HomeMy WebLinkAbout#15 Village Park PreserveBUSINESS ITEM 5A
STAFF REPORT
DATE: 9/5/2017
REGULAR
ITEM #: 15
MOTION
TO: City Council
FROM: Emily Becker, City Planner
AGENDA ITEM: Village Park Preserve Final Plat
REVIEWED BY: Jack Griffin, City Engineer
Joan Ziertman, Planning Program Assistant
BACKGROUND:
The Council is being asked to consider a Final Plat request from Pulte Homes of MN LLC for the 1st
Addition of Village Park Preserve, a planned 104 unit residential development. The 1st Addition
includes 36 single family lots that are located within a 22.786 acre area to the south of Easton Village
and to the north of Heritage Farms. Staff is recommending approval of the request subject to
compliance with the conditions listed in this report.
ISSUE BEFORE COUNCIL:
The Commission is being asked to recommend approval of the Final Plat request for the 1st Addition
of Village Park Preserve based on its consistency with the approved Preliminary Plat.
PROPOSAL DETAILS/ANALYSIS:
General Information.
Applicant: Pulte Homes of MN LLC, 7500 Office Ridge Circle, Ste 325, Eden Prairie, MN
55344 (will act as both developer of the property and builder of homes)
Property Owners: Schitgen Farms, Inc., 10880 Stillwater Boulevard N, Lake Elmo, MN 55042 and
Mark Holliday, PO Box 243, Lake Elmo, MN 55042
Location: PID Numbers 13.029.21.44.0004 and 13.029.21.49.0002
Request: Application for final plat approval of a 36 unit residential subdivision to be
named Village Park Preserve.
Zoning: LDR – Limited Density Residential
Surrounding: North – Easton Village (LDR – Limited Density Residential); West – Reid Park
(PF – Public and Quasi Public Open Space; South – Heritage Farms (Open
Space Development); East – Lake Elmo Airport (Baytown Township).
Comp. Plan: Village Urban Low Density Residential (1.5 - 2.49 units per acre)
2
History: Property was included in Village Planning Area boundary and municipal sewer
service area as defined in the 2013 Village Land Use Plan. Site has historically
been used for farming activities, including the growing of agricultural crops.
Sketch Plan review by Planning Commission on 06/30/2014. A Comprehensive
Plan Amendment was approved on 7/15/2014 by Resolution 2014-60, and
Preliminary Plat was approved on 9/16/2014 by Resolution 2014-74. Preliminary
plans revised 12/01/2014.
Action Deadline: Application Complete – 7/25/2017
60 Day Deadline – 9/23/2017
Extension Letter Mailed – No
120 Day Deadline – N/A
Regulations: Chapter 153 – Subdivision Regulations
Article 10 – Urban Residential Districts (LDR)
§150.270 Storm Water, Erosion, and Sediment Control
Consistency with Preliminary Plat.
Revised Preliminary Plat. The Preliminary Plans were revised after Preliminary Plat was approved to
address the City Engineer comments provided in the memo dated September 4, 2014. The updated
preliminary plans removed four lots to accommodate infiltration area #1SE, which had previously
not been fully contained in the outlot. The Applicant has revised the preliminary plans to include
back these four lots, keeping the infiltration basin contained in Outlot C. The revised preliminary
plans also include Outlot G, which will be a developer-owned outlot that will include a totlot. The
preliminary plasn
Proposed Dimensional Standards. The lot sizes of the proposed Final Plat vary slightly from the
approved Preliminary Plat, though no lot size is smaller than the required minimum of 8,000 square
feet. Additionally, no lot width is narrower than the required minimum width of 65 feet.
Connection to McLeod Property. The owner of PID# 13.029.21.43.0001 (11580 30th St N) has
expressed interest in developing this parcel. The Applicant has provided a road connection from the
street proposed to be named Lower 31st Street North to this parcel. This has been done so that this
parcel can eliminate its current access from 30th Street North.
Added Eyebrow Islands. It had been recommended that landscape islands breaking up the large
eyebrows in the northwest and northeast corners of the plat should be provided. The applicant added
this, and the City Engineer review memo asks for turning radius for these eyebrows in order to
determine if a standard fire truck and snow plow can maneuver through.
Density. The density is consistent with Preliminary Plat and the density designated for Village Urban
Low Density (1.5-2.49 units per acre). The net acreage is 53.694 acres – 5.687 parkland – 0.88 acres
for arterial right of way = 47.127. 104 units / 47.127 net acres = a density of 2.21 units per acre.
Outlots.
• Outlot A, which will be used for stormwater pond #1SE, will be city-owned and is 320,270
square feet.
• Outlot B will be platted as Village Preserve 2nd Addition.
• Outlot C will be dedicated as parkland and is 247,711 square feet.
3
• Outlot D will be dedicated as parkland, likely with the Gonyea West Development, and is
267,352 square feet with 16,207 square feet of wetland.
• Outlot E, which will be used for stormwater pond #2SE, will be city-owned and is 43,437
square feet.
• Outlot F, which will be used for stormwater pond #3SE, will be city-owned and is 36,250
square feet.
Right-of-Way Dedicated for Entire Plat. 5.187 acres
Parkland. The developer has dedicated an approximate 2.9 acre parcel from the Preliminary Plat
area for parkland dedication for the Village Preserve development. This has reduced the gross area of
the plat from the approved Preliminary Plat from 63.6 acres 60.520 acres. A 6.826 acre parcel for
parkland dedication credit for a future development (likely Gonyea West) will be owned by a
different developer (Gonyea Homes). This results in a net area of 53.694 acres to calculate parkland
dedication. 10% parkland dedication is required for this development (5.369 acres) and will be
satisfied with dedication of Outlot C, which is 5.687 acres, less the 0.317 gas easement (5.369 acres).
Gonyea Homes has indicated that they would be willing to dedicate Outlot D with the platting of
Village Park Preserve Final Plat, provided the City provides written documentation memorializing
that this land can be used to satisfy parkland dedication for a future development. This would
alleviate staff concern that there would be a gap between Reid Park and Outlot C until such time that
Gonyea West develops. If Outlot D does not end up being dedicated, an extension of Reid Park
would not be created as planned. If the Council is not amenable allowing this land to be used as
parkland dedication credit for a future development, both Staff and the Planning Commission
recommend that Outlot C and Outlot D be divided east-west and that the northernmost outlot be
dedicated as parkland so that a land-locked parcel is not created.
Trails. There is a small trail connection from the street connecting to the McLeod property that dead
ends in Outlot C. If construction of the trail is credited towards parkland dedication, there would be a
surplus of parkland dedication. Additionally, the trail dead ends and does not provide value for
connecting the development to Reid Park. Staff is recommending that either the developer take on
the cost of connecting the trail through Outlot C & D to Reid Park in addition to the required land
dedication; that the developer construct the trail through Outlod C & D to connect to Reid Park and
dedicate less land; or if the City feels that the trail is unnecessary, to eliminate the trail altogether.
Additionally, the trails along Village Parkway should connect to Manning Avenue. There should be a
crosswalk to the south side of 30th Street to utilize the existing trail.
Private Totlot. In addition the parkland mentioned above, the revised preliminary plans also show
Outlot G as being dedicated towards a developer-owned parcel of land that will house a private totlot.
Engineering Comments. The City Engineer has reviewed the revised Preliminary Plans as well as
Final Plat, and these comments can be reviewed in the attached Village Park Preserve Revised
Preliminary Plans and 1st Addition Final Plat Engineering comments review memo dated August 10,
2017. Outlined comments include the following:
• Preliminary Plans. The preliminary plans are not approved and must be approved before the
City will accept any resubmittals of Final Plat and Plans. It is a recommended condition of
approval that the applicant revise these plans and the City approve them prior to review by
City Council.
o Valley Branch Watershed District Permit. The applicant has obtained a Valley
Branch Watershed District permit, but the permit was approved based on plans dated
February of 2017. The applicant will need to obtain approval of revised plans.
4
o Village Parkway Standards. Street lighting, boulevard tree layout, sidewalk and trail
placement need to meet the Village Parkway design standards and tie into/coordinate
with the existing Easton Village street lights. It is a recommended condition of
approval that all plans comply with the updated Village Parkway standards.
o Easements. Construction easements are not shown on the construction plans and need
to be in order to facilitate engineering review. This has been added as a recommended
condition of approval. These easements must be approved by the City and executed.
o Grading Plans.
The stormwater management report must be revised to describe how the
model was changed and what changes were made to the storm sewer
infrastructure with the August 8 plan revisions.
The storm sewer pipe along the lots on the northeast corner of the
development do not meet minimum storm sewer pipe cover.
The localized 100-year HWL contour must be fully protected by the drainage
and utility easement.
o Additional Comments. All other comments as outlined in the City Engineer review
memo dated August 10, 2017 must be addressed, and revised plans must be approved
by the City.
• 1st Addition Final Plat
o Plunge Pool within Manning Avenue Right-of-Way. The Manning Avenue right-of-
way that will be required for the Manning Avenue improvement project may not be
sufficient for the proposed plunge pool within said right-of-way. It is a recommended
condition of approval that the developer provide an escrow as determined by the City
per the Development Agreement to ensure that such right-of-way is sufficient. In the
event that additional right-of-way is needed for the Manning Avenue improvement
project, the City shall draw upon this escrow account.
o Right-of-Way for Entrance of Village Parkway. There is insufficient right-of-way
provided along either side of the entrance to Village Parkway. It is a recommended
condition of approval that the Preliminary Plat and Plans and Final Plat and Plans
provide sufficient right-of-way for a 16 foot boulevard on either side of the entrance
island. Further, sight triangles need to be added to the plat and plans. This is included
in the City Engineer Review memo, which the conditions reference.
o Grading. The Final Construction Plans shall be revised to show phasing of grading.
o Outlots. Outlots A, B, C (labeled H in revised preliminary plans), E and F
(Stormwater) and C (Parkland) must be dedicated to the City as part of the Final Plat.
City ownership of the outlots must be noted in the final construction plans
Metropolitan Airports Commission (MAC) Comments. MAC has reviewed the proposed Final
Plat and has made the following comments. MAC also reviewed the Preliminary Plat and made
similar comments, but conditions of approval were not adopted based on all of these comments.
Staff is recommending conditions of approval as indicated below based on these comments.
• The area receives routine aircraft overflight activity (approximately 27,000 annual aircraft
operations).
• Residents should be provided information on the properties’ locations relative to the Lake
Elmo Airport (this has been added as a recommended condition of approval). Easton Village
was required to include this as an article in their development’s declaration of easements,
5
covenants, conditions and restrictions, and it is recommended that this same article be
included in the equivalent instrument for Village Park Preserve.
• MAC also recommends that the City require appropriate noise attenuation construction
practices for residential structures. It was a condition of approval for the Easton Village
Final Plat that builders are encouraged to incorporate interior noise reduction measures into
single family residential structures within the subdivision based on the Metropolitan
Council’s Builder Guide, and Staff recommends that this same condition of approval be
added for Village Park Preserve.
• MAC’s letter dated August 2, 2017 indicates that the applicant should file an aeronautical
study with the Federal Aviation Administration (FAA) for the proposed development site
(including construction equipment) to ensure that it will not have an adverse impact on Lake
Elmo Airport. However, an email from MAC that was sent in September of 2014 after
Preliminary Plat was approved by the City indicates that such a study would likely not be
beneficial to the City or to MAC. As such, Staff is not recommending that this be added as a
condition of approval.
• The MAC does not generally support the open-water retention ponds due to hazards to the
flight of aircraft due to the use of the ponds by Canada geese and other waterfowl but
acknowledges there are engineering challenges within the development site that make the
sole use of dry ponds or infiltration basins impractical. MAC has indicated that a physical
barrier should be created between the water and manicured lawns; there should be a
reduction of overall surface area of the water; emergent vegetation should be encouraged to
grow; manicured lawn/turf in close proximity to the water source should be eliminated by
using a native prairie seed mix. The landscape plans indicate that native seed mix will be
used surrounding the ponds and has limited the overall surface area of the water as much as
possible. Staff does not recommend, however, that the applicant be made to construct a
physical barrier between the water and manicured lawns, Easton Village was not required to
construct such a barrier, and Staff does not feel it is just to require this development to
adhere to this requirement.
• Landscaping comments made by the MAC are addressed in the Landscaping section of this
report.
Building Official/Public Safety Review. The Building Official and Fire Chief reviewed the
proposed Final Plat and have verified that the fire hydrant locations and spacing are in compliance
with applicable codes and standards. The on-street parking and signage will be dictated by the city
parking ordinance.
Access. There is a connection to 30th Street via Village Parkway, a minor collector road that will
serve as the primary access and circulation route for the development, extending from 30th Street to
Easton Village. Temporary access to Manning Avenue (CSAH 15) will be provided but will be
closed off at some point in the future.
Landscape Plans. The Landscape Plans will need to be revised prior to recording of the Final Plat
as follows:
• Manning Avenue Right-of-Way needs to be properly identified.
• The Preliminary Landscape Plan for the entire development needs to be submitted.
• Updated Village Parkway design and specifications need to be provided. Salt tolerant sod
needs to be identified in this right-of-way.
• Certain Landscape Details and Notes need to be added.
6
• Water meter size and location need to be identified on the Landscape Plans consistent with
the final utility plans and the number of proposed water service meters for the entire
development need to be indicated on the preliminary utility plans.
• Utilities need to be identified on the landscaping plan to help identify conflicts.
• Conflicts between street lighting and street trees need to be eliminated.
• Landscaping in pond maintenance accesses and benches needs to be eliminated.
• Lindens and Sugar Maples should be replaced with a different species because of
respective issues with Japanese Beatle damage and disturbed development soils.
• The northerly Oaktree within the 30th Street/Village Parkway median should be eliminated
to avoid conflicts with larger vehicles.
• The Village Parkway trails and sidewalks should be revised to intersect with the 30th Street
intersection.
• The Metropolitan Airports Commission (MAC) has indicated that the mixture of overstory
and evergreen trees proposed along the south and east sides of Stormwater Pond #1SE
closest to the approach surface for Runway 04 could grow to become an obstruction. Trees
planted in the vicinity of an approach surface may require removal at some future date if
they become an obstruction to the airspace.
Buffering. A condition of the Comprehensive Plan Amendment previously approved by adoption of
Resolution 2014-60 was that additional buffering and screening be provided along the southwest
portion of the property, particularly the east boundary of the McLeod property. Trees have been
proposed to provide screening, and infiltration area #1SE (that were formerly four lots that have
since been removed) will provide a buffer. Additionally, the Comprehensive Plan designates a buffer
area on the north and east side of this development. This is accomplished through stormwater pond
#1SE, which creates a 40-150 foot separation from residential lots to street right-of-way, as well as
landscaping that includes evergreens providing year-round screening.
Streets. There does not exist an Upper 30th Street North or Lower 31st Street North within the City,
so these proposed street names comply with the policy. However, the Linden Avenue North street
name should be removed, as the City’s street naming policy states that the names of deflecting
streets shall not vary unless an intersection exists. Therefore, Upper 30th Avenue should continue
until it intersects with Lower 31st Street North.
On the Preliminary Plat, there are the proposed street names of 31st Street North and Lilac Avenue
North. These street names already exist within the City. Additionally, there is no intersection
between the streets proposed to be named 31st Street North, Lilac Avenue North, and Lower 31st
Street North. Therefore, 31st Street North should be changed to Upper 31st Street North and should
continue midway down the loop and should change to Lower 31st Street North. Additionally, the
street connecting to the McLeod property should be named a name starting with Li-
All local streets provide a 60 foot right-of-way and are 28 feet wide, which will allow for on-street
parking on both sides.
Final Plat Approval Process. The City’s subdivision ordinance establishes the procedure for
obtaining final subdivision approval, in which case a final plat may only be reviewed after the City
takes action on a preliminary plat. As long as the final plat is consistent with the preliminary
approval, it must be approved by the City. Please note that the City’s approval of the Village Park
Preserve Preliminary Plat did include a series of conditions that must be met by the applicant, which
are addressed in the “Review and Analysis” section below. There are no public hearing
requirements for a final plat.
7
PLANNING COMMISSION REVIEW:
The Planning Commission reviewed the proposed Final Plat at its August 14, 2017 meeting. The
Planning Commission had the following comments in regard to the proposed Final Plat:
Trail Connection to Reid Park. The Planning Commission felt that the trail connection to Reid
Park was necessary so as not to have the residents of the development have to go down to 30th Street
and cross to get to the trail on the south side of the street to get to Reid Park.
Outlot D. At the time of Planning Commission review, the applicant had stated that Outlot D was to
be dedicated at a later time as parkland. As previously mentioned, the Planning Commission had
recommended that Outlot C and Outlot D be divided east-west. The Planning Commission
recommended that the southernmost parcel be dedicated to the City as parkland, as this outlot would
include the trail. Staff would not like to see a landlocked parcel be created however. Since the
Planning Commission, Gonyea has agreed to dedicated Outlot D at the time of platting of 1st
Addition, provided the City provide written documentation that it will accept this outlot as parkland
dedication for a future development. Staff has verified with the City Attorney that this can be done
by either putting a provision in the Development Agreement with the developer of Village Park
Preserve and in the development agreement with Gonyea or in a memorandum of understanding with
Gonyea. Because of this, Staff has not drafted the Planning Commission’s recommended condition
but amended it as shown below:
24) Outlot D shall be dedicated to the City prior to recording of the plat, with the City providing
documentation agreeing that this land may be used for parkland dedication for a future
development.
Landscaping in Outlot H and Possible Development of the McLeod Property. Joe Bush of JP
Bush Homes, who has been working with the owner of 11580 30th St N (James McLeod) was at the
Planning Commission meeting and explained that the possible future development of the
aforementioned parcel may necessitate the need to tie in to Infiltration Area #1SE. This may disturb
the landscaping that is proposed on the landscape plans. As such, the Planning Commission has
recommended adding the following condition:
13) The Landscape Plans for the 1st Addition shall not include landscaping within Outlot C so as
to not interfere with any amendments needed to Infiltration Area #1SE to accommodate
potential development of the McLeod parcel. Landscape Plans for Outlot C shall not be
submitted until the last phase of the development.
PARKS COMMISSION REVIEW:
The Parks Commission reviewed the proposed Final Plat at its August 21, 2017 meeting. The Parks
Commission voted to recommend accepting Outlot D as parkland dedication for a future
development but specifically wanted to see it be parkland dedication for Gonyea West, not just any
development that Gonyea proposes. Additionally, the Parks Commission voted to recommend that
the applicant not construct the trail on the west side of the development to Reid Park, as there is
already connectivity from the development to Reid Park through sidewalks on the side streets, a trail
on Village Parkway, and the trail on the south side of 30th Street.
In order to provide an update concerning the conditions associated with the preliminary plat for
Village Park Preserve, Staff has prepared the following:
8
Preliminary Plat Conditions as designated by Resolution 2014-74 – With Staff Update
Comments (updated information in bold italics):
1) The Metropolitan Council must approve the Comprehensive Plan Amendment for the Holliday
parcel in advance of the City’s consideration of an application for Final Plat for the Village Park
Preserve Subdivision. Comments: The Metropolitan Council approved the Comprehensive
Plan Amendment for the Holliday parcel on September 23, 2014.
2) In advance of Final Plat application, the applicant shall provide adequate title evidence
satisfactory of the City Attorney. Comments: The Applicant will close on the property prior to
recording the final plat for the 1st Addition. Evidence of ownership will be provided prior to
submitting the Final Plat mylars for City signatures.
3) All required modifications to the plans as requested by the City Engineer in a review
memorandum dated September 4, 2014 shall be incorporated into the plans prior to consideration
of a Final Plat. Comments: The preliminary plans have been updated and submitted to the City
Engineer for review. These have not yet been approved. It is a recommended condition of
approval of Final Plat that revisions to the revised Preliminary Plat and Plans be made
according to the City Engineer review memo dated August 10, 2017. These plans are to be
approved prior to review by Council and resubmittal of Final Plat and Plans.
4) The Preliminary Plat approval is conditioned upon the applicant meeting all minimum City
standards and design requirements. Comments: The preliminary plans have been updated and
submitted to the City Engineer for review. It is a condition of Final Plat that revisions to the
Preliminary Plat and Plans be made according to the City Engineer review memo dated
August 10, 2017 and approved prior to review by Council and resubmittal of Final Plat and
Plans.
5) The developer shall follow all of the rules and regulations spelled out in the Wetland
Conservation Act, and shall acquire the needed permits from Valley Branch Watershed District
prior to the commencement of any grading or development activity on the site. Comments: It is
a recommended condition of approval that these rules and regulations be followed, and the
Applicant obtained Valley Branch Watershed District approval on July 13, 2017.
6) Related to the proposed storm water discharge to the south, the Applicant must provide written
permission from all property owners of the affected parcels located south of the proposed 30th
Street culvert consenting to the discharge location, volume and rate(s) in advance of submitting
Final Plat. Comments: Washington County has provided a letter dated September 3, 2014
indicating that the proposed access point on 30th Street is acceptable. The applicant has
provided a Drainage and Utility Easement, Temporary Construction Easement, and Right-of-
Way easement from the McLeod property, as well as a Temporary Construction Easement
from the Krueger property.
7) The Applicant shall be responsible for the submission of final plans and the construction of all
improvements within the 30th Street right-of-way as required by the City and further described in
the review memorandum from the City Engineer dated September 4, 2014. Comments: The
Applicant has submitted final plans and will construct all improvements within the 30th Street
right-of-way as required by the City.
9
8) The Applicant shall observe all right-of-way and other requirements included in a review
memorandum from Washington County dated September 3, 2014. The Final Plat application
has been submitted to the County for review. It is a recommended condition of approval that
the Applicant obtain a letter from Washington County that sufficient right-of-way along CSAH
15/Manning Avenue and at the intersection of 30th Street, as this is programmed for a traffic
signal and additional turn lanes in the future. The plat has been updated to dedicate the
appropriate amount of right-of-way along CSAH 15/Manning Avenue North, but the
construction plans should still be updated to show this dedicated right-of-way. Additionally, a
right-of-way permit be obtained for any work in the CSAH 15/Manning Avenue right-of-way;
a drainage report and calculations be submitted to Washington County along with written
conclusions that the volume and rate of stormwater run-off into the county right-of-way will
not increase as part of the project; and access control must be dedicated to Washington County
along CSAH 15/Manning Avenue.
9) The Landscape Plan shall be updated per the recommendations of the City’s Landscape
Consultant, described in a memo dated September 4, 2014. Tree protection measures for trees
intended to be saved according to the submitted Tree Survey must be included in the Final
Landscape Plan. Comments: It is a recommended condition of approval that the Applicant
obtain City approval for the Landscape Plans.
10) The Applicant must enter into a separate grading agreement with the City prior to the
commencement of any grading activity in advance of Final Plat and plan approval. The City
Engineer shall review any grading plan that is submitted in advance of Final Plat, and said plan
shall document extent of any proposed grading on the site. Comment: Grading will be
addressed in the Development Agreement that will likely be approved concurrently with Final
Plat. If the Applicant wishes to grade prior to Final Plat approval, this condition must be met.
11) The Applicant shall install an additional row of trees in the rear of Lots 1-3, Block 1 to provide
additional screening for the eastern boundary of the McLeod property to satisfy the condition of
approval related to the requested Comprehensive Plan Amendment. Comments: It is a
recommended condition of approval that the Landscape Plans be approved by the City’s
Landscape Architect and that these additional row of trees be installed.
12) The developer shall obtain all required permits from Northern Natural Gas to perform
construction work over the gas line that runs from north to south across the site. Comments: The
final plans have been approved by Northern Natural Gas, and the easement agreement is
ready to be signed. It is a recommended condition of approval that the Applicant execute this
easement.
13) The developer shall submit a letter from the Metropolitan Airports Commission agreeing to
design of stormwater facilities acceptable to the City prior to submitting the Final Plat
application. Comments. The MAC provided a letter dated December 5, 2014 to the City which
indicates that while they do not advocate the construction of open-water retention ponds in
close proximity to their airports due to their potential to attract and/or sustain hazardous
wildlife, that they acknowledge both the engineering challenges on the development site that
make the sole use of dry ponds or infiltration basins to accommodate the upstream developed
flows and the surface water runoff from on-site development impractical and the efforts being
made by the City to design and construct a regional stormwater retention system to reduce the
10
volume and rate of unmitigated stormwater flowing to parcels in the immediate vicinity of the
airport.
Staff and the Planning Commission are recommending certain conditions that have been specifically
identified as part of the final plat review, and that have not otherwise been addressed by the
applicant. The City Engineer’s review letter does identify several issues that need to be addressed by
the developer in order for the City to deem the final plans complete. Staff is recommending that City
Officials not sign the final plat mylars until the City’s construction plan review is finalized and all
necessary easements are documented on the final plat.
Based on the above Staff report and analysis, Staff is recommending approval of the final plat with
several conditions intended to address the outstanding issues noted above and to further clarify the
City’s expectations in order for the developer to proceed with the recording of the final plat.
Recommended Conditions of Approval:
1) The Preliminary Plat and Plans shall be revised as requested by the City Engineer in the
Village Park Preserve Revised Preliminary Plans review memorandum dated August 10,
2017 and approved prior to review by City Council and resubmittal of Final Plat and Plans.
2) After approval of Preliminary Plat and Plans by the City, submitted final grading, drainage,
and erosion control plans, sanitary and storm water management plans, landscape plans, and
street and utility construction plans shall be reviewed and approved by the City Engineer and
applicable Staff prior to the recording of the Final Plat. All changes and modifications to the
plans requested by the City Engineer in the memorandums addressing Village Park Preserve
1st Addition Final Plat dated August 10, 2017 shall be incorporated into these documents
before they are approved. Final Construction Plans and Specifications must be prepared in
accordance with the City approved Preliminary Plans and in accordance with the City
Engineering Design Standards Manual dated March 20, 2017 using City details, plan notes,
and specifications.
3) All easements as requested by the City Engineer and Public Works Department shall be
documented on the Final Plat prior to its execution by City Officials.
4) All off-site easements as required and approved by the City Engineer and Public Works
Director shall be documented on the Final Plat prior to release of the Final Plat for recording.
5) The Applicant shall enter into an agreement acceptable to the City Administrator that fully
addresses reimbursement to the City, together with full security, to cover the costs for the
future relocation of any storm sewer outfall pipe infrastructure and plunge pool, including
right-of-way acquisition that will be required in conjunction with the CSAH 15 (Manning
Avenue) 4-lane improvement project.
6) Outlots A, B, C (labeled H in revised preliminary plans), E and F (Stormwater) and C
(Parkland) must be dedicated to the City as part of the Final Plat. City ownership of the
outlots must be noted in the final construction plans.
11
7) Final Construction Plans must include a detailed phasing plan for all infrastructure
components and the plans must be prepared to clearly delineate between improvements to be
completed with the 1st Addition and the improvements to be completed with future additions.
8) No construction for Village Park Preserve 1st Addition may begin until the applicant has
received City Engineer and City Planner approval for the revised Preliminary Plans and Final
Construction Plans and Specifications; the applicant has obtained and submitted to the City
all applicable permits, easements and permissions needed for the project; and a
preconstruction meeting has been held by the City’s engineering department.
9) The Final Plat shall not be recorded until final construction plan approval has been granted.
10) Village Park Preserve 1st Addition includes trunk watermain (12-inch diameter) pipe
oversizing. Payment for pipe oversizing from the City standard 8-inch pipe should be
addressed as part of the development agreement. It is recommended that the City request
sanitary sewer pipe oversizing to be stubbed to the Village Parkway/30th Street North
intersection.
11) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a
Developer’s Agreement acceptable to the City Attorney and approved by the City Council
that delineates who is responsible for the design, construction, and payment of the required
improvements for the Village Park Preserve Final Plat with financial guarantees therefore.
12) The Landscape Plans must be updated and approved by the City’s Landscape Architect.
These plans shall include the additional row of trees as required by a condition of Preliminary
Plat approval.
13) The Landscape Plans for the 1st Addition shall not include landscaping within Outlot C so as
to not interfere with any amendments needed to Infiltration Area #1SE to accommodate
potential development of the McLeod parcel. Landscape Plans for Outlot C shall not be
submitted until the last phase of the development.
14) A Landscape License Agreement shall be executed for the maintenance of City outlots and
right-of-ways prior to release of the final plat by City Officials.
15) The applicant shall provide a disclosure statement to all first homeowners in the development
advising of the airport and associated over-flights, and all builders shall be encouraged to
incorporate interior noise reduction measures into single family residential structures within
the subdivision based on the Metropolitan Council’s Builder Guide.
16) The Applicant shall obtain a letter from Washington County that sufficient right-of-way
along CSAH 15/Manning Avenue and at the intersection of 30th Street, as this is
programmed for a traffic signal and additional turn lanes in the future; a right-of-way permit
be obtained for any work in the CSAH 15/Manning Avenue right-of-way; a drainage report
and calculations be submitted to Washington County along with written conclusions that the
volume and rate of stormwater run-off into the county right-of-way will not increase as part
of the project; and access control must be dedicated to Washington County along CSAH
15/Manning Avenue.
12
17) The Preliminary and Final Plans shall be updated to adhere to the most recent Village
Parkway design standards as adopted by the City.
18) The Applicant shall either construct a connecting trail through Outlots C & D to Reid Park in
addition to the required land dedication; construct a connecting trail through Outlod C & D to
Reid Park and dedicate less land; or eliminate the trail altogether.
19) The Village Parkway trail and sidewalk shall be extended further south to standard
intersection location (30th Street Boulevard alignment). A crosswalk on Village Parkway
between the sidewalk and trail shall be added, and pedestrian ramps for 30th Street crossing
shall be aligned for trail connection to existing 30th Street trail.
20) The Applicant shall provide the City with a copy of the Northern Natural Gas permit and
abide by any conditions of approval.
21) The developer shall follow all of the rules and regulations spelled out in the Wetland
Conservation Act.
22) The site plan is subject to a storm water management plan meeting State, Valley Branch
Watershed District (VBWD) and City rules and regulations. Specifically, the Applicant shall
obtain approval from the VBWD for revised plans. Storm water and storm sewer facilities
proposed as part of the site plan to meet State and VBWD permitting requirements must be
constructed in accordance with the City Engineer Design Standards.
23) Street names on the Preliminary Plans and Final Plat shall be consistent with the City’s street
naming policy, removing the names Linden Avenue North and Lilac Avenue North and
change 31st Street North to Upper 31st Street North.
24) Outlot D shall be dedicated to the City prior to recording of the plat, with the City providing
documentation agreeing that this land may be used for parkland dedication for a future
development.
DRAFT FINDINGS
Staff and the Planning Commission are recommending the following findings with regards to the
proposed Village Park Preserve Final Plat:
1) That all the requirements of City Code Section 153.07 related to the Final Plan and Final Plat
have been met by the Applicant.
2) That the proposed Final Plat for Village Park Preserve consists of the creation of 36 single-
family detached residential structures.
3) That the Village Park Preserve Final Plat is generally consistent with the Preliminary Plat and
Plans as approved by the City of Lake Elmo on September 16, 2014 and as amended to
comply with conditions of preliminary plat approval with the exceptions of issues identified
in the August 14, 2017 Staff report to the Planning Commission.
13
4) That the Village Park Preserve Final Plat is consistent with the Lake Elmo Comprehensive
Plan and the Future Land Use Map for this area.
5) That the Village Park Preserve Final Plat complies with the City’s Urban Low Density
Residential zoning district regulations.
6) That the Village Park Preserve Final Plat complies with all other applicable zoning
requirements, including the City’s landscaping, storm water, sediment and erosion control
and other ordinances with the exception of issues identified in the August 14, 2017 Staff
report to the Planning Commission.
7) That the Village Park Preserve Final Plat complies with the City’s subdivision ordinance.
8) That the Village Park Preserve Final Plat is generally consistent with the City’s engineering
standards with the exception of necessary plan revisions outlined by the City Engineer in his
review comments to the City regarding Preliminary Plans and 1st Addition Final Plat dated
August 10, 2017.
RECOMMENDATION:
Staff and the Planning Commission approval of the Village Park Preserve Final Plat with the 24
conditions of approval as listed in the Staff report. Suggested motion:
“Move to adopt Resolution 2017-089, approving the Village Park Preserve Final Plat with the 24
conditions of approval as recommended by Staff and the Planning Commission.”
ATTACHMENTS:
1. Application, Final Plat and Updated Plans (included updated Preliminary Plans)
2. City Engineer Review Memos dated August 10, 2017
3. MAC Review Comments
1
Resolution 2017-089
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2017-089
A RESOLUTION APPROVING FINAL PLAT FOR VILLAGE PARK PRESERVE
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the
laws of the State of Minnesota; and
WHEREAS, Pulte Homes of MN LLC, 7500 Office Ridge Circle, Ste 325, Eden Prairie, MN
55344 (“Applicant”) has previously submitted an application to the City of Lake Elmo (“City”) for a Final
Plat for Village Park Preserve; and
WHEREAS, on June 30, 2014, the Lake Elmo Planning Commission reviewed a General
Sketch Plan of the property; and
WHEREAS, on July 15, 2014, the Lake Elmo City Council approved a Comprehensive
Plan Amendment to re-guide PID# 13.029.21.44.0002 from Rural Area Development to Urban
Low Density Residential; and
WHEREAS, on September 8, 2014, the Lake Elmo Planning Commission held a public hearing,
reviewed and recommended approval of the Village Park Preserve Preliminary Plat; and
WHEREAS, on September 16, 2014, the Lake Elmo City Council adopted Resolution 2014-74
approving the Preliminary Plat for a 104-unit single family subdivision, subject to 13 conditions; and
WHEREAS, on August 14, 2017, the Lake Elmo Planning Commission reviewed the
Village Park Preserve Final Plat and recommended approval subject to 24 conditions; and
WHEREAS, on September 5, 2017, the Lake Elmo City Council reviewed the Village
Park Preserve Final Plat and made the following findings:
1) That all the requirements of City Code Section 153.07 related to the Final Plan and Final Plat
have been met by the Applicant.
2) That the proposed Final Plat for Village Park Preserve consists of the creation of 36 single-
family detached residential structures.
3) That the Village Park Preserve Final Plat is generally consistent with the Preliminary Plat and
Plans as approved by the City of Lake Elmo on September 16, 2014 and as amended to
comply with conditions of preliminary plat approval with the exceptions of issues identified
in the August 14, 2017 Staff report to the Planning Commission.
4) That the Village Park Preserve Final Plat is consistent with the Lake Elmo Comprehensive
Plan and the Future Land Use Map for this area.
2
Resolution 2017-089
5) That the Village Park Preserve Final Plat complies with the City’s Urban Low Density
Residential zoning district regulations.
6) That the Village Park Preserve Final Plat complies with all other applicable zoning
requirements, including the City’s landscaping, storm water, sediment and erosion control
and other ordinances with the exception of issues identified in the August 14, 2017 Staff
report to the Planning Commission.
7) That the Village Park Preserve Final Plat complies with the City’s subdivision ordinance.
8) That the Village Park Preserve Final Plat is generally consistent with the City’s engineering
standards with the exception of necessary plan revisions outlined by the City Engineer in his
review comments to the City regarding Preliminary Plans and 1st Addition Final Plat dated
August 10, 2017.
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby
approve the Village Park Preserve of Lake Elmo Final Plat subject to the following conditions:
1) The Preliminary Plat and Plans shall be revised as requested by the City Engineer in the
Village Park Preserve Revised Preliminary Plans review memorandum dated August 10,
2017 and approved prior to resubmittal of Final Plat and Plans.
2) After approval of Preliminary Plat and Plans by the City, submitted final grading, drainage,
and erosion control plans, sanitary and storm water management plans, landscape plans, and
street and utility construction plans shall be reviewed and approved by the City Engineer and
applicable Staff prior to the recording of the Final Plat. All changes and modifications to the
plans requested by the City Engineer in the memorandums addressing Village Park Preserve
1st Addition Final Plat dated August 10, 2017 shall be incorporated into these documents
before they are approved. Final Construction Plans and Specifications must be prepared in
accordance with the City approved Preliminary Plans and in accordance with the City
Engineering Design Standards Manual dated March 20, 2017 using City details, plan notes,
and specifications.
3) All easements as requested by the City Engineer and Public Works Department shall be
documented on the Final Plat prior to its execution by City Officials.
4) All off-site easements as required and approved by the City Engineer and Public Works
Director shall be documented on the Final Plat prior to release of the Final Plat for recording.
5) The Applicant shall enter into an agreement acceptable to the City Administrator that fully
addresses reimbursement to the City, together with full security, to cover the costs for the
future relocation of any storm sewer outfall pipe infrastructure and plunge pool, including
right-of-way acquisition that will be required in conjunction with the CSAH 15 (Manning
Avenue) 4-lane improvement project.
3
Resolution 2017-089
6) Outlots A, B, C (labeled H in revised preliminary plans), E and F (Stormwater) and C
(Parkland) must be dedicated to the City as part of the Final Plat. City ownership of the
outlots must be noted in the final construction plans.
7) Final Construction Plans must include a detailed phasing plan for all infrastructure
components and the plans must be prepared to clearly delineate between improvements to be
completed with the 1st Addition and the improvements to be completed with future additions.
8) No construction for Village Park Preserve 1st Addition may begin until the applicant has
received City Engineer and City Planner approval for the revised Preliminary Plans and Final
Construction Plans and Specifications; the applicant has obtained and submitted to the City
all applicable permits, easements and permissions needed for the project; and a
preconstruction meeting has been held by the City’s engineering department.
9) The Final Plat shall not be recorded until final construction plan approval has been granted.
10) Village Park Preserve 1st Addition includes trunk watermain (12-inch diameter) pipe
oversizing. Payment for pipe oversizing from the City standard 8-inch pipe should be
addressed as part of the development agreement. It is recommended that the City request
sanitary sewer pipe oversizing to be stubbed to the Village Parkway/30th Street North
intersection.
11) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a
Developer’s Agreement acceptable to the City Attorney and approved by the City Council
that delineates who is responsible for the design, construction, and payment of the required
improvements for the Village Park Preserve Final Plat with financial guarantees therefore.
12) The Landscape Plans must be updated and approved by the City’s Landscape Architect.
These plans shall include the additional row of trees as required by a condition of Preliminary
Plat approval.
13) The Landscape Plans for the 1st Addition shall not include landscaping within Outlot C so as
to not interfere with any amendments needed to Infiltration Area #1SE to accommodate
potential development of the McLeod parcel. Landscape Plans for Outlot C shall not be
submitted until the last phase of the development.
14) A Landscape License Agreement shall be executed for the maintenance of City outlots and
right-of-ways prior to release of the final plat by City Officials.
15) The applicant shall provide a disclosure statement to all first homeowners in the development
advising of the airport and associated over-flights, and all builders shall be encouraged to
incorporate interior noise reduction measures into single family residential structures within
the subdivision based on the Metropolitan Council’s Builder Guide.
16) The Applicant shall obtain a letter from Washington County that sufficient right-of-way
along CSAH 15/Manning Avenue and at the intersection of 30th Street, as this is
programmed for a traffic signal and additional turn lanes in the future; a right-of-way permit
be obtained for any work in the CSAH 15/Manning Avenue right-of-way; a drainage report
and calculations be submitted to Washington County along with written conclusions that the
4
Resolution 2017-089
volume and rate of stormwater run-off into the county right-of-way will not increase as part
of the project; and access control must be dedicated to Washington County along CSAH
15/Manning Avenue.
17) The Preliminary and Final Plans shall be updated to adhere to the most recent Village
Parkway design standards as adopted by the City.
18) The Preliminary Plans shall be revised to dedicate parkland adjacent to Reid Park, creating an
extension of Reid Park. The Applicant shall either construct a connecting trail through
Outlots C & D to Reid Park in addition to the required land dedication; construct a
connecting trail through Outlod C & D to Reid Park and dedicate less land; or eliminate the
trail altogether.
19) The Village Parkway trail and sidewalk shall be extended further south to standard
intersection location (30th Street Boulevard alignment). A crosswalk on Village Parkway
between the sidewalk and trail shall be added, and pedestrian ramps for 30th Street crossing
shall be aligned for trail connection to existing 30th Street trail.
20) The Applicant shall provide the City with a copy of the Northern Natural Gas permit and
abide by any conditions of approval.
21) The developer shall follow all of the rules and regulations spelled out in the Wetland
Conservation Act.
22) The site plan is subject to a storm water management plan meeting State, Valley Branch
Watershed District (VBWD) and City rules and regulations. Specifically, the Applicant shall
obtain approval from the VBWD for revised plans. Storm water and storm sewer facilities
proposed as part of the site plan to meet State and VBWD permitting requirements must be
constructed in accordance with the City Engineer Design Standards.
23) Street names on the Preliminary Plans and Final Plat shall be consistent with the City’s street
naming policy, removing the names Linden Avenue North and Lilac Avenue North and
change 31st Street North to Upper 31st Street North.
24) Outlot D shall be dedicated to the City prior to recording of the plat, with the City providing
documentation agreeing that this land may be used for parkland dedication for a future
development.
Passed and duly adopted this 5th day of September, 2017 by the City Council of the City of Lake
Elmo, Minnesota.
___________________________________
Mike Pearson, Mayor
ATTEST:
____________________________________
5
Resolution 2017-089
Julie Johnson, City Clerk
PAGE 1 of 3
MEMORANDUM
Date: August 10, 2017
To: Emily Becker, City Planner Re: Village Park Preserve 1st Addition – Final Plat
Cc: Chad Isakson, P.E., Assistant City Engineer Engineering Review Comments
From: Jack Griffin, P.E., City Engineer
An engineering review has been completed for Village Park Preserve 1st Addition. Final Plat/Construction Plans were
received on July 17, 2017 and revised Preliminary Plans for the Village Park Preserve received on August 8, 2017. The
review consisted of the following documentation prepared by Sathre‐Bergquist, Inc.:
Village Park Preserve Site Plans, Preliminary Plat, and Preliminary Plans dated August 8, 2017.
Village Park Preserve Stormwater Management Plan dated August 2017. (February 2017).
Village Park Preserve Final Plat received July 17, 2017. No print/preparation date.
Village Park Preserve Final Plat Narrative dated July 17, 2017.
Village Park Preserve Final Plat/Construction Plans dated July 17, 2017.
STATUS/FINDINGS: Engineering review comments have been provided in two separate memos; one for Final Plat
approval, and one to assist with the Preliminary Plan revisions. A review has not been completed for the Final
Plat/Construction Plans. Please see the following review comments relating to the Final Plat application.
FINAL PLAT: VILLAGE PARK PRESERVE 1ST ADDITION
Final Plat approval should be contingent upon the applicant updating the Preliminary Plans in accordance with
the engineering review memorandum dated August 10, 2017 and approved by the City Engineer and City
Planner. The preliminary plans must be approved by the City prior to the City accepting any revised Final Plat
or Final Construction Plans and Specifications for the 1st Addition and before the Final Plat application is
presented to the City Council.
Final Plat approval should be contingent upon the applicant entering into an agreement acceptable to the City
Administrator that fully addresses reimbursement to the City, together with full security, to cover the costs for
the future relocation of any storm sewer outfall pipe infrastructure and plunge pool, including right‐of‐way
acquisition, that will be required in conjunction with the CSAH 15 (Manning Avenue) 4‐lane improvement
project.
Outlots A, B, C (labeled H in the revised preliminary plans), E and F (Stormwater) and C (Parkland) must be
dedicated to the City as part of the Final Plat. Outlot D is shown as developer owned. City ownership of the
Outlots must be noted on the final construction plans.
The Final Plat must be updated to include the infiltration basin 1SE Outlot with the 1st Addition.
The Final Plat must be updated to include Outlot C (Parkland) along the west side of the gas main
easement with the 1st Addition or utility easements must be provided for all proposed utilities.
The Final Plat must be updated to include the right‐of‐way for Lower 31st Street, portions of Lilac
Avenue, and the stub street to the McCleod property with the 1st Addition.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4283
PAGE 2 of 3
The Final Plat must be updated to include additional 32 ft. right‐of‐way dedication along CSAH 15
(Manning Avenue) as required by Washington County.
The Final Plat must be updated to include additional right‐of‐way along 30th Street North to provide
sight triangles as shown on the preliminary plans and to provide a minimum 16 ft. boulevard along
the northern border of the street (both east and west of Village Parkway).
All easements as required by the City Engineer and Public Works Director shall be documented on the Final
Plat prior to the release of the Final Plat for recording.
All off‐site easements as required by the City Engineer and Public Works Director to complete any off‐site
improvements must be provided in the City standard form of easement agreement and signed by all parties
prior to the release of the Final Plat for recording.
Fully executed permanent and temporary easements are needed to complete the 30th Street North
turn lane improvements.
Fully executed permanent easements are needed to complete the Infiltration Basin 1SE
improvements.
Fully executed temporary easements are needed to complete the storm sewer outfall pipe
improvements south of 30th Street North and along the west side of CSAH 15 (Manning Avenue).
Permanent easements may also be required as may be identified with the Final Construction Plans.
Final Plat approval should be contingent on the plans including a bituminous trail connection to Reid Park.
The site plan is subject to a storm water management plan meeting State, VBWD and City rules and
regulations. Storm water and storm sewer facilities proposed as part of the site plan to meet State and VBWD
permitting requirements must be constructed in accordance with the City Engineering Design Standards.
A VBWD permit has been approved for the development based on the Stormwater Management
Plan dated February 2017.
The site plans and Stormwater Management Plan have been subsequently revised and will require
additional review and administrative approval from VBWD.
Final Construction Plans and Specifications must be prepared in accordance with the City approved
Preliminary Plans and in accordance with the City Engineering Design Standards Manual, dated March 2017
using City details, plan notes and specifications.
All streets are proposed to be publically owned and maintained. Public streets must be designed to
meet the City’s Engineering Design Standards including R/W width (60‐feet), street width (28‐feet)
and cul‐de‐sac radii (60 foot radius R/W / 45 foot radius pavement), intersection geometrics, and
vertical curves. Temporary cul‐de‐sacs are required as part of development phasing.
Village Parkway must be revised to meet all Village Parkway Collector Design Guidelines dated May
2017 including street lighting, boulevard layout and landscaping requirements.
Drainage and utility easements are required over all storm sewer, sanitary sewer and watermain not
located on City Outlots and right‐of‐way, minimum 30‐feet in width, 15 feet from centerline of pipe.
All storm water facilities, including storm water ponds, infiltration basins, wetlands and wetland
buffers, must be placed in Outlots deeded to the City for maintenance purposes. The Stormwater
Facility Outlots must fully incorporate the 100‐year HWL, 10 foot maintenance bench and all
maintenance access roads.
All lots must have the minimum floor elevation at least 2 feet above any adjacent 100‐year HWL and
the 100‐year HWL shall not encroach onto any lot. All lots must have the low opening elevation at
least 1 foot above any adjacent emergency overflow (EOF) elevation.
Stormwater Ponds must be constructed meeting City standards. Stormwater Wet Ponds are required
to have a minimum of 3 feet in depth to the NWL, constructed with 3:1 side slopes and both a 10:1
aquatic bench and a 10:1 maintenance bench. Designated maintenance access roads, 20 feet in
width, must be provided for all storm water facilities with slope no greater than 10%. Both the NWL
and 100‐year HWL elevations and contours must be shown on the plans.
The 100‐year HWL elevation and contour must be calculated and placed on the plans for all rear yard
catch basin areas. Drainage and utility easements must fully include the localized 100‐year HWL.
All emergency overflow elevations must be fully protected by drainage easement.
The maximum curb run prior to a catch basin is 350 feet.
PAGE 3 of 3
The storm sewer system shall be designed to maintain the City standard minimum pipe cover of 3 ft.
Drain tile is required as part of the City standard street section at all localized low points in the street.
Drain tile considerations may impact the storm sewer design and depth requirements at low points.
Final Construction Plans must include a detailed phasing plan for all infrastructure components and the plans
must be prepared to clearly delineate between improvements to be completed with the 1st Addition and the
improvements to be completed with future additions.
No construction for Village Park Preserve 1st Addition may begin until the applicant has received City Engineer
and City Planner approval for the revised Preliminary Plans and the Final Construction Plans and
Specifications; the applicant has obtained and submitted to the City all applicable permits, easements and
permissions needed for the project; and a preconstruction meeting has been held by the City’s engineering
department.
The Final Plat shall not be recorded until final construction plan approval is granted.
Village Park Preserve 1st Addition includes trunk watermain (12‐inch diameter) pipe oversizing. Payment for
pipe oversizing from the City standard 8‐inch pipe should be addressed as part of the development
agreement. It is recommended that the City request sanitary sewer pipe oversizing to be stubbed to the
Village Parkway / 30th Street North intersection.
PAGE 1 of 3
MEMORANDUM
Date: August 10, 2017
To: Emily Becker, City Planner Re: Village Park Preserve
Cc: Chad Isakson, P.E., Assistant City Engineer Revised Preliminary Plans
From: Jack Griffin, P.E., City Engineer
An engineering review has been completed for the revised Preliminary Plans for the Village Park Preserve received
on August 8, 2017. The submittal consisted of the following documentation prepared by Sathre‐Bergquist, Inc.:
Village Park Preserve Site Plans, Preliminary Plat, and Preliminary Plans dated August 8, 2017.
STATUS/FINDINGS: Village Park Preserve received conditional Preliminary Plat approval in 2014. Preliminary
Plans must be updated and resubmitted to address the conditions of approval from Resolution 2014‐74. Many
comments listed herein were provided in the engineering review memos dated September 4, 2014 and December
19, 2014, and August 3, 2017.
PRELIMINARY PLANS
Review and verify with the City Planner the Outlot ownership requirements for Outlots C and D adjacent
to Reid Park and update plans accordingly.
The typical section for Village Parkway must be revised as shown in the Village Parkway Collector Design
Guidelines. See attached Village Parkway Collector Design Guidelines with Village Parkway typical
sections.
Preliminary Plans. All plan sheets must be updated to show Village Parkway consistent with City standards
and dimensions, including boulevard tree layout, sidewalk and trail placement, and street light plans.
Landscape plans must be included in the preliminary plan set and identified in the plan Index. The
Preliminary plans are one plan set for City records and files.
The signage/striping plan must be included in the preliminary plan set and identified in the plan Index.
Add street light plan or include street lighting plan with pavement marking and signage plans. Update
Index accordingly. Detail the Village Parkway street light plan meeting the attached Village Parkway
design standards as adopted by the City. The street light plan must show and tie into/coordinate with the
existing Easton Village street lights and the Village Parkway boulevard tree layout.
Preliminary Plans must be updated to show all easements to be obtained to construct the project (i.e.
McCleod and Krueger easements).
PRELIMINARY STREET PLANS
ST 1. The trail connection stub proposed toward Reid Park should be extended to connect to the existing
Reid Park trail. Please work with Lake Elmo planning staff to determine final development trail connection
requirements.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4283
PAGE 2 of 3
ST1. Add Village Parkway typical section meeting City design standards. See attached detail to add to the
plan set. The typical section must be placed on the plans in sufficient scale so that it is easily noticed and
can be easily read in 11 x 17 format. The submitted detail is inadequate and incorrect.
ST2. Add a typical section for the Village Parkway divided entrance at 30th Street. The typical sections
must be drawn similar to the Village Parkway standard detail and in sufficient scale that they are easily
noticed and can be easily read in 11 x 17 format.
ST2‐ST4. Add turn lane taper ratios along Village Parkway and 30th Street North.
ST2. 30th Street turn lane typical sections must be increased in size to be easily noticed and can be easily
read in 11 x 17 format.
ST2. Revise 30th Street turn lane and typical sections to consist of 12 ft. through lanes, 12 ft. turn lanes
(plus 2ft. curb reaction) and 16 ft. minimum boulevards. Plans should indicate removal of concrete curb
and gutter.
ST2. Proposed R/W along 30
th Street does not provide adequate boulevard at Village Parkway
intersection. Minimum city standard Boulevard is 16 feet. Grading plans must be revise to prevent the
Pond 1SE 100‐year HWL level from encroaching the R/W.
ST2. Grading plans must be revise to prevent the Infiltration Area 1SE 100‐year HWL level from
encroaching the Village Parkway R/W.
ST2. Extend both Village Parkway sidewalk and trail further south to standard intersection location (30th
Street Blvd alignment). Add crosswalk on Village Parkway between sidewalk and trail. Align pedestrian
ramps for 30th Street crossing for trail connection to existing 30th Street trail.
ST2. Provide separate Autoturn plan demonstrating adequate snow plowing turning radius for Village
Parkway/30th Street North intersection with rear winged snow plow.
ST2 and ST3. Existing condition information is incomplete along 30th Street. Existing R/W width is not
shown. Existing curb and gutter is not identified. 30th Street Circle North R/W and street width is not
shown. 30th Street Circle curb and gutter or shoulder width is not identified. 30th Street trail is not
identified, and trail width is not noted. Please note that when preparing plans for improvements adjacent
to abutting properties that existing conditions (structures, trees, driveways, drainage ways, fencing,
pavement materials, overhead and underground utilities, signs, wells, septic systems, etc.) must be shown
on the plans for a minimum distance of 100 feet and in full detail to demonstrate matching existing
conditions and any potential impacts.
ST3. Pavement marking and signage plan must include all of Village Parkway. All plan notes must be
consistent with City standard specifications, plan notes and details found on the City website. Signage
plan should include signs throughout the entire development.
ST7. Provide street name for stub street.
ST5 and ST8. ST5 eyebrow center island geometry should mimic the eyebrow shown on ST8. Provide
pavement widths and eyebrow turning radius for each eyebrow. Submit separate plans showing Autoturn
for standard fire truck and snow plow.
PRELIMINARY UTILITY PLANS
Adjust the sanitary sewer alignment from MH‐7 and MH‐11 by adding and/or relocating structures to
maintain the sewer at the approximate centerline of the street. Pipe varies too much from centerline.
UP4. Label the existing culvert size, material and inverts for the box culvert crossing 30th Street North.
Plans should call out extension length, material and size.
UP5. Label the existing culvert size, material and inverts for the culvert crossing Manning Avenue adjacent
to the plunge pool.
UP5. Provide plunge pool 100‐year HWL contour and all existing conditions residing within and adjacent
to the flood level, including property lines.
UP5. Label the existing culvert size, material and inverts for the culvert crossing 30th Street. If pipe is to
be abandoned the pipe must be filled with sand prior to plugging both ends. Provide existing and
proposed grading for each side of the culvert to demonstrate culvert can be abandoned.
PAGE 3 of 3
UP5‐UP6. Include existing and proposed contours for the storm sewer outfall pipe design. Provide all
existing conditions and impacts along storm sewer outfall pipe. Please note that when preparing plans for
improvements adjacent to abutting properties that existing conditions (structures, trees, driveways,
drainage ways, fencing, pavement materials, overhead and underground utilities, signs, wells, septic
systems, etc.) must be shown on the plans for a minimum distance of 100 feet and in full detail to
demonstrate matching existing conditions and any potential impacts.
UP6. Proposed storm sewer outfall pipe and plunge pool conflict with the future proposed improvements
along CSAH 15 (Manning Avenue). Issue needs to be addressed.
PRELIMINARY GRADING PLANS
Revise the August 8, 2017 Stormwater Management Report to add a plan revision section which describes
how the model was changed and what changes were made to the storm sewer infrastructure with the
August 8 plan revisions.
Rear yard grading/storm sewer pipe must be revised to meet minimum storm sewer pipe cover. When
flared end sections are placed in rear yards they must be located along property lines with grading
designed to increase pipe cover quickly to City standard requirements. Lookout lots may be needed to
assist with pipe cover.
GP2. Pond 1SE 100‐year HWL contour must be fully contained within Outlot A. Revise grading for L9‐B5.
GP2. Grading/storm sewer revisions are required along Lots 9‐16, Block 5. Preliminary plan approval was
granted for the plans dated 11/25/2014 which is a far better grading/storm sewer design including
building pad elevations, culvert inverts, pipe cover and pond 100‐year flood level backups.
GP2/UP3. Revise lot easements for Lots 12‐16, Block 5. The localized 100‐year HWL contour must be fully
protected by drainage and utility easement.
GP3. Grading/storm sewer revisions are required along Lots 1‐11, Block 6. Preliminary plan approval was
granted for the plans dated 11/25/2014 which is a far better grading/storm sewer design including
building pad elevations, culvert inverts, pipe cover and pond 100‐year flood level backups.
GP3. Maintain minimum 30 feet wide easement centered over Pond 4SE outfall pipe, including 30 feet
wide without building setback line encroachments from either Lot 8 or 9, Block 8. Issue not addressed.
GP3. Provide 100‐year HWL and EOF for Lot 18, Block 6. Issue not fully addressed.
The storm water management report should be revised to acknowledge that no overland emergency
overflow is being proposed for Ponds 1SE, 2SE, 3SE and 4SE. Instead emergency overflow is being
designed through the use of redundant pipe systems. Issue not addressed.
LANDSCAPE PLANS
LP2‐LP5. Show all utilities (watermain, sanitary sewer and storm sewer, including water/sewer service
stubs) on landscape plans and revise plans to maintain minimum tree/utility offset of 10 feet.
LP2‐LP5. Revise boulevard tree placement along Village Parkway per the attached Village Parkway design
standards.
LP4. Revise Lilac and 31st Street center island planting to coordinate with utility conflicts.
Landscape Plans must identify irrigation service locations and must coordinate with utility plan irrigation
service stub.