HomeMy WebLinkAbout03-14-2005 PCMI
CITY OF LAKE ELMO
3800 LAVERNE AVE
LAKE ELMO, MN 55042
Phone: (651) 777-5510 Fax: 777-9615
Www.LakeElmo.Ora
Lake Elmo Planning Commission
MEETING NOTICE
Monday, March 14, 2005, 7:00 p.m.
ff s*** e9ie#¢►b9M4s4144.opo ossi ,*444-0.+4.‹,e
In Council Chambers
Lake Elmo City Hall
3800 Laverne Ave. N.
Lake Elmo, MN 55042
"lo, 4. 4, 9994i%#:99 d 9@�9f
AGENDA
a�9li�C«aArei 96��
14944,,,4
1. Agenda
2. Minutes
3. PUBLIC HEARING: Conditional Use Permit — City of Lake Elmo
To construct a Public Works Facility and a Water Tower Facility in a PF Zoning District
4. PUBLIC HEARING: Variance — Public Works Facility
Exterior Surface Materials
5. PUBLIC HEARING: Zoning Text Amendment
• To Add Home Occupations in the RR Zoning District
6. PUBLIC HEARING: CIP Amendment, 2005-2009
7. PUBLIC HEARING: Variance — Mike Lynskey/Village North Office Park
Visible Roofing Materials
8. Minor Subdivision: Olinger — 9057 Lake Jane Trail
9. Comprehensive Plan Modifications:
a. Policy
b. Land Use Text
10. Adjourn
AN. .DED/APPROVED: 4/11/05
City of Lake Elmo
Planning Commission Meeting
Minutes of March 14, 2005
Chairman Helwig called to order the meeting of the Lake Elmo Planning Commission at 7:00 p.m.
COMMISSIONERS PRESENT: Deziel, Roth, Ptacek, Sessing, Sedro, Schneider, Armstrong, Lyzenga,
and Fliflet. STAFF PRESENT: Planner Dillerud, Administrator Rafferty, City Engineer Prew, Finance
Director Bouthilet, and Recording Secretary Schaffel. ALSO PRESENT: Mayor Johnston and
Councilmember Johnson.
Pledge of Allegiance
Agenda
Pledge of Allegiance and City Council Update are missing from the Agenda. M/S/P, Sessing/Sedro, to
accept the Agenda as amended. VOTE: 9:0.
Minutes
M/S/P, Ptacek/Sedro, to approve the Minutes of February 23, 2005 after deleting all the extra pages of
notes at the end. VOTE: 9:0.
PUBLIC HEARING: CUP — Public Works and Water Storage Facilities AND
PUBLIC HEARING: Variance — Exterior Surface Materials — Public Works Facility
The Planner introduced the city's application for a conditional use permit to construct an 11,000 square
feet public works facility and a 500,000 gallon water storage facility over 100 feet in height on the edge
of a farm field of 19.8 acres in the southern portion of Sunfish Lake Park. He reported that the site zoned
PF, and public facilities are a Conditional Use in that zone. He noted that the application also includes a
Section 520 Site Plan.
The Planner reminded the Commission that the Facilities and Staffing Report that was adopted and
became part of the Comprehensive Plan strongly suggested a larger facility for public works. He also
noted that the need for new and expanded water storage was clearly demonstrated in the Community
Facilities element of the 2000 -2020 Comprehensive Plan.
The planner reported that the site plan is consistent with standards of the City Code except for the
exterior siding, and that a variance application is included for metal siding. The steel siding design was
intended to give a rural feel rather than a commercial feel for the structure. The variance for the siding
will help achieve the desired appearance of a rural structure to the building.
The water tower is dealt with somewhat differently as a utility transmission structure.
The planner stated that the Planning Staff Report does not include firm recommendations for action by
the Commission because the applicant is the City, and the planner is a City staff member.
Administrator Rafferty presented the site plan and design. He said there are 350 acres in Sunfish Lake
Park of which 20 acres will be used. The facility would be situated at the entrance, not in the woods. He
said the parcel of land is farmed commercially. The city leases the land to the farmer. He estimated that
95% of the equipment in the proposed facility will be used in the park maintenance activity at some time
during the year. He said a number of exteriors were reviewed and the most appealing was for the
structure to look like a barn and yet still serve all the needs this type of facility serves. He said the site
will be served by city water and a septic system. A warming shelter with bathrooms can be added in the
future.
Terri Olson, Architect with TKDA
Ms. Olson said the public works facility design came from incorporating public works and parks
equipment to be stored there. The building will have offices, showers, bathrooms, wash bays, and vehicle
Lake Elmo Planning Commission Meeting Minutes of March 14, 2005 1
Ag. ,DED/APPROVED: 4/11/05
storage. Storage will be available for salt, sand, dirt, class 5 gravel, etc. The design allows the
opportunity for future expansion. She said potentially a warming shelter addition could be tied into the
utilities. She reported that a great deal of time went into choosing the rural barn look with a gabled roof
and high clerestory windows.
Rich Gray, TKDA
Mr. Gray said the building would be sited in a saddle area of the site, minimizing cutting and filling. It is
also setback from the park entrance as a buffer and to allow it to appear to settle into the landscape.
Excess fill around the edges will be used to berm, offering further screening. Storm drainage will be
infiltration, and he said that soils there are well suited for it. All drainage can be managed on -site.
Landscaping plans are designed to use all native materials. He said there would be some mown grass
around the building, then prairie grasses to blend with the surroundings. Shelter belts on two sides offer
windbreaks and screening. He said that evergreens on the south side will do the same.
Administrator Rafferty introduced the water tower project, and its history.
Tom Prew, City Engineer
Mr. Prew said that water system improvements have been reviewed for several years. In 2000, a water
plan said the City needed another well, and additional elevated water storage to replace the existing
75,000 gallon Old Village tower at a location better suited to the expanded service area of the system.
He then reminded the Commission of the limited service area of the Oakdale Water Service Agreement,
and that the agreement with Oakdale will be expiring soon. He said that the water service plan that has
been prepared brings the Oakdale -served and Old Village systems together as a single Lake Elmo system.
He reported that the City -owned land adjacent to Sunfish Park meets the criteria of distance from the two
Old Village System wells, and a storage tank at that location offers enough height and pressure to service
customers in the Lake Jane area together with the entire present Old Village System all the way to
Carriage Station. He noted that the timing for the water storage project is ideal now, with Tapestry going
in. He said they selected the back corner of the City -owned property to get as far from existing
neighborhoods as possible.
The Administrator said the rationale for the variance to allow the standing seam metal siding on the
Public Works/Parks Maintenance Building is to provide rural character to the structure in that type of
setting. He noted that concrete panels would not look appropriate in that setting; and that Staff had
visited a number of similar facilities in other cities to review the finished products. He noted that some of
those facilities were built in or adjacent to a park.
Commissioner Schneider said a letter from Park Commission Chairman Bob Schumacher indicated the
Parks Commission saw this application but there is no feedback in the packet.
Commissioner Roth asked how far the water can travel with acceptable pressure.
Engineer Prew said it depends on topography because not lateral distance but height of the storage facility
is critical. He said the reason to use gravity elevated storage is to minimize stops and starts on the pumps
thereby extending the pump life. The City also requires a reserve of water to fight fires.
Commissioner Schneider asked how about Well #3 figures into the water system equation
The Engineer said Well #3 is part of another separate water system. As development occurs south, the
City will need to bring up Well #3 and another water tower
Commissioner Schneider asked if the City can get by without a new water storage tower.
Engineer Prew said the system continues to work without it but the City does not have the fire protection
it should, and wells will wear out faster. He noted that some fires in recent years emptied the tower in the
Old Village. He said that TKDA recommended the correct size and location of water storage for the
Lake Elmo Planning Commission Meeting Minutes of March 14, 2005 2
4DED/APPROVED: 4/11/05
community. He advised that a well and tower should not be located next to each other. The facilities
are situated better across town from each other to equalize pressure with no separate mains, just looped.
Commissioner Schneider asked if this is the only place the city can put a water tower.
The Engineer explained it was sited near population and where growth is going to be, but there could be
other sites, which would add expense to the project.
THE CHAIR OPENED THE PUBLIC HEARING AT 7:45 PM
Ed Nielsen
He said the Council did not know about contracts made to people whose land was purchased in this
location many years ago. He and Lloyd Shervhein went to farmer's homes asking for land for parks
purposes, and they could have provided the information. The reason for urgency was that developers
wanted the land. He said a covenant was made between Lehart Friedrich and the Council that the land
would be used for parks purposes. Years later another council came to Lehart for more land for a
maintenance building. He said no he did not want a maintenance building on his property. Mr. Nielsen
displayed some historic promotional materials. He said there were covenants between the citizens and the
Friedrichs. He said the Council wanted to use Lions Park for a village office and the people spoke to
prevent it. He stated that Sunfish Lake Park is our most beautiful park, and we build these facility
structures for development.
Mr. Nielsen asked the Planner where the information came from for the staff report regarding the farming
of this site. He said that Lehart paid the City for farming rights every year and the money came into the
Parks Commission every year. He said a land trust should be generated to protect these parks from
invasion. The current staff and council did not know the history of these agreements.
Mr. Nielsen displayed a letter from David Steele of the Parks Commission. Mr. Nielsen said the landfill
still has twenty acres to put the maintenance building upon; and there is more land there too. He
suggested alternative locations such as the north portion of Lake Elmo Parks Reserve.
Dave Morgan, Former Parks Commissioner
Mr. Morgan said that people gave their land, some unwillingly, to create the Park. He said the council's
number one responsibility is to people who are here, not those coming. He said the landfill shows 110
acres, yet only 10 are filled.
Merle Olson
Mr. Olson said he is the son-in-law of Lehart Friedrich. He said a covenant was made between the family
and city and citizens of Lake Elmo. The land was sold at reduced value for a park only. He would not
have sold it for a water tower and public works. When asked to sell land for a public works facility,
Lehart said he would not do so. He said the park property is valuable for our citizens for the future.
David Steele, Parks Commissioner
Dr. Steele said it is a very important decision to take several acres of one of the parks, chewing it off for
other purposes, and it sets a dangerous precedent. On February 22, the application was brought to the
Parks Commission for the first time. He was not in attendance but his understanding was it was a brief
discussion. The Parks Commission did not have background, information, and knowledge. He said he
does not feel they have that yet.
Jim Blackford
Mr. Blackford said the central core question is "What do we stand for?" He said he is not against the
water facility or a public works facility. He said the city was well-intentioned. He said the citizens of
Lake Elmo want to keep open spaces and control development. He said Sunfish Lake Park is Lake
Elmo's gem of parks, and the City wants to stick a water tower right in the middle of it. He said that is
inconsistent to what we believe in. He said there are other good places for locating water towers. There
Lake Elmo Planning Commission Meeting Minutes of March 14, 2005 3
dDED/APPROVED: 4/11/05
are better places in commercial areas. He suggested the commercial zone off 39th Street is close to the
proposed water line; and that there are many sites on Highway 5 and Ideal Avenue which is highest part
of the city in elevation. He said a water tower belongs along the gateway to the city along commercial,
highway, or railroad tracks. He said the plan should not only be stopped but repudiated. He said he
would like to see permanent protection for our parks.
Dick Hedquist, 3440 Kelvin
Mr. Hedquist said he has lived here 35 years. He saw buffalo on Lehart's farm. This is a growing
community, if this is all we have for a park then we should keep the park. Towers can be placed
anywhere we have the elevation.
Rosalie Wahl
Ms. Wahl said she has resided for 50 years on 47th Street North. Her two concerns are the near -sanctity of
park land, and are we keeping our promises made. Park land should remain so in perpetuity with
permanent protection. She suggested placing the park in a land trust.
Judith Blackford
Ms. Blackford said she spoke to the Parks Chairman who said he read it in the paper, and nobody had
notified him. She said morality and ethics go in perpetuity just like the land that was given us. She said
she gets enjoyment seeing deer being fed on those acres. She said the residents care about this park.
Chuck Harstad
Mr. Harstad said that Lehart was proud of the land he dedicated. He asked if the city has looked at all the
options, and have they been evaluated. He said this is an integrity issue if a governing body cannot keep
promises made. He asked the commission to look at the integrity issue and other options for alternative
locations.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 8:26 P.M.
Commissioner Ptacek questioned whether the bond issue had specific verbiage regarding exclusive use of
the land purchased for parks.
The Administrator said the City's legal counsel will make a presentation tomorrow. There are no legal
covenants or restrictions to the City. There was purchase agreement language referring to park use but
that language did not go into the final sale documents. As far as alternate sites for the tower, he said
several sites were looked at.
Commissioner Sedro asked if the City had looked at the landfill site. She said a public works facility is
there now and there are no covenants.
The Planner said the landfill is still controlled by MPCA easements, regardless of ownership. MPCA can
still evict the City's present Public Works building should methane be detected there.
Commissioner Fliflet asked if there were compelling reasons why the facilities could not go somewhere
else.
Administrator Rafferty said that the two facilities can be addressed separately. The staff and engineer
analyzed all other areas. This site was the fourth or fifth analyzed, and based upon sustaining,
investment, and a balance, this is the best location as it pertains to the water system and the tower. The
engineer would have to analyze hydraulic flows to determine if another site would lend itself to it. He
said there is concern about methane on the landfill site, and how it might infiltrate into the tower and
build up. He emphasized he was not concerned about water quality issues but tower issues. He said the
original house on the site south of the landfill fence was acquired by outside agencies. He said there were
several confidential sites reviewed prior to selecting the subject site for the Public Works/Parks facility.
Lake Elmo Planning Commission Meeting Minutes of March 14, 2005 4
A4, ADED/APPROVED: 4/11/05
Commissioner Deziel said variance findings the City must meet regarding the exterior surfacing of the
maintenance facility are: 1.) reasonable use, 2.) plight due to property not self-created, and 3.) would not
change essential character of the neighborhood. Number 2 may be created by the City. He said the City
makes the code and we should meet the code. While he is not opposed to it, we expect others to build to
meet the code. If the law is the law for all we should obey our own laws.
Commissioner Schneider said bonds have been sold for the maintenance facility . He asked if now it will
cost additional funds for land purchase should the Sunfish site not be used. Does relocation add a large
cost to the project?
The Planner said relocation adds large cost to the project.
M/S, Ptacek, to recommend no action on the conditional use permit to construct a public works facility
and a water storage facility on city -owned land in Sunfish Lake Park. FAILED FOR LACK OF A
SECOND.
Chairman Armstrong said he firmly believes there are no legal restrictions to using this City -owned land
for public works/parks and a water storage facility, and while he is firmly convinced the city has a moral
obligation to uphold, Staff has done the best they could. The City desperately needs a public
works/parks facility and a water storage facility.
M/S/P, Armstrong/Schneider, to recommend denial of the application for a conditional use permit to
construct a public works facility and a water storage facility on City -owned land adjacent to Sunfish Lake
Park, or in the alternative, to recommend that the City Council withdraw the applications based upon the
Findings that park land should not be utilized for more intense uses.
Commissioner Armstrong said residents are strongly opposed to allowing parks facilities to be used for a
water tower and a garage. He said it was unfortunate that the agreements did not survive into the deeds.
He recommended that the Facilities Committee be reinstated because they made progress finding sites for
a new city hall.
Commissioner Deziel said he thought the motion was appropriate. The commission does not know
enough and might need more education. He said we need more public input at an earlier point in the
process. He said the Parks commission knew of this application late in the process.
Commissioner Fliflet said the problem seems to be more with the site than with a variance or conditional
use permit.
Commissioner Lyzenga said the city can expect this type of conflict to become more common as we
move into the future. We will look at this more often - balancing the concerns of long-term residents with
new residents. The City has to build a water tower and put out fires. She said that the cheapest solution
may not be the best solution, and we may have to dig into our pockets to hang onto our values.
VOTE: 8:0:1 Abstain: Helwig - for reasons of potential conflict of interest.
THE CHAIRMAN RECESSED AT 8:49 P.M.
THE CHAIR RECONVENED AT 9:04 P.M.
PUBLIC HEARING: Zoning Text Amendment — To allow Home Occupations in RR
COMMISSIONER SESSING EXCUSED HIMSELF AND STEPPED DOWN FROM THE TABLE.
The Planner explained that Home Occupations are allowed in all residential districts but are not
mentioned in the RR Zone. He reported that the City Attorney researched the zoning ordinance into the
1970's, and found that Home Occupations were never included in the RR Zone. He also reported that the
Planner researched any amendments and found none whether recommending removal of Home
Lake Elmo Planning Commission Meeting Minutes of March 14, 2005 5
AIL.1DED/APPROVED: 4/11/05
Occupations from RR or inclusion of it. The Planner provided code language for the inclusion of Home
Occupations in the RR portion of the zoning code.
THE CHAIRMAN OPENED THE PUBLIC HEARNG AT 9:08 P.M.
AT 9:09 P.M., THE CHAIRMAN CLOSED THE PUBLIC HEARING AFTER HEARING NO
COMMENTS.
M/S/P, Ptacek/Sedro, to recommend approval of a zoning text amendment for Section 300.07 4.b.2, to
allow Home Occupations in the RR Zoning District.
Commissioner Ptacek said the matter was simple housekeeping.
VOTE: 9:0.
COMMISSIONER SESSING RETURNED TO THE TABLE.
PUBLIC HEARING: CIP 2005-2009 AMENDMENT
The Planner introduced the City's application to amend the CIP 2005-09. He advised that an amendment
to the CIP is an amendment to the Comprehensive Plan. He said the section proposed for is the street
construction/reconstruction section is the Infrastructure Reserve Fund. He reported that the City
Engineer has sampled the Hilltop sub grade, and has determined it was not as bad as presumed. Instead
of total reconstruction of Hilltop the City Engineer now recommends a less costly mill and resurface
project. The Planner said that finding will free some street funds in 2006 to undertake deferred overlay
projects in 2006
Commissioner Fliflet said it appears the cost has gone up for those overlays about $18,000.
The Planner said that cost has gone up
THE CHAIRMAN OPENED THE PUBLIC HEARING AT 9:16 P.M.
NO SPEAKER CAME FORWARD, AND THE CHAIRMAN CLOSED THE PUBLIC HEARING AT
9:17 P.M.
M/S/P, Ptacek/Sessing, to recommend approval of an amendment to the Capital Improvement Program
2005-09, Infrastructure Reserve Fund to add 2007 street overlays to the 2006 program, and amend the
Hilltop project from reconstruction to overlay. VOTE: 9:0.
PUBLIC HEARING: Variance — Visible Roofing Materials — Village North Office Park
The Planner reminded the Commission of the application by Mike Lynskey for a site plan and minor
subdivision for an office building. The Planning Commission had previously recommended denial. He
advised the Commission that the applicant has waived the 60 day review period, and has requested going
forward with the variance to allow asphalt roofing.
Commissioner Deziel said the proposed roofing materials are a reasonable use of the property.
Tracy Gallowitz
She said the partnership is excited to have an office building in the Old Village. They tailored their
architecture after the bank and the Carriage Station dental office. She said it looks professional, and it
may eventually become part of a PUD application. She said that asphalt shingles will tie in with what is
already in the city. She said all the commercial buildings in the area have asphalt shingle except for
Leslie's. She said the metal seam roof will not look like what they are trying to achieve. She requested
the commission reconsider the entire application package together with the roofing variance.,
Lake Elmo Planning Commission Meeting Minutes of March 14, 2005 6
AN,_.JDED/APPROVED: 4/11/05
Mike Diem, Architectural Network
Mr. Diem said Arch Net has their office in the Carriage Station Professional Park. He said they listened
carefully to what Lake Elmo wants. They designed all four of those buildings in Carriage Station.; He
displayed a photo of one of those office buildings. He said the Carriage Station buildings were designed
with asphalt shingle before the code was changed. They could do it with standing seam but it would be a
challenge, and asphalt shingle will be a smoother transition with the residential community planned north
of the site. He said that a low slope roof with complex hips and valleys lend itself to asphalt shingles.
Tim Freeman, Land Surveyor and Planner, FFE
Mr. Freeman reminded the commission that the last time this application was before them, the motion for
denial of the subdivision was because of the variance. He said that the variance is part of the site plan.
The applicant will build a septic system. He asked that the commission approve the minor subdivision
and site plan/variance so the applicant can move forward with the project.
THE CHAIRMAN OPENED THE PUBLIC HEARING AT 9:33 P.M.
NO SPEAKER CAME FORWARD, AND THE CHAIRMAN CLOSED THE PUBLIC HEARING AT
9:34 P.M.
Commissioner Sedro suggested looking at visible roofing materials standards in these zones on a future
agenda after the comp plan work.
Commissioner Ptacek said the key to the issue is roofing materials and the essential character of a
neighborhood. The Council previously approved PUDs on Highway 5 and Carriage Station. While a
precedent is established, we don't want to let down our guard for the southern gateway to the City either.
There are some very specific materials required in Eagle Point Business Park because of that gateway,
which he said he considers less important here.
Commissioner Deziel said the variance requested is more in line of character of the neighborhood. All
asphalt roofs there except for one, which is a major aspect of the neighborhood.
Commissioner Sedro said if there is no need to allow asphalt shingles and there is no hardship. She would
vote against it until we change the code.
M/S/F, Deziel/Helwig, to recommend approval of a variance to allow high grade architectural asphalt
shingles rather than other materials allowed by code on a roof in Village North Office Park based upon
the Findings that this is a reasonable use, it is not the cause of the property owner, and it will not change
the character of the neighborhood but actually be more in compliance with it.
Commissioner Deziel said the main problem is our own code. This is third time we have come upon one
of these, and he has heard no good logical reason yet to disallow asphalt shingles.
Commissioner Roth said this situation puts the Commission in a difficult position to follow interpretation
of the rules and code. He suggested staff bring visible roofmg materials to the table sooner than before
the Comprehensive Plan work is completed rather than later.
Chairman Helwig agreed.
VOTE: 4:5, Roth, Sessing, Sedro, Schneider, Armstrong.
Commissioner Deziel asked for a date to review visible roofing materials. He would like staff to bring it
to Public Hearing on April 11, 2005.
Chairman Helwig agreed there have been too many variances.
Lake Elmo Planning Commission Meeting Minutes of March 14, 2005 7
AILADED/APPROVED: 4/11/05
Tim Freeman
Mr. Freeman said the Minor Subdivision is a separate issue. Planning Commission could make a
conditional approval so project can move forward for funding.
M/S/P, Armstrong/Roth, to recommend approval of a Minor Subdivision and Site Plan for the Lake Elmo
Business Park with the conditions that the applicant installs a septic system and subject to only permitted
roofing materials. Vote: 9:0.
Minor Subdivision: 9057 Lake Jane Trail - Olinger
The Planner explained that this request for a minor subdivision follows a rezoning and comprehensive
plan amendment from 2004. The applicant proposes to divide a parcel for their daughter and a second
parcel for a neighbor to have water access. In the event the neighbor does not purchase that parcel, it will
be reserved for recreational use for the future development on the larger parent parcel, and covenants will
be drafted to prevent the parcel from ever becoming buildable.
Commissioner Sedro noted that in the staff report a typo indicates a no -build covenant for Parcel C not B.
Tim Freeman
He said the minor subdivision is consistent with what was presented in 2004. He said the application
meets code and DNR requirements in every respect.
M/S/P, Ptacek/Sessing, to recommend approval of a minor subdivision of property at 9057 Lake Jane
Trail subject to the condition that the city attorney approve covenant language on the title of Parcel C
prohibiting the construction of a structure on that lot. VOTE: 9:0.
City Council Update
The Planner updated the commission about the previous Council meeting.
Comprehensive Plan Modifications
Policy
The Planner distributed copies of his latest edits and drafts and a table for staging to the commission. The
Planner announced that he has changed the Public Hearing date to April 4.
The Planner said staging is important in an urbanizing situation with introduction of sewer, since the City
must provide staffing, infrastructure, and services. Most communities that have urbanization in the future
have a staging plan.
The Planner explained the tables for staging options.
Scenario No. 1 heavily back loads the growth at the minimum pace prescribed by the MOU.
Scenario No. 2 also backloads, but to a lesser degree than #1
Scenario No. 3 attempts to distribute the growth relatively evenly over the 30 year period.
Scenario No. 4 front loads to accommodate the fiscal aspects of City infrastructure costs —
particularly water.
The Planner said staging can be done by building permits per year, an infrastructure control ordinance,
limiting lots platted or permits issued to slow installation of infrastructure.
Administrator Rafferty said the number of units south and north of 10th Street is dividing the allocation
annually as well. We have serious concerns making sure we are not in financial jeopardy. He said that
needs to be considered for a front load scenario.
Administrator Rafferty said the entire water system south and north must be constructed from water
connection fees and revenues in the enterprise fund, or the General Fund becomes obligated. He said if
we want development in the Old Village and to make it a commercial center, it gets harder if not
Lake Elmo Planning Commission Meeting Minutes of March 14, 2005 8
A6, ,DED/APPROVED: 4/11/05
recognized as a center early on.
The Planner said he hoped to present some very detailed Land Use Mapping, but we just don't have the
time to do it. He said the rush is to get something in to Met Council that meets desires, if not the detail
we prefer at this time.
Commissioner Lyzenga asked for a recap on funding options for municipal services. She would like a
review of bonding, tax levies, etc., because we are getting to the point of conflicting fiscal and
philosophical paths, and she needs the education on how City can pay for these things.
Administrator Rafferty said the City must build, balance, and pay for a system without burdening the
taxpayers.
Commissioner Roth asked if the land use mapping can have enough detail so existing residents can
understand the plan over twenty-five years and broader strokes where there are no existing residents yet.
He said he would like to see some level of detail around public services as well. Water, sewer, police,
fire, parks, etc.
The Planner said that after Land Use comes System Plans. TKDA will do a good deal of that for the City,
but can not proceed without knowing the future land use assumptions..
Commissioner Deziel asked if graduated density bands will be in the mapping.
Commissioner Schneider said we should not front load development . He asked how long before we get
paid back for water put in today.
The Planner said it takes one year to build a tower; and water elevation and a well house and water lines
are required before development can proceed.
Mayor Johnston said the commission should think about senior housing to include in the plan. That
requires a fair bit of development frontloading. With a care facility with comprehensive care, you cannot
give it 10 units per month. We cannot build a quality senior facility if it is completely back loaded.
Commissioner Fliflet said that no matter what staging we decide, even back loading does not preclude for
a senior facility to be built much earlier.
The Planner said it is also not right to make someone wait for 1,000 units.
Commissioner Lyzenga asked if we would be throwing a party where nobody comes by frontloading the
development pace.
The Planner said developers are here now.
Commissioner Ptacek asked for input from the table of numbers from the City Council.
Adjourn at 10:45 p.m.
Respectfully submitted,
Kimberly Schaffel
Recording Secretary
Lake Elmo Planning Commission Meeting Minutes of March 14, 2005 9