HomeMy WebLinkAbout2020-2024 DRAFT for PCCity of Lake Elmo Capital Improvement Program 2020 – 2024 Planning Commission Draft 11/13/19 1 TABLE OF CONTENTS Introduction What is a CIP? .................................................................................................................3 Scope of the Draft CIP .....................................................................................................3 Funding Sources...............................................................................................................4 Project Priorities...............................................................................................................5 2020-2024 CIP Overview Street Projects ..................................................................................................................6 Project Highlights by Department ...................................................................................6 CIP Reports (Appendix) Projects Listings………………………………………………………………………..10 Projects by Year & Priority ..…………………………………………………………..13 Funding Source Summary……………………………………………………………...16 Projects by Funding Source 2020-2024 ……………………………………………….17 Projects by Funding Source 2020-2029 ……………………………………………….20 Projects & Funding Sources by Department…………………………………………...25 Project Detail……………………………….…………………………………………..29 2 INTRODUCTION What is a CIP? A Capital Improvement Program, or CIP, is a multi-year (typically 5 years) capital expenditure plan for a city’s infrastructure (such as streets, parks and utility systems), vehicles, equipment and public buildings. It identifies the major projects needed and desired by the community, their potential costs and how they would be financed. Including a project in a CIP does not commit the city to that project. The City Council must specifically authorize each one, and the associated funding, before any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the budgeting process), projects may go forward as planned, advance ahead of schedule, be removed entirely, or new projects may be added, depending upon changes in circumstances and priorities. The Minnesota Land Planning Act requires that the implementation plan portion of the Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water supply, parks and open space) for a five-year time period. Cities often expand the scope of their CIPs to include other capital needs (major equipment replacements, for example) and sometimes look beyond the five-year time period, up to 20 years in the future for some projects. Such projects represent more of a “wish-list” that can be evaluated each time the plan is updated. As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter 473.865 provides that “a local governmental unit shall not adopt any official control or fiscal device which is in conflict with its comprehensive plan.” A fiscal device includes a budget or bond issue; so it is important that the plan and CIP be kept-up-to date and in sync with city budgets. The primary benefit of a CIP is as a financial planning tool to help the city plan for the impact of capital needs on future budgets and property taxes, and to help forecast the need for borrowing to undertake major projects. The information developed as part of the capital planning process can help document the need for various projects and assist the City Council to sort out competing priorities. Scope of the CIP Lake Elmo’s CIP includes all capital projects that cost at least $25,000 and have a useful life span of five years or longer. Projects include all capital needs including major repairs to buildings and equipment purchases and replacements. Any projects not meeting these parameters would be reviewed as part of the annual operating budget, but would not be included in the CIP. 3 Funding Sources The CIP identifies a possible funding source(s) for each project listed. The various funding sources are as follows: Debt Service Fund Projects financed by borrowing, later to be repaid with property taxes, and potentially special assessments depending upon the characteristics of the project. General Fund Annual operating budget, primarily funded by property tax revenues. Park Improvement Fund Existing City fund, receipts from cash-in-lieu of land park dedication fees paid by developers and others who subdivide their land. Stormwater Fund Funds come from fees paid by users of the Stormwater system Wastewater Fund Funds come from fees paid by users of the Wastewater System Vehicle Replacement Fund Fund used to segregate funds set aside for planned replacements of existing vehicles. Funds are transferred from the operating budget (primarily property taxes) and the sale of equipment. Water Fund Municipal State Aid (MSA) Funds come from fees paid by users of the Water System State aid funds allocated to the City each year; annual allocation grows as the City grows. In addition to these sources, it is possible that future projects could be funded from donations, grants, user fees or other sources not listed. In 2019 the Vehicle Replacement Fund was revived. The expected fund balance at 12/31/19 is estimated to be about $215,000. The updated proposed schedule of revenues and expenditures assumes the 2% increase in the tax rate each year continues. 4 Revenue from the sale of equipment is not included in the above table. Project Priorities Capital improvement projects should be prioritized in some way so that limited funding can be allocated to those which are most important. This is difficult because the varying nature of the projects and their benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may have some disadvantages because they may give a false sense of objectivity or precision to the priority setting process. Others use simpler systems, or simply do not try to compare projects that are like “apples and oranges.” There is no accepted system or “industry standard” for prioritizing projects. The following system has been utilized by staff: 1 Critical or urgent, high-priority projects that should be done if at all possible; a special effort should be made to find sufficient funding for all of the projects in this group. 2 Very important, high-priority projects that should be done as funding becomes available. 3 Important and worthwhile projects to be considered if funding is available; may be deferred to a subsequent year. 4 Less important, low-priority projects; desirable but not essential. 5 Future Consideration 2020-2024 CIP OVERVIEW For 2020 through 2024, the draft CIP includes 72 separate projects (active, pending and new recommendations) with a total estimated cost of $60,741,401. All cost estimates are preliminary and based on current dollars. No assumptions have been made about inflation. It will be Year Revenue Expense Balance 2020 $872,139 $298,500 $788,715 2021 $794,679 $310,000 $1,273,394 2022 $150,000 $972,500 $450,894 2023 $175,000 $289,000 $336,894 2024 $200,000 $209,000 $327,894 2025 $387,300 $55,000 $660,194 2026 $424,500 $35,000 $1,049,694 2027 $635,290 $1,028,500 $656,484 2028 $1,010,030 $0 $1,666,514 2029 $531,000 $230,000 $1,967,514 5 important to refine and update costs when the plan is reviewed, especially for projects in the first year or two of the plan. Some projects beyond the five-year planning period are also included in the CIP. Most of these projects are replacements for equipment and vehicles (such as fire trucks) which may have a life span of 10, 15 or 20 years and more. The plan may include “pending” projects for which timelines (and in most cases, cost estimates) have not yet been identified. As more information is developed about the need for, cost, and possible funding sources for these projects, they will be included in future CIP updates. Street Projects The update includes the following street projects in the CIP: •PW-026, Reclaim roads in Heritage Farms at a cost of $1,774,000 in 2020. State grant will cover cost of roads in Stonegate 2nd since it is tied to a water project. •PW-027, Reconstruction of roads in Tamarack Farms, and Hamlet on Sunfish Lake and Old Village Phase 5 for $2,864,00 in 2021. •PW-030, CSAH 15/30th St Signal for $250,000 in 2023 •PW-031, CSAH6/Inwood Street Signal for $250,000 in 2024 •PW-034, 15th St N (MSA Street) for $1,045,000 moved to 2022 from 2020 •PW-035, UP RR Crossing-Village Parkway for $525,000 moved to 2021 from 2020 •PW-036, UP RR Crossing-Private Drive Closure for $105,000 moved to 2021 from 2020 •PW-037, UP RR Crossing-Klondike Ave for $262,500 moved to 2021 from 2020 •PW-038, Reclaim roads in Fields of St. Croix 1 and 2 and Old Village Phase 6 streets, $3,045,000 in 2022 •PW-039, Reclaim roads in Parkview Estates, Cardinal Ridge, Torres Pines, Beaut Crest and Irish Ct and Old Village Phase 7, $2,289,200 in 2023 •PW-040, Reclaim roads in Tana Ridge, Carriage Station, and 59th St Ct/55th St/Julep Way for $1,653,000 in 2024. •PW-052, Ideal Ave (Phase 2) for $800,000 in 2022 •PW-053, Ideal Ave (CSAH 13) from CSAH 14 to CSAH 6, for $800,000 in 2024 •PW-057, Manning Phase 3 for $250,000 in 2021 and $1,400,000 in 2023 •PW-058, TH 36/Manning Interchange for $2 million (very rough estimate) in 2021 •PW-059, Keats Ave/TH 36 Acceleration Lane was removed since we learned we were not awarded a state grant •PW-066, Manning Phase 4 (I-94 up to Oakland Middle School) for $50,000 (planning) in 2024 (new) May not see actual bill from county until construction sometime later. •PW-067, Manning/Hudson Stoplight for $250,000 in 2021 is covered by developer. (new) •PW-069, 5th St/Inwood Ave Signal light for $100,000 in 2020. About 2/3rds of City portion is covered by developers. (new) Project Highlights by Department 6 Administration/Finance: AF-001, New City Hall, Fire Station and Public Works Improvements, is the only request in this department. The project costs have been increased by 3% from the 2018 estimates from Leo A Daly. The project activities would be split over three years 2020-2022 since the last tenant lease expires in June 2022. However, costs are shown as two separate bond issues. Fire: F-010, Replace B1 for $60,000 in 2021. F-011, Engine E1 replacement for $580,000 in 2022 F-017, Turnout Gear Replacements for $60,000 in 2022 F-018 and F-019, Tahoes for Fire Department in 2020 and 2022, are being added back into the CIP. Previous council/committee in 2016 removed them and anticipated them going in operating budget when sales cost were subtracted from new cost the difference was less than $25,000. Staff proposes putting them back in to the CIP since the asset is over $25,000 and to fund them through the Vehicle Replacement Fund. Parks and Recreation: PR-007, Sunfish Lake Park Improvements for $120,000 in 2020 for mountain bike trails and $90,000 in 2021 includes paving hiking trails to meet ADA standards. PR-009, Central Greenway Regional Trail for $50,000 in 2023. This project has been updated to reflect the recent work between the city and county on the Central Greenway Corridor through Lake Elmo. Total project costs are estimated at $12 million. However the trail will be built out in segments over many years depending upon grant funding, development and road work. PR-015, Dump Truck for $90,000 in 2022 PR-017, New or Refurbished Ballfields for $1 million in 2022. PR-018, New Park Development for $150,000 in 2020 (Inwood) PR-019, Dog Park for $25,000 in 2023 PR-020, Utility Vehicle/Trail Groomer for $37,000 in 2024 Public Works: Street Projects were mentioned above The remaining projects are equipment purchases. Costs have been updated to reflect more recent pricing. Only purchase proposed for 2020 is Dump Truck with Plow. Sewer System: S-003, Hamlet on Sunfish Lake Sewer, for $140,000 in 2020 and $60,000 in 2021. This is per an agreement with MPCA The City Engineer has proposed doing S-005, Old Village Sewer Extension Phase Five and S-016 Old Village Phase Six combined over a two year period in 2021 and 2022 S-012, Section 36 Trunk Sewer Oversizing since the Four Corners Development will install it will be about $250,000 in 2021 7 S-013, Sewer Oversizing for $35,000 in 2020 for Legacy and Wildflower S-017, Old Village Sewer Extension Phase Seven for $548,625 in 2023 S-018, Heritage Farms Sewer Extension for $980,000 in 2020 (new) Storm Water System: SW-001, Phase 2 Regional Drainage Improvements for $600,000 in 2022 and $800,000 in 2023. The costs and dates are estimates and will depend upon development. SW-002, Phase 3 Regional Drainage Improvements for $500,000 in 2022. The costs and dates are estimates and will depend upon development. SW-003, Kramer Lake Floodplain Study for $60,000 in 2022 assumes a grant from the watershed district Water System: W-005, Old Village water main Phase Five and Phase 6 (W-025) done combined over two years for revised estimated cost of $626,588 each year in 2021 and 2022 W-006, Elevated Storage Tank #3, for revised estimated costs of $275,000 in 2020 and 3,200,000 in 2021 W-008, Village East Trunk Water main, for $132,000 in 2020 W-010, Paint Water Tower Tank #2 for $800,000 in 2023 W-013, Water main Oversizing for $38,000 in 2020 and $70,000 in 2021 and $119,000 in 2024 W-014, Well & Pump house #5 for $2,510,000 in 2020 W-017, Water Main upgrades and extension consistent with road work. Heritage Farms water main upgrades for $50,000 and Stonegate water extension for $3.63m in 2020 includes funding for water extension to Stonegate from the state. W-018, Water Main extension to Hamlet on Sunfish Lake for $1,702,000 consistent with road work and assuming state grant funds are received. W-019, SCADA System Upgrade for revised estimated costs of $50,000 in 2022 W-022, Utility Truck for $70,000 in 2021 with costs split equally amongst water and sewer W-023, Water Meter Change out for revised cost of $50,000 each year in 2019-2022 W-024, Automated Radio Read System for $300,000 in 2022 W-026, Old Village water extension Phase Seven for revised cost estimate of $265,650 in 2023 W-027, Pressure Reduction Station-Connection to WT #3 for revised cost estimate of $132,000 in 2021 W-028, Blackford Water Extension for $37,000 in 2020 assumes state funding W-029, 31st St Water Extension for $459,000 in 2020 assume state funding W-030, Water Main extension to Parkview Estates, Cardinal Ridge, Torres Pines, and Irish Ct consistent with road work and assumes state grants for $4,039,200 in 2023 W-031, water main upgrades in Fields of St Croix 2 consistent with road work for $50,000 8  W-032, water main upgrades in Tana Ridge and Carriage Station consistent with road work for $100,000 in 2024 9 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota PROJECT LISTING20202024thru Includes Projects from All Years Admin/Finance Department Status Project #Project Name New City Hall, Fire Station, PW ImprovementsActiveAF-001 Building Department Status Project #Project Name Replacement Inspection TruckActiveB-001 Fire Department Status Project #Project Name Replacement of Parking Lot at Station #2PendingF-005 Rescue Engine E2ActiveF-001 Tender 1ActiveF-004 SCBA ReplacementsActiveF-007 B 1ActiveF-010 E1 EngineActiveF-011 B 2ActiveF-012 T2 Tender/EngineActiveF-013 Boat and TrailerActiveF-014 RangerActiveF-015 L1 Ladder TruckActiveF-016 Turnout Gear ReplacementsActiveF-017 CV 1 (Tahoe)New Recommendation F-018 CV 2 (Tahoe)New Recommendation F-019 Parks and Recreation Status Project #Project Name 50th Street TrailPendingPR-002 Demontreville Park ImprovementsPendingPR-003 Pebble Park ImprovementsActivePR-005 Sunfish Lake Park ImprovementsActivePR-007 Central Greenway Regional TrailActivePR-009 Dump TruckActivePR-015 New or Refurbished BallfieldsActivePR-017 New Park DevelopmentActivePR-018 Dog ParkActivePR-019 Utility Vehicile/Trail GroomerActivePR-020 Public Works Department Status Project #Project Name 2019 Street ImprovementsPendingPW-013 Keats Ave/TH 36 Acceleration LanePendingPW-059 LoaderActivePW-004 TractorActivePW-006 Lake Elmo Ave at 5th St Turn LaneActivePW-010 PickupTruck / plowActivePW-019 Vac TrailerActivePW-023 2020 Street ImprovementsActivePW-026 2021 Street ImprovementsActivePW-027 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 10 CSAH19/Hudson Blvd Signal & Turn LaneActivePW-029 CSAH 15/30th Street SignalActivePW-030 CSAH 6/Inwood SignalActivePW-031 15th Street North (MSA Street)Active PW-034 UP RR Crossing - Village ParkwayActivePW-035 UP RR Crossing - Private Drive ClosureActivePW-036 UP RR Crossing: Klondike AveActivePW-037 2022 Street ImprovementsActivePW-038 2023 Street ImprovementsActivePW-039 2024 Street ImprovementsActivePW-040 2025 Street IrmprovementsActivePW-041 2026 Street ImprovementsActivePW-042 Service TruckActivePW-043 Trac HoeActivePW-044 Tandem Plow TruckActivePW-045 Dump Truck w/PlowActivePW-047 Mini LoaderActivePW-048 Asphalt Hot BoxActivePW-049 Dump Truck with PlowActivePW-050 Ideal Ave (CSAH 13) Phase 2ActivePW-052 Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6ActivePW-053 SkidloaderActivePW-054 2027 Street ImprovementsActivePW-055 2028 Street ImprovementsActivePW-056 Manning Ave Phase 3ActivePW-057 TH 36/Manning InterchangeActivePW-058 Pickup w/plowActivePW-060 PickupActivePW-061 DumpTruck w/plow, sander & underbodyActivePW-062 Pickup w/lift gate & plowActivePW-063 Pickup w/lift gate & plowActivePW-064 Dump Truck w/plow, sander & underbodyActivePW-065 Manning Phase 4New Recommendation PW-066 Manning/Hudson StoplightNew Recommendation PW-067 2029 Steet ImprovementsNew Recommendation PW-068 5th St./Inwood Ave Signal LightNew Recommendation PW-069 Sewer Department Status Project #Project Name Hamlet on Sunfish Lake Sewer ExtensionActiveS-003 Old Village Sewer Extension Phase 5 & 6ActiveS-005 Section 36 Trunk Sewer Main OversizingActiveS-012 Sewer OversizingActiveS-013 Old Village Sewer Extension Phase 5 & 6ActiveS-016 Old Village Sewer Extension Phase 7ActiveS-017 Heritage Farms Sewer ExtensionNew Recommendation S-18 Storm Water Department Status Project #Project Name Phase 2 Regional Drainage ImprovementsActiveSW-001 Phase 3 Regional Drainage ImprovementsActiveSW-002 Kramer Lake Floodplain StudyActiveSW-003 Surface Water Management Plan (Comp Plan) updateActiveSW-004 Water Department Status Project #Project Name 2019 Street Improvement Project - water componentPendingW-001 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 11 OV Sewer Extension; Phase 5&6; water componentActiveW-005 Elevated Storage Tank #3ActiveW-006 Hammes Estates 12" bypassActiveW-007 Village East Trunk Watermain PRVActiveW-008 Paint Water Tank at PWActiveW-010 Well #4 Pump - Pull and RebuildActiveW-012 Watermain OversizingActiveW-013 Well & Pumphouse #5ActiveW-014 2020 Street & Utility Improvements-WaterActiveW-017 2021 Street & Utility Improvements-WaterActiveW-018 SCADA UpgradeActiveW-019 Utility TruckActiveW-022 Water Meter Change OutActiveW-023 Automated Radio Read SystemActiveW-024 OV sewer extension phase 6 & 5; water componentActiveW-025 OV sewer extension Phase 7; water componentActiveW-026 Pressure Reduction Station-Connection to WT #3ActiveW-027 Blackford Water ExtActiveW-028 31st St Area Water ExtensionActiveW-029 2023 Street Projects-water componentActiveW-030 2022 Street Projects-water componentActiveW-031 2024 Street Projects-water componentActiveW-032 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 12 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota PROJECTS BY YEAR & PRIORITY 2020 2024thru Project Name Department Project #Priority Project Cost 2020 Priority 1 Critical PW-047Dump Truck w/Plow 1 250,000Public Works Department PW-0695th St./Inwood Ave Signal Light 1 100,000Public Works Department W-006Elevated Storage Tank #3 1 275,000Water Department W-014Well & Pumphouse #5 1 2,510,000Water Department W-023Water Meter Change Out 1 50,000Water Department 3,185,000Total for: Priority 1 Priority 2 Very Important AF-001New City Hall, Fire Station, PW Improvements 2 1,287,500Admin/Finance Department W-008Village East Trunk Watermain PRV 2 132,000Water Department W-028Blackford Water Ext 2 37,000Water Department W-02931st St Area Water Extension 2 459,000Water Department 1,915,500Total for: Priority 2 Priority 3 Important F-018CV 1 (Tahoe)3 48,500Fire Department PR-007Sunfish Lake Park Improvements 3 120,000Parks and Recreation PW-0262020 Street Improvements 3 2,574,000Public Works Department S-003Hamlet on Sunfish Lake Sewer Extension 3 140,000Sewer Department S-013Sewer Oversizing 3 35,000Sewer Department S-18Heritage Farms Sewer Extension 3 980,000Sewer Department W-013Watermain Oversizing 3 38,000Water Department W-0172020 Street & Utility Improvements-Water 3 3,680,000Water Department W-022Utility Truck 3 70,000Water Department 7,685,500Total for: Priority 3 Priority 4 Less Important PR-018New Park Development 4 150,000Parks and Recreation 150,000Total for: Priority 4 12,936,000Total for 2020 2021 Priority 1 Critical W-006Elevated Storage Tank #3 1 3,200,000Water Department W-023Water Meter Change Out 1 50,000Water Department 3,250,000Total for: Priority 1 Priority 2 Very Important AF-001New City Hall, Fire Station, PW Improvements 2 4,609,250Admin/Finance Department PW-006Tractor 2 130,000Public Works Department PW-035UP RR Crossing - Village Parkway 2 525,000Public Works Department Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 13 Project Name Department Project #Priority Project Cost PW-036UP RR Crossing - Private Drive Closure 2 105,000Public Works Department PW-037UP RR Crossing: Klondike Ave 2 262,500Public Works Department PW-048Mini Loader 2 120,000Public Works Department PW-058TH 36/Manning Interchange 2 2,000,000Public Works Department PW-067Manning/Hudson Stoplight 2 250,000Public Works Department 8,001,750Total for: Priority 2 Priority 3 Important F-010B 1 3 60,000Fire Department PR-007Sunfish Lake Park Improvements 3 90,000Parks and Recreation PW-0272021 Street Improvements 3 2,864,000Public Works Department PW-057Manning Ave Phase 3 3 250,000Public Works Department S-003Hamlet on Sunfish Lake Sewer Extension 3 60,000Sewer Department S-005Old Village Sewer Extension Phase 5 & 6 3 929,775Sewer Department S-012Section 36 Trunk Sewer Main Oversizing 3 250,000Sewer Department W-005OV Sewer Extension; Phase 5&6; water component 3 626,588Water Department W-013Watermain Oversizing 3 70,000Water Department W-0182021 Street & Utility Improvements-Water 3 1,702,000Water Department W-027Pressure Reduction Station-Connection to WT #3 3 132,000Water Department 7,034,363Total for: Priority 3 Priority 4 Less Important PW-049Asphalt Hot Box 4 60,000Public Works Department 60,000Total for: Priority 4 18,346,113Total for 2021 2022 Priority 1 Critical F-011E1 Engine 1 580,000Fire Department F-017Turnout Gear Replacements 1 60,000Fire Department PR-017New or Refurbished Ballfields 1 1,000,000Parks and Recreation PW-050Dump Truck with Plow 1 250,000Public Works Department W-023Water Meter Change Out 1 50,000Water Department 1,940,000Total for: Priority 1 Priority 2 Very Important AF-001New City Hall, Fire Station, PW Improvements 2 5,381,750Admin/Finance Department W-019SCADA Upgrade 2 50,000Water Department 5,431,750Total for: Priority 2 Priority 3 Important F-019CV 2 (Tahoe)3 52,500Fire Department PR-015Dump Truck 3 90,000Parks and Recreation PW-03415th Street North (MSA Street)3 1,045,000Public Works Department PW-0382022 Street Improvements 3 3,045,000Public Works Department PW-052Ideal Ave (CSAH 13) Phase 2 3 800,000Public Works Department S-016Old Village Sewer Extension Phase 5 & 6 3 929,775Sewer Department SW-001Phase 2 Regional Drainage Improvements 3 600,000Storm Water Department SW-002Phase 3 Regional Drainage Improvements 3 500,000Storm Water Department SW-003Kramer Lake Floodplain Study 3 60,000Storm Water Department W-024Automated Radio Read System 3 300,000Water Department W-025OV sewer extension phase 6 & 5; water component 3 626,588Water Department W-0312022 Street Projects-water component 3 50,000Water Department Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 14 Project Name Department Project #Priority Project Cost 8,098,863Total for: Priority 3 15,470,613Total for 2022 2023 Priority 2 Very Important PW-004Loader 2 185,000Public Works Department PW-044Trac Hoe 2 85,000Public Works Department 270,000Total for: Priority 2 Priority 3 Important PR-009Central Greenway Regional Trail 3 50,000Parks and Recreation PW-030CSAH 15/30th Street Signal 3 250,000Public Works Department PW-0392023 Street Improvements 3 2,289,200Public Works Department PW-054Skidloader 3 70,000Public Works Department PW-057Manning Ave Phase 3 3 1,400,000Public Works Department S-017Old Village Sewer Extension Phase 7 3 548,625Sewer Department SW-001Phase 2 Regional Drainage Improvements 3 800,000Storm Water Department W-026OV sewer extension Phase 7; water component 3 265,650Water Department W-0302023 Street Projects-water component 3 4,039,200Water Department 9,712,675Total for: Priority 3 Priority 4 Less Important PR-019Dog Park 4 25,000Parks and Recreation W-010Paint Water Tank at PW 4 800,000Water Department 825,000Total for: Priority 4 10,807,675Total for 2023 2024 Priority 1 Critical PW-066Manning Phase 4 1 50,000Public Works Department 50,000Total for: Priority 1 Priority 3 Important F-012B 2 3 90,000Fire Department PR-020Utility Vehicile/Trail Groomer 3 37,000Parks and Recreation PW-031CSAH 6/Inwood Signal 3 250,000Public Works Department PW-0402024 Street Improvements 3 1,653,000Public Works Department PW-053Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 3 800,000Public Works Department PW-060Pickup w/plow 3 41,000Public Works Department W-013Watermain Oversizing 3 119,000Water Department W-0322024 Street Projects-water component 3 100,000Water Department 3,090,000Total for: Priority 3 Priority 4 Less Important PW-019PickupTruck / plow 4 41,000Public Works Department 41,000Total for: Priority 4 3,181,000Total for 2024 GRAND TOTAL 60,741,401 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 15 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota FUNDING SOURCE SUMMARY 2020 thru 2024 TotalSource20202021202220232024 Debt Service 36,988,9262,754,000 15,159,613 11,883,113 4,739,200 2,453,000 General Fund 225,00030,000 85,000 60,000 50,000 Grants/Donation 14,767,2007,266,000 2,452,000 1,060,000 3,989,200 Municipal Sate Aid (MSA)2,545,0001,000,000 1,045,000 250,000 250,000 Park Dedication Fund 435,000270,000 90,000 75,000 Sewer Fund 1,085,625210,000 310,000 565,625 Storm Water Fund 17,00017,000 Vehicle Replacement Fund 2,079,000298,500 310,000 972,500 289,000 209,000 Water Fund 2,598,650545,000 252,000 450,000 1,132,650 219,000 11,373,500 19,658,613 15,470,613 11,057,675 3,181,000 60,741,401GRAND TOTAL Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 16 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota PROJECTS BY FUNDING SOURCE 2020 2024thru TotalSourceProject #Priority 2020 2021 2022 2023 2024 Debt Service AF-001 11,278,5005,896,750 5,381,750New City Hall, Fire Station, PW Improvements 2 PW-026 1,774,0001,774,0002020 Street Improvements 3 PW-027 2,864,0002,864,0002021 Street Improvements 3 PW-036 105,000105,000UP RR Crossing - Private Drive Closure 2 PW-037 262,500262,500UP RR Crossing: Klondike Ave 2 PW-038 3,045,0003,045,0002022 Street Improvements 3 PW-039 2,289,2002,289,2002023 Street Improvements 3 PW-040 1,653,0001,653,0002024 Street Improvements 3 PW-052 800,000800,000Ideal Ave (CSAH 13) Phase 2 3 PW-053 800,000800,000Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 3 PW-057 1,650,0001,650,000Manning Ave Phase 3 3 PW-058 1,000,0001,000,000TH 36/Manning Interchange 2 S-005 929,775929,775Old Village Sewer Extension Phase 5 & 6 3 S-016 929,775929,775Old Village Sewer Extension Phase 5 & 6 3 S-18 980,000980,000Heritage Farms Sewer Extension 3 SW-001 1,400,000600,000 800,000Phase 2 Regional Drainage Improvements 3 SW-002 500,000500,000Phase 3 Regional Drainage Improvements 3 W-005 626,588626,588OV Sewer Extension; Phase 5&6; water component 3 W-006 3,475,0003,475,000Elevated Storage Tank #3 1 W-025 626,588626,588OV sewer extension phase 6 & 5; water component 3 36,988,9262,754,000 15,159,613 11,883,113 4,739,200 2,453,000Debt Service Total General Fund F-017 60,00060,000Turnout Gear Replacements 1 PW-035 25,00025,000UP RR Crossing - Village Parkway 2 PW-049 60,00060,000Asphalt Hot Box 4 PW-066 50,00050,000Manning Phase 4 1 PW-069 30,00030,0005th St./Inwood Ave Signal Light 1 225,00030,000 85,000 60,000 50,000General Fund Total Grants/Donation PR-017 1,000,0001,000,000New or Refurbished Ballfields 1 PW-026 800,000800,0002020 Street Improvements 3 PW-035 500,000500,000UP RR Crossing - Village Parkway 2 PW-067 250,000250,000Manning/Hudson Stoplight 2 PW-069 70,00070,0005th St./Inwood Ave Signal Light 1 SW-003 60,00060,000Kramer Lake Floodplain Study 3 W-014 2,270,0002,270,000Well & Pumphouse #5 1 W-017 3,630,0003,630,0002020 Street & Utility Improvements-Water 3 W-018 1,702,0001,702,0002021 Street & Utility Improvements-Water 3 W-028 37,00037,000Blackford Water Ext 2 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 17 TotalSourceProject #Priority 2020 2021 2022 2023 2024 W-029 459,000459,00031st St Area Water Extension 2 W-030 3,989,2003,989,2002023 Street Projects-water component 3 14,767,2007,266,000 2,452,000 1,060,000 3,989,200Grants/Donation Total Municipal Sate Aid (MSA) PW-030 250,000250,000CSAH 15/30th Street Signal 3 PW-031 250,000250,000CSAH 6/Inwood Signal 3 PW-034 1,045,0001,045,00015th Street North (MSA Street)3 PW-058 1,000,0001,000,000TH 36/Manning Interchange 2 2,545,0001,000,000 1,045,000 250,000 250,000Municipal Sate Aid (MSA) Total Park Dedication Fund PR-007 210,000120,000 90,000Sunfish Lake Park Improvements 3 PR-009 50,00050,000Central Greenway Regional Trail 3 PR-018 150,000150,000New Park Development 4 PR-019 25,00025,000Dog Park 4 435,000270,000 90,000 75,000Park Dedication Fund Total Sewer Fund PW-044 17,00017,000Trac Hoe 2 S-003 200,000140,000 60,000Hamlet on Sunfish Lake Sewer Extension 3 S-012 250,000250,000Section 36 Trunk Sewer Main Oversizing 3 S-013 35,00035,000Sewer Oversizing 3 S-017 548,625548,625Old Village Sewer Extension Phase 7 3 W-022 35,00035,000Utility Truck 3 1,085,625210,000 310,000 565,625Sewer Fund Total Storm Water Fund PW-044 17,00017,000Trac Hoe 2 17,00017,000Storm Water Fund Total Vehicle Replacement Fund F-010 60,00060,000B 1 3 F-011 580,000580,000E1 Engine 1 F-012 90,00090,000B 2 3 F-018 48,50048,500CV 1 (Tahoe)3 F-019 52,50052,500CV 2 (Tahoe)3 PR-015 90,00090,000Dump Truck 3 PR-020 37,00037,000Utility Vehicile/Trail Groomer 3 PW-004 185,000185,000Loader2 PW-006 130,000130,000Tractor2 PW-019 41,00041,000PickupTruck / plow 4 PW-044 34,00034,000Trac Hoe 2 PW-047 250,000250,000Dump Truck w/Plow 1 PW-048 120,000120,000Mini Loader 2 PW-050 250,000250,000Dump Truck with Plow 1 PW-054 70,00070,000Skidloader3 PW-060 41,00041,000Pickup w/plow 3 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 18 TotalSourceProject #Priority 2020 2021 2022 2023 2024 2,079,000298,500 310,000 972,500 289,000 209,000Vehicle Replacement Fund Total Water Fund PW-044 17,00017,000Trac Hoe 2 W-008 132,000132,000Village East Trunk Watermain PRV 2 W-010 800,000800,000Paint Water Tank at PW 4 W-013 227,00038,000 70,000 119,000Watermain Oversizing 3 W-014 240,000240,000Well & Pumphouse #5 1 W-017 50,00050,0002020 Street & Utility Improvements-Water 3 W-019 50,00050,000SCADA Upgrade 2 W-022 35,00035,000Utility Truck 3 W-023 150,00050,000 50,000 50,000Water Meter Change Out 1 W-024 300,000300,000Automated Radio Read System 3 W-026 265,650265,650OV sewer extension Phase 7; water component 3 W-027 132,000132,000Pressure Reduction Station-Connection to WT #3 3 W-030 50,00050,0002023 Street Projects-water component 3 W-031 50,00050,0002022 Street Projects-water component 3 W-032 100,000100,0002024 Street Projects-water component 3 2,598,650545,000 252,000 450,000 1,132,650 219,000Water Fund Total 60,741,40111,373,500 19,658,613 15,470,613 11,057,675 3,181,000GRAND TOTAL Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 19 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota PROJECTS BY FUNDING SOURCE 2020 2029thru Total20202021202220232024Source20252026202720282029 #Priority Debt Service 11,278,5005,896,750 5,381,750New City Hall, Fire Station, PW Improvements AF-001 2 1,774,0001,774,0002020 Street Improvements PW-026 3 2,864,0002,864,0002021 Street Improvements PW-027 3 105,000105,000UP RR Crossing - Private Drive Closure PW-036 2 262,500262,500UP RR Crossing: Klondike Ave PW-037 2 3,045,0003,045,0002022 Street Improvements PW-038 3 2,289,2002,289,2002023 Street Improvements PW-039 3 1,653,0001,653,0002024 Street Improvements PW-040 3 2,000,0002,000,0002025 Street Irmprovements PW-041 3 2,000,0002,000,0002026 Street Improvements PW-042 3 800,000800,000Ideal Ave (CSAH 13) Phase 2 PW-052 3 800,000800,000Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 PW-053 3 2,000,0002,000,0002027 Street Improvements PW-055 3 2,000,0002,000,0002028 Street Improvements PW-056 3 1,650,0001,650,000Manning Ave Phase 3 PW-057 3 1,000,0001,000,000TH 36/Manning Interchange PW-058 2 2,000,0002,000,0002029 Steet Improvements PW-068 3 929,775929,775Old Village Sewer Extension Phase 5 & 6 S-005 3 929,775929,775Old Village Sewer Extension Phase 5 & 6 S-016 3 980,000980,000Heritage Farms Sewer Extension S-18 3 1,400,000600,000 800,000Phase 2 Regional Drainage Improvements SW-001 3 500,000500,000Phase 3 Regional Drainage Improvements SW-002 3 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 20 Total20202021202220232024Source20252026202720282029 #Priority 626,588626,588OV Sewer Extension; Phase 5&6; water component W-005 3 3,475,0003,475,000Elevated Storage Tank #3 W-006 1 626,588626,588OV sewer extension phase 6 & 5; water component W-025 3 Debt Service Total 46,988,9262,754,000 15,159,613 11,883,113 4,739,200 2,453,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 General Fund 60,00060,000Turnout Gear Replacements F-017 1 25,00025,000UP RR Crossing - Village Parkway PW-035 2 60,00060,000Asphalt Hot Box PW-049 4 50,00050,000Manning Phase 4 PW-066 1 30,00030,0005th St./Inwood Ave Signal Light PW-069 1 General Fund Total 225,00030,000 85,000 60,000 50,000 Grants/Donation 16,00016,000RangerF-015 3 1,000,0001,000,000New or Refurbished Ballfields PR-017 1 800,000800,0002020 Street Improvements PW-026 3 500,000500,000UP RR Crossing - Village Parkway PW-035 2 250,000250,000Manning/Hudson Stoplight PW-067 2 70,00070,0005th St./Inwood Ave Signal Light PW-069 1 60,00060,000Kramer Lake Floodplain Study SW-003 3 2,270,0002,270,000Well & Pumphouse #5 W-014 1 3,630,0003,630,0002020 Street & Utility Improvements- Water W-017 3 1,702,0001,702,0002021 Street & Utility Improvements- Water W-018 3 37,00037,000Blackford Water Ext W-028 2 459,000459,00031st St Area Water Extension W-029 2 3,989,2003,989,2002023 Street Projects-water component W-030 3 Grants/Donation Total 14,783,2007,266,000 2,452,000 1,060,000 3,989,200 16,000 Municipal Sate Aid (MSA) 250,000250,000CSAH 15/30th Street Signal PW-030 3 250,000250,000CSAH 6/Inwood Signal PW-031 3 1,045,0001,045,00015th Street North (MSA Street)PW-034 3 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 21 Total20202021202220232024Source20252026202720282029 #Priority 1,000,0001,000,000TH 36/Manning Interchange PW-058 2 Municipal Sate Aid (MSA) Total 2,545,0001,000,000 1,045,000 250,000 250,000 Park Dedication Fund 210,000120,000 90,000Sunfish Lake Park Improvements PR-007 3 50,00050,000Central Greenway Regional Trail PR-009 3 150,000150,000New Park Development PR-018 4 25,00025,000Dog Park PR-019 4 Park Dedication Fund Total 435,000270,000 90,000 75,000 Sewer Fund 17,00017,000Trac Hoe PW-044 2 200,000140,000 60,000Hamlet on Sunfish Lake Sewer Extension S-003 3 250,000250,000Section 36 Trunk Sewer Main Oversizing S-012 3 35,00035,000Sewer Oversizing S-013 3 548,625548,625Old Village Sewer Extension Phase 7 S-017 3 35,00035,000Utility Truck W-022 3 Sewer Fund Total 1,085,625210,000 310,000 565,625 Storm Water Fund 17,00017,000Trac Hoe PW-044 2 Storm Water Fund Total 17,00017,000 Vehicle Replacement Fund 60,00060,000B 1 F-010 3 580,000580,000E1 Engine F-011 1 90,00090,000B 2 F-012 3 650,000650,000T2 Tender/Engine F-013 4 20,00020,000Boat and Trailer F-014 3 103,50048,500 55,000CV 1 (Tahoe)F-018 3 115,50052,500 63,000CV 2 (Tahoe)F-019 3 90,00090,000Dump Truck PR-015 3 37,00037,000Utility Vehicile/Trail Groomer PR-020 3 185,000185,000LoaderPW-004 2 130,000130,000TractorPW-006 2 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 22 Total20202021202220232024Source20252026202720282029 #Priority 41,00041,000PickupTruck / plow PW-019 4 34,00034,000Trac Hoe PW-044 2 250,000250,000Dump Truck w/Plow PW-047 1 120,000120,000Mini Loader PW-048 2 250,000250,000Dump Truck with Plow PW-050 1 70,00070,000SkidloaderPW-054 3 41,00041,000Pickup w/plow PW-060 3 35,00035,000PickupPW-061 3 205,500205,500DumpTruck w/plow, sander & underbody PW-062 3 45,00045,000Pickup w/lift gate & plow PW-063 3 45,00045,000Pickup w/lift gate & plow PW-064 3 230,000230,000Dump Truck w/plow, sander & underbody PW-065 3 Vehicle Replacement Fund Total 3,427,500298,500 310,000 972,500 289,000 209,000 55,000 35,000 1,028,500 230,000 Water Fund 17,00017,000Trac Hoe PW-044 2 132,000132,000Village East Trunk Watermain PRV W-008 2 800,000800,000Paint Water Tank at PW W-010 4 35,00035,000Well #4 Pump - Pull and Rebuild W-012 3 227,00038,000 70,000 119,000Watermain Oversizing W-013 3 240,000240,000Well & Pumphouse #5 W-014 1 50,00050,0002020 Street & Utility Improvements- Water W-017 3 50,00050,000SCADA Upgrade W-019 2 35,00035,000Utility Truck W-022 3 150,00050,000 50,000 50,000Water Meter Change Out W-023 1 300,000300,000Automated Radio Read System W-024 3 265,650265,650OV sewer extension Phase 7; water component W-026 3 132,000132,000Pressure Reduction Station- Connection to WT #3 W-027 3 50,00050,0002023 Street Projects-water component W-030 3 50,00050,0002022 Street Projects-water component W-031 3 100,000100,0002024 Street Projects-water component W-032 3 Water Fund Total 2,633,650545,000 252,000 450,000 1,132,650 219,000 35,000 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 23 Total20202021202220232024Source20252026202720282029 #Priority 11,373,500 19,658,613 15,470,613 11,057,675 3,181,000 72,140,901GRAND TOTAL 2,090,000 2,035,000 3,028,500 2,000,000 2,246,000 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 24 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota PROJECTS & FUNDING SOURCES BY DEPARTMENT 2020 2024thru Total20202021202220232024DepartmentProject #Priority Admin/Finance Department AF-001 11,278,5001,287,500 4,609,250 5,381,750New City Hall, Fire Station, PW Improvements 2 Debt Service 5,896,750 5,381,750 11,278,500 11,278,5001,287,500 4,609,250 5,381,750Admin/Finance Department Total Fire Department F-010 60,00060,000B 1 3 Vehicle Replacement Fund 60,000 60,000 F-011 580,000580,000E1 Engine 1 Vehicle Replacement Fund 580,000 580,000 F-012 90,00090,000B 2 3 Vehicle Replacement Fund 90,000 90,000 F-017 60,00060,000Turnout Gear Replacements 1 General Fund 60,000 60,000 F-018 48,50048,500CV 1 (Tahoe)3 Vehicle Replacement Fund 48,500 48,500 F-019 52,50052,500CV 2 (Tahoe)3 Vehicle Replacement Fund 52,500 52,500 891,00048,500 60,000 692,500 90,000Fire Department Total Parks and Recreation PR-007 210,000120,000 90,000Sunfish Lake Park Improvements 3 Park Dedication Fund 120,000 90,000 210,000 PR-009 50,00050,000Central Greenway Regional Trail 3 Park Dedication Fund 50,000 50,000 PR-015 90,00090,000Dump Truck 3 Vehicle Replacement Fund 90,000 90,000 PR-017 1,000,0001,000,000New or Refurbished Ballfields 1 Grants/Donation 1,000,000 1,000,000 PR-018 150,000150,000New Park Development 4 Park Dedication Fund 150,000 150,000 PR-019 25,00025,000Dog Park 4 Park Dedication Fund 25,000 25,000 PR-020 37,00037,000Utility Vehicile/Trail Groomer 3 Vehicle Replacement Fund 37,000 37,000 1,562,000270,000 90,000 1,090,000 75,000 37,000Parks and Recreation Total Public Works Department PW-004 185,000185,000Loader2 Vehicle Replacement Fund 185,000 185,000 PW-006 130,000130,000Tractor2 Vehicle Replacement Fund 130,000 130,000 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 25 Total20202021202220232024DepartmentProject #Priority PW-019 41,00041,000PickupTruck / plow 4 Vehicle Replacement Fund 41,000 41,000 PW-026 2,574,0002,574,0002020 Street Improvements 3 Debt Service 1,774,000 1,774,000 Grants/Donation 800,000 800,000 PW-027 2,864,0002,864,0002021 Street Improvements 3 Debt Service 2,864,000 2,864,000 PW-030 250,000250,000CSAH 15/30th Street Signal 3 Municipal Sate Aid (MSA)250,000 250,000 PW-031 250,000250,000CSAH 6/Inwood Signal 3 Municipal Sate Aid (MSA)250,000 250,000 PW-034 1,045,0001,045,00015th Street North (MSA Street)3 Municipal Sate Aid (MSA)1,045,000 1,045,000 PW-035 525,000525,000UP RR Crossing - Village Parkway 2 General Fund 25,000 25,000 Grants/Donation 500,000 500,000 PW-036 105,000105,000UP RR Crossing - Private Drive Closure 2 Debt Service 105,000 105,000 PW-037 262,500262,500UP RR Crossing: Klondike Ave 2 Debt Service 262,500 262,500 PW-038 3,045,0003,045,0002022 Street Improvements 3 Debt Service 3,045,000 3,045,000 PW-039 2,289,2002,289,2002023 Street Improvements 3 Debt Service 2,289,200 2,289,200 PW-040 1,653,0001,653,0002024 Street Improvements 3 Debt Service 1,653,000 1,653,000 PW-044 85,00085,000Trac Hoe 2 Sewer Fund 17,000 17,000 Storm Water Fund 17,000 17,000 Vehicle Replacement Fund 34,000 34,000 Water Fund 17,000 17,000 PW-047 250,000250,000Dump Truck w/Plow 1 Vehicle Replacement Fund 250,000 250,000 PW-048 120,000120,000Mini Loader 2 Vehicle Replacement Fund 120,000 120,000 PW-049 60,00060,000Asphalt Hot Box 4 General Fund 60,000 60,000 PW-050 250,000250,000Dump Truck with Plow 1 Vehicle Replacement Fund 250,000 250,000 PW-052 800,000800,000Ideal Ave (CSAH 13) Phase 2 3 Debt Service 800,000 800,000 PW-053 800,000800,000Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 3 Debt Service 800,000 800,000 PW-054 70,00070,000Skidloader3 Vehicle Replacement Fund 70,000 70,000 PW-057 1,650,000250,000 1,400,000Manning Ave Phase 3 3 Debt Service 1,650,000 1,650,000 PW-058 2,000,0002,000,000TH 36/Manning Interchange 2 Debt Service 1,000,000 1,000,000 Municipal Sate Aid (MSA)1,000,000 1,000,000 PW-060 41,00041,000Pickup w/plow 3 Vehicle Replacement Fund 41,000 41,000 PW-066 50,00050,000Manning Phase 4 1 General Fund 50,000 50,000 PW-067 250,000250,000Manning/Hudson Stoplight 2 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 26 Total20202021202220232024DepartmentProject #Priority Grants/Donation 250,000 250,000 PW-069 100,000100,0005th St./Inwood Ave Signal Light 1 General Fund 30,000 30,000 Grants/Donation 70,000 70,000 21,744,7002,924,000 6,566,500 5,140,000 4,279,200 2,835,000Public Works Department Total Sewer Department S-003 200,000140,000 60,000Hamlet on Sunfish Lake Sewer Extension 3 Sewer Fund 140,000 60,000 200,000 S-005 929,775929,775Old Village Sewer Extension Phase 5 & 6 3 Debt Service 929,775 929,775 S-012 250,000250,000Section 36 Trunk Sewer Main Oversizing 3 Sewer Fund 250,000 250,000 S-013 35,00035,000Sewer Oversizing 3 Sewer Fund 35,000 35,000 S-016 929,775929,775Old Village Sewer Extension Phase 5 & 6 3 Debt Service 929,775 929,775 S-017 548,625548,625Old Village Sewer Extension Phase 7 3 Sewer Fund 548,625 548,625 S-18 980,000980,000Heritage Farms Sewer Extension 3 Debt Service 980,000 980,000 3,873,1751,155,000 1,239,775 929,775 548,625Sewer Department Total Storm Water Department SW-001 1,400,000600,000 800,000Phase 2 Regional Drainage Improvements 3 Debt Service 600,000 800,000 1,400,000 SW-002 500,000500,000Phase 3 Regional Drainage Improvements 3 Debt Service 500,000 500,000 SW-003 60,00060,000Kramer Lake Floodplain Study 3 Grants/Donation 60,000 60,000 1,960,0001,160,000 800,000Storm Water Department Total Water Department W-005 626,588626,588OV Sewer Extension; Phase 5&6; water component 3 Debt Service 626,588 626,588 W-006 3,475,000275,000 3,200,000Elevated Storage Tank #3 1 Debt Service 3,475,000 3,475,000 W-008 132,000132,000Village East Trunk Watermain PRV 2 Water Fund 132,000 132,000 W-010 800,000800,000Paint Water Tank at PW 4 Water Fund 800,000 800,000 W-013 227,00038,000 70,000 119,000Watermain Oversizing 3 Water Fund 38,000 70,000 119,000 227,000 W-014 2,510,0002,510,000Well & Pumphouse #5 1 Grants/Donation 2,270,000 2,270,000 Water Fund 240,000 240,000 W-017 3,680,0003,680,0002020 Street & Utility Improvements-Water 3 Grants/Donation 3,630,000 3,630,000 Water Fund 50,000 50,000 W-018 1,702,0001,702,0002021 Street & Utility Improvements-Water 3 Grants/Donation 1,702,000 1,702,000 W-019 50,00050,000SCADA Upgrade 2 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 27 Total20202021202220232024DepartmentProject #Priority Water Fund 50,000 50,000 W-022 70,00070,000Utility Truck 3 Sewer Fund 35,000 35,000 Water Fund 35,000 35,000 W-023 150,00050,000 50,000 50,000Water Meter Change Out 1 Water Fund 50,000 50,000 50,000 150,000 W-024 300,000300,000Automated Radio Read System 3 Water Fund 300,000 300,000 W-025 626,588626,588OV sewer extension phase 6 & 5; water component 3 Debt Service 626,588 626,588 W-026 265,650265,650OV sewer extension Phase 7; water component 3 Water Fund 265,650 265,650 W-027 132,000132,000Pressure Reduction Station-Connection to WT #3 3 Water Fund 132,000 132,000 W-028 37,00037,000Blackford Water Ext 2 Grants/Donation 37,000 37,000 W-029 459,000459,00031st St Area Water Extension 2 Grants/Donation 459,000 459,000 W-030 4,039,2004,039,2002023 Street Projects-water component 3 Grants/Donation 3,989,200 3,989,200 Water Fund 50,000 50,000 W-031 50,00050,0002022 Street Projects-water component 3 Water Fund 50,000 50,000 W-032 100,000100,0002024 Street Projects-water component 3 Water Fund 100,000 100,000 19,432,0267,251,000 5,780,588 1,076,588 5,104,850 219,000Water Department Total GRAND TOTAL 60,741,40112,936,000 18,346,113 15,470,613 10,807,675 3,181,000 Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 28 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact City Administrator 2020 2024thru Department Admin/Finance Department Description New City Facilities 1. Space Needs Study in 2017 including fire station and public works needs 2. cost estimates from BKV Space Needs Study dated November 21, 2017 for public works improvements 3. cost estimates for new fire station/city hall from Leo A Dlay study April 4, 2018 ($10.5m) increased for inflation 4. Public Works Improvements to existing facility $250,000 in 2018 for larger salt shed $515,000 in 2020 for office addition $257,500 in 2021 for yard improvements 5. New City Hall/Fire Station 2020-2022 Project #AF-001 Priority 2 Very Important Justification Would allow all staff (except public works) to be at one site, community meeting rooms, updated council chambers. Locate single fire station in more central location with better access to main roads. Brookfield lease was $33k per year and increasing. Brookfield office builiding and land purchased in 2018 Lease expirations: 3- month to month with 60-90 day notice 1-annual 12/31/19 1-3/31/20 1-12/31/20 1-12/31/21 1-6/30/22 *relocation costs: personal property moving costs and reestablishment costs Budget Impact/Other Borrowing split over multiple years. 50% of funds borrowed must be spent within 12 months. Debt payments to be split amongst General Fund (80%), Water (10%) and Sewer (10%) 2020: degisn and preconstruction costs of new city hall/fire station ($772,500); public works office addition ($515,000) 2021: council chambers and fire apparatus bay additions ($4,351,750) and public works yard impr ($257,500) 2022: remodel of Brookfield and repurchase from EDA ($5,381,750) costs are based off of 2019 build estimates and include construction inflation of 3% Useful Life 40 years Project Name New City Hall, Fire Station, PW Improvements Category Buildings Type Improvement Status Active Total20202021202220232024Expenditures 772,500772,500Planning/Design 10,506,000515,000 4,609,250 5,381,750Construction/Maintenance 1,287,500 4,609,250 5,381,750 11,278,500Total Total20202021202220232024Funding Sources 11,278,5005,896,750 5,381,750Debt Service 5,896,750 5,381,750 11,278,500Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 29 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Fire Chief 2020 2024thru Department Fire Department Description Replace 2001 B1 brush/grass rig=F350 w/markings and lighting Project #F-010 Priority 3 Important Justification End of Useful Life Replaces 2001 F-350 Budget Impact/Other Useful Life 15 years Project Name B 1 Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 60,00060,000Equip/Vehicles/Furnishings 60,000 60,000Total Total20202021202220232024Funding Sources 60,00060,000Vehicle Replacement Fund 60,000 60,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 30 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Fire Chief 2020 2024thru Department Fire Department Description Replacement of 1997 Engine that was refurbished in 2007 Project #F-011 Priority 1 Critical Justification End of Useful Life May not be needed if in one station, depending on staffing and pumping capacity Budget Impact/Other Useful Life 25 years Project Name E1 Engine Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 580,000580,000Equip/Vehicles/Furnishings 580,000 580,000Total Total20202021202220232024Funding Sources 580,000580,000Vehicle Replacement Fund 580,000 580,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 31 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Fire Chief 2020 2024thru Department Fire Department Description Replacement of 2004 B 2 Brush/grass rig Project #F-012 Priority 3 Important Justification Budget Impact/Other Useful Life 20 years Project Name B 2 Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 90,00090,000Equip/Vehicles/Furnishings 90,000 90,000Total Total20202021202220232024Funding Sources 90,00090,000Vehicle Replacement Fund 90,000 90,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 32 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Fire Chief 2020 2024thru Department Fire Department Description Replacement of 24 sets of turnout gear Project #F-017 Priority 1 Critical Justification End of useful life Budget Impact/Other Useful Life Project Name Turnout Gear Replacements Category Equipment: Fire Equip Type Maintenance Status Active Total20202021202220232024Expenditures 60,00060,000Equip/Vehicles/Furnishings 60,000 60,000Total Total20202021202220232024Funding Sources 60,00060,000General Fund 60,000 60,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 33 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Fire Chief 2020 2024thru Department Fire Department Description Replace 2015 CV1, (Duty vehicle) w/emergency equipment, lighting and graphics. Project #F-018 Priority 3 Important Justification End of manufacturer’s warranty. Optimize resale value. Possible offset of up to $35,000.00 resale. Will sell as is, or remove emergency equipment for possible reuse and sell as passenger vehicle. Budget Impact/Other Less maintenance/repairs required to upkeep new vehicle Useful Life 0 Project Name CV 1 (Tahoe)Category Vehicles Type Equipment Status New Recommendation Total20202021202220232024Expenditures 48,50048,500Equip/Vehicles/Furnishings 48,500 48,500Total Total20202021202220232024Funding Sources 48,50048,500Vehicle Replacement Fund 48,500 48,500Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 34 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Fire Chief 2020 2024thru Department Fire Department Description Replace 2017 CV2, (Duty vehicle) w/emergency equipment, lighting and graphics. Project #F-019 Priority 3 Important Justification End of manufacturer’s warranty. Optimize resale value. Possible offset of up to $38,000.00 resale. Will sell as is, or remove emergency equipment for possible reuse and sell as passenger vehicle. Budget Impact/Other Less maintenance/repairs required to upkeep new vehicle Useful Life 5 years Project Name CV 2 (Tahoe)Category Vehicles Type Equipment Status New Recommendation Total20202021202220232024Expenditures 52,50052,500Equip/Vehicles/Furnishings 52,500 52,500Total Total20202021202220232024Funding Sources 52,50052,500Vehicle Replacement Fund 52,500 52,500Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 35 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact City Administrator 2020 2024thru Department Parks and Recreation Description (2020) Development of 4 miles of mountain biking trails at $30,000 per mile per Trail Source (2021) Paving of trails Cost estimate: Improve trails to ADA standards in Area 2 (prairie area): $90,000 for 6 foot wide asphalt 1 mile trail Project #PR-007 Priority 3 Important Justification Explore Mt biking at direction of Council (10/17) ADA trails consistent with Development Guide for Sunfish Lake Park as approved by MN Land Trust Budget Impact/Other Useful Life Project Name Sunfish Lake Park Improvements Category Park Improvements Type Improvement Status Active Total20202021202220232024Expenditures 210,000120,000 90,000Construction/Maintenance 120,000 90,000 210,000Total Total20202021202220232024Funding Sources 210,000120,000 90,000Park Dedication Fund 120,000 90,000 210,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 36 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact City Administrator 2020 2024thru Department Parks and Recreation Description Central Greenway Regional Trail beginning at CSAH 19 and I-94, traveling through Lake Elmo Park Reserve, east along Stillwater Bvld to Manning Ave and then north to TH36. Project #PR-009 Priority 3 Important Justification Trail would address the following community needs: -Deliver students safely to school -Bring people to our downtown -Bring people to our parks -Provide safe recreation -Trail Diversity-Provide feel of Lake Elmo -Omit need to bike down Hwy 5/CSAH 14 -Compatibility with public grant opportunities -Compatibility with private funding opportunities Feasibility of land acquisition will be a consideration Trail likely to be built in segments in conjuction with county road projects and as funding allows through Met Council or other state grants Budget Impact/Other Additional trails to maintain-labor and materials for snow removal if desired by city Trail construction cost may be as high as $12 million. City would expect cost share with county as well as grants to offset costs. 2023 costs are for trail through new roundabout at CSAH 19 and CSAH 10 Future costs will be added as they are known Useful Life Project Name Central Greenway Regional Trail Category Park Improvements Type Improvement Status Active Total20202021202220232024Expenditures 50,00050,000Construction/Maintenance 50,000 50,000Total Total20202021202220232024Funding Sources 50,00050,000Park Dedication Fund 50,000 50,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 37 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Parks and Recreation Description 550 dump pickup replaces 2009 vehicle. . Project #PR-015 Priority 3 Important Justification End of Useful life Budget Impact/Other Useful Life Project Name Dump Truck Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 90,00090,000Equip/Vehicles/Furnishings 90,000 90,000Total Total20202021202220232024Funding Sources 90,00090,000Vehicle Replacement Fund 90,000 90,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 38 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact City Administrator 2020 2024thru Department Parks and Recreation Description New ballfields to be constructed or refurbished after Tartan ball fields are no longer used by the public Project #PR-017 Priority 1 Critical Justification Replacement of some of the fields at Tartan Park lost to development of Royal Oaks Golf Course Community Budget Impact/Other Funding to be provided from developer in development agreement with Royal Golf. Funds to be used for acquisition of land, if necessary, and builidngor refurbishing of (a) new ballfield(s). Useful Life 40 years Project Name New or Refurbished Ballfields Category Park Improvements Type Improvement Status Active Total20202021202220232024Expenditures 1,000,0001,000,000Construction/Maintenance 1,000,000 1,000,000Total Total20202021202220232024Funding Sources 1,000,0001,000,000Grants/Donation 1,000,000 1,000,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 39 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact City Administrator 2020 2024thru Department Parks and Recreation Description New park to be developed in the Wildflower/Village Preserve area in 2019 and in Inwood in 2020 Project #PR-018 Priority 4 Less Important Justification Areas identified during development as a park search area to provide recreational opportunities to new residents. Budget Impact/Other Useful Life 40 years Project Name New Park Development Category Park Improvements Type Improvement Status Active Total20202021202220232024Expenditures 150,000150,000Construction/Maintenance 150,000 150,000Total Total20202021202220232024Funding Sources 150,000150,000Park Dedication Fund 150,000 150,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 40 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Parks and Recreation Description Parks commission recommended the search and planning for a dog park somewhere near the denser developments Improvements would be minimal such as fencing Project #PR-019 Priority 4 Less Important Justification Residents on small lots in denser developments need a place to take their dogs for exercise. By providing a dog park those who let their dogs run off leash in other parks can be redirected Budget Impact/Other Useful Life 25 years Project Name Dog Park Category Park Improvements Type Improvement Status Active Total20202021202220232024Expenditures 25,00025,000Construction/Maintenance 25,000 25,000Total Total20202021202220232024Funding Sources 25,00025,000Park Dedication Fund 25,000 25,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 41 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Parks and Recreation Description Replaces 2014 Kubota Project #PR-020 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 years Project Name Utility Vehicile/Trail Groomer Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 37,00037,000Equip/Vehicles/Furnishings 37,000 37,000Total Total20202021202220232024Funding Sources 37,00037,000Vehicle Replacement Fund 37,000 37,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 42 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Public Works Department Description Replace 1999 loader Project #PW-004 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful Life 15 years Project Name Loader Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 185,000185,000Equip/Vehicles/Furnishings 185,000 185,000Total Total20202021202220232024Funding Sources 185,000185,000Vehicle Replacement Fund 185,000 185,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 43 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Public Works Department Description Replace 2004 John Deere Tractor Cost include all ditch and mowing attachments Additional cost for snowblower ($30k included in total) Additonal cost for wing/controls ($15,000) Project #PW-006 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful Life 15 years Project Name Tractor Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 130,000130,000Equip/Vehicles/Furnishings 130,000 130,000Total Total20202021202220232024Funding Sources 130,000130,000Vehicle Replacement Fund 130,000 130,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 44 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Public Works Department Description Replacement for 2012 F250 End of usefull life (7 years) Project #PW-019 Priority 4 Less Important Justification Replacement for 2012 F250 End of useful life Budget Impact/Other Useful Life 10 years Project Name PickupTruck / plow Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 41,00041,000Equip/Vehicles/Furnishings 41,000 41,000Total Total20202021202220232024Funding Sources 41,00041,000Vehicle Replacement Fund 41,000 41,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 45 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description Reconstruction of roads in Heritage Farms, Stonegate 2nd Project #PW-026 Priority 3 Important Justification Per pavement management plan reviewed by Engineer and Public Works Director Stonegate 2nd roads done in conjunction with water extension project and is covered by state grant Budget Impact/Other $495,000 assessment revenue including $11,000 from City for Heritage Park Useful Life 25 years Project Name 2020 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20202021202220232024Expenditures 2,574,0002,574,000Construction/Maintenance 2,574,000 2,574,000Total Total20202021202220232024Funding Sources 1,774,0001,774,000Debt Service 800,000800,000Grants/Donation 2,574,000 2,574,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 46 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description $1,577,000 Tamarack Farms reconstruct and Hamlet on Sunfish Lake reclaim $1,287,000 for Ov Phase 5 & 6 (completed in 2 years) Project #PW-027 Priority 3 Important Justification Per pavement management plan reviewed by Engineer and Public Works Director Budget Impact/Other $473,100 assessment revenue for Tamarck and Hamlet $386,100 for OV 5&6 Useful Life 25 years Project Name 2021 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20202021202220232024Expenditures 2,864,0002,864,000Construction/Maintenance 2,864,000 2,864,000Total Total20202021202220232024Funding Sources 2,864,0002,864,000Debt Service 2,864,000 2,864,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 47 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description CSAH 15/30th Street signal improvements. May be stand alone project or with CSAH 15 Phase 3 Project #PW-030 Priority 3 Important Justification Improvement needed due to increase of traffic Washington County study Budget Impact/Other Useful Life 25 years Project Name CSAH 15/30th Street Signal Category Street Construction Type Maintenance Status Active Total20202021202220232024Expenditures 250,000250,000Construction/Maintenance 250,000 250,000Total Total20202021202220232024Funding Sources 250,000250,000Municipal Sate Aid (MSA) 250,000 250,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 48 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description CSAH 6/ Inwood Signal Improvements - to replace 4-way stop. Project #PW-031 Priority 3 Important Justification Budget Impact/Other Useful Life 25 years Project Name CSAH 6/Inwood Signal Category Street Reconstruction Type Maintenance Status Active Total20202021202220232024Expenditures 250,000250,000Construction/Maintenance 250,000 250,000Total Total20202021202220232024Funding Sources 250,000250,000Municipal Sate Aid (MSA) 250,000 250,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 49 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description 15th Street reconstruction Project #PW-034 Priority 3 Important Justification Significant patching made in 2018 to extend road life a couple years. Recon needed per pavement management plan reviewed by Engineer and Public Works Director Budget Impact/Other Potential for some assessments Useful Life 25 years Project Name 15th Street North (MSA Street)Category Street Reconstruction Type Improvement Status Active Total20202021202220232024Expenditures 1,045,0001,045,000Construction/Maintenance 1,045,000 1,045,000Total Total20202021202220232024Funding Sources 1,045,0001,045,000Municipal Sate Aid (MSA) 1,045,000 1,045,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 50 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description UP RR Crossing - Village Parkway Project #PW-035 Priority 2 Very Important Justification To allow connectivity between developing neighborhoods north and south of the tracks Budget Impact/Other Useful Life 40 years Project Name UP RR Crossing - Village Parkway Category Street Construction Type Improvement Status Active Total20202021202220232024Expenditures 525,000525,000Construction/Maintenance 525,000 525,000Total Total20202021202220232024Funding Sources 25,00025,000General Fund 500,000500,000Grants/Donation 525,000 525,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 51 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description UP RR Crossing - Private driveway closure required for Village Parkway Crossing Project #PW-036 Priority 2 Very Important Justification Railroad requirement in order to get new crossing at Village Parkway Budget Impact/Other Useful Life 40 years Project Name UP RR Crossing - Private Drive Closure Category Unassigned Type Improvement Status Active Total20202021202220232024Expenditures 105,000105,000Construction/Maintenance 105,000 105,000Total Total20202021202220232024Funding Sources 105,000105,000Debt Service 105,000 105,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 52 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description UP RR Crossing - Klondike - upgraded crossing to inlcude light and gates Project #PW-037 Priority 2 Very Important Justification Railroad requirement in order to build new crossing at Village Parkway Budget Impact/Other Useful Life 40 years Project Name UP RR Crossing: Klondike Ave Category Street Construction Type Unassigned Status Active Total20202021202220232024Expenditures 262,500262,500Construction/Maintenance 262,500 262,500Total Total20202021202220232024Funding Sources 262,500262,500Debt Service 262,500 262,500Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 53 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description Annual Street Improvements- Fields of St Croix 1st and 2nd reclaims $1,758,000 And $1,287,000 for OV 5 & 6 (Over 2 years) Project #PW-038 Priority 3 Important Justification Annual street improvements per Engineering recommendation Budget Impact/Other $527,400 assessment revenue for Fields $386,100 assessment revenue for Ov 5&6 Useful Life 25 years Project Name 2022 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20202021202220232024Expenditures 3,045,0003,045,000Construction/Maintenance 3,045,000 3,045,000Total Total20202021202220232024Funding Sources 3,045,0003,045,000Debt Service 3,045,000 3,045,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 54 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description Annual Street Imrpovements $1,803,000-Parkview Estates, Cardinal Ridge, Torres Pines, Beaut Crest, Irish Ct (reclaims) $486,200-Old Village Phase 7 (Legion Ave N) Project #PW-039 Priority 3 Important Justification Annual street improvements per Engineering recommendation Budget Impact/Other $540,900 assessment revenue for neighborhoods $145,860 for OV 7 Useful Life 25 years Project Name 2023 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20202021202220232024Expenditures 2,289,2002,289,200Construction/Maintenance 2,289,200 2,289,200Total Total20202021202220232024Funding Sources 2,289,2002,289,200Debt Service 2,289,200 2,289,200Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 55 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description Annual Street Improvements Tana Ridge, Carriage Station, 59th St Ct/55th St/Julep Way (reclaims) Project #PW-040 Priority 3 Important Justification Annual street improvements per recommendation by City Engineer Budget Impact/Other $495,900 assessment revenue Useful Life 25 years Project Name 2024 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20202021202220232024Expenditures 1,653,0001,653,000Construction/Maintenance 1,653,000 1,653,000Total Total20202021202220232024Funding Sources 1,653,0001,653,000Debt Service 1,653,000 1,653,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 56 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Public Works Department Description Replace 2006 Case Backhoe with a more manuverable unit. Project #PW-044 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other $85,000 total cost split amongst water, stormwater , streets, and parks sewer Useful Life Project Name Trac Hoe Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 85,00085,000Equip/Vehicles/Furnishings 85,000 85,000Total Total20202021202220232024Funding Sources 17,00017,000Sewer Fund 17,00017,000Storm Water Fund 34,00034,000Vehicle Replacement Fund 17,00017,000Water Fund 85,000 85,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 57 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Public Works Department Description Single Axel plow truck to replace 1998 model Project #PW-047 Priority 1 Critical Justification End of Useful Life Budget Impact/Other Useful Life Project Name Dump Truck w/Plow Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 250,000250,000Equip/Vehicles/Furnishings 250,000 250,000Total Total20202021202220232024Funding Sources 250,000250,000Vehicle Replacement Fund 250,000 250,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 58 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Public Works Department Description Mini loader to replace 2006 Case Back Hoe with a more manuverable unit. Will be outfitted with a plow for cul de sacs and other narrow streets. Project #PW-048 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful Life Project Name Mini Loader Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 120,000120,000Equip/Vehicles/Furnishings 120,000 120,000Total Total20202021202220232024Funding Sources 120,000120,000Vehicle Replacement Fund 120,000 120,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 59 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Public Works Department Description Slide in unit for dump truck. Will replace a trailer hot box and utilize a single axel dump truck during the summer months Project #PW-049 Priority 4 Less Important Justification End of Useful Life Budget Impact/Other Useful Life Project Name Asphalt Hot Box Category Equipment: PW Equip Type Equipment Status Active Total20202021202220232024Expenditures 60,00060,000Equip/Vehicles/Furnishings 60,000 60,000Total Total20202021202220232024Funding Sources 60,00060,000General Fund 60,000 60,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 60 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Public Works Department Description Replace 2006 model Project #PW-050 Priority 1 Critical Justification End of Useful Life Budget Impact/Other Useful Life Project Name Dump Truck with Plow Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 250,000250,000Equip/Vehicles/Furnishings 250,000 250,000Total Total20202021202220232024Funding Sources 250,000250,000Vehicle Replacement Fund 250,000 250,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 61 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description Cooperatvie project between Washington County, City of Oakdale and City of Lake Elmo Improvements to CSAH 13 from CSAH 14 to 44th St Project #PW-052 Priority 3 Important Justification Need determined by Washington County New development in Oakdale will increase traffic in area Budget Impact/Other 30% assessment to residential properties and public works building Useful Life 20 years Project Name Ideal Ave (CSAH 13) Phase 2 Category Street Reconstruction Type Improvement Status Active Total20202021202220232024Expenditures 800,000800,000Construction/Maintenance 800,000 800,000Total Total20202021202220232024Funding Sources 800,000800,000Debt Service 800,000 800,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 62 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description Cooperative project between Washington County, City of Oakdale and City of Lake Elmo Per Washington County includes: Safety improvements including widening of shoulders Pavement imporvement Turn lane and intersection improvements Pedestrain and non-motorized upgrades Drainage Improvements Project #PW-053 Priority 3 Important Justification Need determined by Washington County Budget Impact/Other All Ag property owned by 3M on Lake Elmo side Useful Life 20 years Project Name Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 Category Street Reconstruction Type Improvement Status Active Total20202021202220232024Expenditures 800,000800,000Construction/Maintenance 800,000 800,000Total Total20202021202220232024Funding Sources 800,000800,000Debt Service 800,000 800,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 63 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Public Works Department Description Additional skidloader to be used to mow park trails and asphalt in the summer. During the winter it can be used to aid in snow removal at city parking lots and possibly on park trails and sidewalks (w/blower) 2 speed highflow Project #PW-054 Priority 3 Important Justification additional skidloader needed due to growth in streets and parks Budget Impact/Other Useful Life Project Name Skidloader Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 70,00070,000Equip/Vehicles/Furnishings 70,000 70,000Total Total20202021202220232024Funding Sources 70,00070,000Vehicle Replacement Fund 70,000 70,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 64 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description CSAH 15 from CSAH 14 to CSAH 10 Per Washington County includes: Expansion to four lane divided highway Access management Intersection control Separate multi-use trail Landscaping and Aesthetics Project #PW-057 Priority 3 Important Justification Need determined by Washington County Budget Impact/Other 30% assessment to residential properties Trail could come from park dedication funds County could delay project if not inlcuded as part of their BOND-2022 Useful Life 25 years Project Name Manning Ave Phase 3 Category Street Reconstruction Type Improvement Status Active Total20202021202220232024Expenditures 250,000250,000Land Acquisition 1,400,0001,400,000Construction/Maintenance 250,000 1,400,000 1,650,000Total Total20202021202220232024Funding Sources 1,650,0001,650,000Debt Service 1,650,000 1,650,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 65 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description New Interchange to replace stop lights at TH 36 and Manning Project #PW-058 Priority 2 Very Important Justification Cooperative project with MNDOT, Washington County, Stillwater, Grant, Oak Park Heights and Stillwater Township. Increased traffic on TH 36 Fatality at intersection in 2013 Budget Impact/Other No cost estimates available Cost share between Wash Co, Mn DOT, Lake Elmo, Grant, Stillwater, and Stillwater Twp Useful Life 25 years Project Name TH 36/Manning Interchange Category Street Construction Type Improvement Status Active Total20202021202220232024Expenditures 2,000,0002,000,000Construction/Maintenance 2,000,000 2,000,000Total Total20202021202220232024Funding Sources 1,000,0001,000,000Debt Service 1,000,0001,000,000Municipal Sate Aid (MSA) 2,000,000 2,000,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 66 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Public Works Department Description Pickup with plow to replace 2014 F250 Project #PW-060 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 years Project Name Pickup w/plow Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 41,00041,000Equip/Vehicles/Furnishings 41,000 41,000Total Total20202021202220232024Funding Sources 41,00041,000Vehicle Replacement Fund 41,000 41,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 67 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description Manning Ave from I-94 to 1300 feet south of CSAH 10 Per Washington County includes: Expansion to a four lane divided highway Access management Intersection control improvements Separate mulit use trail Project #PW-066 Priority 1 Critical Justification Need as determined by Washington County to ensure ongoing safe and efficient operation of this highway Budget Impact/Other Local contribution may not be required until construction phase Useful Life 40 years Project Name Manning Phase 4 Category Street Reconstruction Type Improvement Status New Recommendation Total20202021202220232024Expenditures 50,00050,000Planning/Design 50,000 50,000Total Total20202021202220232024Funding Sources 50,00050,000General Fund 50,000 50,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 68 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description Stoploght at realigned Hudson Blvd and Manning Ave Project #PW-067 Priority 2 Very Important Justification per Washington County Budget Impact/Other Funding from Four Corners 1st Addition Useful Life 25 years Project Name Manning/Hudson Stoplight Category Street Construction Type Improvement Status New Recommendation Total20202021202220232024Expenditures 250,000250,000Construction/Maintenance 250,000 250,000Total Total20202021202220232024Funding Sources 250,000250,000Grants/Donation 250,000 250,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 69 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Public Works Department Description New signal light at the intersection of Inwood Ave N and 5th St Project #PW-069 Priority 1 Critical Justification Traffic study completed by Kwik Trip showed development would meet warrants for a singlaized intersection. Budget Impact/Other Contributions from Hans Hagen and Kwik Trip will cover roughly 2/3rds of the city's cost of the project. City remaining funds to come from general fund. City cost is 1/3 of overall project cost (~$300,000) with remaining to be paid by Washington County Useful Life 25 years Project Name 5th St./Inwood Ave Signal Light Category Street Construction Type Improvement Status New Recommendation Total20202021202220232024Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total20202021202220232024Funding Sources 30,00030,000General Fund 70,00070,000Grants/Donation 100,000 100,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 70 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Sewer Department Description Sewer Extension to Hamlet on Sunfish Lake 2020-sewer extension and connection 2021-repair and upgrades of sewer lines Project #S-003 Priority 3 Important Justification Per 2016 MPCA agreement 100% assessed Budget Impact/Other Useful Life 40 years Project Name Hamlet on Sunfish Lake Sewer Extension Category Wastewater Type Improvement Status Active Total20202021202220232024Expenditures 200,000140,000 60,000Construction/Maintenance 140,000 60,000 200,000Total Total20202021202220232024Funding Sources 200,000140,000 60,000Sewer Fund 140,000 60,000 200,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 71 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Sewer Department Description Sewer extension in the Old Village Phases 5 & 6 (over 2 years) OV 5: 33rd, Kraft , Lampert, 32nd, Langley OV 6: Upper 33rd, 34th, 35th, 36th Properties just south of railroad track would only be completed if easements granted to reach properties Project #S-005 Priority 3 Important Justification Met Coucnil requirement to extend sewer Failing septic systems 100% Assessed Budget Impact/Other Useful Life 40 years Project Name Old Village Sewer Extension Phase 5 & 6 Category Wastewater Type Improvement Status Active Total20202021202220232024Expenditures 929,775929,775Construction/Maintenance 929,775 929,775Total Total20202021202220232024Funding Sources 929,775929,775Debt Service 929,775 929,775Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 72 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Sewer Department Description Section 36 Trunk Sewer Main Project #S-012 Priority 3 Important Justification Section 36 Trunk Sewer Main Development driven from Hudson Blvd to the north Budget Impact/Other Developer paid except for oversizing costs possibly Useful Life 40 years Project Name Section 36 Trunk Sewer Main Oversizing Category Wastewater Type Improvement Status Active Total20202021202220232024Expenditures 250,000250,000Other 250,000 250,000Total Total20202021202220232024Funding Sources 250,000250,000Sewer Fund 250,000 250,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 73 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Sewer Department Description Sewer Oversizing Project #S-013 Priority 3 Important Justification Sewer oversizing based on developer pace and phasing Budget Impact/Other Useful Life 40 years Project Name Sewer Oversizing Category Wastewater Type Improvement Status Active Total20202021202220232024Expenditures 35,00035,000Construction/Maintenance 35,000 35,000Total Total20202021202220232024Funding Sources 35,00035,000Sewer Fund 35,000 35,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 74 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Sewer Department Description Sewer extension in the Old Village Phases 5 & 6 (over 2 years) OV 5: 33rd, Kraft , Lampert, 32nd, Langley OV 6: Upper 33rd, 34th, 35th, 36th Properties just south of railroad track would only be completed if easements granted to reach properties Project #S-016 Priority 3 Important Justification Met Coucnil requirement to extend sewer Failing septic systems 100% Assessed Budget Impact/Other Useful Life Project Name Old Village Sewer Extension Phase 5 & 6 Category Wastewater Type Improvement Status Active Total20202021202220232024Expenditures 929,775929,775Construction/Maintenance 929,775 929,775Total Total20202021202220232024Funding Sources 929,775929,775Debt Service 929,775 929,775Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 75 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Sewer Department Description Legion Ave N Project #S-017 Priority 3 Important Justification Met Coucnil requirement to extend sewer Failing septic systems 100% Assessed Budget Impact/Other Useful Life Project Name Old Village Sewer Extension Phase 7 Category Wastewater Type Improvement Status Active Total20202021202220232024Expenditures 548,625548,625Construction/Maintenance 548,625 548,625Total Total20202021202220232024Funding Sources 548,625548,625Sewer Fund 548,625 548,625Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 76 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Sewer Department Description Extension of municipal sewer to Heritage Farms neighborhood Project #S-18 Priority 3 Important Justification Petition submitted by homeonwers in 2018 Failing septics with limited options for replacement Coordinated with road work for efficiency Budget Impact/Other 100% assessed Useful Life 40 years Project Name Heritage Farms Sewer Extension Category Wastewater Type Improvement Status New Recommendation Total20202021202220232024Expenditures 980,000980,000Construction/Maintenance 980,000 980,000Total Total20202021202220232024Funding Sources 980,000980,000Debt Service 980,000 980,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 77 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Storm Water Department Description Land acquistion (Schiltgen) Project #SW-001 Priority 3 Important Justification 2nd Phase to improving the regional drainage issues timing dependent upon development Budget Impact/Other Useful Life 40 years Project Name Phase 2 Regional Drainage Improvements Category Storm Sewer/Drainage Type Improvement Status Active Total20202021202220232024Expenditures 600,000600,000Land Acquisition 800,000800,000Construction/Maintenance 600,000 800,000 1,400,000Total Total20202021202220232024Funding Sources 1,400,000600,000 800,000Debt Service 600,000 800,000 1,400,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 78 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Storm Water Department Description Phase 3 of Regional Drainage Improvements (VFW Park) Project #SW-002 Priority 3 Important Justification 3rd Phase of Regional Drainage Improvements (VFW Park) Budget Impact/Other Useful Life 40 years Project Name Phase 3 Regional Drainage Improvements Category Storm Sewer/Drainage Type Improvement Status Active Total20202021202220232024Expenditures 500,000500,000Construction/Maintenance 500,000 500,000Total Total20202021202220232024Funding Sources 500,000500,000Debt Service 500,000 500,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 79 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact 2020 2024thru Department Storm Water Department Description Kramer Lake Floodplain Study Project #SW-003 Priority 3 Important Justification Required for I94 Phase 3 area development Budget Impact/Other Funding to come from developer or included as watershed study Useful Life 40 years Project Name Kramer Lake Floodplain Study Category Unassigned Type Improvement Status Active Total20202021202220232024Expenditures 60,00060,000Planning/Design 60,000 60,000Total Total20202021202220232024Funding Sources 60,00060,000Grants/Donation 60,000 60,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 80 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Replace waterman in Old Village phase 5; Upper 33rd, Lower 33r. 34/36th St. W OV Phase 5 and 6 done over 2 years Project #W-005 Priority 3 Important Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Budget Impact/Other 100% covered by water fund Useful Life 40 years Project Name OV Sewer Extension; Phase 5&6; water component Category Water Type Improvement Status Active Total20202021202220232024Expenditures 626,588626,588Construction/Maintenance 626,588 626,588Total Total20202021202220232024Funding Sources 626,588626,588Debt Service 626,588 626,588Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 81 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Water Tower #3 Project #W-006 Priority 1 Critical Justification needed for development in Phase 2 400 RECs available before needed Can be located in either Phase 2 or 3, the closer to Lake Elmo Ave the better Budget Impact/Other Useful Life 40 years Project Name Elevated Storage Tank #3 Category Water Type Equipment Status Active Total20202021202220232024Expenditures 275,000275,000Land Acquisition 3,200,0003,200,000Construction/Maintenance 275,000 3,200,000 3,475,000Total Total20202021202220232024Funding Sources 3,475,0003,475,000Debt Service 3,475,000 3,475,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 82 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description 12" water main pressure reduction valve with bypass Project #W-008 Priority 2 Very Important Justification need to reduce pressure and accommodate water flows Budget Impact/Other Useful Life 40 years Project Name Village East Trunk Watermain PRV Category Water Type Improvement Status Active Total20202021202220232024Expenditures 132,000132,000Construction/Maintenance 132,000 132,000Total Total20202021202220232024Funding Sources 132,000132,000Water Fund 132,000 132,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 83 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Water Department Description Project #W-010 Priority 4 Less Important Justification Recommended by TKDA Utility study in 2016 Regular maintenance of water tank Budget Impact/Other Useful Life 25 years Project Name Paint Water Tank at PW Category Water Type Equipment Status Active Total20202021202220232024Expenditures 800,000800,000Equip/Vehicles/Furnishings 800,000 800,000Total Total20202021202220232024Funding Sources 800,000800,000Water Fund 800,000 800,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 84 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Oversizing cost of watermain pipe installed by developers. Project #W-013 Priority 3 Important Justification Ensures all pipe in the City will have flow capacity necessary for water system Budget Impact/Other Useful Life 40 years Project Name Watermain Oversizing Category Water Type Improvement Status Active Total20202021202220232024Expenditures 227,00038,000 70,000 119,000Construction/Maintenance 38,000 70,000 119,000 227,000Total Total20202021202220232024Funding Sources 227,00038,000 70,000 119,000Water Fund 38,000 70,000 119,000 227,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 85 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Well and Pumphouse #5 Project #W-014 Priority 1 Critical Justification A 5th well and pumphouse to replace well 1 that was closed due to PFCs Budget Impact/Other State Grant funds for about 90% or $2.27m Remainder to come from city water funds to cost share according to increased pump size Useful Life 40 years Project Name Well & Pumphouse #5 Category Water Type Equipment Status Active Total20202021202220232024Expenditures 2,510,0002,510,000Construction/Maintenance 2,510,000 2,510,000Total Total20202021202220232024Funding Sources 2,270,0002,270,000Grants/Donation 240,000240,000Water Fund 2,510,000 2,510,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 86 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description 2020 street improvement project - water component Hertitage Farms (existing water) and Stonegate 2nd (new water) Project #W-017 Priority 3 Important Justification improvements to existing watermain in Heritage farms $50,000 extension of water to Stonegate 2nd due to PFCs $3,630,000 Budget Impact/Other funding for Stonegate 2nd water component subject to city receving 3M settlement funds from the state Useful Life 40 years Project Name 2020 Street & Utility Improvements-Water Category Water Type Improvement Status Active Total20202021202220232024Expenditures 3,680,0003,680,000Construction/Maintenance 3,680,000 3,680,000Total Total20202021202220232024Funding Sources 3,630,0003,630,000Grants/Donation 50,00050,000Water Fund 3,680,000 3,680,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 87 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description 2021 Street & Utility Improvements-water component (Hamlet on Sunfish Lake) Project #W-018 Priority 3 Important Justification Over a dozen wells with PFAS advisories. Coordinate with road work for efficiency. Budget Impact/Other Contingent upon getting state grant funds Useful Life 40 years Project Name 2021 Street & Utility Improvements-Water Category Water Type Improvement Status Active Total20202021202220232024Expenditures 1,702,0001,702,000Construction/Maintenance 1,702,000 1,702,000Total Total20202021202220232024Funding Sources 1,702,0001,702,000Grants/Donation 1,702,000 1,702,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 88 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Upgrade current water system SCADA Project #W-019 Priority 2 Very Important Justification Current 2008 system useful life through 2023; however upgrades would provide critical functionality improvements Budget Impact/Other Useful Life 15 years Project Name SCADA Upgrade Category Water Type Equipment Status Active Total20202021202220232024Expenditures 50,00050,000Equip/Vehicles/Furnishings 50,000 50,000Total Total20202021202220232024Funding Sources 50,00050,000Water Fund 50,000 50,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 89 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Water Department Description Replaces current 2007 vehicle vehicle used almost everyday for locates, rounds, meter change outs, etc Project #W-022 Priority 3 Important Justification End of Useful Life Budget Impact/Other $70,000 total cost shared equally amongst water and sewer Useful Life Project Name Utility Truck Category Vehicles Type Equipment Status Active Total20202021202220232024Expenditures 70,00070,000Equip/Vehicles/Furnishings 70,000 70,000Total Total20202021202220232024Funding Sources 35,00035,000Sewer Fund 35,00035,000Water Fund 70,000 70,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 90 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Water Department Description Replace 200 obsolete Sensus and Neptune meters each year with new Sensus 1 pro meters Project #W-023 Priority 1 Critical Justification Old meters not working properly leads to the need to estimate usage therefore billing process takes more staff time Budget Impact/Other Useful Life 15 years Project Name Water Meter Change Out Category Water Type Improvement Status Active Total20202021202220232024Expenditures 150,00050,000 50,000 50,000Equip/Vehicles/Furnishings 50,000 50,000 50,000 150,000Total Total20202021202220232024Funding Sources 150,00050,000 50,000 50,000Water Fund 50,000 50,000 50,000 150,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 91 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Public Works Director 2020 2024thru Department Water Department Description Automated radio read system for water meters. Project #W-024 Priority 3 Important Justification Eliminates the need to drive around and obtain reads. Improves billing and gives "real time" readings to help detect leaks. Budget Impact/Other Useful Life Project Name Automated Radio Read System Category Water Type Improvement Status Active Total20202021202220232024Expenditures 300,000300,000Equip/Vehicles/Furnishings 300,000 300,000Total Total20202021202220232024Funding Sources 300,000300,000Water Fund 300,000 300,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 92 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Replacement of water mains in conjunction with sewer extension to Phase 6 and 5 done over 2 years Project #W-025 Priority 3 Important Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Budget Impact/Other Useful Life Project Name OV sewer extension phase 6 & 5; water component Category Water Type Improvement Status Active Total20202021202220232024Expenditures 626,588626,588Construction/Maintenance 626,588 626,588Total Total20202021202220232024Funding Sources 626,588626,588Debt Service 626,588 626,588Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 93 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Old Village Phase 7 water main replacement on Legion Ave Project #W-026 Priority 3 Important Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Budget Impact/Other Useful Life Project Name OV sewer extension Phase 7; water component Category Water Type Improvement Status Active Total20202021202220232024Expenditures 265,650265,650Construction/Maintenance 265,650 265,650Total Total20202021202220232024Funding Sources 265,650265,650Water Fund 265,650 265,650Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 94 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Pressure reduction station-12" Project #W-027 Priority 3 Important Justification nneded when water crosses Keats Ave Budget Impact/Other Useful Life 40 years Project Name Pressure Reduction Station-Connection to WT #3 Category Water Type Improvement Status Active Total20202021202220232024Expenditures 132,000132,000Construction/Maintenance 132,000 132,000Total Total20202021202220232024Funding Sources 132,000132,000Water Fund 132,000 132,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 95 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Extension of water main to Blackford property Project #W-028 Priority 2 Very Important Justification some private wells have received health based advisories and are on bottled water Budget Impact/Other project continegent upon city recevieng state funds Useful Life 40 years Project Name Blackford Water Ext Category Water Type Improvement Status Active Total20202021202220232024Expenditures 37,00037,000Construction/Maintenance 37,000 37,000Total Total20202021202220232024Funding Sources 37,00037,000Grants/Donation 37,000 37,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 96 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Petition recevied from city in 2017 to extend water on 31st St south of the UP Railroad Project #W-029 Priority 2 Very Important Justification private wells recevied health based advisories due to PFCs Budget Impact/Other project contingent upon city receeving state funds Useful Life 40 years Project Name 31st St Area Water Extension Category Water Type Improvement Status Active Total20202021202220232024Expenditures 459,000459,000Construction/Maintenance 459,000 459,000Total Total20202021202220232024Funding Sources 459,000459,000Grants/Donation 459,000 459,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 97 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Water extensions to Parkview Estates, Cardinal Ridge, Torres Pines and Irish Ct due to PFAS contamination Upgrades to water system in Beaut Crest coordinated with road work for efficiency Project #W-030 Priority 3 Important Justification Opportune time for water replacements is when road is already opened for construction Budget Impact/Other New water main extensions contingent upon receving staet grant funds Useful Life 40 years Project Name 2023 Street Projects-water component Category Water Type Improvement Status Active Total20202021202220232024Expenditures 4,039,2004,039,200Construction/Maintenance 4,039,200 4,039,200Total Total20202021202220232024Funding Sources 3,989,2003,989,200Grants/Donation 50,00050,000Water Fund 4,039,200 4,039,200Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 98 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Water upgrades to Fields 2 Project #W-031 Priority 3 Important Justification Aged watermain to be replaced when road work is done for efficiency Budget Impact/Other Useful Life 40 years Project Name 2022 Street Projects-water component Category Water Type Improvement Status Active Total20202021202220232024Expenditures 50,00050,000Construction/Maintenance 50,000 50,000Total Total20202021202220232024Funding Sources 50,00050,000Water Fund 50,000 50,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 99 Capital Improvement Plan - 2020 - 2024 City of Lake Elmo, Minnesota Contact Engineer 2020 2024thru Department Water Department Description Water system upgrades as road work is completed for efficiency Project #W-032 Priority 3 Important Justification Budget Impact/Other Useful Life 40 years Project Name 2024 Street Projects-water component Category Water Type Improvement Status Active Total20202021202220232024Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total20202021202220232024Funding Sources 100,000100,000Water Fund 100,000 100,000Total Thursday, October 24, 2019Produced Using the Plan-It Capital Planning Software 100