting the flow to the east at this intersection through the Boulder Ponds subdivision.   Add grading plans and erosion control plans for the Inwood PUD 5th Addition. The grading plans should show  the existing grading conditions and call out the phasing and removal of the temporary sedimentation basins  along with the permanent final grading. The plan should also describe and address the erosion control  provisions for the construction of the Inwood PUD 5th Addition. Grading, erosion control and site restoration  plan notes should be incorporated on the appropriate plan sheet and removed from the detail sheets.    Sheet No. 1‐3 – Remove temporary cul‐de‐sac on Island Trail between 2nd and 3rd Addition.   Sheet No. 4‐10 – Show all easements on all utility plans.   FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261 Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283    PAGE 2 of 3   Sheet No. 4‐10 – Provide notes in plan view to label and callout 4” insulation.   Sheet No. 4‐10 – The utility plans must be updated to incorporate any proposed Irrigation services after the  irrigation service plans have been reviewed and approved by the City Landscape Architect.   Sheet No. 4‐5 – 12” watermain crossing of Island Trail at 10 th Street should be perpendicular with Island Trail.   Extend 12” watermain to the north and replace (2) 45‐degree bends with 12x12 tee. Add 12” Gate Valve on  south leg of tee.   Sheet No. 4 – Add Gate Valve on the north leg of the watermain cross at STA 5+50 Island Trail.   Sheet No. 4 – Show insulation at the storm sewer crossing at STA 6+10 of Island Trail.   Sheet No. 4 – Revise the existing manhole invert (and field verify note) with the As‐built invert elevation.   Sheet No. 4 – Remove localized high point in the watermain profile from STA 0+00 to STA 1+50 of Island  Trail. Carry straight grade from the connection point to the watermain offset.   Sheet No. 5 – Extend watermain along 10th Street to the plat limits.   Sheet No. 6 – Modify sanitary sewer slopes from MH 1 to MH 7 to be 0.50%.   Sheet No. 7 – Add 8” Gate Valve on east watermain segment on the north side of 9th Street Place N., adjacent  to MH‐2.  Revise service stationing.   Sheet No. 7 – Remove 4” service from MH‐9.  Service to be installed using a wye from the sewer mainline.   Sheet No. 7 – Place hydrant on southern leg of Upper 9th Place North between lots 3 and 4.   Sheet No. 8 – Remove 22‐degree bend from northern intersection of Irving Blvd and Island Trail.  Have 8”  DIP connect perpendicular to 12” watermain.  Keep 8” gate valve at connection.   Sheet No. 8 – Revise sanitary sewer grade from MH‐3 to MH‐11 to 3.16% and MH 11 to MH 14 to 0.50%   Sheet No. 9 – Add 12” Gate Valve at STA 6+00 on Irving Boulevard so that less than 20 lots are impacted  when the system is isolated.   Sheet No. 10 – Relocate the 12” Gate Valve on Irene Avenue to keep it out of the street centerline.   Sheet No. 10 – Label Outlot K on the plans in the northwest corner to identify the parcel with the proposed  watermain installation.   Sheet No. 10 – Revise the watermain connection and Outlot K watermain alignment to connect the proposed  watermain to the newly constructed Inwood Trunk Watermain 16”x12” tee at the intersection of Inwood  Avenue and 10th Street. The existing conditions must reflect the as‐built Inwood Trunk Watermain Plans.   Sheet No. 10 – Provide minimum 30 foot wide watermain utility easement centered over the pipe over  Outlot K.  A. Revise Plat accordingly.   Sheet No. 10 – Add minimum 30 foot wide watermain utility easement centered over the pipe on lots 6 and  7, Block 4 for the 12” watermain pipe. Revise Plat accordingly.   Sheet No. 11‐14 – Storm Sewer Structures within 10 ft. of watermain to have water tight connections per  MDH requirements.  Include note on each storm sewer plan sheet and mark applicable storm structure.  Also  include water stop grouting ring detail.   Sheet No. 11‐14 – Minimum drain tile run is 100 ft. Clean‐outs must be provided every 150 ft.    Sheet No. 11 – Modify draintile invert elevation in CBMH 316 to be 1025.04.   Sheet No. 11 – Show HWL and NWL for Pond W1. Show in plan and profile.    Sheet No. 11 – Add invert and label FES at Pond W1.   Sheet No. 11 – The maximum run without catch basins is 350 feet. Add catch basins along Irving Boulevard  or adjust catch basin locations accordingly (CBMH 305 and 306 exceed 400‐feet from the high point of Irving  Boulevard).   Sheet No. 12 – Revise the existing CBMH invert (and field verify note) with the As‐built invert elevation   Sheet No. 13 – Add 100 ft. draintile runs from CBMH 288A and CB 288B.   Sheet No. 13 – Reconfigure storm sewer to place CBMH at the end rads of Irving Boulevard (west side) to  capture storm water flowing down Irving Boulevard before reaching Island Trail.  This will allow the valley  gutter to be removed.   Sheet No. 15‐20 – K‐values must be placed on the plans for all vertical curves and must meet City standards.   Sheet No. 15 – Revise R/W width or revise street section of Island Trail between 10th Street and Irving  Boulevard. The proposed R/W width is insufficient to meet City street and boulevard layout standards.    PAGE 3 of 3   The minimum one‐way street width is 18 feet from face of curb to face of curb; not back of curb to  back of curb. The lane width must be increased by 1 ft.   The Island Trail w/median typical section on Sheet No. 25 does not allow for boulevard trees  meeting minimum safety setbacks.   Revise Plat accordingly.    Sheet No. 16‐18 – Street grades along the one‐way loop roads are proposed at the City minimum 0.5% for  long distances. Due to construction tolerances this grade has not be working on previous Inwood PUD  Additions. Street grades should be increased to provide better drainage of the streets. City acceptance will  not be granted for standing water at any point in the roadway.   Sheet No. 16‐18 – The end turning radius of 35 ft. for each of the one‐way loop roads do not meet the City  minimum standard of 45 ft. Revise end radius to the minimum 45 ft. or provide additional pavement width  to accommodate an equivalent turning radius. Revise Plat accordingly.   Sheet No. 19 – Revise the intersection of Irving Boulevard and Island Trail to align the drive lane centerlines.  Provide a center median on the west leg of Irving Boulevard. Revise Plat accordingly.   Sheet No. 20 – Revise the intersection of Irving Court to intersect Irving Boulevard at 90‐degrees for the first  50 feet. Revise Plat accordingly.   Sheet No. 20 – Revise the Irving Court cul‐de‐sac to meet the City minimum boulevard width.   Sheet No. 21‐22 – At locations were a stop sign and street sign are proposed at an intersection they should  be combined into one pole.   Sheet No. 21‐22 – The city standard street light note should include the fixture specification as a 100W HPS  California Acorn (black in color) with a 15 ft. aluminum pole (also black in color).   Sheet No. 21 – Add light pole at the intersection of Island Trail and 10th Street.   Sheet No. 21 – Add second set of turn arrows for the turn lanes of Island Trail.   Sheet No. 21 – Add fog line and yellow median line striping along Island trail.  Show striping ending at the  southerly median nose.   Sheet No. 21 – Turn lane widths conflict with the widths shown on the typical section on Sheet No. 25.   Sheet No. 22 – Add light poles along Irving Boulevard at the lot line of Lots 30‐31, Lot 11 and Outlot D, and  at the intersection of Irving Boulevard and Irving Court.   Sheet No. 22 – Add light poles along Upper 9th Street at the lot lines of 19‐20 and 5‐6.   Sheet No. 24 – Replace the Cottage Grove Valley Gutter detail with the Lake Elmo Standard Detail 505.   Sheet No. 25 – Remove City Standard Detail 807A.    Sheet No. 25 – Add the Lake Elmo Standard Detail 514 (Saw and Seal).   Replace Sheet No. T1‐T4 with the updated CSAH 10 (10th Street) Turn Lane Plans. Note the City standard trail  width is 8 feet.   Lake Elmo has adapted MRWA tracer wire standards for Sanitary Sewer which includes grounding rod anode  and grade level access box on all sanitary sewer services.  Add these specifications/details into the plans.   Add a Plan Sheet to address the installation of the 8 foot bituminous trail along 10th Street from Island Trail  to Inwood Avenue (CSAH 13).    STORM SEWER CHART   Revise and resubmit a storm sewer calculation chart based on pl an changes and verify that all minimum and  maximum pipe velocities meet city standards. Verify pipe cover meeting minimum 3 feet and verify pipe  velocities meeting city design standards. Minimum allowable pipe velocity is 3 fps, maximum allowable pipe  velocity is 15 fps and maximum allowable pipe discharge is 5 fps.   The storm sewer chart invert for STMH‐303 does not match the plan invert.   The storm sewer chart invert for CBMH‐280 does not match the plan invert.    LANDSCPAPE PLANS   Add plan note to the landscape plans to require all trees to be field located and approved by the city prior  to planting trees.  Resolution 2014-94 CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA RESOLUTION NO. 2014-94 A RESOLUTION APPROVING THE INWOOD PRELIMINARY PLAT AND PRELIMINARY PUD PLAN WHEREAS, Hans Hagen Homes, 941 NE Hillwind Road, Suite 300, Fridley, MN and Inwood 10, LCC, 95 South Owasso Boulevard West, St. Paul, MN (“Applicants”) have submitted an application to the City of Lake Elmo (“City”) for a Preliminary Plat and a Planned Unit Development (PUD) Preliminary Plan for a planned development to be called InWood, copies of which are on file in the City Planning Department; and WHEREAS, the proposed Planned Unit Development is for a mixed-use Planned Unit Development on 157 acres of land located at the southeast corner of Inwood Avenue and 10th Street in Lake Elmo and will include 275 single-family residential lots, 264 multi-family residential units, and approximately 90,000 square feet of commercial/office uses; and WHEREAS, the Preliminary Plat and Preliminary Plans include the single family portions of the overall PUD development; and WHEREAS, the Lake Elmo City Council approved the InWood PUD Concept Plan on September 16, 2014, and WHEREAS, the Lake Elmo Planning Commission held a Public Hearing on November 24, 2014 to consider the Preliminary Plat and Preliminary Plans for the PUD; and WHEREAS, on November 24, 2014 the Lake Elmo Planning Commission adopted a motion to recommend that the City Council approve the Inwood PUD Preliminary Plat and Preliminary Plans; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation concerning the Inwood PUD Preliminary Plat and Preliminary Plans to the City Council as part of a memorandum from the Planning Department dated December 2, 2014; and WHEREAS, the City Council reviewed the recommendation of the Planning Commission and the proposed Inwood PUD Preliminary Plat and Preliminary Plans at a meeting on December 2, 2014. NOW, THEREFORE, based upon the testimony elicited and information received, the City Council makes the following: 2 Resolution 2014-094 FINDINGS 1) That the procedure for obtaining approval of said PUD Preliminary Plan is found in the Lake Elmo City Code, Section 154.800. 2) That all the requirements of said City Code Section 154.800 related to the PUD Preliminary Plan have been met by the Applicant. 3) That the InWood preliminary plat complies with the City’s subdivision ordinance and is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 4) That the proposed PUD Preliminary Plan is for a mixed-use Planned Unit Development on 157 acres of land located at the southeast corner of Inwood Avenue and 10th Street in Lake Elmo and that the Preliminary Plan includes 275 single-family residential lots. 5) That the PUD Preliminary Plan will be located on property legally described on the attached Exhibit “A”. 6) That the proposed PUD will allow a more flexible, creative, and efficient approach to the use of the land, and will specifically relate to existing zoning district standards in the following manner (with exceptions as noted): Setback LDR Zoning District (Min.) Inwood PUD (Min.) Front Yard 25 feet 20 feet Interior Side Yard 10 Feet Principal Structure Side / 5 Feet Garage Side 4 Feet Rear Yard 20 feet 20 feet Lot Area 8,000 square feet 4,250 square feet Lot Depth N/A 110 feet Lot Width 60 feet 38 feet a) The InWood PUD shall be exempt from Section 154.457 of the Lake Elmo Zoning Ordinance concerning the width of attached garages b) All other requirements for the City’s LDR zoning district will apply, including the allowed uses and other site and development standards 7) That the InWood PUD General Concept Plan was approved by the City on September 16, 2014, and that the submitted Preliminary Plat and Preliminary PUD Plan is consistent with the approved General Concept Plan. 3 Resolution 2014-094 8) That the InWood preliminary plat and preliminary PUD plan are consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area, with the exception of the narrowing and extending of the commercial area further south of 10th Street along Inwood Avenue as approved in the General Concept Plan. 9) That the InWood preliminary plat and preliminary PUD plan generally complies with the City’s LDR - Urban Low Density Residential and HDR – High Medium Density Residential zoning districts with the exceptions to lot size, lot width, setbacks, and garage width requirements as specified above. 10) That the InWood preliminary plat and preliminary PUD plan comply with the City’s subdivision ordinance. 11) That the InWood preliminary plat and preliminary PUD plan comply with the City’s Planned Unit Development Regulations. 12) That the InWood preliminary plat and preliminary PUD plan comply with City’s Engineering Standards, except where noted in the review memorandum from the City Engineer dated 11/16/14 and 11/24/14. 13) That the InWood preliminary plat and preliminary PUD plan comply with other City ordinances, such as landscaping, tree preservation, and erosion and sediment control. 14) That the InWood preliminary plat and preliminary PUD plan achieve multiple identified objectives for planned developments within Lake Elmo. CONCLUSIONS AND DECISION Based on the foregoing, the Applicants’ application for a PUD Concept Plan is granted, provided the following conditions are met: 1) The applicant shall work with Community Development Director to name all streets in the subdivision in a manner acceptable to the City prior to the submission of final plat. 2) The City and the applicant shall reach an agreement concerning the location and dedication of land associated with the proposed water necessary to provide adequate water service to the InWood project area prior to the acceptance of a final plat for any portion of the PUD area. 3) The preliminary landscape plan shall be updated to address the review comments from the City’s landscape architecture consultant as noted in a review letter dated November 18, 2014. 4) Prior to the submission of a final plat for any portion of the InWood PUD, the developer shall reach agreement with the City to determine the appropriate park dedication calculations for the entire development area. 5) As part of any development agreement that includes improvements to one of the adjacent County State Aid Highways (CSAH 13 and 10th Street), the City and the developer shall determine the appropriate responsibility for the cost of these improvements. 4 Resolution 2014-094 6) The applicant must enter into a separate grading agreement with the City prior to the commencement of any grading activity in advance of final plat and plan approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document extent of any proposed grading on the site. 7) The applicant shall continue to work with the City on the final design of 5th Street, and in particular, the transition from the InWood PUD to properties located further to the east (including the Boulder Ponds development and land owned by Bremer Financial Services). 8) The utility construction plans shall be updated to incorporate the recommendations of the City Engineer concerning the appropriate location and size of sewer services through the PUD planning area, including any requested oversizing of these facilities to service adjacent properties. 9) The proposed public street access to 5th Street from Streets D2 and the southeast park area (Park 1) shall be eliminated from the preliminary development plans in order to bring the proposed spacing into conformance with the City’s access spacing guidelines. The developer shall provide access into the park to the satisfaction of the City Engineer. 10) All center median planting areas as depicted on the preliminary plat and plans shall be owned by the City of Lake Elmo and maintained by the Home Owners Association. The applicant shall enter into a maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park, trails, or open space on the final plat. 11) The applicant must either move the planned north/south tail through Park 1 further to the west around an existing wetland area located approximately 400 feet south of 10th Street or will need to work with the South Washington Watershed District to design a multi-purpose trail through the buffer area that complies with all applicable watershed district’s requirements. 12) The Final Plat and Plans must address the requested modifications outlined in the City Engineer’s review memoranda dated November 16, 2014 and November 24, 2014. 13) The applicant shall be responsible for updating the final construction plans to include the construction of all improvements within County rights-of-way as required by Washington County and further described in the review letter received from the County dated November 17, 2014. 14) Prior to recording the Final Plat for any portion of the area shown in the Preliminary Plat, the Developer shall enter into a Developers Agreement acceptable to the City Attorney that delineates who is responsible for the design, construction, and payment of public improvements. 15) The developer must follow all the rules and regulations of the Wetland Conservation Act, and adhere to the conditions of approval for the South Washington Watershed District Permit. 16) The developer shall provide landscape material along the west side of Pond #200 to the satisfaction of the City’s landscape consultant. 17) The developer shall incorporate elements from the Lake Elmo Theming Study at the intersection of “Street B” and 10th Street and at the intersection of 5th Street and Inwood Avenue. 18) The developer shall install a multi-purpose trail along 10th Street between “Street B” and Inwood Avenue. 5 Resolution 2014-094 19) The multi-purpose trail through the eastern buffer area shall be kept as far west on the applicant’s property as possible, and the final alignment of this trail shall be subject to review by the City’s landscape consultant. Passed and duly adopted this 2nd day of December 2014 by the City Council of the City of Lake Elmo, Minnesota. __________________________________ Mike Pearson, Mayor ATTEST: ________________________________ Adam Bell, City Clerk PLANNING COMMISSION DATE: 11/24/14 AGENDA ITEM: 4A – PUBLIC HEARING CASE # 2014-48 ITEM: InWood PUD – Preliminary Plat and Preliminary PUD Plan SUBMITTED BY: Kyle Klatt, Community Development Director REVIEWED BY: Nick Johnson, City Planner Jack Griffin, City Engineer Stephen Mastey, Landscape Architecture, Inc. Greg Malmquist, Fire Chief SUMMARY AND ACTION REQUESTED: The Planning Commission is being asked to consider a Preliminary Plat and Preliminary PUD Plan application from Hans Hagen Homes and InWood 10, LLC for a mixed use Planned Unit Development (PUD) to be located on 157 acres of land at the southeast corner of Inwood Avenue and 10th Street in Lake Elmo. The application for a Preliminary Plat and Preliminary PUD Plan follows the City’s approval of a general concept plan for the site, and the plans as submitted are consistent with this earlier approval. While the overall plans include a mix of single-family residential, medium to high density residential, and commercial development, the applicant has provided detailed preliminary plans for only the single-family portion of the site. The proposed plat includes 275 single family detached lots, while the remainder of the site will be platted as outlots for future open space, commercial, and multi-family uses. Preliminary development plans will need to be submitted in the future for these other planned uses. Staff is recommending approval of the request subject to compliance with 15 conditions as noted in the Staff report. GENERAL INFORMATION Applicant: Hans Hagen Homes (John Rask), 941 NE Hillwind Rd. Suite 300, Fridley, MN and Inwood 10, LLC (Tom Scheutte) 95 S Owasso Blvd. W., St. Paul, MN Property Owners: Inwood 10, LLC (Tom Scheutte), 95 S Owasso Blvd. W., St. Paul, MN Location: Part of Section 33 in Lake Elmo, immediately south of 10th Street (CSAH 10), immediately north of Eagle Point Business Park, immediately east of Inwood Avenue (CSAH 13) and immediately west of Stonegate residential subdivision. PIDs: 33.029.21.12.0001, 33.029.21.12.0003, 33.029.21.11.0002 and 33.029.21.11.0001. Request: Application for Preliminary Plat and Preliminary Planned Unit Development (PUD) Plan approval of a mixed-use development to be named InWood. The preliminary plat includes 275 single-family residential lots, while the remainder of the site will be platted as outlots (subject to future review and approval by the City of Lake Elmo). PUBLIC HEARING ITEM 4A – ACTION ITEM 2 Existing Land Use and Zoning: Vacant land used for agricultural purposes. Current Zoning: RT– Rural Transitional Zoning District; Proposed Zoning: LDR – Low Density Residential, HDR – High Density Residential and C – Commercial (all with PUD overlay) Surrounding Land Use and Zoning: North: Vacant agricultural land and two residential homes – RR and PF zoning; West: Oak Marsh Golf Course, urban single family subdivision, commercial – City of Oakdale jurisdiction; South: Offices in Eagle Point Business Park (including Bremer Bank facility) – BP zoning; East: Stonegate residential estates subdivision – RE zoning. Comprehensive Plan: Urban Low Density Residential (2.5 – 4 units per acre), Urban High Density Residential/Mixed Use (7.5 – 15 units per acre) and Commercial History: The site has historically been used for agricultural purposes; there is no specific site information on file with the City (the property was subject to development speculation at various times in the past). The applicants have summited a mandatory Environmental Assessment Worksheet (EAW) for the development and the comment period for the EAW ended on October 29, 2014. The City Council will consider adoption of a resolution declaring no need for an EIS (Environmental Impact Statement) at its December 2, 2014 meeting. The City Council approved the general concept plan for the development at its September 16, 2014 meeting. Deadline for Action: Application Complete – 10/10/14 60 Day Deadline – 12/10/14 Extension Letter Mailed – No 120 Day Deadline – 2/10/15 Applicable Regulations: Chapter 153 – Subdivision Regulations Article 10 – Urban Residential Districts (LDR and MDR) Article 16 – Planned Unit Development Regulations §150.270 Storm Water, Erosion, and Sediment Shoreland Management Overlay District REQUEST DETAILS The City of Lake Elmo has received a request from Hans Hagen Homes and InWood 10, LLC for approval of a preliminary plat and preliminary development plans associated with the InWood Planned Unit Development. The PUD will be located on 157 acres of land located southeast of the intersection of Inwood Avenue and 10th Street in Lake Elmo, and is consistent with the development uses and areas as depicted in the general concept plan for the property. The submitted plans cover the entire site; however, the developer intends to proceed construction of only the single family areas at this time, and will need to submit more detailed plans for the multi-family and commercial areas in the future. As noted during the concept plan review, the overall project can be divided up into three distinct areas on the plans, which includes a multi-family area south of 5th Street, a single-family “lifestyle housing” neighborhood north of 5th Street, and commercial areas with frontage along Inwood Avenue. Within the residential areas, the developer plans a mix of different housing options, PUBLIC HEARING ITEM 4A – ACTION ITEM 3 including single-family detached housing, townhouses, and multi-family. The planned single-family areas differ from typical residential neighborhoods in that the lots are smaller than otherwise allowed in the LDR zoning district, with reduced setbacks from the LDR standards as well. The homes to be built in these areas are intended to appeal to a different market then a typical neighborhood by incorporating common open areas, association-maintained lawns and driveways, and other services, and with amenities that are more typical in a townhouse type of development. The concept plan was approved by the City Council with conditions that ultimately resulted in reductions to the overall dwelling unit count for the project. These changes included the elimination of any multi-family residential north of the proposed 5th Street alignment, and further reductions in the number of single-family lots to provide additional space for a larger park in the extreme southeastern part of the site. The preliminary plans as submitted include 275 single-family residential detached dwelling units (down from 281 on the original concept plan) all located in a contiguous area on the site north of 5th Street and east of the planned commercial areas along Inwood Avenue. For the purposes of this review, the proposed commercial and multi-family areas of the site will not be discussed in terms of specific uses and building footprints or other site details since these details will need to be provided as part of any future PUD and subdivision review and approvals. This is very similar to the approach used in the Eagle Point Business Park, with individual construction projects being reviewed by the City as buildings are proposed for undeveloped sites within the park. The staff review therefore focuses on the single-family portions of the site in terms of the general planning and zoning issues, and all of the single-family lots that are being platted as part of the proposed preliminary plat. All other areas of the development are shown as outlots, and therefore will be subject to future subdivision approval. With the approval of the preliminary development plans as submitted, the developer may proceed with final plat approval for the single-family portions of the InWood development. As part of the concept plan review, the City did approve the configuration of uses as shown on the preliminary development plan. This site layout includes the creation of a commercial area that extends approximately 400 feet east of Inwood Avenue and is located between 10th Street and 5th Street. The preliminary plans also mirror the concept plan with the designation of a multi-family for all portions of the site that are south of 5th Street. The other significant development area represents the remainder of the site, which is planned for single-family development. In addition, the plans include a buffer along the eastern boundary of the site that maintains the 100-foot buffer specified for this area in the Comprehensive Plan. The proposed land uses and configuration of these uses were deemed to be in compliance with the City’s Comprehensive Plan by the City Council as part of the findings of approval for the concept plan. The applicant has not deviated from the concept plan approval with the preliminary plat and PUD plan submissions. While specific details concerning development within the commercial and multi-family outlots will be provided with future plan submissions, the applicant has provided the required preliminary plans for all site grading, erosion control, grading, storm water management, utilities, streets, sidewalks, landscaping, and other details for the entire development area. These plans will serve as the basis for all future reviews, whether these reviews are for a final plat related to the single family areas of the site or more detailed preliminary development plans for the commercial and multi-family portion of the InWood PUD. The City’s overall PUD process has three phases: 1) General Concept Plan, 2) Preliminary Development Plan, and 3) Final Plan. It should be noted that the Planning Commission reviewed the InWood General Concept Plan at meetings conducted on August 25th and September 8 of this year, PUBLIC HEARING ITEM 4A – ACTION ITEM 4 with approval by the City Council at its September 16, 2014 meeting with the adoption of Resolution No. 2014-72. Approval of the General Concept Plan allows the applicant to proceed with preparation of preliminary plans, which the applicant has now submitted. Staff has reviewed the approved General Concept Plan and all the conditions associated with the approval. The applicant has also provided a point-by-point response to the conditions of approval, which is included in the application packet provided to the Planning Commission. The applicant has previously explained the rational for requesting a Planned Unit Development (PUD) as part of the concept plan application, and Staff has agreed that using the PUD process for the development of this site is reasonable and beneficial for the City in a number of ways, including: • The PUD process allows the City to review the site as a whole instead of dealing with individual development projects that may or may not be connected to each other. • This overall approach allows the City to work with the developer on a series of larger planning and development issues on this site, including determining the appropriate road configurations through this area, the best manner in which to serve not just the applicant’s site, but adjacent areas with sewer and water services, and many other connected issues including park dedication, trails, County road improvements, landscaping and buffering and other aspects to site development. • The developer has requested certain exceptions from standard zoning requirements (as allowed through the PUD process) in order to bring forward a unique development that provides a housing option not presently found in Lake Elmo. The resulting project will function similar to a townhouse project, but with all of the homes on individual lots under separate ownership. • The integrated approach allows the developer to plan for common maintenance and upkeep of the areas around individual homes, which further allows for some unique street configurations that will bring open space into a median planting/storm water area within certain streets in the development. • The development proposes a mix of uses and activities across the site that can be integrated as one larger development instead of separate areas. For instance, the planned roads have been designed to provide necessary access to residential and commercial areas while providing for appropriate separation between these uses. • The applicant has previously provided documentation that the development plans are consistent with the City’s requirements for consideration of a PUD. In terms of new roads to serve the InWood development, the preliminary plans include the extension of the City’s planned 5th Street minor collector road from the western-most extension of this road through the Boulder Ponds development to the east all the way its eventually termination point at Inwood Avenue. The developer is proposing to build this road as part of the Phase 1 improvements, and it will serve as the main collector road for moving traffic through the middle portion of the development while providing an important link to the east. The other major road feature, labeled as Street B and Street B-2 on the plans, will provide a north and south connection through the entire site and will eventually provide a link between 10th Street, 5th Street, and Eagle Point Boulevard and the extreme southern portion of the development. Other local streets will be constructed as the residential lots are platted or in conjunction with future plans for multi-family and commercial development. PUBLIC HEARING ITEM 4A – ACTION ITEM 5 The other major features of the InWood Preliminary PUD Plans include the creation of a new park area immediately to the west of the existing Stonegate Park in the southwestern portion of the development; an extensive trail system providing access throughout the internal portions of the development, a site-wide storm water infiltration system that is intended to comply with South Washington Watershed District requirements, and the use of center medians within individual neighborhoods to provide common green space within the local street system. The applicant has also submitted a concept plan for the use of Outlot P in the northwestern portion of the site in response to the Planning Commissions request for additional gathering space in this area. The InWood planned development is located within Stage 1 of the I-94 Corridor Planning Area, and pubic water and sewer services are presently available to the site via connections to the Eagle Point Business Park. The City’s Comprehensive Plan calls for installation of a public water trunk line to bring water down to this area from the north that will also provide connections to City of Lake Elmo water system for the other near-by developments to the east. PLANNING AND ZONING ISSUES Because the Planning Commission has previously received a significant amount of information along with the concept plan for the InWood PUD and spent several hours over the course of two meetings reviewing this information, Staff will therefore focus on those aspects of the plans that have been changed or updated since the City’s concept plan approval, along with a general summary of the PUD request as submitted by the applicant of the current report. Other general issues are noted as well. As required by the City’s Zoning and Subdivision Ordinances, the applicant has provided a much greater amount of information as part of the current submission than is required for a Concept. Because of this, Staff will not attempt to spell out every single change or update from the concept plan, but instead will provide a summary of the most significant changes that have been made to address specific comments from the Commission as follows: • All multi-family development is located south of 5th Street, and the area previously planned for multi-family housing in the extreme northwest portion of the site has been changed to commercial development. These units have been eliminated from the plans and resulted in a fairly significant drop to the overall site density. • The southeastern corner has been reconfigured to provide a larger park area adjacent to the Stonegate Park. The general park concept layout is consistent with a plan that was presented by the applicant during the concept plan review. • The portion of 5th Street extending to the east and south of the applicants’ site has been reconfigured to avoid any additional right-of-way acquisition from Bremer Bank. • Sidewalks have been added to both sides of “Street B” per the recommendation of the Planning Commission. • Any lots that were encroaching into the required 100-foot buffer area between InWood and Stonegate have been moved to comply with this requirement. PUBLIC HEARING ITEM 4A – ACTION ITEM 6 • In response to the Planning Commission request for additional small park in the northwest corner of the development the developer has submitted a concept for Outlot P (Street N) that shows how this area could be used for public gathering space associated amenities. The applicant has accurately pointed out that the City’s reviewing bodies did have differences of opinions concerning the size and most appropriate improvement for this area. • As a response to a specific condition of approval, the developer has proposed specific design considerations for the single family homes. These standards will be incorporated as part of the City approval. There are other aspects of the development plans that were discussed by the Planning Commission but that have not been changed based on the City Council’s direction to have the Commission reconsider these items as part of its preliminary development plan review. Please refer to the attached minutes for the specific Council direction on these review items. These specific development items include the following: • The plans as submitted do not incorporate sidewalks on the interior loop roads throughout the subdivision. The developer has provided a response to this Condition in the application packet (Page 6 of Exhibit A), and has explained how these particular streets have been designed to accommodate pedestrians safely. In particular, the applicant stated that these streets have been designed to slow traffic, provide space for guest parking in a location that reduces conflict points, promote clear sight lines along the road, reduce or eliminate cut- through traffic, soften the landscape with plantings in the median, and minimize the distance to sidewalk and trails that connect to the broader trail network within and outside the development. • The lots at the end of the Streets E, F, and H have been left in a configuration that follows the concept plan submission. The applicant again has provided a response to the concept plan condition of approval as noted on Page 7 of Exhibit A in their PUD application materials. The applicant has specifically stated in this response that making this change would require pushing the lots back towards the boundary with Stonegate instead of maintaining a more substantial buffer than otherwise required to preserve the existing landscaping in this area. Staff would also like to point out that the resulting lots at the end of the curve are actually very similar in size to the “designer” lots in the southern portion of the development. As depicted on the InWood preliminary plat, the designer lots range in size from 8,346 to 11,931 square feet while the lots at the end of the loop roads in the eastern portion of the site range in size from 8,800 square feet to 10,754 square feet. Please note that all of the lots at the end of these cul-de-sacs meet the minimize lot size requirements of the City’s LDR Zoning Districts For all practical purposes, there is not a lot of differentiation, if any, between these two types of lots in terms of size, and the applicant has indicated that making these lots larger will have the unintended consequence of impacting the existing landscape buffer. • The applicant has accurately noted that the County does not have plans for trails along either Inwood Avenue or 10th Street as part of its long-range plans, and has therefore not included such trails as part of the preliminary development plans. After discussing this matter with the County, Staff does not object to the applicant’s position concerning trails along and within the County right-of-way, but would like to note that the City’s trail plan does include a connection from the intersection of 10th and Inwood through this development to the east. Staff is recommending that as a condition of approval for the preliminary PUD plans, that the PUBLIC HEARING ITEM 4A – ACTION ITEM 7 preliminary development plans be updated to include a trail connection either along Inwood Avenue from 10th Street to either 5th Street or to the planned trail segment along 9th Street or a trail connection along 10th Street that connects Street B and the trail to the east to Inwood Avenue. The applicant has provided a detailed summary and response to all other conditions of approval that addresses the City’s previous review comments, along with a line-by-line response to the application submission requirements for this type of request. Staff has reviewed this information and found that it is an accurate response to the various development requirements and conditions of concept plan approval. The InWood development includes a request for a Planned Unit Development and some related flexibility as permitted under this ordinance. In order to grant a PUD, an applicant is required to demonstrate compliance with the City’s PUD applicant requirements and PUD Objectives. These requirements and objectives are spelled out in the attached PUD Narrative provided by the applicant, along a response for each item. For the most part, the single family portion of the development is consistent with the zoning requirements for the City’s LDR – Low Density Residential Zoning District, with the exceptions that were discussed during the concept plan review and are summarized as follows: Setback LDR Zoning District (Min.) Inwood PUD (Min.) Front Yard 25 feet 20 feet Interior Side Yard 10 Feet Principal Structure Side / 5 Feet Garage Side 4 Feet Rear Yard 20 feet 20 feet Lot Area 8,000 square feet 4,250 square feet Lot Depth N/A 110 feet Lot Width 60 feet 38 feet All other requirements for the City’s LDR zoning district will apply, including the allowed uses and other site and development standards. Please note that the above table includes some minor modifications from the numbers proposed by the developer and are being recommended by Staff in order to ensure that there is sufficient flexibility to construct the subdivision as proposed. The purpose of this table is to document the minimum expectation for lots and homes in the development, and is otherwise consistent with the development plans. Staff is also recommended numbers that will allow for minor revisions to various site planning issues that have been identified by Staff, including wetland buffers, provision of adequate storm water infiltration areas, and road adjustments that are necessary for the development to comply with all applicable City development and engineering standards. For instance, the City is requesting that all wetland buffers be contained within an outlot and not spill over on to private properties. The developer should be able to address this review comment by making small adjustments to the property boundaries in these portions of the site to that the actual on site conditions will not necessarily need to be changed. The application packet provided by the applicant provides a fairly detailed response to the City’s PUD Ordinance requirements for a preliminary development plan, and Staff will not be providing PUBLIC HEARING ITEM 4A – ACTION ITEM 8 much more in terms of further analysis for this information, but would like to specifically comment on the following aspects of the plan: • The City’s PUD requirements require that 20% of the project area not within street rights-of- way must be preserved as open space (and the ordinance specifically allows infiltration areas to be counted towards this amount). The applicant has provided a specific plan as part of the application materials that demonstrates that over 30% of the site, including roads, will be open space. • While the proposed lot dimensional standards listed above are lower than those required in the LDR zoning district, the applicant has proposed a preliminary plan that includes a mixture of lot sizes and widths throughout the development, including “designer lots” in the southwest portion of the site that will predominately comply with the LDR district standards. The overall breakdown of lot widths is listed in the development application as follows: o 16% of lots are 38 feet in width o 53% are 50 feet in width o 16% are 58 feet in width o 15% are 65 feet in width With the provision of open space as note above and even with the smaller lot sizes that have been proposed, this development falls within the lower end of the range allowed for low density residential development in the City Comprehensive Plan. • The PUD applicant materials include a specific zoning and phasing plan for the project. As noted in the previous Staff report concerning this matter, the base zoning will be established at the time the final plat is recorded for the entire development (the specific land use areas will not be established as separate outlots until this time). The Zoning for the property will be split between LDR, HDR – High Density Residential, and C – Commercial consistent with the corresponding land uses on the applicant’s plans. The Phasing Plan divides the single family area into four distinct phases, starting with the neighborhoods immediately adjacent and north of 5th Street. As noted earlier, the phase 1 area includes the construction of 5th Street across the entire development site. There is no time frame established for the construction of any buildings or public improvements within the commercial or multi-family portions of the site. The overall site plan for the property follows the adopted concept plan very closely. Staff has conducted a review of the detailed plat and plans and specific comments from Staff concerning these plans are listed in the following section of this report. The following is a general summary of the subdivision design elements that have proposed as part of the InWood preliminary plat and plans: Zoning and Site Information: • Existing Zoning: RT – Rural Development Transitional District • Proposed Zoning: LDR, MDR and C • Total Site Area: 157.2 acres • Total Residential Units: 539 (275 single family, 264 multi-family per PUBLIC HEARING ITEM 4A – ACTION ITEM 9 development plans) • Proposed Density (Net): Single Family – 3.0 units per acre Multi-family – 9.1 units per acre Proposed Lot Dimensional Standards through Planned Unit Development Process: • As listed above Proposed Street Standards: • ROW Width – Local 60 ft. (per Subdivision Ordinance) • ROW Width – Minor Collector 100 ft. (Engineering Standard) • ROW Width – Loop Roads 40 ft. (one way segment with median) • Street Widths – Local: 28 ft. (per City standard) • Street Widths – Loop Roads 22 ft. (one way) The standards listed above are all either in compliance with the applicable requirements from the City’s zoning and subdivision regulations, or are consistent with requested modifications through the proposed planned unit development (PUD). Based on Staff’s review of the Preliminary Plat and Preliminary PUD Plan, the applicant has generally demonstrated compliance with the majority of the applicable codes, and the requested modifications or flexibilities as allowed under the City’s PUD Ordinance represent a reasonable request given the various design goals the applicant it trying to achieve. REVIEW AND ANALYSIS City Staff has reviewed the InWood preliminary plat and preliminary PUD plan. In general, the proposed plat will meet all applicable City requirements for conditional approval, and any deficiencies or additional modifications that are needed are noted as part of the review record. In addition, the City has received a detailed list of comments from the City Engineer, the Fire Chief and the City’s Landscape Consultant, Stephen Mastey, all of which are attached for consideration by the Commission. In addition to the general comments that have been provided in the preceding sections of this report, Staff would like the Planning Commission to consider the following review comments as well: Critical Path Issues: • Water Tower. The City’s water supply plan, last updated as part of the 2008 Comprehensive Plan Update, indicates that a water tower is necessary to serve this area in order to provide adequate water system operations to serve the additional units (both commercial and residential REC units) within the proposed development area. Although the Comprehensive Plan does identify a water tower southwest of the 10th Street and Inwood Avenue intersection of the applicant’s property, the land owner has been negotiating with the City to identify a location for this water tower on land they presently own north of 10th Street. At this point, there is a general agreement in place for the City to acquire land roughly midway between 15th Street and 10th Street and adjacent to Inwood Avenue, which would allow the City to construct the tower with the other planned water improvements in the area. As noted during the concept plan review, the location of the tower will need to be finalized prior to the platting of any property within the PUD project area. PUBLIC HEARING ITEM 4A – ACTION ITEM 10 • 5th Street. The applicant has submitted plans for 5th Street that comply with the location for this road as depicted in the City’s transportation plan. As the Planning Commission has seen with other projects in the area, transition from InWood to Boulder Ponds by the Bremer Bank facility and Stonegate Park has previously been identified as a pinch point and an extremely difficult transition area for this segment of the road. In balancing the needs and expectations of all impacted parties, while also adhering to the road alignment as previously approved by the City, the developer has submitted plans that avoid any further impacts to Bremer’s property while keeping the curve somewhat tighter to minimize impacts to Stonegate Park and the new park area adjacent to Stonegate. The curve as proposed would reduce the intended design speed for 5th Street through this area; however, both the applicant and Bremer Bank have stated that they would prefer this solution to a higher deign speed. Should the proposed design be found to be problematic as planning for 5th Street continues into the final plat submission, the City will still be able to continuing working with the applicant and neighboring property owners on an acceptable solution. As noted below, the applicant has also agreed to modify the preliminary plan to eliminate two of the existing access points on to 5th Street, which will also help ensure that that the proposed design will serve the intended function of the road. Staff is recommending that the plans as submitted be approved for InWood, with the understanding that additional conversations with the affected property owners and the results of any further analysis will be taken into consideration as the developer’s plans are finalized for their entire segment. Other Issues: • City Engineer Comments. The City Engineer has submitted a detailed list of comments that will need be addressed prior to the City’s approval of final development plans for this property. None of the comments represent a critical concern (other than the ones noted above) that will not be able to be addressed by the applicant as they finalize the development plans for the site, and most of the comments are requesting technical revisions to ensure compliance with the City’s engineering and development standards. Of particular note, the City Engineer has requested a realignment of Street N around Outlot P to meet the City’s required geometrics and is asking that all wetland buffers and the high water level of storm water infiltration ponds be located on publicly owned outlots. • Sewer and Water. The City will be extending water down Inwood Avenue to serve the urban service areas along the I-94 Corridor as identified in the City’s Comprehensive Plan. Prior to the completion of this water project, the InWood development will be served under the City’s current agreement with the City of Oakdale. The water main project is expected to be completed in 2015. The developer will also be required to install sewer service throughout the project area, and the City Engineer has asked that the preliminary plans be updated to accommodate the oversizing necessary to provide adequate service levels within and adjacent to this development. The developer has provided a general response to the City Engineer’s comments, and will continue working with the City Engineer to ensure that the final design accommodates the City’s service needs for the entire area. • Environmental Review. The public comment period for the InWood EAW was completed on October 29, 2014. The City received six letters from commenting agencies, and based on the comments received, Staff agrees with the developer that none of the comments provided represent a significant environmental issue that could not otherwise be addressed through the City’s review and approval process. The City Council will be considering the EAW comments at its December 2, 2014 meeting, and will be asked to consider a resolution PUBLIC HEARING ITEM 4A – ACTION ITEM 11 finding no need to perform an EIS (Environmental Impact Statement) at this time. The developer is also working on a response to the comments that will be included with the Council resolution. • Design Standards. The Planning Commission requested the inclusion of residential design standards as part of the PUD approval. The developer has proposed specific design standards for the residential homes as listed in the PUD Narrative and response to conditions of approval. • Trails. In order to help better illustrate the location of all trails and sidewalks planned within the development the developer has submitted a specific color plan illustrating the location of these improvements throughout the project area. Staff would like to noted that although the developer is not planned to install any trails beyond those shown along Inwood Avenue and 10th Street, the City’s Trail Plan does depict a City trail extending from this intersection to the City’s wide trail network to the south and east of this area. Based on this plan, Staff is recommending that the preliminary development plans be updated to include a trail connection either along Inwood Avenue from 10th Street to either 5th Street or to the planned trail segment along 9th Street or a trail connection along 10th Street that connects Street B and the trail to the east to Inwood Avenue. o Trail Adjacent to Wetland. In response to comments from the City Engineer, the applicant will need to either move the planned north/south tail through Park 1 further to the west around an existing wetland area or will need to work with the South Washington Watershed District to design a multi-purpose trail through the buffer area that complies with the watershed district’s requirements. • Sidewalks. The developer has provided a sidewalk along both sides of Street B in response to the concept plan review comments from the City. The developer’s response to other sidewalk issues are noted elsewhere in this report. • Washington County Review. The City has received an updated set of comments from the County that mirror its review of the concept plan. The developer will need to prepare plans for the intersection of Inwood Avenue and 5th Street and Street B and 10th Street that comply with the County’s requirements for intersection improvements at these intersections. Staff is recommending that a condition of approval note that the City and developer will need to determine the appropriate cost sharing for these required improvements as part of a development agreement for the Phase 1 and Phase 3 development areas. The County is also asking for additional right-of-way to be platted along 10th Street; the final plat will need to incorporate the County’s requirements for right-of-way in this portion of the plat. • 5th Street Access. Staff is recommending that access to 5th Street from Streets D2 and the southwest park be eliminated from the development plans in order to bring the proposed spacing into conformance with the City’s access spacing guidelines. Staff is requesting that the developer continue working with the City to determine the most appropriate access into and out of the southwest park area. Staff is encouraging the inclusion of a connecting road between the park area and Outlot C in the approximately location of Lot 4, Block 7 on the preliminary plat. • Zoning. Staff will bring forward the appropriate zoning map amendments for consideration once the applicant has submitted a final plat for the first phase of the development. PUBLIC HEARING ITEM 4A – ACTION ITEM 12 • Wetlands. The wetlands identified on the site are being protected from development. The City Engineer has requested that the applicant keep all buffer areas around these wetlands on publicly owned property. • Landscape Plan Review/Tree Preservation. The City’s Landscape Architect has completed an initial review of the proposed landscape plan and tree preservation plan, and his review comments are attached. The developer has been asked to provide additional documentation to verify that the eastern evergreen trees would be exempt from the City’s replacement requirements. • Park Dedication. The applicant has indicated that 12.2% of the overall land area planned for single family development will be dedicated as public parkland, which exceeds the City’s requirement for land dedication for this type of use. The City will need to work with the developer to account for the multi-family and commercial park land calculations as part of any future development agreements for the project. • Phasing. The developer will be constructing all of 5th Street and roughly one-third of the single-family lots as part of Phase 1. The applicant will need to enter into a development contract with the City related to the improvements necessary to service this development. • Fire Chief Comments. Comments from the Fire Chief are attached for consideration by the Planning Commission. These comments will be taken into account as the final construction plans are being reviewed by the City. Other Comments: • Subdivision Requirements. The City’s Subdivision Ordinance includes a fairly lengthy list of standards that must be met by all new subdivisions, and include requirements for blocks, lots, easements, erosion and sediment control, drainage systems, monuments, sanitary sewer and water facilities, streets, and other aspects of the plans. Many of these requirements have been addressed as part of the City Engineer’s review memo (which is summarized below). After reviewing the proposed plat and PUD plan, Staff has not found any aspect of the plat that conflict with these requirements. • Comprehensive Plan. With the elimination of the multi-family area in the northwest portion of the site, the overall densities proposed within both the single-family area and multi-family area are very much in line with the City’s future land use plan. In this case, the Low Density Residential land use allows for residential densities at 2.5 to 3.99 units per acre and the applicant has proposed a net density of 3.0 units per acre. For the multi-family area, the developer is indicating that these densities will fall in the range of 8.4 to 9.1 units per acre, which is well within the Comprehensive Plan guidance of 7.5 to 15 units per acre. • Buffer Area. The preliminary development plans indicate that no residential parcels will encroach into the required 100-foot buffer area between Stonegate and the InWood PUD. There are several locations in which the developer is providing a larger buffer area than required, with some areas as wide as 230 feet. • Street Names. The final plat will need to incorporate street names per the direction of the Planning Department. • Shoreland Ordinance. The preliminary development plans have been designed to comply with the City’s Shoreland Management Overlay District. The specific development plans PUBLIC HEARING ITEM 4A – ACTION ITEM 13 that are subject to Shoreland regulations will need to be reviewed with any future development proposals for these site. • Watershed District Review. Staff has not received any comments from the South Washington Watershed District concerning the InWood PUD. The development will need to comply with watershed district regulations and permitting requirements as the project moves forward for construction. • Theming. Staff has distributed the Branding and Theming Study completed by Damon Farber and Associates to the applicants previously. In finalizing a landscape plan for the site, staff would recommend that the applicants consider the inclusion of various theming elements and amenities identified in the plan for various locations within the development. For example, the 5th Street and Inwood Avenue Intersection presents a gateway opportunity for the City. Utilizing some of the elements described in the theming study would help the development and City achieve unique design that is consistent with the theme that the City is attempting to augment and achieve as private development moves forward. Based on the above Staff report and analysis, Staff is recommending approval of the preliminary plat and preliminary PUD plan with 15 conditions intended to address the outstanding issues noted above and to further clarify the City’s expectations in order for the developer to move forward with a final plat and final PUD plan. The recommended conditions are divided into two categories to better communicate the purpose and intent of the conditions. The recommended conditions are as follows: Recommended Conditions of Approval: Pending Review and Approvals 1) The applicant shall work with Community Development Director to name all streets in the subdivision in a manner acceptable to the City prior to the submission of final plat. 2) The City and the applicant shall reach an agreement concerning the location and dedication of land associated with the proposed water necessary to provide adequate water service to the InWood project area prior to the acceptance of a final plat for any portion of the PUD area. 3) The preliminary landscape plan shall be updated to address the review comments from the City’s landscape architecture consultant as noted in a review letter dated November 18, 2014. 4) Prior to the submission of a final plat for any portion of the InWood PUD, the developer shall work with the City to determine the appropriate park dedication calculations for the entire development area. 5) As part of any development agreement that includes improvements to one of the adjacent County State Aid Highways (CSAH 13 and 10th Street), the City and the developer shall determine the appropriate responsibility for the cost of these improvements. 6) The applicant must enter into a separate grading agreement with the City prior to the commencement of any grading activity in advance of final plat and plan approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat, and said plan shall document extent of any proposed grading on the site. 7) The applicant shall continue to work with the City on the final design of 5th Street, and in particular, the transition from the InWood PUD to properties located further to the east (including the Boulder Ponds development and land owned by Bremer Financial Services). PUBLIC HEARING ITEM 4A – ACTION ITEM 14 8) The utility construction plans shall be updated to incorporate the recommendations of the City Engineer concerning the appropriate location and size of sewer services through the PUD planning area, including any requested oversizing of these facilities to service adjacent properties. Modifications to the Preliminary Plat and Preliminary PUD Plans 9) The proposed public street access to 5th Street from Streets D2 and the southwest park area (Park 1) shall be eliminated from the preliminary development plans in order to bring the proposed spacing into conformance with the City’s access spacing guidelines. Staff is requesting that the developer continue working with the City to determine the most appropriate access into and out of the southwest park area. 10) All center median planting areas as depicted on the preliminary plat and plans shall be owned by the City of Lake Elmo and maintained by the Home Owners Association. The applicant shall enter into a maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park, trails, or open space on the final plat. 11) The applicant must either move the planned north/south tail through Park 1 further to the west around an existing wetland area located approximately 400 feet south of 10th Street or will need to work with the South Washington Watershed District to design a multi-purpose trail through the buffer area that complies with all applicable watershed district’s requirements. 12) The Final Plat and Plans must address the requested modifications outlined in the City Engineer’s review memorandum dated November 16, 2014. 13) The applicant shall be responsible for updating the final construction plans to include the construction of all improvements within County rights-of-way as required by Washington County and further described in the review letter received from the County dated November 17, 2014. Plat Restrictions 14) Prior to recording the Final Plat for any portion of the area shown in the Preliminary Plat, the Developer shall enter into a Developers Agreement acceptable to the City Attorney that delineates who is responsible for the design, construction, and payment of public improvements. 15) The developer must follow all the rules and regulations of the Wetland Conservation Act, and adhere to the conditions of approval for the South Washington Watershed District Permit. DRAFT FINDINGS Staff is recommending that the Planning Commission consider the following findings with regards to the proposed InWood preliminary plat and preliminary PUD plan: • That the InWood PUD General Concept Plan was approved by the City on September 16, 2014, and the submitted Preliminary Plat and Preliminary PUD Plan is consistent with the approved General Concept Plan. PUBLIC HEARING ITEM 4A – ACTION ITEM 15 • That the InWood preliminary plat and preliminary PUD plan are consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. • That the InWood preliminary plat and preliminary PUD plan generally complies with the City’s LDR - Urban Low Density Residential and MDR – Urban Medium Density Residential zoning districts. • That the InWood preliminary plat and preliminary PUD plan comply with the City’s subdivision ordinance. • That the InWood preliminary plat and preliminary PUD plan comply with the City’s Planned Unit Development Regulations. • That the InWood preliminary plat and preliminary PUD plan comply with City’s Engineering Standards, except where noted in the review memorandum from the City Engineer dated 11/16/14. • That the InWood preliminary plat and preliminary PUD plan comply with other City zoning ordinances, such as landscaping, tree preservation, and erosion and sediment control. • That the InWood preliminary plat and preliminary PUD plan achieve multiple identified objectives for planned developments within Lake Elmo. RECCOMENDATION: Staff recommends that the Planning Commission recommend approval of the InWood Preliminary Plat and Preliminary PUD Plan with the 15 conditions of approval as listed in the Staff report. Suggested motion: “Move to recommend approval of the InWood Preliminary Plat and Preliminary PUD Plan with the 15 conditions of approval as drafted by Staff based on the findings of fact listed in the Staff Report.” ATTACHMENTS: 1. InWood PUD Application Booklet a. PUD Plans b. Application Forms c. PUD Narrative d. Open Space Plan e. Plat Narrative f. Preliminary Plat g. Grading Plan h. Utility Plan i. Landscape Plan j. HOA Documents PUBLIC HEARING ITEM 4A – ACTION ITEM 16 2. Park “N” Concept 3. City Engineer Review Memorandum, dated 11/16/14 4. Fire Chief Review Memorandum, dated 11/17/14 5. Landscape Consultant Review Memorandum, dated 11/18/14 6. Washington County Review Memorandum, dated 11/17/14 7. City Council Meeting Minutes – Excerpt from 9/16/14 Meeting 8. Not Included in Packet – Available Upon Request: a. Storm Water Management Plan ORDER OF BUSINESS: - Introduction ........................................................................................ Planning Staff - Report by Staff ................................................................................... Planning Staff - Questions from the Commission ............................ Chair & Commission Members - Open the Public Hearing .................................................................................. Chair - Close the Public Hearing .................................................................................. Chair - Discussion by the Commission .............................. Chair & Commission Members - Action by the Commission ..................................... Chair & Commission Members PUBLIC HEARING ITEM 4A – ACTION ITEM 3 Lake Elmo Planning Commission Minutes; 3‐13‐17 requires it.  He stated that he does not control the Ebertz property, but he is willing to  give them an easement for access.      Public Hearing opened at 7:52 pm    No one spoke and there were no written comments    Public Hearing closed at 7:52 pm    Williams feels that this is a good development and good for this spot.  He does have  concerns about the access spacing, traffic flow for all the drive thru and parking needs  to be more detailed.  The offsets to open space he is willing to discuss, but needs to be  convinced with more details of landscaping and architectural design.  Dodson agrees  with Williams and would like to see an agreement worked out with the property owner  to the West.  There was discussion regarding concern with the traffic flow of the drive  thru.  Kreimer would like to see a couple of islands in the center of parking lot to break it  up a little bit.  He is also concerned about the turn radius for the multiple drive‐thru and  is concerned about the access spacing.      Lundquist thinks this will be a great addition to the community and she is not concerned  about the drive‐thru radius.  Hartley is uncomfortable permitting some of these  activities without knowing what the actual use or scale will be.   He would like to see  them as Conditional Use Permits as the use comes in.  Kreimer would like to add  condition #19 that the applicant shall be limited to 4 drive thru accesses and 2 of these  must be low intensity uses.  Miller stated that the approval or denial for a drive thru  would impact how you lay out the site and construct the building.  Dodson is wondering  if the design of the buildings limits what types of businesses would go in there.  Miller  stated that the design would dictate what types of businesses would go in there.      Williams is wondering if with the next phase the developer could give them information  regarding the drive thru traffic.  Hartley stated that the drive thru traffic could be part of  the parking space analysis.         M/S/P: Dodson/Williams, move to add condition of approval #19 that an analysis be  done on the drive thru traffic volume, including any impact on the parking areas as well  as the secondary access and overall development,  Vote: 7‐0, motion carried  unanimously.         Dorschner feels that this would be self‐managing as businesses will pick a location that  will accommodate their needs.  He doesn’t see the concern with the parking as this  development doesn’t seem any more dense than in other communities.  Lundquist  agrees.  She sees the traffic going around with a flow.        4 Lake Elmo Planning Commission Minutes; 3‐13‐17 M/S/P: Dorschner/Lundquist, move to recommend approval of the Lakewood Crossing  2nd addition PUD Concept Plan with the 19 conditions of approval as drafted by staff and  amended by the Planning Commission, based on the findings of fact listed in the staff  report, Vote: 7‐0, motion carried unanimously.     Williams would like a friendly amendment to #14 that the word “for” be inserted at the  beginning of the sentence.  This friendly amendment was accepted.  Wensman  suggested that for condition #17, the first part of sentence should be struck and it  should read “a deed restriction that guarantees access to the parking for all uses must  be submitted.”  This friendly amendment was accepted.      Public Hearing – Final Plat and PUD Plans – Inwood 5th Addition    Wensman started his presentation regarding Inwood 5th Addition final plat and PUD  Plans.  This is the last addition of the residential portion of the development.  This is a  replatting of Outlots A, B, F and G of Inwood 3rd Addition.  They are proposing 101 Single  family lots.  In 2014, Washington County conducted a Preliminary Plat review and  requested an additional 32 ft of ROW from future 10th Street improvements.  This  condition was a condition of approval documented in several locations.  It is in the 2014  Preliminary Plat report, the resolution approving Preliminary Plat and the signed  developer’s agreement.  At one point the Developer was talking with the County about  ROW to the north.  That never transpired and plans were never updated.  The County  has control over the proposed Island Trail and 10th street intersection and they want the  32 ft of dedicated ROW with this plat.      Another condition of preliminary plat approval is that the developer install a multi‐ purpose trail along 10th street between Island Trail and Inwood Ave.  Staff was  supportive of removal of this trail, but the Commission and Council’s resolution of  approval required this trail.  Preliminary Plat was never updated and it is not included in  Inwood 5th Plat submittal.     There are some Landscaping and engineering revisions that  are required, such as removal of certain trees and berms and required water main  easements.      Kreimer asked if there is room to build the homes if they do the 32 foot ROW  dedication.  Wensman stated that those are deep lots, but the back yards will have part  of the berms and it will tighten things up.  Williams is wondering why the application is  not deemed incomplete without that ROW dedication.  Wensman stated that it was  originally deemed incomplete.  The Developer provided more information and upon the  City Attorney’s advice, it can be dealt with through conditions.   There was discussion  about the advantage of the trail ROW to the North vs. the South.  The trail would be  located within the 32 feet of ROW being required.  Wensman stated that from a  Planning perspective, the trail is desirable to move people to the future commercial  properties to the West.  Dodson asked if the segment of trail along 10th street would be  a City trail.  Wensman stated that he thinks it is HOA owned and maintained, but he is  not sure.    5 Lake Elmo Planning Commission Minutes; 3‐13‐17   Williams stated that condition #4 should be South Washington instead of Valley Branch  watershed district.      Hartley is wondering if this was reviewed by the Fire Chief, specifically if the Circles that  dead end are wide enough.  Wensman stated that it was a concern of the City Engineer  and he would like the pavement widened there so that they function better.         John Rask, MI Homes, stated that the cul‐de‐sacs are standard radius for cul‐de‐sacs so  they would accommodate a fire truck.  He does not necessary disagree with the  conditions of approval of Preliminary Plat, but what is missing is that there were  subsequent approvals granted for final plats and grading that didn’t have this trail.  They  had discussions with the County and they agreed to take the ROW and trail to the  North.  Rask feels that with the staff turnover, some things have fallen through the  cracks.   Rask stated that these discussions were held after the Preliminary Plat was  approved.  He feels that the County has changed the requirements.  When Inwood was  approved, it was known and stated that both Inwood and 10th Street would someday be  4 lane roads with trails on one side.  Rask stated that if they grant the ROW, they will  need to take out the berm and the trail was never once shown on any of their plans.   The berm was installed at expense to the developer to make the development look  better.  They graded the berm with a grading permit and no one ever mentioned that  the trail wasn’t on the plan.  Rask feels they are consistent with the City’s trail plan and  added trails at the City’s request.  Rask is making the following request that 1) the  Planning Commission find that the trail along 10th street is inconsistent with the City’s  Comprehensive Plan 2) Strike the conditions requiring additional ROW and a trail along  10th Street 3) Reconfirm that the trail and additional Row should be on the north side of  10th Street 4) allow the existing berm to remain as approved in the Development  contract approved by the City Council.          Dodson asked what would happen to the berm if the additional 32 feet of ROW is given.   Rask stated that they would need to take out the berm.  Williams asked why it couldn’t  be moved to the south.  Rask stated that the whole row of lots would be lost as it  couldn’t remain in the ROW.  Williams asked when the developer was made aware of  the staff’s analysis of the ROW issue.  Rask stated that it was probably in December.   What happened is they went to County for an access permit to construct the road and  then they were told about the trail and additional ROW.  Rask doesn’t believe that the  County has that authority.  Williams doesn’t see that the City should be involved in this  other than dealing with what is in written record which is the condition of approval.     Wensman stated that the trail and the ROW were conditions of approval that are in  multiple locations and were carried over from Preliminary Plat.  It is typical for the  County to require these things with access and typical for the City to require that as part  of the plat.      Public Hearing opened at 9:00 pm  6 Lake Elmo Planning Commission Minutes; 3‐13‐17   No one spoke and there were no written comments    Public Hearing closed at 9:00 pm    Williams thinks that the trail and ROW issue is more complicated than they can deal  with tonight.  He would suggest that under condition #9 that at the end add “unless the  County submits written permission for less ROW”.  He feels that the written record  shows that the ROW should be dedicated, but it is up to the County.  Wensman stated  that the County has reaffirmed their letter from November 17, 2014, that they would  still need that ROW.   Handt stated that if the City does not get that ROW at the time of  plat, when the County does need to acquire the land, they will come back and charge  the City for the acquisition of the ROW.  Rask disagrees with that statement.      M/S/P:  Williams/Dodson, move to add finding #8 that the legal issues surrounding the  additional 32 feet of ROW and the trail from Island to Inwood along 10th Street are  beyond the scope of the Planning Commission, Vote: 6‐1, motion carried, with  Lundquist opposed.  Lundquist feels that they have an obligation to remain consistent  with what the County is asking for.        M/S/P:  Kreimer/Dodson, move to add finding #9 that the Planning Commission finds  significant value to the existing berm that the developer built along 10th Street and the  County should be requested to retain the berm regardless of the ROW issue, Vote: 6‐1,  motion carried, with Lundquist opposed.       Wensman stated that the County is fine with the berm staying as long as there is a wall  once it gets to the ROW.  They don’t want to have to move or restore the berm if  improvements need to be made.  Lundquist stated that 10th street is a major thorough  fare with plans to go to a 4 lane and they need the space.        M/S/P:  Dodson/Williams, move to recommend removing condition number 11  requiring a multi‐purpose trail along 10th Street between Island Trail and Inwood Ave be  removed, Vote: 7‐0, motion carried unanimously.       Kreimer remembers the discussion about the trails and he remembers giving up the  requirement for a trail on Inwood, but that they decided that they wanted the trail  along 10th Street.  Larson stated that there is already a trail through the development to  the commercial so it is not like there is no trail at all.  Dorschner remembers the  developer stating that they could get easements on the North side of 10th for the trail.   He feels it makes sense to make the connection.  Rask stated that to give more ROW  and build the trail, he would have to remove the berm.  Rask stated that when they sat  down with the County, he felt that there was no compromise.  He feels that the County  wants everything and is willing to give nothing.      7 Lake Elmo Planning Commission Minutes; 3‐13‐17 M/S/P:  Kreimer/Williams, move to add a condition requiring that the section of trail  from Island trail to the eastern buffer is built, Vote: 7‐0, motion carried unanimously.       M/S/P:  Dodson/Williams, move to add a finding #10 that the City consider any trail  required to be implemented by the development from Island Trail to Inwood be  credited towards parkland dedication, Vote: 7‐0, motion carried unanimously.       M/S/P: Williams/Dorschner, move to recommend approval of Inwood 5th Addition Final  Plat and Final PUD plans with 11 conditions of approval based on the findings as  amended in the staff report, Vote: 7‐0, motion carried unanimously.       Public Hearing – Zoning Map Amendment and Preliminary Plat and PUD Plans ‐ Royal  Golf    Wensman started his presentation regarding the rezoning from PF to GCC – Golf Course  Community and the Preliminary Plat and PUD Plans.  Wensman went through the issues  from the Concept plan that were addressed with the Preliminary plan.  With the PUD  Overlay, the developer has requested flexibility.  They would like single access to the  clubhouse, lot sizes smaller than 9000 for villa lots, 40% impervious and 20 ft front yard  setbacks on villa lots, 50 ft ROW on Street C, add’l subdivision and neighborhood signs,  and garages greater than 1000 sq ft to be permitted rather than a CUP.      With the Shoreland evaluation, there are 100 lots within the shoreland area, the  development is preserving 50.5% or the shoreland, where 50% is required, less than  allowed base density within each shoreland, shoreland impact zones and steep slopes  preserved in Lake Elmo and Downs Lake, 70% of shoreland impact preserved for Rose  and Horseshoe, 59.9% of Lake Elmo shoreland preserved, and preserved a  wildlife/drainage corridor from NW to SE.  The developer needs to maintain a 100 ft  Natural Corridor outside of lot areas.  They have 89 feet, so staff has made the 100 foot  corridor a condition of approval.   The GCC minimum lot size is 9000 sq feet.  The PUD  flexibility sought is 6,600 sq ft on some lots.  The average lot size is 13,499 sq feet  because of some of the larger lots.  There is also a request for PUD flexibility for 20’  front setback and 7.5’ setbacks.  The 7.5’ setback averaging is already allowed by policy.  Staff is requesting there be an exhibit which clearly shows specific lots and setbacks, no  encroachments into D & U easements and lots with 20’ setbacks should have garages  adorned with windows or other architectural features for sides of garages facing the  public ROW.  The GCC maximum impervious per lot is 30%, the request for PUD  flexibility is for 40%.  Staff feels this is ok as it matches LDR zoning and will be limited to  the villa lots.  The developer is asking to forego the sidewalk requirement on a number  of streets.  Staff is only supportive of street C having no sidewalk because of site  limitations.  Dodson would like the exhibit showing the setbacks to also show which lots  can have the larger garage.