HomeMy WebLinkAbout# 11 I-94 Lift Station and Sanitary Sewer Improvments STAFF REPORT DATE: June 20, 2017 CONSENT ITEM #: 11 AGENDA ITEM: I-94 Lift Station (No. 1) and Sanitary Sewer Improvements - Change Order No. 1 SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Rob Weldon, Public Works Director Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Change Order No. 1 for the I-94 Lift Station (No. 1) and Sanitary Sewer Improvements? BACKGROUND: RL Larson Excavating, Inc. was awarded a construction contract to complete the I-94 Lift Station (No. 1) and Sanitary Sewer Improvements on May 2, 2017. PROPOSAL DETAILS/ANALYSIS: RL Larson Excavating, Inc. has submitted a change order to furnish and install lift station pumps (3) that were redesigned in response to revised pumping conditions required by Met Council. All City sanitary sewer permit applications are subject to Met Council review prior to MPCA review and approval. To approve the permit, Met Council required revised pumping conditions to meet long term discharge rates and location for the Lake Elmo sewage that is generated in the southwest sewer area. FISCAL IMPACT: This change order will increase the contract in the amount of $17,853.72 bringing the revised construction contract to $826,983.42. With this change order the project remains within the authorized project budget and contingencies. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 1 for the I-94 Lift Station (No. 1) and Sanitary Sewer Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 1 for the I-94 Lift Station (No. 1) and Sanitary Sewer Improvements, thereby increasing the contract amount by $17,853.72”. ATTACHMENTS: 1. Change Order No. 1. CONTRACT CHANGE ORDER FORM CHANGE ORDER NO. DATE: TO: UNIT EA Amount of Original Contract $ Sum of Additions/Deductions approved to date (CO Nos.         )$ Contract Amount to date $ Amount of this Change Order   (ADD)   (DEDUCT)   (NO CHANGE)$ Revised Contract Amount $ The Contract Period for Completion will be   (UNCHANGED)  (INCREASED)  (DECREASED)days APPROVED BY ENGINEER:  FOCUS ENGINEERING APPROVED BY CONTRACTOR DATE DATE APPROVED BY OWNER:  CITY OF LAKE ELMO, MINNESOTA DATE DATE 0 This Document will become a supplement to the Contract and all provisions will apply hereto. The Contract Documents are  modified as follows upon execution of this Change Order.  BYENGINEER 809,129.70 0.00 809,129.70 17,853.72 826,983.42 INCREASE/(DECREASE) $17,853.72CO1‐1 $5,951.243 RL Larson Excavating, Inc., 2255 12th Street SE, St. Cloud, MN 56304 I‐94 LIFT STATION (NO. 1) AND SANITARY SEWER IMPROVEMENTS PROJECT NO. 2016.134 1 June 13, 2017 Revise Pump Design ITEM NET CONTRACT CHANGE $17,853.72 CITY OF LAKE ELMO, MINNESOTA BYBY CHANGE ORDER DESCRIPTION / JUSTIFICATION: The lift station pumps (3 pumps) were redesigned in response to revised pumping conditions required by Met Council after  receiving contractor bids. Met Council reviews all City sanitary sewer permit applications prior to MPCA review and approval.  To approve the permit, Met Council required revised pumping conditions to meet long term discharge rates and location for  the Lake Elmo sewage that is generated in the southwest sewer sevice area.  Attachments  (list documents supporting change):None DESCRIPTION OF PAY ITEM QTY UNITE PRICE 6/13/2017 FOCUS Engineering, inc.CHANGE ORDER FORM