HomeMy WebLinkAbout# 12 - 2017 Street Improvements - Change Order No. 2 STAFF REPORT DATE: September 19, 2017 CONSENT AGENDA ITEM: 2017 Street Improvements - Change Order No. 2 SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Rob Weldon, Public Works Director Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Change Order No. 2 for the 2017 Street Improvements? BACKGROUND: Hardrives, Inc. was awarded a construction contract to complete the 2017 Street Improvements on May 16, 2017. The project is in construction with a substantial completion date of September 22, 2017. PROPOSAL DETAILS/ANALYSIS: Hardrives, Inc. has submitted a change order to address two design changes requested by the City as follows: 1. Adjust the concrete curb and gutter stringline to provide smooth transitions and verify boulevard drainage. The existing roads were not paved a consistent width and this additional work was needed to field design the width transitions. 2. Install a concrete valley gutter at Jamaca Boulevard and 53rd Street. The valley gutter was installed per plan to better facilitate drainage through the intersection but did not have a bid item for payment purposes. 3. Provide an operator and equipment to stockpile reclaim gravel material at Public Works. The contractor was asked to assist Public Works with the proper equipment to handle the material and pace of delivery of the material to the Public Works site. FISCAL IMPACT: This change order will increase the contract in the amount of $12,169.96 bringing the revised construction contract to $1,066,118.35. With this change order the project remains within the authorized project budget and contingencies. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 2 for the 2017 Street Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 2 for the 2017 Street Improvements, thereby increasing the contract amount by $12,169.96”. ATTACHMENTS: 1. Change Order No. 2. CONTRACT CHANGE ORDER FORM CHANGE ORDER NO. DATE: TO: UNIT HR SF HR Amount of Original Contract $ Sum of Additions/Deductions approved to date (CO Nos. 1) $ Contract Amount to date $ Amount of this Change Order   (ADD)   (DEDUCT)   (NO CHANGE)$ Revised Contract Amount $ The Contract Period for Completion will be   (UNCHANGED)  (INCREASED)  (DECREASED)days APPROVED BY ENGINEER:  FOCUS Engineering, inc. APPROVED BY CONTRACTOR DATE DATE APPROVED BY OWNER:  CITY OF LAKE ELMO, MINNESOTA DATE DATE 0 This Document will become a supplement to the Contract and all provisions will apply hereto. The Contract Documents are  modified as follows upon execution of this Change Order.  BYENGINEER 1,038,206.14 15,742.25 1,053,948.39 12,169.96 1,066,118.35 INCREASE/(DECREASE) $5,800.96CO2‐1 $90.6464 HARDRIVES, INC. 14475 QUIRAM DRIVE ROGERS, MN 55374 2017 STREET IMPROVEMENTS PROJECT NO. 2016.135 2 September 11, 2017 CONCRETE CURB STRING LINE ADJUSTMENTS ITEM $2,064.00300$6.88 NET CONTRACT CHANGE $12,169.96 CITY OF LAKE ELMO, MINNESOTA BYBY CHANGE ORDER DESCRIPTION / JUSTIFICATION: This change order is being processed at the direction of the City to amend the Contract to complete additional work as follows:  1) Adjust concrete curb and gutter stringline to provide smooth transitions and verify boulevard drainage. The existing roads were not paved a  consistent width and this additional work was needed to field design the width transitions. 2) Install a concrete valley gutter at Jamaca Boulevard and 53rd Street. The valley gutter was installed per plan to better facilitate drainage  through the intersection but did not have a bid item for payment purposes. 3) Provide an operator and equipment to stockpile reclaim gravel material at Public Works. The contractor was asked to assist Public Works  with the proper equipment to handle the material and pace of delivery of the material to the Public Works site. Attachments  (list documents supporting change):None DESCRIPTION OF PAY ITEM QTY UNIT PRICE CO2‐2 CONCRETE VALLEY GUTTER CO2‐3 STOCKPILE EXCESS RECLAIM AT PUBLIC WORKS 20.5 $210.00 $4,305.00 9/11/2017 FOCUS Engineering, inc.CHANGE ORDER FORM