HomeMy WebLinkAbout# 17 Lakewood Crossing 2nd Addition Preliminary and Final Plat and PUD Plans1
STAFF REPORT
DATE: June 20, 2017
REGULAR
ITEM #: 17
MOTION
TO: City Council
FROM: Emily Becker, City Planner
AGENDA ITEM: Lakewood Crossing 2nd Addition Preliminary and Final Plat and Planned
Unit Development (PUD) Plans
REVIEWED BY: Stephen Wensman, Planning Director
BACKGROUND:
CM Properties 94, LP has submitted application to the City for a Preliminary and Final Plat and Planned
Unit Development (PUD) Plans for Outlot A of Lakewood Crossing 1st Addition. The proposal will
subdivide the existing 3.82 acre parcel in to three separate parcels. These parcels will include a full
service restaurant with outdoor patio; quick service restaurants with drive-throughs; and other retail
activities.
Applicant and
Property Owner:
CM Properties 94, LP c/o MFL Properties Corp., 3460 Washington Dr., Ste 100
Eagan, MN 55122
Location: Southwest of Kwik Trip Gas Station (9955 Hudson Blvd N), PID#
3402921440015
Existing Land Use
and Zoning:
Vacant land, Commercial (C)
Comprehensive
Plan:
Commercial
History: The property has been under the ownership of CM Properties 94, LP for over 45
years, and it is the intent that this company will continue to own the property for
years to come.
Lakewood Crossing Preliminary Plat, Final Plat and Conditional Use Permit for
a gasoline station (Kwik Trip) Approval: 7/22/2014
Lakewood Crossing 2nd Addition PUD Concept Plan Approval: 3/21/2017
Deadline for
Action:
Application Complete: 5/30/2017
60 Day Deadline: 7/28/2017
Extension Letter Mailed: N/A
120 Day Deadline: N/A
Applicable
Regulations:
Article XVI – Planned Unit Developments
Article XII – Commercial Districts
Chapter 153: Subdivision Regulations
ISSUE BEFORE COUNCIL:
The Council is respectfully being requested to review the proposed Preliminary and Final Plat and PUD
Plans and either approve or deny the request.
PROPOSAL DETAILS/ANALYSIS:
2
PUD and Plat Process. The applicant has submitted application for both Preliminary and Final Plat and
PUD Plans concurrently. The applicant received PUD Concept Plan approval by Council on March 21,
2017. Approval of the PUD Concept Plan alone did not afford the developer/applicant any rights but did
provide feedback to the applicant regarding the proposed development.
Identified PUD Objectives. The PUD process is appropriate for the proposed development to allow
flexibility in the location, design, and mix of commercial uses on a single large site. The City should
consider whether one or more of the objectives listed in Section 154.751 are met when reviewing requests
for approval of planned unit developments. It is of Staff opinion that the following objectives are met with
this request:
A. Innovation in land development techniques that may be more suitable for a given parcel than
conventional approaches.
Note: The parcel is an irregularly-shaped parcel and so meeting all of the lot dimension
requirements of the Commercial zoning district would be a hardship.
F. Coordination of architectural styles and building forms to achieve greater compatibility within the
development and surrounding land uses.
Note: The development will include additional retail and service businesses which will
supplement the gas station.
PUD Flexibility. The following outlines PUD flexibility the applicant seeks. In summary, the applicant is
requesting flexibility from the following zoning standards:
• Medical facilities, drive-throughs, and outdoor dining as a permitted, rather than conditional, use.
• Minimum lot width
• Impervious surface allowance
• Parking lot setback
• Certain Lake Elmo Design Guidelines and Standards Manual
• Certain landscape requirements
• Waive off-street loading requirements
• Required 20% protected open space within a PUD
• Signage
Permitted and Conditional Uses. The proposed development will include a full service restaurant with
outdoor patio; quick service restaurants with drive-throughs; chiropractic care, and other retail activities.
General retail sales and restaurants are permitted uses within the Commercial zoning district, while
medical facilities (chiropractic care), drive-through facilities, and outdoor dining are conditional uses.
• Conditional Use to Permitted Use. Because the applicant is proposing a Planned Unit
Development, the applicant is requesting that uses that would normally be conditional become
permitted uses within this development. This is to prevent new tenants from having to go the
Conditional Use Permit process. It should be noted that if plans are significantly amended (i.e. an
additional drive through is requested after the PUD is approved), the PUD would also need to be
amended. If the Commission wishes to recommend that these uses be allowed as permitted, rather
than conditional, uses within this PUD, the Commission should thoroughly review the proposal,
requesting more information if needed, in order to properly ensure that standards are being met
and that the proposed uses will not be detrimental to the development or surrounding area
Medical Facilities. The Code mandates that medical facilities have access to an arterial or collector street
of sufficient capacity to accommodate generated traffic and that two access points are granted. Currently,
the site plan only indicates one access. Therefore, this standard is not met. However, it should be noted
that the proposed medical facility would be a chiropractic office, which is a less intense use than other
medical facilities such as urgent care or an emergency room is, and the two access points would likely not
be needed.
3
Drive-Throughs. The applicant had previously proposed four drive-throughs in the Concept PUD Plan.
The applicant hired Spack Consulting to perform a Drive-Through Analysis to review information of
these different drive-through types to determine whether sufficient stacking was provided. Due to
feedback from this report and subsequent discussions regarding potential circulation conflicts, the
previously-proposed high volume drive-through located on the east end of the Lot 2 building was
eliminated, reducing the number of proposed drive-throughs to three.
• Recommendations from Report. Summarily, the drive-through report recommends the following
to improve drive-through operations. It is a recommended condition of approval that the
Applicant adhere to all recommendations made in this report:
o Locate drive-through windows in buildings to maximum vehicle stacking.
o Offset median islands and parking lot driving lanes from the drive-throughs between Lots
1 and 2 to avoid driver confusion.
Note: The Applicant has offset the landscape medians to address this comment.
o Provide one-way eastbound circulation around the west, south, and east sides of Lots 1
and 2 to avoid unnecessary conflicts with drive-through vehicles at the windows.
Note: The updated Site Plan does not indicate one-way traffic along the south of
Lots 1 and 2 nor the east side of Lot 1. It should be noted that these aisles are
wide enough by City standards for a 2-way aisle driveway in a parking lot. Lines
clearly delineating the two aisles should be provided on the site plan if the City is
to allow two-way traffic along these aisles.
o Provide appropriate signage and pavement markings for all drive-through lanes to inform
drivers of expected operations. A convex mirror may be necessary in select areas to
improve sight distance and see other approaching vehicles.
• Explanation of Low-Volume and High-Volume Drive-Throughs. Spack included reports that
looked at drive-through lane usage of five different land uses in Minnesota: banks, car washes,
coffee shops, fast food restaurants, dry cleaners and pharmacies.
o Proposed Low-Volume Drive Throughs provide enough storage space for approximately
four vehicles before they begin to spill out into the drive-through and block drive aisles.
Based on the maximum number of cars observed in queue at any one time in Spack’s
report, land uses with low-volume drive-throughs include: car wash, pharmacy, dry
cleaner, and sit-down takeaway restaurant.
o Proposed High-Volume Drive Throughs provide enough storage space for approximately
twelve stacked vehicles. Based on the maximum number of cars observed in queue at any
one time in Spack’s report, land uses with high-volume drive-throughs include: fast food
restaurant, coffee shop, donut/bakery shop, and bank.
o It is a recommended condition of approval that uses utilizing these drive-throughs be
limited to those which the drive-through can support.
• Adherence to Standards. The Applicant has still not provided enough detail for Staff to analyze if
adherence to all standards for restaurants with drive-throughs have been met. It is a recommended
condition of approval that the Applicant provide this information.
Standard Required Proposed
Sec. 154.304: Standards for Food Services
Restaurant
with Drive-
Through
1. Drive-through elements shall not be
located between the front façade of
the principal building and the street.
No service shall be rendered,
deliveries made or sales conducted
within the required front yard,
although tables may be provided for
customer use.
2. Site design shall accommodate a
1. The drive-through elements are not
outlined. One of the elements appears to
be in front yard of Lot 3.
2. This is hard to determine without
knowing exact locations of speakers and
service windows, however the applicant
has provided a report prepared by a traffic
consultant which analyzes the site design
and has made necessary changes.
3. Canopy detail and other structure detail
4
logical and safe vehicle and pedestrian
circulation pattern. Adequate queuing
lane space shall be provided, without
interfering with on-site
parking/circulation.
3. Drive-through canopies and other
structures, where present, shall be
constructed from the same materials
as the primary building, and with a
similar level of architectural quality
and detailing.
4. Sound from any speakers used on
the premises shall not be audible
above a level of normal conversation
at the boundary of any surrounding
residential district or on any
residential property.
5. Each food or beverage drive-
through business shall place refuse
receptacles at all exits.
not provided.
4. Unable to determine.
5. Information not provided.
Outdoor Dining. The standard set forth in Section 154.554 of the Zoning Code for outdoor dining is that
tables cannot block a public sidewalk or other walkway needed for pedestrian circulation. Minimum of 5
ft. of sidewalk must remain open. There is only one small sidewalk in front of the building located on Lot
3 which provides access from the parking lot to the building. Because the exact placement of the tables
will likely be up to the occupant of the building, which may change from time to time, this standard has
been added as a recommended condition of approval.
Lot Dimensions and Bulk Requirements. Generally, the proposed development meets lot dimension
and bulk requirement standards. Flexibility is being requested on:
• Lot width minimum. The parcel that is being developed is a uniquely-shaped parcel, and so the
manner in which the parcel is being subdivided is unique.
• Impervious surface for Lot 2. The overall impervious surface of the three parcels averages 75%,
which meets the Commercial zoning district’s maximum impervious surface requirement. Lot 2
individually, however, exceeds this maximum requirement at 80%.
• Parking setback on Lot 1. The parking lot will cover all three lots, so there is a 0 ft. setback
between the three newly-created parcels. Also, the parking lot is connected to a through lane on
the east side of the property with an 8.7 ft. setback. Setbacks from the south and west of the
parcel are met.
Driveway Standards. Flexibility is being requested for the following on driveway standards:
• Distance from driveway to side lot line (5 feet required). Lot 3 will share a driveway access with
Kwik Trip, to the east of the property, and so will not meet this standard with a 0 ft. setback.
Commercial District Design Standards. The following details significant design standards set forth by
the City of Lake Elmo Design Guidelines and Standards that have not been met in the proposal. The
Commission should consider whether or not flexibility should be allowed for the following standards:
• Orientation of buildings. The unique shape of the parcel that is being developed resulted in a
unique shape of Lot 3. As a result, the building is oriented according to the shape of the parcel
and to accommodate better traffic circulation and proximity to the parking lot.
5
• Landscaped open or gathering spaces. Being that this a small commercial development located in
close proximity to the highway that will likely serve quick visits, Staff does not feel it necessary
to provide this open space. An outdoor dining area is being proposed, and the restaurants will
likely provide adequate seating for guests.
• Sidewalks. No sidewalk is provided along Hudson Blvd. However, there are no other sidewalks
along Hudson Blvd. to which it could connect. There is an on-road bike lane on Hudson Blvd that
will accommodate bikers.
• Streetscape Lighting. No lighting is provided along Hudson Blvd. Lighting is provided within the
interior of the parking lot.
• Fencing of Outdoor Dining Areas. The applicant has not indicated on the site plan where the
outdoor dining will be located.
• Site furnishings. The manual details that furnishings such as decorative fencing, trash receptacles,
planters, bicycle racks, and benches are recommended – design elements from Branding &
Theming Study encouraged. The Applicant has indicated that the site will include decorative
fencing, lighting, trash enclosures, and benches.
• Parking. There is minimal exterior parking lot landscaping and screening provided. Also, the
parking lot is located in the front of 2 buildings and exceeds 60% of street frontage.
Landscape Requirements. The applicant has amended the landscape plans to comply with some of the
deviations from City standards that were outlined during the Concept PUD Plan review. However, there
are still standards to which the proposed plans do not adhere. The proposed Landscape Plan does not meet
the following standards of the Zoning Code. The Commission should consider whether flexibility should
be provided via the PUD process or if these standards should be met.
• There are only five trees proposed along Hudson Blvd, and six are required.
• Thornless Hawthorn (deciduous ornamental) are required to be 2” caliper, not 1.5” as proposed.
• There is no screening consisting of masonry wall, fence, berm, or hedge provided along Hudson
Blvd that is 3.5-4’ in height and less than 50% opaque as required, but the drive-through lane is
screened with a spire hedge.
Tree Preservation Requirements. There are no trees currently on the site, and so a tree preservation plan
is not required.
Off-Street Parking. The applicant meets general parking space size and aisle width standards. The
applicant has provided a narrative that explains that adequate parking has been provided.
• Specific Minimum Off-Street Parking Requirements. The applicant is unsure exactly what the
final tenant mix will be, but has shown that assuming 19,000 square feet of the buildings are retail
and 8,700 square feet are restaurants, that a total of 164 parking spaces would be required. The
applicant is providing 165 parking stalls, or 5.92 stalls per 1,000 square feet, so the proposed
parking is more than adequate.
• Shared Parking. The applicant has indicated in a narrative that a Reciprocal Easement and
Operating Agreement has been drafted and will be recorded to account for shared parking and
access. This is a recommended condition of approval.
Off-Street Loading Areas. Section 154.211 of the Zoning Code requires that off-street loading areas be
provided in all districts for any nonresidential use which involves the receipt or distribution of materials
or merchandise by trucks or similar vehicles and has a gross floor area of 5,000 square feet of more. The
proposed site plan does not provide an off-street loading area. The applicant has provided a narrative that
indicates that deliveries to Lake Elmo Shoppes will occur behind the buildings and will utilize the service
door in the back of each tenant space and that no dock doors or drive-in doors are needed for the types of
tenants that occupy Lake Elmo Shoppes. Staff is supportive of waiving the off-street loading requirement.
Sign Regulations.
6
• Comprehensive Sign Plan. A Comprehensive Sign Plan is required of any applicant for all
planned developments and commercial or industrial multi-tenant developments where different
occupancies will compete for permitted square footage on a single lot. The Applicant has
submitted a Comprehensive Sign Plan, attached to this report, detailing proposed wall signage
and two ground signs. The Applicant states in the narrative that an increased amount of signage is
being requested in order to be seen by the vast number of commuters and the local traffic
patterns. Their signs will provide consistency in size and construction materials, while allowing
each tenant the flexibility and square footage to showcase building storefronts, brand names, and
individual site locations as best as possible.
• Wall signs. The current standard for wall signs is 1 square footage per 1 lineal foot of storefront.
The Applicant has submitted an exhibit which shows what signs of this size would look like on
the proposed building, stating that this ratio looks quite small on the façade. The applicant has
submitted the request for 2.5 square feet of signage for every one lineal foot of building on the
front and rear façades and 1.5 square feet of signage for every one lineal foot of building on the
east and west elevations.
• Ground Signs. One ground sign per street frontage is allowed per lot, and ground signs on lots
that front streets with the number of traffic lanes and speed limit of these lots are allowed to be a
maximum height of 12 feet and 80 square feet. The applicant has proposed two ground signs: one
12 feet, 4 inches in height and 80 square feet, and one 30 feet in height and 273 square feet. The
proposed signs meet the setback requirement of 15 feet of a crosswalk, or within 15 feet of the
intersection of any circulation lane, driveway, or alley. Because the property abuts the Keats Ave
N to WB I-94 ramp and Hudson Blvd, the Applicant is looking for visibility from both frontages.
Open Space. The City’s PUD ordinance sets forth the requirement that at least 20% of the project area
within a PUD be preserved as protected open space. This requirement appears to be more appropriate or
applicable to residential development. However, other public and site amenities may be approved as an
alternative to this requirement. The proposed PUD does not meet the open space requirement. The
applicant has provided a narrative that proposes that this development enhances the site and retail
shopping and dining experience with enhanced architectural materials and site furnishings through natural
colors, textures, and shapes; flanking that offers a three-dimensional quality and skyline interest; mixture
of materials; unique cornices; variety of awnings; ornamental light fixtures; and four-sided architecture.
Lighting. The applicant has stated that a photometric plan has been ordered and will be forwarded to the
City once received. It is a recommended condition of approval that a lighting plan be submitted meeting
Sections 150.035-150.038 of the City Code.
Engineering Comments. Attached is a memorandum from the City Engineer dated May 31, 2017, which
details a number of comments that will need to be addressed. A condition of approval has been added that
requires that the Applicant address all of the comments outlined in this memo. Outlined comments
include the following:
• No construction for Lakewood Crossing 2nd Addition may begin until the applicant has received
Engineer approval for Final Construction Plans; all applicable permit approvals; easements and
permissions for the project; and a preconstruction meeting has been held.
• Preliminary plans must be updated and the final construction plans must include a right turn lane
along eastbound Hudson Boulevard and any additional fire hydrants as required by the Fire
Chief/Building Official.
• Preliminary and final construction plans and plat must be updated to include all necessary
drainage and utility easements as required for the public sanitary sewer and watermain/hydrants.
Traffic. The applications have been sent to Minnesota Department of Transportation (MNDOT), as the
development abuts the Keats Ave N to WB I-94 ramp, and Washington County, as the County has
indicated a study will be done on the Keats Ave N and Hudson Blvd N intersection, to which this project
is near. MNDOT had made comments that the grading should stay within the limits of the development;
7
the Hudson Blvd right-of-way should be shown as City of Lake Elmo rather than MNDOT; and MNDOT
drainage permit will be required.
Access Management. Hudson Blvd is planned as a major collector road. The Comprehensive Plan’s
access management guidelines limit full commercial driveway access to 660 ft spacing. The PUD
Concept Plan had shown a second access on the site approximately 240 ft away from the access to Kwik
Trip. It was a recommended condition of approval of the PUD Concept Plan that the Applicant work to
include PID# 34.292.1440004 (Ebertz Property – the small property to the west) as part of the
Preliminary Plat and PUD Plans or work with the owner of this property to provide shared access. The
Applicant details in the narrative that because CM Properties 94, LP does not own or control this
property, access was not able to be shifted. The Applicant eliminated the second access on the
Preliminary and Final Plat and PUD Plans application as a result, and Staff recommends the developer
continue to work with the Ebertz’s to gain access to a secondary access to Hudson Blvd on the Ebertz
property in the future. A future access driveway connection to the adjacent westerly property has been
shown on this site plan. There are currently no plans for a raised center median along Hudson Boulevard,
and so right-in/right-out access locations cannot be allowed along Hudson Boulevard.
A right turn lane should be required on Hudson Boulevard. There is an existing westbound turn lane on
Hudson Boulevard at the existing access location to this development. However, an eastbound right turn
should be required as part of this project to handle increased traffic volumes. Hudson Boulevard is
expected to receive significant growth in traffic volume as the I-94 corridor develops. It is the goal of the
City to maintain Hudson Boulevard as a two-lane road. Therefore, left and right turn lanes will need to be
implemented throughout the corridor to facilitate the turning movements for the developing areas while
maintaining mobility of the through traffic.
Fire Chief and Building Official Comments. The Fire Chief and Building Official have reviewed the
proposed site plan and have the following comments as they relate to the Utility Plan:
• The drive-through aisle and lane to the west of the drive-through are 12 and 16 feet in width. The
drive-through aisle on Lot 3 also indicates a width of 12 feet. These should be at least 20 feet in
width to allow for required apparatus access around the perimeter of the buildings.
• Additional fire hydrants will be needed on the northwest end of the building on Lot 2, the
northeast end of the building on Lot 1, and the southwest end of the building on Lot 3.
• Additional watermain and fire hydrant easements will be required over the additional fire hydrant
locations and watermains.
Circulation. In addition to issues raised in the drive-through section of this report, there is a bit of
concern about circulation on the site. The shared access with Kwik Trip could prove to be confusing to
site visitors, as the existing median is essentially where the right turn lane for the Kwik Trip portion of the
access is. Additionally, drivers accessing Kwik Trip from the proposed development may or may not
know to stop for oncoming traffic from those exiting back portion of Kwik Trip. Additional striping may
improve this situation. A recommended condition of approval is that the Applicant provide additional
striping and/or a stop sign in this area to facilitate proper traffic circulation.
Municipal Sanitary Sewer and Water Supply. The proposed site is located within the Stage 1 Regional
Sewer area. The property is currently served with municipal sewer and water, and no phasing is required
for infrastructure improvements. The Applicant has indicated in the submitted narrative that sanitary
sewer and water service be extended to the property to the west, provided the owner is willing to pay the
cost to extend. The owner at this time appears willing, but no agreement has been reached. The Applicant
has suggested as an alternative that the property access utilities under Hudson Blvd from the North. This,
however, is a business decision that should ultimately be made by Council. The City should only accept
one boring under Hudson Blvd. A boring was made for Kwik Trip, so Staff recommends that no
additional borings be allowed. As such, the Applicant should be made to extend sanitary sewer and water
8
service to the westerly parcel regardless of whether or not the owner of the aforementioned parcel agrees
to help pay for it.
Stormwater. An infiltration basin is provided on the east side of the property. Stormwater runoff will be
routed through two underground parking lot storm chamber systems that will provide infiltration and
retention in addition to one above ground infiltration basin. The above ground infiltration basin will be
obtained by converting an existing storm water pond to an infiltration basin. Pretreatment for the
infiltration basins will be provided by oversized sump manholes equipped with scour prevention devices.
Due to proximity to the Kwik Trip site, the MPCA should be consulted to verify infiltration practices will
be allowed. Written landowner permission may be required for any off-site storm water discharges to
adjacent properties to avoid negative impacts to downstream properties.
Phasing. The Applicant has requested to plat all three lots at this time, but construction will occur in three
phases: Three phases: 1st: 14,700 sf building on Lot 1 2nd: 10,120 sf building on Lot 2 3rd: 3,192 sf
building on Lot 3. The Applicant should submit construction plans for approval by the City which will
detail phasing of utilities and grading and site improvements.
Existing Easements. The Applicant has indicated the need to vacate existing easements over the
property. The Applicant will need to submit a separate application for this, and the public hearing may be
held at the City Council meeting concurrently with Preliminary and Final Plat and PUD Plan approval.
Comprehensive Plan. The property is guided for and zoned Commercial. The proposed development is
commercial in nature. Commercial development is guided for 4.5-7 residential equivalency units (REU)
per acre.
Residential Equivalency Units (REU). Because the development is within the beginning stages, the Met
Council has not yet made a determination for WAC/SAC Charges. However, the following outlines REU
information for the proposed uses within the development:
Restaurant
Fixed Seating (actual number of seats) 10 seats 1
Non-Fixed Seating (the greater of the square feet of dining area @ 15 square
feet/seat or number of seats shown on the plan) 10 seats 1
Outdoor patios and sidewalk seating are counted same as inside seating.
(See Section 5.2.1.7.1 for discount) - -
Drive-in (See Section 5.2.1.7 for discount) 9 parking
1
Take-out (no seating) 3,000 square
feet 1
Outpatient clinic *17 fixture
units
1
Sterilizer (4 hours x gallons per minute x 60 minutes) 274 gallons 1
X-ray film processor (4 hours x gallons per minute x 60 minutes) 274 gallons 1
Retail Store (deduct mechanical rooms, elevator shafts, stairwells, escalators,
restrooms and unfinished storage areas) (for remainder use other criteria) (i.e. Gas
Pumping)
3,000 square
feet
1
Shower (if lockers are included use Locker Room criteria) *17 fixture
units
1
Park Dedication/Parks and Trails. The parkland dedication requirement for the proposed commercial
development is presently $4,500 per acre in lieu of dedicated land. The proposed development area is
3.82 acres in size, and so the required parkland dedication based on the present fee schedule would total
$17,190. The Parks Commission was informed of the proposed development at the March 20, 2017
meeting.
9
PUD Agreement. A PUD agreement that clearly articulates permitted and conditional uses, placement of
structures, development intensity, density, setbacks, building requirements, lot requirements, signage, or
other elements of the plan that deviate from the Commercial Zoning District standards will be
incorporated into the Findings of the Resolution if the PUD is approved. The PUD Agreement will
provide the development regulations that prevail for the site. Those items not addressed by the PUD
Agreement will default to the underlying Commercial Zoning standards.
PLANNING COMMISSION/PUBLIC HEARING:
The Planning Commission held a public hearing and considered this request at its June 12, 2017 meeting.
No public inquiries or comments were received prior to the public hearing, and no one from the public
spoke at the public hearing.
Amended Findings of Fact. The Planning Commission recommended adding the following finding of
fact to the Staff-recommended findings of fact:
12. The Applicant will be extending municipal sewer and water to the westerly property (PID#
34.029.21.44.0004), providing benefit to the City.
Amended Conditions of Approval. The Planning Commission also recommended the following
amendments to the Staff-recommended conditions of approval (in red, underlined text):
9. The Applicant shall amend the proposed Landscape Plan to comply with City standards and obtain
approval by the City. The Landscape Plan shall include additional landscaping along the Keats Ave N to
WB I-94 ramp.
• Staff Comment: This motion was made with an affirmative vote of 3-2. The reasoning for
this is to keep headlights of cars in the parking lot and drive-throughs from shining
towards cars on the ramp. Because the ramp does not constitute as street frontage,
landscaping standards that apply to street frontage do not apply.
21. Permitted medical facilities shall be limited to non-urgent facilities, including but not limited to
clinics, eye doctors, and dental facilities.
22. The Applicant shall add site amenities such as benches, trash receptacles, decorative lighting, and
signage compliant with the Lake Elmo Design Guidelines and Standards Manual to the site plan.
23. Fencing shall be provided enclosing all outdoor dining areas.
The Planning Commission also discussed concern about the traffic flow near the shared entrance to Kwik
Trip, specifically that which may be caused by the median that blocks the approach to the right-hand turn
lane exit. Additionally, the Planning Commission wanted to see the two-lane drive through lanes on the
southern portion of the site both be one-way.
The Planning Commission recommended approval with the amended findings of fact and conditions of
approval with an affirmative vote of 5-0.
RECOMMMENDED FINDINGS OF FACT AND CONDITIONS OF APPROVAL:
Findings of fact and conditions of approval as recommended by Staff and the Planning Commission are
outlined in the attached Resolution 2017-063.
FISCAL IMPACT:
10
The development of this currently vacant site will create three taxable parcels. Additionally, it will
contribute SAC/WAC fees and park dedication fees of $17,190.
RECOMMENDATION:
Staff and the Planning Commission recommend the Council adopt Resolution 2017-063 approving the
Lakewood Crossing 2nd Addition Preliminary and Final Plat and PUD Plans with the 23 conditions of
approval as recommended by Staff and the Planning Commission. Suggested motion:
“Move to adopt Resolution 2017-063 approving Lakewood Crossing 2nd Addition Preliminary and
Final Plat and PUD Plans with the 23 conditions of approval as drafted by Staff and the Planning
Commission based on the findings of fact listed in the Staff Report.”
ATTACHMENTS:
1. Preliminary and Final Plat and PUD Plans application.
2. Engineering Review Memo dated May 31, 2017.
3. Comprehensive Sign Plan
4. Fire Chief and Building Official Comments
5. MNDOT Review Comments
6. Resolution 2017-063 granting Preliminary and Final Preliminary Plat and PUD Plans Approval
Written Statements:
The following are answers to Questions 2a thru 2m on the Preliminary Plat Application
form:
a. Record Owner Engineer / Surveyor
CM Properties 94, L.P. Carlson McCain, Inc.
3460 Washington Drive, Suite 100 3890 Pheasant Ridge Drive NE, Suite 100
Eagan, MN 55122 Blaine, MN 55449
Attn: Bruce Miller Attn: Joe Radach, PE
(651) 452-3303 (763) 489-7912
Architect
Architectural Consortium, LLC
901 No. Third Street, Suite 220
Minneapolis, MN 55401
Attn: Kathy Anderson
(612) 436-4030
b. The property has an unassigned address but is currently legally described as Outlot
A, Lakewood Crossing, according to the recorded plat thereof, Washington County,
MN.
PID #34.029.21.44.0015
Zoning – Commercial
Parcel Size – 3.82 Acres / 166,449 Sq.Ft.
c. Subdivision Name: Lakewood Crossing
Number of Lots: Three (3)
d. N/A
e. The intent of this 3 lot, 3 building project is to create a successful retail project
providing a warm and inviting place for residents in the area to shop and dine. Our
goal is to have a quality, sit down, full service restaurant on the east side of the
project including a large outdoor patio to accommodate outside seating for
restaurant patrons. In addition to a sit down restaurant, we are targeting fast
casual restaurants with drive thru, coffee with drive thru, a hair salon, dry cleaner,
chiropractor, bank or credit union with drive thru and other similar services and
retail businesses. Our intention is to build the project in three (3) phases with the
initial plan to construct at 14,700 square foot retail building and follow up with a
10,120 square foot and 3,440 square foot building as the market dictates. Our firm
has owned this property for over 45 years and we intend to continue to own it for
years to come. Our intention is to build something both we and the City can be
proud of and that meets what the market is looking for and stands the test of time
architecturally.
f. N/A
Written Statements
Page 2
g. The property is currently served with municipal sewer and water. No phasing is
required for infrastructure improvements.
h. There are only 3 non-related, non-public property owners within 350’ and they are
also excited about the prospect of additional development occurring on this corner.
This development will have positive impact on property values in this area by
providing much needed retail and service businesses.
i. This development should not conflict with nearby land uses. As a matter of fact, it is
our intent to get tenants who enhance our neighbors property values and provide
goods and services to the residential areas in and around this intersection.
j. In the grand scheme of development occurring in Lake Elmo, this project is
relatively minor in terms of city services required and will not create a burden on
the City. As a matter of fact, commercial tax rates are significantly higher than
residential and therefore this project will only help the budgets of the City,
County and School District.
k. N/A
l. As this is a small commercial development, we are intending on providing a park
dedication fee in lieu of dedication which the City will be able to utilize to enhance
its overall parks / open space plan.
m. Our intention is to commence construction in July or August with the first phase
14,300 square foot building to be complete by year end. The Phase II and Phase III
building will be constructed as the market dictates.
Narrative Answering Questions / Concerns Raised for Concept Approval
and Outlined in Resolution 2017-026:
1. Regarding the City Engineer comments from that March 8th Memorandum, the plans
have been revised to address most of the comments. To address the second access to the
west, as we do not own or control the property to the west, we are not able to shift the
access. However, we are willing to provide an access easement to the property owner to
the west to provide them access so they won’t need to request a third access. In
addition, when the City determines the traffic counts warrant it, we will install a
median on Hudson Boulevard to restrict access to right in and right out only. Regarding
the turn lanes, our intention is not to build the secondary (westerly) access with Phase I
and therefore will only utilize the existing shared access with Kwik Trip. When we
build Phase II we will construct the turn lanes as needed. Regarding the extension of
water and sanitary sewer to the property to the west, we will accommodate provided
that owner is willing to pay the cost to extend. We have had discussions with them and
they appear willing however no agreement has been reached. If we are not able to reach
an agreement, the property still can be served with utilities by jacking them under
Hudson Blvd. from the North. As a reminder, this is what we had to do with the water
when we developed Kwik Trip.
2. It is acknowledged and we shall obtain all other necessary permits. Attached find
VBWD Permit #2017-08 Permit dated March 27, 2017.
3. As mentioned above, we will extend sanitary sewer and water to the westerly property
provided we can come to an agreement with the property owner. In the alternative,
they can extend the utilities from the property they own to the north.
4. It is acknowledged a storm water maintenance agreement will be required. Please
provide City standard form or if you don’t have one, we can prepare.
5. The Landscape Plan has been revised to provide four (4) more parking islands,
landscaping on north side of driveway as well as other modifications to comply with City
standards.
6. Acknowledge a Letter of Credit / Financial Guaranty is required for landscape
materials.
7. Attached is a Comprehensive Sign Plan along with a narrative detailing the flexibility
being requested.
8. The three (3) buildings will be a mix of retail, service and restaurant uses. Section
154.2 of the Code for General Retail is 1 space per 250 square feet or 4 spaces per 1,000
square feet. Lake Elmo Shoppes will have a total of 27,860 square feet. Based on
general retail of 4 spaces per 1,000 sq.ft., this results in 111 required stalls. We are
providing 165 stalls or 5.92 per 1,000 sq.ft. which is significantly over what is required
by code. Some uses, such as restaurants require more parking (1 stall per 100 sq.ft. =
10 stalls per 1,000 sq.ft.) and others require less than general retail such as personal
services at 3.33 per 1,000 sq.ft. Although we are not sure what the final tenant mix will
be, if 19,000 sq.ft. were retail that would require 77 stalls and 8,700 sq.ft. of restaurants
which would require 87 stalls for a total of 164 parking stalls Based on our experience
in owning and developing retails centers, we are confident we have more than adequate
parking.
Narrative – Page 2
Lake Elmo Shoppes
9. To address the site amenity as alternate to 20% open space, we are offering to enhance
the site and retail shopping and dining experience with enhanced architectural
materials and site furnishings. The Lake Elmo Shoppes architecture is upgraded and
features a variety of warm, natural colors, textures and shapes. The corner towers
flanking each end features standing seam metal roofs and offer a 3-dimensional quality
as well as skyline interest. A mixture of stone, brick and glass combine to help provide
individuality to the various tenants. Unique cornices project above the signage band for
added interest. A variety of both canvas and metal awnings create pedestrian scale
interest. Ornamental light fixtures repeat intermittently for nighttime attraction. The
architecture is four-sided being that is visible from both the highway and internal.
Signage is limited to designated areas within each tenant lease lines and design
controls of individually lit channel letters will ensure quality.
The overall development sets an up-scale environment with the attention to details
within the streetscape. Coordinated benches, trash receptacles and bike racks, outdoor
dining patios with wrought iron fencing, pedestrian scale ornamental light fixtures and
landscaping all combine to enhance the shopping experience.
10. The plans detail the location of the drive-thru elements. Based on questions at the
Planning Commission and City Council, we commissioned a drive thru analysis which
will be addressed in further detail in 19 below.
11. A photometric plan has been ordered and will be forwarded to the City once received. It
is acknowledged, an acceptable photometric plan is a condition of final approval.
12. It is understood the final plan showing location of fire hydrants, no parking and fire
lanes need approval from the building official and fire chief.
13. The adjacent property owner to the west will not be a party of the Preliminary Plat or
PUD however, we will work with them to provide shared access in the location noted on
the site plan.
14. Although we are not proposing to construct any new access points with the first phase of
the development, it is acknowledged turn lanes will need to be constructed with the new
access.
15. It is our position, current traffic doesn’t warrant widening Hudson Blvd., but depending
on future development to the north and west, future road improvements may be
necessary.
16. Lake Elmo Shoppes deliveries will occur behind the buildings and will utilize the service
door in the back of each tenant space. No dock doors or drive-in doors are needed for the
types of tenants we will be pursuing.
17. A Reciprocal Easement and Operating Agreement drafted and will be recorded to
account for shared parking and access.
Narrative – Page 3
Lake Elmo Shoppes
18. All mechanical rooftop equipment will be screened by the high parapet walls provided in
the design of Lake Elmo Shoppes.
19. Attached is the drive-thru analysis prepared by Spark Consulting Engineers. As you
will see the report, Spark states the two high volume and two low volume drive-thru
locations have sufficient stacking and circulation. However, based on some of the
comments in the report and subsequent discussions regarding potential circulation
conflicts, we did decide to eliminate the “high volume” drive-thru located on the east end
of the Lot 2 building. Therefore, the request for drive-thru’s has been revised to three
(3).
f:
\
j
o
b
s
\
4
9
6
1
-
4
9
8
0
\
4
9
7
6
-
l
a
k
e
e
l
m
o
r
e
t
a
i
l
\
p
h
a
s
e
2
\
c
a
d
\
e
n
g
i
n
e
e
r
i
n
g
\
4
9
7
6
_
d
e
t
a
i
l
s
.
d
w
g
Sa
v
e
D
a
t
e
:
04
/
2
6
/
1
7
C7
of 11
DE
T
A
I
L
S
REVISIONS
DRAWN BY:
DESIGNED BY:
ISSUE DATE:
JTR
JTR
02/03/17
Joseph T. Radach, P.E.Name:
Signature:
Date:02/03/17 License #:45889
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota
38
9
0
P
h
e
a
s
a
n
t
R
i
d
g
e
D
r
.
N
E
#
1
0
0
,
B
l
a
i
n
e
,
M
N
Ph
o
n
e
:
7
6
3
-
4
8
9
-
7
9
0
0
F
a
x
:
7
6
3
-
4
8
9
-
7
9
5
9
EN
V
I
R
O
N
M
E
N
T
A
L
◦ E
N
G
I
N
E
E
R
I
N
G
◦ S
U
R
V
E
Y
I
N
G
MF
C
P
R
O
P
E
R
T
I
E
S
C
O
R
P
.
34
6
0
W
a
s
h
i
n
g
t
o
n
D
r
i
v
e
,
S
u
i
t
e
1
0
0
Ea
g
a
n
,
M
N
5
5
1
2
2
1. 04/26/17 Per City comments.
2. 05/24/17 Per City Comments.
3.
4.
5.
6.
LA
K
E
E
L
M
O
S
H
O
P
P
E
S
La
k
e
E
l
m
o
,
M
i
n
n
e
s
o
t
a
f:
\
j
o
b
s
\
4
9
6
1
-
4
9
8
0
\
4
9
7
6
-
l
a
k
e
e
l
m
o
r
e
t
a
i
l
\
p
h
a
s
e
2
\
c
a
d
\
e
n
g
i
n
e
e
r
i
n
g
\
4
9
7
6
_
d
e
t
a
i
l
s
.
d
w
g
Sa
v
e
D
a
t
e
:
04
/
2
6
/
1
7
C8
of 11
DE
T
A
I
L
S
REVISIONS
DRAWN BY:
DESIGNED BY:
ISSUE DATE:
JTR
JTR
02/03/17
Joseph T. Radach, P.E.Name:
Signature:
Date:02/03/17 License #:45889
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota
38
9
0
P
h
e
a
s
a
n
t
R
i
d
g
e
D
r
.
N
E
#
1
0
0
,
B
l
a
i
n
e
,
M
N
Ph
o
n
e
:
7
6
3
-
4
8
9
-
7
9
0
0
F
a
x
:
7
6
3
-
4
8
9
-
7
9
5
9
EN
V
I
R
O
N
M
E
N
T
A
L
◦ E
N
G
I
N
E
E
R
I
N
G
◦ S
U
R
V
E
Y
I
N
G
MF
C
P
R
O
P
E
R
T
I
E
S
C
O
R
P
.
34
6
0
W
a
s
h
i
n
g
t
o
n
D
r
i
v
e
,
S
u
i
t
e
1
0
0
Ea
g
a
n
,
M
N
5
5
1
2
2
1. 04/26/17 Per City comments.
2. 05/24/17 Per City Comments.
3.
4.
5.
6.
LA
K
E
E
L
M
O
S
H
O
P
P
E
S
La
k
e
E
l
m
o
,
M
i
n
n
e
s
o
t
a
f:
\
j
o
b
s
\
4
9
6
1
-
4
9
8
0
\
4
9
7
6
-
l
a
k
e
e
l
m
o
r
e
t
a
i
l
\
p
h
a
s
e
2
\
c
a
d
\
e
n
g
i
n
e
e
r
i
n
g
\
4
9
7
6
_
d
e
t
a
i
l
s
.
d
w
g
Sa
v
e
D
a
t
e
:
04
/
2
6
/
1
7
C9
of 11
DE
T
A
I
L
S
REVISIONS
DRAWN BY:
DESIGNED BY:
ISSUE DATE:
JTR
JTR
02/03/17
Joseph T. Radach, P.E.Name:
Signature:
Date:02/03/17 License #:45889
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota
38
9
0
P
h
e
a
s
a
n
t
R
i
d
g
e
D
r
.
N
E
#
1
0
0
,
B
l
a
i
n
e
,
M
N
Ph
o
n
e
:
7
6
3
-
4
8
9
-
7
9
0
0
F
a
x
:
7
6
3
-
4
8
9
-
7
9
5
9
EN
V
I
R
O
N
M
E
N
T
A
L
◦ E
N
G
I
N
E
E
R
I
N
G
◦ S
U
R
V
E
Y
I
N
G
MF
C
P
R
O
P
E
R
T
I
E
S
C
O
R
P
.
34
6
0
W
a
s
h
i
n
g
t
o
n
D
r
i
v
e
,
S
u
i
t
e
1
0
0
Ea
g
a
n
,
M
N
5
5
1
2
2
1. 04/26/17 Per City comments.
2. 05/24/17 Per City Comments.
3.
4.
5.
6.
LA
K
E
E
L
M
O
S
H
O
P
P
E
S
La
k
e
E
l
m
o
,
M
i
n
n
e
s
o
t
a
f:
\
j
o
b
s
\
4
9
6
1
-
4
9
8
0
\
4
9
7
6
-
l
a
k
e
e
l
m
o
r
e
t
a
i
l
\
p
h
a
s
e
2
\
c
a
d
\
e
n
g
i
n
e
e
r
i
n
g
\
4
9
7
6
_
d
e
t
a
i
l
s
.
d
w
g
Sa
v
e
D
a
t
e
:
04
/
2
6
/
1
7
C10
of 11
DE
T
A
I
L
S
(C
M
P
S
Y
S
T
E
M
)
REVISIONS
DRAWN BY:
DESIGNED BY:
ISSUE DATE:
JTR
JTR
02/03/17
Joseph T. Radach, P.E.Name:
Signature:
Date:02/03/17 License #:45889
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota
38
9
0
P
h
e
a
s
a
n
t
R
i
d
g
e
D
r
.
N
E
#
1
0
0
,
B
l
a
i
n
e
,
M
N
Ph
o
n
e
:
7
6
3
-
4
8
9
-
7
9
0
0
F
a
x
:
7
6
3
-
4
8
9
-
7
9
5
9
EN
V
I
R
O
N
M
E
N
T
A
L
◦ E
N
G
I
N
E
E
R
I
N
G
◦ S
U
R
V
E
Y
I
N
G
MF
C
P
R
O
P
E
R
T
I
E
S
C
O
R
P
.
34
6
0
W
a
s
h
i
n
g
t
o
n
D
r
i
v
e
,
S
u
i
t
e
1
0
0
Ea
g
a
n
,
M
N
5
5
1
2
2
LA
K
E
E
L
M
O
S
H
O
P
P
E
S
La
k
e
E
l
m
o
,
M
i
n
n
e
s
o
t
a
1. 04/26/17 Per City comments.
2. 05/24/17 Per City Comments.
3.
4.
5.
6.
f:
\
j
o
b
s
\
4
9
6
1
-
4
9
8
0
\
4
9
7
6
-
l
a
k
e
e
l
m
o
r
e
t
a
i
l
\
p
h
a
s
e
2
\
c
a
d
\
e
n
g
i
n
e
e
r
i
n
g
\
4
9
7
6
_
d
e
t
a
i
l
s
.
d
w
g
Sa
v
e
D
a
t
e
:
04
/
2
6
/
1
7
C11
of 11
DE
T
A
I
L
S
(C
M
P
S
Y
S
T
E
M
)
REVISIONS
DRAWN BY:
DESIGNED BY:
ISSUE DATE:
JTR
JTR
02/03/17
Joseph T. Radach, P.E.Name:
Signature:
Date:02/03/17 License #:45889
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota
38
9
0
P
h
e
a
s
a
n
t
R
i
d
g
e
D
r
.
N
E
#
1
0
0
,
B
l
a
i
n
e
,
M
N
Ph
o
n
e
:
7
6
3
-
4
8
9
-
7
9
0
0
F
a
x
:
7
6
3
-
4
8
9
-
7
9
5
9
EN
V
I
R
O
N
M
E
N
T
A
L
◦ E
N
G
I
N
E
E
R
I
N
G
◦ S
U
R
V
E
Y
I
N
G
MF
C
P
R
O
P
E
R
T
I
E
S
C
O
R
P
.
34
6
0
W
a
s
h
i
n
g
t
o
n
D
r
i
v
e
,
S
u
i
t
e
1
0
0
Ea
g
a
n
,
M
N
5
5
1
2
2
1. 04/26/17 Per City comments.
2. 05/24/17 Per City Comments.
3.
4.
5.
6.
LA
K
E
E
L
M
O
S
H
O
P
P
E
S
La
k
e
E
l
m
o
,
M
i
n
n
e
s
o
t
a
ROCK MULCH, TYP.
IN ALL ISLANDS
SOD
SOD
SOD
SOD
SOD
SOD
see
d
ROCK MULCH ALL
ISLANDS, typ.
SOD
SOD
SEE
D
SEED DISTURBED
AREA BEHIND
BACK OF WALL
poly edger, typ.
shredded
hardwood
mulch
G
17
C
1
D
1
G
8
G
8
F
2
C
1
D
1
D
1
A
1
G
27
G
7
A
1
D
1 G
15
A
1
J
14
K
6
H
3
G
4
mndot
33-261
seed mix
see
d
poly
edger
poly
edger
J
10
SEED DISTURBED
AREA BEHIND
BACK OF WALL
SoD AREA
in front
OF WALL
sod (3) rows in
back of curb
B
6
poly
edger
rock
mulch
H
24
E
1 C
3
I
19A
2
G
8
E
2
E
3
E
1
poly
edger
SOD
f:
\
j
o
b
s
\
4
9
6
1
-
4
9
8
0
\
4
9
7
6
-
l
a
k
e
e
l
m
o
r
e
t
a
i
l
\
p
h
a
s
e
2
\
c
a
d
\
e
n
g
i
n
e
e
r
i
n
g
\
4
9
7
6
_
l
s
c
p
.
d
w
g
Sa
v
e
D
a
t
e
:
05
/
2
4
/
1
7
L1
of 2
LA
N
D
S
C
A
P
E
P
L
A
N
REVISIONS
DRAWN BY:
DESIGNED BY:
ISSUE DATE:
SDB
SDB
02/03/17
James A. Kalkes RLAName:
Signature:
Date:05/24/17 License #:45071
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Landscape Architect under the
laws of the State of Minnesota
38
9
0
P
h
e
a
s
a
n
t
R
i
d
g
e
D
r
.
N
E
#
1
0
0
,
B
l
a
i
n
e
,
M
N
Ph
o
n
e
:
7
6
3
-
4
8
9
-
7
9
0
0
F
a
x
:
7
6
3
-
4
8
9
-
7
9
5
9
EN
V
I
R
O
N
M
E
N
T
A
L
◦ E
N
G
I
N
E
E
R
I
N
G
◦ S
U
R
V
E
Y
I
N
G
Know what's below.
before you dig.Call
R
MF
C
P
R
O
P
E
R
T
I
E
S
C
O
R
P
.
34
6
0
W
a
s
h
i
n
g
t
o
n
D
r
i
v
e
,
S
u
i
t
e
1
0
0
Ea
g
a
n
,
M
N
5
5
1
2
2
1. 04/26/17 PER CITY COMMENT
2.
3.
4.
5.
6.
landscape notes
1.iRRIGATION SHALL BE PROVIDED FOR ALL
SOD AND LANDSCAPE AREAS.
2.sOD AND IRRIGATE ALL DISTURBED AREAS
UNLESS OTHERWISE NOTED.
3.landscape beds to receive 3" of
shredded hardwood mulch unless
otherwise noted.
4.rOCK mULCH = 1-1/2" DRESSER tRAP rOCK @
3" depth WHERE NOTED.
5.hEAVY COMMERCIAL GRADE POLY EDGER
SHALL BE USED AROUND THE PERIMETER OF
LANDSCAPE BEDS NOTED ON PLAN.
6.REFER TO DETAIL SHEET L2 FOR GENERAL
NOTES, PLANTING SPECIFICATIONS, PLANTING
NOTES, IRRIGATION NOTES, AND PLANTING
DETAILS.
7.REFER TO GRADING PLAN FOR GRADES AND
EROSION CONTROL.
8.REMOVE ANY BURLAP, TWINE, ROPES AND/OR
WIRING FROM THE TOP AND SIDES OF
ROOTBALL FOR ALL BALLED AND
BURLAPPED PLANTS.
9.rEMOVE CONTAINERS AND CUT CIRCLING
ROOTS IF PLANTS ARE CONTAINER GROWN.
10.ALL PLANTINGS SHALL RECEIVE FERTILIZER AS
FOLLOWS:
11.0-20-20 GRANULAR FERTIZER APPLIED AT
THE TIME OF PLANTING AT A RATE OF 12 OZ.
PER 2.5 CALIPER INCHES OF TREE AND 6 OZ.
PER SHRUB.
12.PLACE LANDSCAPE FILTER FABRIC UNDER
ALL MULCHED AREAS. FILTER FABRIC SHALL
BE 100% INTERWOVEN 5.1oz NEEDLE PUNCHED
POLYPROPYLENE FABRIC MANUFACTURED BY
DEWITT. USE PRO 5 "WEED BARRIER" OR
APPROVED EQUAL.
landscape REQUIREMENTS
1.a Minimum of (1) tree per 50 LF of Street
frontage.
2.Additionally, (5) trees shall be planted
per (1) acre of developed Land or
disturbed by development activity
landscape notes
mndot 33-261 seed mix
TOTAL STREET FRONTAGE = 296 LF. 6 TREES
REQUIRED
OVERALL SITE ACREAGE = 3.82. 19 TREES
REQUIRED.
TOTAL TREES REQUIRED = 25
TOTAL TREES PROVIDED = 25
LA
K
E
E
L
M
O
S
H
O
P
P
E
S
La
k
e
E
l
m
o
,
M
i
n
n
e
s
o
t
a
f:
\
j
o
b
s
\
4
9
6
1
-
4
9
8
0
\
4
9
7
6
-
l
a
k
e
e
l
m
o
r
e
t
a
i
l
\
p
h
a
s
e
2
\
c
a
d
\
e
n
g
i
n
e
e
r
i
n
g
\
4
9
7
6
_
l
s
c
p
.
d
w
g
Sa
v
e
D
a
t
e
:
05
/
2
4
/
1
7
L2
of 2
LA
N
D
S
C
A
P
E
D
E
T
A
I
L
S
REVISIONS
DRAWN BY:
DESIGNED BY:
ISSUE DATE:
SDB
SDB
02/03/17
James A. KalkesName:
Signature:
Date:License #:45071
I hereby certify that this plan, specification
or report was prepared by me or under my
direct supervision and that I am a duly
Licensed Landscape Architect under the
laws of the State of Minnesota
38
9
0
P
h
e
a
s
a
n
t
R
i
d
g
e
D
r
.
N
E
#
1
0
0
,
B
l
a
i
n
e
,
M
N
Ph
o
n
e
:
7
6
3
-
4
8
9
-
7
9
0
0
F
a
x
:
7
6
3
-
4
8
9
-
7
9
5
9
EN
V
I
R
O
N
M
E
N
T
A
L
◦ E
N
G
I
N
E
E
R
I
N
G
◦ S
U
R
V
E
Y
I
N
G
MF
C
P
R
O
P
E
R
T
I
E
S
C
O
R
P
.
34
6
0
W
a
s
h
i
n
g
t
o
n
D
r
i
v
e
,
S
u
i
t
e
1
0
0
Ea
g
a
n
,
M
N
5
5
1
2
2
1. 04/26/17 PER CITY COMMENT
2.
3.
4.
5.
6.
IRRIGATION NOTES:
1.Landscape Contractor shall be responsible for providing shop drawings illustrating
irrigation plans and specifications as part of the scope of work when bidding. These
shall be approved by the landscape architect prior to order.
2.Verify existing/proposed system location.
3.unless otherwise noted, all sod/seed and planting areas indicated on the plan shall be
100% irrigated. the irrigation shall include the public right of way between the
property line and back of curb where new landscape improvements are proposed.
4.it shall be the landscape contractors responsibility to insure that all sodded/seeded
and planted areas are irrigated properly, including those areas directly around
and abutting building foundation.
5.the landscape contractor shall provide the owner with a watering/lawn irrigation
schedule appropriate to the project site conditions and to plant material growth
requirements.
GENERAL NOTES:
1.LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON THE PROPERTY WITH THE GENERAL
CONTRACTOR AND BY GOPHER STATE ONE CALL PRIOR TO STAKING PLANT LOCATIONS.
2.COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATION WITH OTHER
CONTRACTORS WORKING ON THE SITE.
3.WHERE EXISTING TREES AND/OR SIGNIFICANT SHRUB MASSINGS ARE FOUND ON THE SITE WHETHER
SHOWN ON THE DRAWINGS OR NOT, THEY SHALL BE PROTECTED AND SAVED UNLESS NOTED TO BE
REMOVED AND/OR ARE WITHIN THE GRADING LIMITS. ANY QUESTION REGARDING WHETHER PLANT
MATERIAL SHOULD OR SHOULD NOT REMAIN SHOULD BE BROUGHT TO THE ATTENTION OF THE
LANDSCAPE ARCHITECT PRIOR TO REMOVAL.
4.ALL EXISTING TREES TO REMAIN SHALL BE FERTILIZED AND PRUNED TO REMOVE DEAD WOOD AND
DAMAGED OR RUBBING BRANCHES.
5.BB TREES AND SHRUBS ARE BALLED AND BURLAPPED.
6.NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL IS REQUESTED OF THE
LANDSCAPE ARCHITECT BY THE LANDSCAPE CONTRACTOR PRIOR TO SUBMISSION OF BID AND/OR
QUOTATION.
7.ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST ADDITION OF THE AMERICAN STANDARD FOR
NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN.
8.THE CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL NEWLY INSTALLED
MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY
OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
9.CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE INSPECTION.
10.WARRANTY FOR THE LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE
LANDSCAPE ARCHITECT AFTER THE COMPLETION OF PLANTING ALL LANDSCAPE MATERIALS. NO
PARTIAL ACCEPTANCE WILL BE CONSIDERED.
11.CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR FROM THE
DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO BE PROVIDED AT NO ADDITIONAL COST
TO THE OWNER.
PLANTING SPECIFICATIONS:
1.PLANTING BED PREPARATION: ALL MASS PLANTING BEDS SHALL BE TILLED TO A MINIMUM DEPTH
OF 10". AMENDMENTS SHALL BE APPLIED AFTER CULTIVATION.
2.BACKFILL SOIL: USE SOIL EXCAVATED FROM PLANTING HOLES & PROVIDE AMENDMENTS. REMOVE
ALL DEBRIS AND ROCKS LARGER THAN 3" IN Dia.
9.FERTILIZATION: iT IS RECOMMENDED THAT Newly planted trees and shrubs should NOT be
fertilized the first year. If necessary, begin fertilizing TREES and shrubs the second
year after establishment AT A RATIO AND RATE BASED ON A SOIL TEST.
10.MULCH MATERIAL: AS SPECIFIED ON LANDSCAPE PLANS. MASS MULCH ALL PLANTING BEDS TO 3"
DEPTH OVER FIBER MAT WEED BARRIER. ALL PERRENIAL PLANTING BEDS TO RECEIVE 3" DEEP
SHREDDED HARDWOOD MULCH WITH NO FIBER WEED MAT BARRIER. ALL DECIDUOUS AND
EVERGREEN TREES TO RECEIVE 6" DEEP SHREDDED HARDWOOD MULCH WITH NO MULCH IN
DIRECT CONTACT WITH TREE TRUNK.
11.TREE STAKING: IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO STAKE AND/OR GUY THE
TREES ACCORDING TO THE DETAILS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE EVERY
STEP NECESSARY TO MAINTAIN THE TREES AND SHRUBS OIN AN UPRIGHT AND PLUMB CONDITION
AT ALL TIMES UNTIL THE END OF THE PLANT GUARANTEE PERIOD, ESPECIALLY WHERE VANDALISM,
SOIL OR WIND CONDITIONS ARE A PROBLEM.
12.TREE WRAPPING: WRAPPING MATERIAL SHALL BE QUALITY, HEAVY WATERPROOF CREPE PAPER
MANUFACTURED FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES IN THE FALL PRIOR TO 12-1
AND REMOVE ALL WRAPPING BY 5-1.
13.RODENT PROTECTION: PROVIDE ON ALL TREES, EXCEPT SPRUCE UNLESS OTHERWISE NOTED.
14.PLANTING PLAN: ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE
PLANS. THE PLAN TAKES PRECEDENCE OVER THE NOTES. RESPECT STATED DIMENSIONS. DO
NOT SCALE DRAWINGS.
15.EDGING: EDGING SHALL BE 4: P.V.C COMMERCIAL GRADE EDGING WITH THREE (3) METAL
ANCHOR STAKES PER 20 FOOT SECTION, UNLESS OTHERWISE NOTED ON THE PLAN. ALL MASS
PLANTING BEDS SHALL HAVE EDGING PLACED BETWEEN MULCH AND ANY ADJACENT TURF AREAS.
LA
K
E
E
L
M
O
S
H
O
P
P
E
S
La
k
e
E
l
m
o
,
M
i
n
n
e
s
o
t
a
PLANTING NOTES:
1.No planting to be installed until grading and
construction has been completed in the immediate
area.
2.All plant material locations must be reviewed and
approved by the landscape architect prior to any
and all digging.
3.If the landscape contractor perceives and
deficiencies in the plant selections, soil conditions, or
any other site condition which might negatively affect
plant material establishment, survival or guarantee,
they shall bring these deficiencies to the attention of
the landscape architect prior to installation.
4.Adjustments in the location of proposed plant
material may be needed in the field. Should an
adjustment be advised, the landscape architect must
be notified.
5.All plants to be installed per planting details.
6.One shrub per type and size in each planting bed and
every tree should be clearly identified (common or
latin nomenclature) with a plastic tag which shall not
be removed prior to owner acceptance.
7.Where sod/seed abuts paved surfaces, finished
grade of seed/sod shall be held 1” below surface
elevation of trail, slab, curb, etc.
8.Sod shall be laid parallel to the contours and
shall have staggered joints. On slopes steeper than
3 : 1 or in drainage swales, the sod shall be staked
to the ground.
9.Seed all areas disturbed due to grading other than
those to receive sod.
10.Repair all damage to property from planting
operators at no cost to the owner.
05/24/17
PAGE 1 of 3
MEMORANDUM
Date: May 31, 2017
To: Emily Becker, City Planner Re: Lakewood Crossing 2nd Addition
Cc: Stephen Wensman, Planning Director Preliminary/Final Plat Review
From: Jack Griffin, P.E., City Engineer
An engineering review has been completed for the Lakewood Crossing 2nd Addition Preliminary/Final Plat. The
submittal consisted of the following documentation received on May 30, 2017 and prepared by Carlson McCain:
Lake Elmo Shoppes Site Improvement Plans dated May 24, 2017.
Lake Elmo Shoppes Stormwater Management Plans dated April 26, 2017.
Lakewood Crossing 2nd Addition Plat dated April 26, 2017.
Narrative, not dated.
STATUS/FINDINGS: Following comments should be incorporated as conditions of Preliminary/Final Plat approval.
FINAL PLAT: LAKEWOOD CROSSING 2ND ADDITION
The Final Plat shall not be recorded until final construction plan approval is granted and all easements as
requested by the City Engineer and Public Works department are documented on the Final Plat.
No construction for Lakewood Crossing 2nd Addition may begin until the applicant has received City
Engineer approval for the Final Construction Plans; the applicant has obtained and submitted to the City all
applicable permits, easements and permissions needed for the project; and a preconstruction meeting has
been held by the City’s engineering department.
Final Construction Plans and Specifications must be prepared for any phased site improvements and
submitted for review and approval by the City Engineer prior to construction. The Final Construction Plans
and Specifications must be prepared in accordance with the City Engineering Design Standards Manual
using City details, plan notes and specifications and meeting City Engineering Design Guidelines.
The preliminary plans must be updated and the final construction plans must include a right turn lane along
eastbound Hudson Boulevard and any additional fire hydrants as required the Fire Chief/Building Official.
The preliminary/final construction plans must be updated to include all necessary drainage and utility
easements as required for the public sanitary sewer and watermain/hydrants.
There are no Outlots as part of this Plat to be dedicated to the City.
Prior to the start of construction a Stormwater Maintenance and Easement Agreement in the City’s
standard form must be executed and recorded with the County.
Traffic and Access Management Requirements:
Primary access. The shared access location with Kwik Trip has been approved for this site.
Right turn lane should be required on Hudson Boulevard. There is an existing westbound left turn lane on
Hudson Boulevard at the existing access location to this development. However an eastbound right turn
should be required as part of this project to handle the increa sed traffic volumes. Hudson Boulevard is a local
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4285
PAGE 2 of 3
collector roadway and Municipal State Aid route. Hudson Boulevard is expected to receive significant growth
in traffic volume as the I94 corridor develops. The road is considered to be a major collector for serving the
area but it is the goal of the City to maintain the road as 2‐lanes. In order to achieve that goal left and right
turn lanes will need to be implemented throughout the corridor to facilitate the turning movements for the
developing areas while maintaining the mobility of the through traffic.
Secondary access. The site does not have sufficient frontage along Hudson Boulevard to accommodate a
secondary access. The secondary access shown on the concept plans approximately 250 feet to the west of
the shared access has therefore been eliminated as required by staff. The Access Management Guidelines
per the City’s Comprehensive Transportation Plan requires access spacing of 1/8 mile (660 feet) for full
access intersections and commercial driveways along Hudson Boulevard. A shared access driveway was
planned as part of the Lakewood Crossing 1st Addition to allow access to the proposed development area
while maintaining the required access spacing guidelines.
Future secondary access potential. A second access location cou ld be planned along the south side of Hudson
Boulevard that would align with the property to the west of Lakewood 2 Addition with this parcel (PID No.
3402921440004) coordinating and sharing access with Lakewood 2nd Addition. A potential future access
connection to the adjacent westerly property has been shown on the site plan.
Right‐in/Right‐out access locations cannot be allowed along Hudson Boulevard since the roadway does not
include raised center medians to prohibit left turning movements from the site. There currently are no plans
for a center raised median along Hudson Boulevard.
Grading, Drainage & Erosion Control Plan:
Governing Specifications and Plan Details for grading and erosion control must be in accordance with the
City of Lake Elmo standard specifications.
Retaining walls that exceed 4 feet in height must have a design submitted and certified by an engineer
licensed in the state of Minnesota.
Utility Plans:
Connection to existing sanitary sewer stub. The project proposes to connect to the existing sanitary sewer
stub located in the northeast corner of the property and is extended throughout the development to connect
3 commercial buildings. Sanitary sewer is extended along the northwest property line and stubbed to the
westerly adjacent plat limits as required by City policy. A drainage and utility easement is shown on the plat
over the portion of sanitary sewer to be owned and maintained by the City.
Connection to existing watermain stub. The project proposes to connect to an existing 8‐inch watermain
located in the northeast corner of the property and is extended along the northwest property line and
stubbed to the westerly adjacent plat limits as required by City policy. A service stub is shown for connection
for Lot 3. A lateral 6‐inch watermain to the south of the development is also proposed for the placement of
a fire hydrant and the connection of two additional buildings. A drainage and utility easement is shown on
the plat over the portion of watermain/hydrant to be owned and maintained by the City.
Fire Hydrant locations. Additional fire hydrants may be required based on review by the Fire Chief/Building
Official. All watermain and fire hydrants required for the project are to be owned and maintained by the City
and will require the necessary easements outlined below.
Drainage and utility easements are required over all public sanitary sewer and watermain not located on
City Outlots and right‐of‐way, minimum 30‐feet in width, 15 feet from centerline on each side of pipe
(including 15 feet from all sides of a fire hydrant). Drainage and utility easements must be provided on the
plat or in the City’s standard form of easement agreement.
Stormwater Management:
The site plan is subject to a storm water management plan meeting State, VBWD and City rules and
regulations. A VBWD permit has been obtained for the improvements.
Stormwater runoff will be routed through two underground parking lot storm chamber systems that will
provide infiltration and retention in addition to one above ground infiltration basin. The above ground
infiltration basin will be obtained by converting an existing storm water pond to an infiltration basin.
PAGE 3 of 3
Pretreatment for the infiltration systems will be provided by oversized sump manholes equipped with scour
prevention devices.
Due to the proximity of the site to the Kwik Trip Service Station the applicant should review with MPCA if
infiltration practices will be allowed, in particular the planned conversion of the existing storm water pond
to a storm water infiltration basin directly east and adjacent to the service station.
The proposed storm water facilities will be privately owned and maintained. Prior to the start of onsite
construction a Stormwater Maintenance and Easement Agreement in the City’s standard form must be
executed and recorded with the County. The agreement shall provide a maintenance plan defining the
maintenance responsibilities for the private owner, the type of maintenance and the maintenance intervals.
Written landowner permission may be required for any off‐site storm water discharges to adjacent
properties to avoid negative impacts to downstream properties.
COMPREHENSIVE SIGN PLAN NARRATIVE
Lake Elmo Shoppes is proposed to be an upscale neighborhood shopping and dining
experience. Signage for Lake Elmo Shoppes should be allocated and designed to encompass
a professional, first class look and feel. When potential tenants deliberate on signing leases
and joining the Lake Elmo business community, they must also have the confidence that
their brand will be properly showcased and seen by the vast numbers of commuters and the
local traffic patterns. Our signage goals are to provide consistency in size and construction
materials, while allowing each tenant the flexibility and square footage to showcase their
building storefronts, brand names, and individual site locations as best as possible. Lake
Elmo Shoppes is proposing wall signage and two (2) ground signs.
Wall Signs:
As we began to develop the sign criteria for the various buildings at the Lake Elmo
Shoppes, we reviewed what the current sign code allows, which is 1 square foot of signage
per 1 lineal foot of storefront on the front elevations and .5 square foot of signage per 1
lineal foot of frontage for the rear elevation. Wall signs sized to code are represented on the
attached Exhibit 1 “Sign Per Code”. As you can see on Exhibit 1, at these ratio’s the signs
look small on the storefront and do not “fit” the façade. The signs look dwarfed on these
elevations and certainly do not give the look or exposure that tenants would consider
adequate. Regarding the even smaller signs on the back, the Tenants would pass on adding
signage on the rear of the property as the cost and readability would make for an unworthy
investment.
Exhibit 2 “Comprehensive Sign Plan” represents a 2.5 square feet of signage per 1 lineal
foot of storefront on the front and rear elevations, and a 1.5 square feet of signage per 1
lineal foot on the west and east elevations. As you will see, these signs look much more
proportional and “fit” the elevations much better. These ratios will also create consistency
with any size proportion issues that arise with future tenants and their short and long
business names. The north elevation will now be visible from Hudson Blvd., and tenant’s
will be able to showcase their place of business. The rear signage is really designed to
capture the traffic from the westbound on-ramp traffic to I-94. With this increased size, it
will now be readable and will help in the promotion and success of the Lake Elmo Shoppes
retail and restaurant businesses. The 1.5 square feet of signage per 1 lineal foot on the
west and east elevations will allow those tenants the opportunity to capture additional
angles of east and west traffic and stop light patterns as commuters enter the freeway as
well as from the adjacent Kwik Trip.
The intention of the increased ratios is to develop a uniform criteria that creates a fair
amount of square footage allowance for all tenants. Since there is uncertainty of what new
businesses will occupy each space at this time, utilizing this new ratio implements tenant
fairness while ensuring a professional look. This will also address the variety and length of
actual store names, their corporate sign regulations, and desired letter sizes that tenants
will be required or want to achieve with their space. This provides flexibility and approval
to enhance their investment with the specified ratio, provided that their identity and look is
approved by the Landlord.
Ground Sign #1:
Ground Sign #1 is an attractive 10’x12’ multi-tenant, sign to be located in the northeastern
access and will face Hudson Boulevard. As the two main retail buildings are set back up to
400’ from Hudson Boulevard, this monument will allow potential customers to know which
businesses are in the shopping center. Ground Sign #1 will help in the promotion and
success of these Lake Elmo businesses.
Ground Sign #2:
Ground Sign #2 is an attractive 14’x30’ multi-tenant sign located in the southwest corner of
the development and is intended to provide a signage opportunity to the over 100,000 VPD
on I-94. Ground Sign #2 will have print that is large enough for the traveling public to be
able to notice what businesses are in Lake Elmo Shoppes which will further enhance the
promotion and success of these Lake Elmo businesses.
Lake Elmo Shoppes has 22’ high, prominent storefronts and proportionate signage on these
storefronts is necessary both from the tenants branding perspective as well as the building
look. We believe this Comprehensive Sign Plan overall enhances the quality and
effectiveness of the shopping and dining experience.
EXHIBIT A
SIGN CRITERIA
Lake Elmo Shoppes, Lake Elmo, MN 55042
Tenant agrees to be bound and comply with the Sign Criteria as follows:
1. EXTERIOR SIGNAGE:
A. Tenant shall be required to identify its Leased Premises with an exterior sign.
B. Tenant’s signs shall be retail store identity signs only with restricted copy to designate the
Tenant’s name, product, or service.
C. Each Tenant will be allocated an area on the exterior sign band of the building.
D. Sign size and placement will be restricted to the sign band. The beginning and end of the
Tenant’s sign shall not be nearer than 18” to outside edges of the Tenant’s allocated sign
area, and determined by Lessor as per Exhibit G. All signs shall contain individual letters.
All signs shall be lighted, and all transformers will be installed inside the Tenant’s Leased
Premises. All exterior signs shall be located within the designated signing area. Any
drilling or boring to be done through the exterior wall of the building shall be performed in
accordance with all architecturally accepted methods and every precaution shall be taken to
assure that these areas be sufficiently waterproofed. All illuminated sign letters shall be
channel type construction, plastic faces attached with trim cap. All illuminated sign letters
must be LED lit. Colors need to be approved by the Landlord, raceways behind the parapet
wall are required on all signage above the roof line and must be installed in a manner as to
not void the roof warranty.
E. Each Tenant is allowed (1) sign on the Front of the Building (North Elevation) and (1) on the
Back of the Building (South Elevation).
F. The total sign surface area of all wall signs on a façade shall not exceed 2.5 square feet of
sign area per 1 lineal feet of storefront leased on the front elevation.
G. Each end cap Tenant is allowed (1) additional signage area that will be utilized to face the
west or east elevations for a maximum total of (3) signs for those Tenant’s only. End cap
tenants are allowed (1) added sign that is 1.5 sf per lf of leased frontage on that elevation.
H. Awnings are acceptable with Landlord approval. Awnings cannot include logos or copy.
I. The use of predominantly decorative sculpture, coat of arms, shields or other such logos
requires special approval by Landlord
J. Landlord expressly reserves the right to deviate from this sign criteria when dealing with
other tenants.
2. GROUND SIGN #1:
A. (1) freestanding multi-tenant ground sign shall be allowed in the northeast corner of the
development providing signage to Hudson Boulevard.
B. Ground sign is limited to a maximum height of 12.5’.
C. Landlord will allocate which tenants shall be on the ground sign and allocate the amount of
space to the individual tenants.
D. Landlord expressly reserves the right to deviate from this sign criteria when dealing with
other tenants.
E. Freestanding sign will incorporate colors and/or decorative design similarities to building
façade as determined by Landlord.
SIGN CRITERIA
PAGE 2
3. GROUND SIGN #2:
A. (1) freestanding multi-tenant ground sign shall be allowed in the southwest corner of the
development providing signage to I-94.
B. Freestanding sign is limited to a maximum height of 30’
C. Landlord will allocate which tenants shall be on the ground sign and allocate the amount of
space to the individual tenants.
D. Landlord expressly reserves the right to deviate from this sign criteria when dealing with
other tenants.
E. Freestanding sign will incorporate colors and/or decorative design similarities to building
façade as determined by Landlord.
4. PROHIBITED SIGNS:
The following types of signs or sign components shall be PROHIBITED.
A. Signs employing exposed raceways, ballast boxes or transformers.
B. Signs employing moving of flashing lights.
C. Signs, letters, symbols, or identification of any nature painted directly on the surface of the
exterior to Leased Premises.
D. Signs employing unedged or uncapped plastic letters or letters with no returns or expose d
fastenings.
E. Cloth, wood, paper or cardboard signs, stickers, decals or painted signs around or on exterior
surfaces (doors and/or windows of the Leased Premises.
F. Rooftop signs.
G. Signs employing noise-making devices or components.
H. Signs exhibiting the names, stamps, or decals of the sign manufacturer or installer.
I. Signs prohibited by city ordinance.
5. SIGN APPROVALS:
Procedure for obtaining Landlord’s approval of sign drawings
A. Tenant shall submit one (1) set in electronic format (.pdf or .jpg) including a c olor photo
rendering and specifications to Landlord for all proposed sign work.
B. The drawings shall clearly show location of sign onto fascia of building, graphics, color and
construction and attachment details
C. The Landlord shall reply to Tenant with “Approved”, “Approved as Noted” or “Disapproved”.
In no event shall erection of any sign take place without the written approval of the
Landlord. Sign drawings that have been disapproved are to be redesigned and resubmitted
to Landlord for approval within (7) days of receipt by Tenant. After the sign has been
approved by Landlord, Tenant shall also require the approval of the City of Lake Elmo prior
to the erecting said sign if said approval is required or requested by said City. Tenant is
responsible for receiving and paying for all fees associated with the installation of this sign,
including ALL permits.
D. Approval of store design drawings or working drawings and specifications for Tenant’s
Leased Premises does not constitute approval of any sign work
SIGN CRITERIA
PAGE 3
6. GENERAL TENANT REQUIREMENTS
A. The furnishing and installation of signage and all expense incurred shall be the sole
responsibility of the Tenant.
B. Sign construction is to be completed according to the instructions contained w ithin this
criteria
C. All exterior signage installation must be performed utilizing mechanical platforms on the
outside of the building. No ladders may be used in connection with said installation
D. A representative of Landlord must be present prior to the installation of any exterior signage
in order to supervise same
E. Tenant shall, at its own expense, install and maintain a time clock that will cause its
exterior signage to be fully illuminated at times provided in the Lease.
From:Michael Bent
To:Emily Becker
Cc:Greg Malmquist
Subject:Lake Elmo Shoppes Site Plan Review - Revisions
Date:Thursday, May 11, 2017 9:10:20 AM
Hey Emily
Greg and I have reviewed the utility plan for the Lake Elmo Shoppes project. Below are revisions to
the comments I sent to you previously and refer specifically to page C6:
1. The apparatus access roads look pretty good around the entire site with the following
exceptions:
a. The west end of the proposed building on Lot 2 indicates a Drive Thru lane and then a
lane to the west of the drive thu lane, the plan does show a width for this lane, but it
indicates a 16’ width (I missed it), please have the developer widen this to 20’ as the
apparatus access width is set at a minimum 20’ wide. It doesn’t make any sense to
choke the width down to 16’ and then widen it to the required width beyond and
behind the buildings.
2. The fire protection water service is shown on the south side of both buildings. The Fire
Department Connections for both of the proposed buildings will be installed on the north
(front) of the buildings. A fire hydrant will need to be located on the west end island of the
building on lot 2 and the east end island of the building on lot 1, in line with the proposed
hydrant in the island at the northwest corner of lot 1. (totaling 3 hydrants on the north side of
both buildings.)
3. No other hydrants are shown on the plans, another fire hydrant needs to be added in the
vicinity of the west end of the building proposed to the north, my previous comment
regarding the addition of a hydrant on the east end of the building to the north can be
removed, there is an existing hydrant on the Kwik Trip property that will suffice for coverage.
Let me know if you have any questions.
Michael Bent
Building Official
City of Lake Elmo
651-747-3910
mbent@lakeelmo.org
Resolution No. 2017-063
CITY OF LAKE ELMO
WASHINGTON COUNTY, MINNESOTA
RESOLUTION NO. 2017-063
A RESOLUTION APPROVING LAKEWOOD CROSSING 2ND ADDITION PRELIMINARY AND
FINAL PLAT AND PLANNED UNIT DEVELOPMENT PLANS
WHEREAS, CM Properties 94 LP, c/o MFC Properties, 3460 Washington Drive, Suite 100,
Eagan, MN 55112 (“Applicant”) has submitted an application to the City of Lake Elmo (“City”) for
approval of Preliminary and Final Plat and Planned Unit Development (PUD) Plans for Lakewood
Crossing 2nd Addition; and
WHEREAS, the Lake Elmo Planning Commission held a Public Hearing on March 13,
2017 to consider the PUD Concept Plan for Lakewood Crossing 2nd Addition; and
WHEREAS, the Lake Elmo City Council approved the Lakewood Crossing 2nd Addition
Concept Plan on March 21, 2017, and
WHEREAS, The Planning Commission held a public hearing and considered the Lakewood
Crossing 2nd Addition Preliminary and Final Plat and PUD Plans on June 12, 2017 and
recommended approval subject to a number of conditions; and
WHEREAS, the City Council reviewed the recommendation of the Planning Commission
and the proposed Lakewood Crossing 2nd Addition Preliminary and Final Plat and PUD Plans at a
meeting on June 20, 2017; and
NOW, THEREFORE, based upon the testimony elicited and information received, the City
Council makes the following:
FINDINGS
1. That the Applicant has submitted all application requirements outlined in Sections 153.07;
153.08; and 154.759 for Preliminary and Final Plat and PUD Plans.
2. That the Lakewood Crossing 2nd Addition Preliminary Plat and PUD Plans meets at least
one or more of the objectives outlined in Section 154.751 of the Zoning Code.
3. That the Lakewood Crossing 2nd Addition Preliminary and Final Plat and PUD Plans
propose to enhance the site and retail shopping and dining experience with enhanced
architectural materials and site furnishings.
2
Resolution No. 2017-063
4. That the Lakewood Crossing 2nd Addition Preliminary and Final Plat and PUD Plans is
consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this
area.
5. That the Lakewood Crossing 2nd Addition Preliminary and Final Plat and PUD Plans
generally comply with the City’s Commercial zoning district.
6. That the Lakewood Crossing 2nd Addition Preliminary and Final Plat and PUD Plans
complies with the City’s Subdivision Ordinance.
7. That the Lakewood Crossing 2nd Addition Preliminary and Final Plat meets other City
zoning ordinances, such as landscaping, tree preservation, erosion and sediment control, and
other ordinances, except where noted in the conditions of approval, Staff report to the
Planning Commission dated June 12, 2017 or attachments thereto.
8. That the Applicant has requested the following PUD flexibility from the City’s Zoning
Code:
a. Allowing medical facilities, drive-throughs, and outdoor dining as a permitted, rather
than conditional, use.
b. Allowing a minimum lot width of 18 feet for Lot 2.
c. Allowing a maximum impervious surface of 80% for Lot 2, with a total of 75%
impervious surface.
d. Allowing flexibility from the minimum parking lot setbacks from property lines,
allowing a zero foot setback between three lots and an 8.7 foot setback from the lot
to the east.
e. Allowing flexibility from certain Lake Elmo Design Guidelines and Standards
Manual as detailed in the Staff Report to the Planning Commission dated June 12,
2017.
f. To waive off-street loading requirements.
g. To waive requirement PUD requirement for 20% protected open space, as other site
amenities are provided within the development.
h. Approval of a Comprehensive Sign Plan which allows 2.5 square feet of wall
signage per one (1) lineal foot of store front on the front and rear elevations; 1.5
square feet of wall signage per one (1) lineal foot on building on the west and east
elevations; a 10’ X 12’ multi-tenant ground sign near the northeastern corner of the
site; and a 14’ X 30’ multi-tenant monument sign located in the southwest corner of
the site.
9. That the Lakewood Crossing 2nd Addition Preliminary and Final Plat and PUD Plans is
consistent with the City’s engineering standards provided the plans are updated to address
the City Engineer’s comments documented in a letter dated May 31, 2017. The Landscape
Plan shall include additional landscaping along the Keats Ave N to WB I-94 ramp.
10. That the Lakewood Crossing 2nd Addition Preliminary and Final Plat and PUD Plans will
require a relatively minor amount of city services and will not create a significant burden on
the City.
11. That the Lakewood Crossing 2nd Addition Preliminary and Final Plat and PUD Plans will
not conflict with nearby land uses.
3
Resolution No. 2017-063
12. The Applicant will be extending municipal sewer and water to the westerly property (PID#
34.029.21.44.0004), providing benefit to the City.
CONCLUSIONS AND DECISION
Based on the foregoing, the Applicants’ application for Preliminary and Final Plat and PUD Plans,
subject to the following conditions of approval:
1. The Applicant shall address all of the comments outlined in the City Engineer memorandum
dated May 31, 2017.
2. The Final Plat shall not be recorded until final construction plan approval is granted and all
easements as requested by the City Engineer and Public Works department are recorded on
the Final Plat.
3. The Applicant shall obtain all necessary permits including but not limited to all applicable
city permits (building, grading, sign, etc.), NPDES/SWPPP permits, and Valley Branch
Watershed District approval.
4. The Applicant should review with the MPCA if infiltration practices will be allowed, in
particular the planned conversion of the existing storm water pond to a storm water
infiltration basin directly east and adjacent to the service station.
5. The Applicant shall address all comments outlined in the Minnesota Department of
Transportation memorandum dated June 1, 2017.
6. The Applicant shall be required to extend sanitary sewer and municipal water service to the
westerly adjacent property.
7. Stormwater facilities shall be privately owned and maintained. A Stormwater Maintenance
and Easement Agreement in the City’s standard form must be executed and recorded.
8. A right turn lane on Hudson Boulevard shall be constructed at the Applicant to handle
increased traffic volumes.
9. The Applicant shall amend the proposed Landscape Plan to comply with City standards and
obtain approval by the City.
10. The Applicant shall provide financial security for 125% of landscaping materials with a Site
Work Agreement.
11. The Applicant shall provide further information on the proposed drive-through locations
including but not limited to exact location of speakers, windows, and refuse receptacles as
well as drive-through canopy detail.
12. The Applicant shall address all of the recommendations to improve the drive-through
operations as outlined in the Technical Memorandum prepared by Spack Consulting dated
April 12, 2017.
13. The Applicant shall submit a photometric plan, and all lighting must meet requirements of
Sections 150.035-150.038 of the City Code.
14. The Applicant shall pay a park dedication fee of $4500 per acre, totaling $17,190, in lieu of
required parkland.
4
Resolution No. 2017-063
15. The Applicant shall address all comments outlined in the Fire Chief and Building Official
email memos dated May 10, 2017 and May 11, 2017. Specifically, the building on Lot 3
shall be sprinklered; fire hydrant locations shall be added according to comments; and the
drive aisle width to the west of the drive-through lane on Lot 2 shall be widened to 20 feet.
The Applicant shall submit a plan and obtain approval from the Building Official and Fire
Chief for the location of hydrants and No Parking and Fire Lane signs.
16. A Reciprocal Easement and Operating Agreement provided shared parking access across all
lots shall be provided, approved by the City, and recorded.
17. Tables cannot block a public sidewalk or other walkway needed for pedestrian circulation.
Minimum of 5 ft. of sidewalk must remain open
18. Mechanical rooftop equipment must be screened.
19. The Site Plan shall be updated to include lines that clearly delineate two aisles on the lanes
to the south of Lots 1 and 2 and the east side of Lot 1.
20. The Applicant shall provide additional striping and/or a stop sign to facilitate traffic
circulation in the area where access is shared with Kwik Trip.
21. Permitted medical facilities shall be limited to non-urgent facilities, including but not limited
to clinics, eye doctors, and dental facilities.
22. The Applicant shall add site amenities such as benches, trash receptacles, decorative
lighting, and signage compliant with the Lake Elmo Design Guidelines and Standards
Manual to the site plan.
23. Fencing shall be provided enclosing all outdoor dining areas.
Passed and duly adopted this 20th day of June, 2017 by the City Council of the City of Lake Elmo,
Minnesota.
__________________________________
Mike Pearson, Mayor