Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Lion's Park Baseball Field
LION'S PARK BASEBALL FIELD Concept Estimate: 7/28/17 Masterplan Estimate (P-105): 4/28/17 Adjusted Masterplan Estimate (P-106): 5/3/17 Baseball Field Baseball Field 113aseball Field Re-grade $34,100 Re-grade $120,500 (-------------> Re-grade Breakdown: 4/28/17 5/3/17 Re-grade $80,700 Perimeter Fence $22,000 Perimeter Fence $28,200 Surveying&Staking $8,000 $4,000 Perimeter Fence $28,200 Warning Track $10,000 Strip Sod,Import Fill,Regrade $33,000 $33,000 Warning Track $10,000 Infield $13,200 Infield $10,000 Demo Fence $1,200 $1,200 Infield $10,000 Dugouts $24,750 Dugouts $20,000 Remove Trees $3,500 $0 Dugouts $20,000 Bullpens $3,000 Erosion Control $5,0001 $5,000 Bullpens $3,000 Lighting $170,000 Relocate Power Lines $10,000 $1,500 Lighting $85,000 Batting Cages $5,500 Batting Cages $22,300 Irrigation $14,000 $14,000 Batting Cages $10,650 $384,000 Landscape,Sod $22,000 $22,000 $247,550 Irrigation $6,600 Sidewalk(concrete) $13,770 $0 Relocate Volleyball $5,000 Misc. $10,030 $0 PHASE I Total: $247,550 Demo Ex.Arts Bldg. $15,000 1 $120,5001 $80,700 Bleachers $19,800 Relocate Volleyball (Move to Phase II) $5,000 Demo Ex.Arts Bldg. (Move to Phase II) $15,000 PHASE I Total: $404,000 Demo Ex.Conc./RR $4,000 Renovate Conc./RR $20,000 South Parking Lot $32,000 South Parking Lot $16,000 PA Booth $11,000, Concesssions/RR/PA Booth $120,000 PA Booth w/Bleacher $15,000 Concession(re-paint) $1,000 PHASE II Total: $156,000 PHASE II Total: $71,000 Total: $137,950 North Parking Lot $22,000 North Parking Lot $22,000 Picnic Pavilion $21,000 Picnic Pavilion $21,000 Gardens $10,000 Gardens $10,000 Welcome Sign $500 Welcome Sign $500 Pavilion/Warming House $25,000 Pavilion/Warming House $25,000 Walking Paths $8,500 Walking Paths $8,500 PHASE III Total: $87,000 PHASE III Total: $87,000 PHASE 1-III Total: $647,000 PHASE 1-III Total: $405,550 Total General Req's $22,250 Total General Req's $22,250 Total Contingency $30,000 Total Contingency $30,000 Total Construction Fee $47,000 Total Construction Fee $47,000 Arch&Eng.Fees $39,750 Arch&Eng.Fees $39,750 $139,000 $139,000 GRAND TOTAL: $786,000 GRAND TOTAL: $544,550