HomeMy WebLinkAbout07 - Street Improvements - Change Order No. 1 STAFF REPORT DATE: August 1, 2017 CONSENT AGENDA ITEM: 2017 Street Improvements - Change Order No. 1 SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Rob Weldon, Public Works Director Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Change Order No. 1 for the 2017 Street Improvements? BACKGROUND: Hardrives, Inc. was awarded a construction contract to complete the 2017 Street Improvements on May 16, 2017. The project is in construction with a substantial completion date of September 22, 2017. PROPOSAL DETAILS/ANALYSIS: Hardrives, Inc. has submitted a change order to address two design changes requested by the City as follows: 1. Replace an existing roadway culvert that has collapsed (failed) that was not intended for replacement in the original contract. The work includes mobilization and replacement of a culvert that failed at Station 17+50 on 55th Street North. 2. Improve the installation of two culverts by extending them beyond the City right-of-way after obtaining easements from an abutting property. The work includes the extension of culvert 305-1 by approximately 8 feet with the installation of riprap; and the extension of culvert 306-1 by approximately 16 feet with the installation of riprap. FISCAL IMPACT: This change order will increase the contract in the amount of $15,742.25 bringing the revised construction contract to $1,053,948.39. With this change order the project remains within the authorized project budget and contingencies. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 1 for the 2017 Street Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 1 for the 2017 Street Improvements, thereby increasing the contract amount by $15,742.25”. ATTACHMENTS: 1. Change Order No. 1. CHANGE ORDER NO. 1 2017 STREET IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2016.135 QUANTITY UNIT PRICE AMOUNT CO1‐1 LS 1.0 $2,400.00 $2,400.00 CO1‐2 LF 54.0 $5.25 $283.50 CO1‐3 LF 54.0 $60.90 $3,288.60 CO1‐4 EA 1.0 $2,205.15 $2,205.15 CO1‐5 EA 1.0 $700.00 $700.00 CO1‐6 LS 1.0 $3,150.00 $3,150.00 CO1‐7 LS 1.0 $3,715.00 $3,715.00 TOTALS ‐ CHANGE ORDER NO. 1 $15,742.25 After obtaining easements from an abutting property owner the  installation of Culvert 306‐1 can be improved by extending the culvert  an additional 16 LF beyond the street right‐of‐way. Work includes  culvert extension and rip rap placement. DESCRIPTION / JUSTIFICATIONITEM DESCRIPTION OF PAY ITEM UNIT CHANGE ORDER MOBILIZATION REMOVE STORM SEWER CULVERT 306‐1 EXTENSION 18‐INCH RCP STORM SEWER 18‐INCH FES W/ TRASHGUARD CONNECT TO EXISTING STRUCTURE CULVERT 305‐1 EXTENSION Replace an existing roadway culvert at station 17+50 on 55th Street  North that has collapsed (failed) and was not intended for replacement  in the original contract. After obtaining easements from an abutting property owner the  installation of Culvert 305‐1 can be improved by extending the culvert  an additional 8 LF beyond the street right‐of‐way. Work includes  culvert extension and rip rap placement.