HomeMy WebLinkAboutPC 11.13.19 agenda packet 1 THE CITY OF LAKE ELMO 3800 Laverne Avenue North (651) 747-3900 Lake Elmo, MN 55042 www.lakeelmo.org NOTICE OF MEETING The City of Lake Elmo Planning Commission will conduct a meeting on Wednesday November 13, 2019 at 7:00 p.m. AGENDA 1. Pledge of Allegiance 2. Approve Agenda 3. Approve Minutes a. October 28,2019 4. Public Hearings a. 2020—2024 CAPITAL IMPROVEMENT PLAN b. VARIANCE REQUESTS—Vang Residence(2038 Inwood Avenue North) Front yard Setback Variance Side yard Setback Variance C. LAKE ELMO INWOOD APARTMENTS(5Tn Street North and Island Trail) Minor Subdivision(Inwood 71'Addition) Development Stage Planned Unit Development(PUD)Plans 5. New Business None 6. Communications/Updates a. City Council Update 11-5-2019 Meeting • 2040 Comprehensive Plan • Lake Elmo Senior Living(39`h Street) • Zoning Text Amendment—Accessory Building Heights • Mountain Bike Trails in Sunfish Lake Park b. Staff Updates 2 c. Upcoming PC Meetings: 1. November 25,2019 2. December 9,2019 7. Adj ourn ***Note:Every effort will be made to accommodate person or persons that need special considerations to attend this meeting due to a health condition or disability.Please contact the Lake Elmo City Clerk if you are in need of special accommodations. TI It: CITY OF LAKE ELMO City of Lake Elmo Planning Commission Meeting Minutes of October 28, 2019 Commissioner Weeks called to order the meeting of the Lake Elmo Planning Commission at 7:00 p.m. COMMISSIONERS PRESENT: Cadenhead, Hartley, Holtz, Risner, Steil and Weeks COMMISSIONERS ABSENT: None STAFF PRESENT: Planning Director Roberts Approve Agenda: M/S/P: Hartley/Cadenhead move to approve the agenda as presented, Vote: 6-0, motion carried unanimously. Approve Minutes: M/S/P: Risner/Steil move to approve the October 16, 2019 minutes, Vote: 6-0, motion carried unanimously. Public Hearings - None New Business Subdivision Ordinance Update Roberts presented the proposed changes to the subdivision ordinance. For this latest update, he specifically mentioned the items that will be removed from Planning Commission review, street naming, utility easements, the changes recommended by the City Attorney. Hartley asked about lot splits and minor subdivision. Cadenhead asked for some clarification between the three and four lot requirements for lot divisions and minor subdivisions. Roberts explained that it is staff intent to expedite the review process for applicants by not having them attend multiple meetings. He stated that by having only staff review, the Planning Commission would have to have faith in staff that they are providing a thorough review of the plats when they come in. Lake Elmo Planning Commission Minutes; 10-28-19 M/S/P: Holtz/Hartley move to recommend approval of all the suggested amendments to the City Subdivision Ordinance, with the possible change to the warranty information, Vote: 6-0, motion carried unanimously. City Council Updates At the October 15, 2019 meeting City Council approved the Inwood 6th Addition minor subdivision and Kwik Trip Fuel Station CUP. Kwik Trip did a traffic study, their engineer determined that once Kwik Trip is open, there will be a need for a traffic signal at Inwood Avenue and 51h Street North. The developers of the Inwood PUD contributed a portion of the cost of the traffic signal for Inwood Avenue and 51h Street to the City and at the meeting Kwik Trip agreed to pay half of the cities remaining portion of the cost of the new traffic signal. Staff Updates 1. 2040 Comprehensive Plan Update, it received Met Council approval on October 23rd with minor changes. The changes are being finalized and will be presented to the City Council on November 5th 2. Upcoming meeting a. November 13, 2019 a Wednesday, will be the following meeting due to Veteran's Day. Inwood 7th with the multi-family approximately 65 unit apartment building. An original farmhouse located on Inwood is looking to expand, but it does not meet the setbacks in the zoning district. b. November 25, 2019 Meeting adjourned at 8:05 pm Respectfully submitted, Tanya Nuss Permit Technician Lake Elmo Planning Commission Minutes; 10-28-19 THE CITY OF LAKE ELMO STAFF REPORT DATE: November 13, 2019 AGENDA ITEM: 2020-2024 CIP TO: Planning Commission SUBMITTED BY: Kristina Handt, City Administrator BACKGROUND: In May staff developed recommendations for updates to the 2020-2024 Capital Improvement Plan (CIP)working in consultation with the Public Safety Committee, Maintenance Advisory Committee and the Parks Commission. In June, the Finance Committee reviewed the plan and made a recommendation to the Council. Before the recommendation can go to Council, the Planning Commission will need to hold a public hearing on the plan and make a recommendation about whether or not it is consistent with the Comprehensive Plan since the CIP is a component of the Comprehensive Plan. Since the plan years are 2020-2024, the plan should be compared to the 2040 Comprehensive Plan that was adopted by the City Council on November 5t'. ISSUE BEFORE COMMISSION: Is the proposed 2020-2024 Capital Improvement Plan consistent with the 2040 Comprehensive Plan? PROPOSAL DETAILS/ANALYSIS: A copy of the 2020-2024 CIP is included in your packet. It includes projects that cost at least $25,000 and have a useful life span of five years or longer. Projects are prioritized and funding sources are identified. The 2020-2024 CIP includes 72 separate projects with a total estimated cost of about$61 million. These projects include street work,new facilities(city hall and fire station),equipment(fire,public works,parks and utilities),park and trail improvements, and utility infrastructure. FISCAL IMPACT: The total estimated costs of all the projects is $61 million. Funding sources are identified for each project with a summary included on page 14. OPTIONS: After holding the public hearing, the Planning Commission may: 1) Find that the 2020-2024 CIP is consistent with the 2040 Comprehensive Plan 2) Find that the 2020-2024 CIP is not consistent with the 2040 Comprehensive Plan and note the inconsistencies. RECOMMENDATION: "Motion to recommend to the City Council that the 2020-2024 Capital Improvement Plan is consistent with the 2040 Comprehensive Plan" ATTACHMENT: • Draft 2020-2024 Capital Improvement Plan THE CITY OF LAK LMO City of Lake Elmo Capital Improvement Program 2020 — 2024 Planning Commission Draft 11/13/19 1 TABLE OF CONTENTS Introduction Whatis a CIP? .................................................................................................................3 Scopeof the Draft CIP.....................................................................................................3 FundingSources...............................................................................................................4 ProjectPriorities...............................................................................................................5 2020-2024 CIP Overview StreetProjects ..................................................................................................................6 Project Highlights by Department ...................................................................................6 CIP Reports (Appendix) ProjectsListings...................................................................................1 0 Projects by Year& Priority ......................................................................13 Funding Source Summary........................................................................16 Projects by Funding Source 2020-2024 .......................................................17 Projects by Funding Source 2020-2029 .......................................................20 Projects & Funding Sources by Department...................................................25 ProjectDetail.......................................................................................29 2 INTRODUCTION What is a CIP? A Capital Improvement Program, or CIP, is a multi-year(typically 5 years) capital expenditure plan for a city's infrastructure (such as streets,parks and utility systems), vehicles, equipment and public buildings. It identifies the major projects needed and desired by the community, their potential costs and how they would be financed. Including a project in a CIP does not commit the city to that project. The City Council must specifically authorize each one, and the associated funding, before any project may proceed. When the CIP is reviewed(ideally annually, in conjunction with the budgeting process), projects may go forward as planned, advance ahead of schedule, be removed entirely, or new projects may be added, depending upon changes in circumstances and priorities. The Minnesota Land Planning Act requires that the implementation plan portion of the Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water supply, parks and open space) for a five-year time period. Cities often expand the scope of their CIPs to include other capital needs (major equipment replacements, for example) and sometimes look beyond the five-year time period, up to 20 years in the future for some projects. Such projects represent more of a"wish-list"that can be evaluated each time the plan is updated. As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter 473.865 provides that"a local governmental unit shall not adopt any official control or fiscal device which is in conflict with its comprehensive plan." A fiscal device includes a budget or bond issue; so it is important that the plan and CIP be kept-up-to date and in sync with city budgets. The primary benefit of a CIP is as a financial planning tool to help the city plan for the impact of capital needs on future budgets and property taxes, and to help forecast the need for borrowing to undertake major projects. The information developed as part of the capital planning process can help document the need for various projects and assist the City Council to sort out competing priorities. Scope of the CIP Lake Elmo's CIP includes all capital projects that cost at least $25,000 and have a useful life span of five years or longer. Projects include all capital needs including major repairs to buildings and equipment purchases and replacements. Any projects not meeting these parameters would be reviewed as part of the annual operating budget,but would not be included in the CIP. 3 Funding Sources The CIP identifies a possible funding source(s) for each project listed. The various funding sources are as follows: Debt Service Fund Projects financed by borrowing, later to be repaid with property taxes, and potentially special assessments depending upon the characteristics of the project. General Fund Annual operating budget,primarily funded by property tax revenues. Park Improvement Fund Existing City fund, receipts from cash-in-lieu of land park dedication fees paid by developers and others who subdivide their land. Stormwater Fund Funds come from fees paid by users of the Stormwater system Wastewater Fund Funds come from fees paid by users of the Wastewater System Vehicle Replacement Fund Fund used to segregate funds set aside for planned replacements of existing vehicles. Funds are transferred from the operating budget(primarily property taxes) and the sale of equipment. Water Fund Funds come from fees paid by users of the Water System Municipal State Aid(MSA) State aid funds allocated to the City each year; annual allocation grows as the City grows. In addition to these sources, it is possible that future projects could be funded from donations, grants,user fees or other sources not listed. In 2019 the Vehicle Replacement Fund was revived. The expected fund balance at 12/31/19 is estimated to be about $215,000. The updated proposed schedule of revenues and expenditures assumes the 2% increase in the tax rate each year continues. 4 Year Revenue Expense Balance 2020 $872,139 $298,500 $788,715 2021 $794,679 $310,000 $1,273,394 2022 $150,000 $972,500 $450,894 2023 $175,000 $289,000 $336,894 2024 $200,000 $209,000 $327,894 2025 $387,300 $55,000 $660,194 2026 $424,500 $35,000 $1,049,694 2027 $635,290 $1,028,500 $656,484 2028 $1,010,030 $0 $1,666,514 2029 $531,000 $230,000 $1,967,514 Revenue from the sale of equipment is not included in the above table. Project Priorities Capital improvement projects should be prioritized in some way so that limited funding can be allocated to those which are most important. This is difficult because the varying nature of the projects and their benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may have some disadvantages because they may give a false sense of objectivity or precision to the priority setting process. Others use simpler systems,or simply do not try to compare projects that are like"apples and oranges." There is no accepted system or"industry standard"for prioritizing projects. The following system has been utilized by staff- 1 Critical or urgent,high-priority projects that should be done if at all possible; a special effort should be made to find sufficient funding for all of the projects in this group. 2 Very important,high-priority projects that should be done as funding becomes available. 3 Important and worthwhile projects to be considered if funding is available;may be deferred to a subsequent year. 4 Less important,low-priority projects;desirable but not essential. 5 Future Consideration 2020-2024 CIP OVERVIEW For 2020 through 2024, the draft CIP includes 72 separate projects (active, pending and new recommendations) with a total estimated cost of$60,741,401. All cost estimates are preliminary and based on current dollars. No assumptions have been made about inflation. It will be 5 important to refine and update costs when the plan is reviewed, especially for projects in the first year or two of the plan. Some projects beyond the five-year planning period are also included in the CIP. Most of these projects are replacements for equipment and vehicles (such as fire trucks) which may have a life span of 10, 15 or 20 years and more. The plan may include "pending"projects for which timelines (and in most cases, cost estimates)have not yet been identified. As more information is developed about the need for, cost, and possible funding sources for these projects, they will be included in future CIP updates. Street Projects The update includes the following street projects in the CIP: • PW-026, Reclaim roads in Heritage Farms at a cost of$1,774,000 in 2020. State grant will cover cost of roads in Stonegate 2nd since it is tied to a water project. • PW-027, Reconstruction of roads in Tamarack Farms, and Hamlet on Sunfish Lake and Old Village Phase 5 for$2,864,00 in 2021. • PW-030, CSAH 15/301h St Signal for$250,000 in 2023 • PW-031, CSAH6/Inwood Street Signal for$250,000 in 2024 • PW-034, 15th St N (MSA Street) for$1,045,000 moved to 2022 from 2020 • PW-035, UP RR Crossing-Village Parkway for$525,000 moved to 2021 from 2020 • PW-036, UP RR Crossing-Private Drive Closure for$105,000 moved to 2021 from 2020 • PW-037, UP RR Crossing-Klondike Ave for$262,500 moved to 2021 from 2020 • PW-038, Reclaim roads in Fields of St. Croix 1 and 2 and Old Village Phase 6 streets, $3,045,000 in 2022 • PW-039, Reclaim roads in Parkview Estates, Cardinal Ridge, Torres Pines, Beaut Crest and Irish Ct and Old Village Phase 7, $2,289,200 in 2023 • PW-040, Reclaim roads in Tana Ridge, Carriage Station, and 59th St Ct/55th St/Julep Way for$1,653,000 in 2024. • PW-052, Ideal Ave (Phase 2) for$800,000 in 2022 • PW-053, Ideal Ave (CSAH 13) from CSAH 14 to CSAH 6, for$800,000 in 2024 • PW-057, Manning Phase 3 for$250,000 in 2021 and $1,400,000 in 2023 • PW-058, TH 36/Manning Interchange for$2 million(very rough estimate) in 2021 • PW-059, Keats Ave/TH 36 Acceleration Lane was removed since we learned we were not awarded a state grant • PW-066, Manning Phase 4 (I-94 up to Oakland Middle School) for$50,000 (planning) in 2024 (new) May not see actual bill from county until construction sometime later. • PW-067, Manning/Hudson Stoplight for$250,000 in 2021 is covered by developer. (new) • PW-069, 5th St/Inwood Ave Signal light for$100,000 in 2020. About 2/3rds of City portion is covered by developers. (new) Project Highlights by Department 6 Administration/Finance: ➢ AF-001,New City Hall, Fire Station and Public Works Improvements, is the only request in this department. The project costs have been increased by 3% from the 2018 estimates from Leo A Daly. The project activities would be split over three years 2020-2022 since the last tenant lease expires in June 2022. However, costs are shown as two separate bond issues. Fire: ➢ F-010, Replace BI for$60,000 in 2021. ➢ F-011, Engine E1 replacement for$580,000 in 2022 ➢ F-017, Turnout Gear Replacements for$60,000 in 2022 ➢ F-018 and F-019, Tahoes for Fire Department in 2020 and 2022, are being added back into the CIP. Previous council/committee in 2016 removed them and anticipated them going in operating budget when sales cost were subtracted from new cost the difference was less than $25,000. Staff proposes putting them back in to the CIP since the asset is over$25,000 and to fund them through the Vehicle Replacement Fund. Parks and Recreation: ➢ PR-007, Sunfish Lake Park Improvements for$120,000 in 2020 for mountain bike trails and$90,000 in 2021 includes paving hiking trails to meet ADA standards. ➢ PR-009, Central Greenway Regional Trail for$50,000 in 2023. This project has been updated to reflect the recent work between the city and county on the Central Greenway Corridor through Lake Elmo. Total project costs are estimated at$12 million. However the trail will be built out in segments over many years depending upon grant funding, development and road work. ➢ PR-015, Dump Truck for $90,000 in 2022 ➢ PR-017,New or Refurbished Ballfields for$1 million in 2022. ➢ PR-018,New Park Development for$150,000 in 2020 (Inwood) ➢ PR-019, Dog Park for$25,000 in 2023 ➢ PR-020, Utility Vehicle/Trail Groomer for$37,000 in 2024 Public Works: ➢ Street Projects were mentioned above ➢ The remaining projects are equipment purchases. Costs have been updated to reflect more recent pricing. Only purchase proposed for 2020 is Dump Truck with Plow. Sewer System: ➢ 5-003, Hamlet on Sunfish Lake Sewer, for$140,000 in 2020 and$60,000 in 2021. This is per an agreement with MPCA ➢ The City Engineer has proposed doing 5-005, Old Village Sewer Extension Phase Five and 5-016 Old Village Phase Six combined over a two year period in 2021 and 2022 ➢ 5-012, Section 36 Trunk Sewer Oversizing since the Four Corners Development will install it will be about $250,000 in 2021 ➢ 5-013, Sewer Oversizing for$35,000 in 2020 for Legacy and Wildflower ➢ 5-017, Old Village Sewer Extension Phase Seven for$548,625 in 2023 ➢ 5-018, Heritage Farms Sewer Extension for$980,000 in 2020 (new) Storm Water System: ➢ SW-001, Phase 2 Regional Drainage Improvements for$600,000 in 2022 and$800,000 in 2023. The costs and dates are estimates and will depend upon development. ➢ SW-002, Phase 3 Regional Drainage Improvements for$500,000 in 2022. The costs and dates are estimates and will depend upon development. ➢ SW-003, Kramer Lake Floodplain Study for$60,000 in 2022 assumes a grant from the watershed district Water System: ➢ W-005, Old Village water main Phase Five and Phase 6 (W-025) done combined over two years for revised estimated cost of$626,588 each year in 2021 and 2022 ➢ W-006, Elevated Storage Tank#3, for revised estimated costs of$275,000 in 2020 and 3,200,000 in 2021 ➢ W-008, Village East Trunk Water main, for$132,000 in 2020 ➢ W-010, Paint Water Tower Tank#2 for $800,000 in 2023 ➢ W-013, Water main Oversizing for$38,000 in 2020 and$70,000 in 2021 and $119,000 in 2024 ➢ W-014, Well &Pump house #5 for$2,510,000 in 2020 ➢ W-017, Water Main upgrades and extension consistent with road work. Heritage Farms water main upgrades for $50,000 and Stonegate water extension for$3.63m in 2020 includes funding for water extension to Stonegate from the state. ➢ W-018, Water Main extension to Hamlet on Sunfish Lake for$1,702,000 consistent with road work and assuming state grant funds are received. ➢ W-019, SCADA System Upgrade for revised estimated costs of$50,000 in 2022 ➢ W-022, Utility Truck for $70,000 in 2021 with costs split equally amongst water and sewer ➢ W-023, Water Meter Change out for revised cost of$50,000 each year in 2019-2022 ➢ W-024, Automated Radio Read System for$300,000 in 2022 ➢ W-026, Old Village water extension Phase Seven for revised cost estimate of$265,650 in 2023 ➢ W-027, Pressure Reduction Station-Connection to WT #3 for revised cost estimate of $132,000 in 2021 ➢ W-028, Blackford Water Extension for$37,000 in 2020 assumes state funding ➢ W-029, 31 st St Water Extension for$459,000 in 2020 assume state funding ➢ W-030, Water Main extension to Parkview Estates, Cardinal Ridge, Torres Pines, and Irish Ct consistent with road work and assumes state grants for$4,039,200 in 2023 ➢ W-031, water main upgrades in Fields of St Croix 2 consistent with road work for $50,000 8 ➢ W-032, water main upgrades in Tana Ridge and Carriage Station consistent with road work for$100,000 in 2024 9 City of Lake Elmo, Minnesota Capital Improvement Plan - 2020 - 2024 PROJECT LISTING Includes Projects from All Years Admin/Finance Department Status Project# Project Name Active AF-001 New City Hall,Fire Station,PW Improvements Building Department Status Project# Project Name Active B-001 Replacement Inspection Truck >ire Department Status Project# Project Name Pending F-005 Replacement of Parking Lot at Station#2 Active F-001 Rescue Engine E2 Active F-004 Tender 1 Active F-007 SCBA Replacements Active F-010 B 1 Active F-011 E1 Engine Active F-012 B 2 Active F-013 T2 Tender/Engine Active F-014 Boat and Trailer Active F-015 Ranger Active F-016 L1 Ladder Truck Active F-017 Turnout Gear Replacements New Recommendation F-018 CV 1(Tahoe) New Recommendation F-019 CV 2(Tahoe) Parks and Recreation Status Project# Project Name Pending PR-002 50th Street Trail Pending PR-003 Demontreville Park Improvements Active PR-005 Pebble Park Improvements Active PR-007 Sunfish Lake Park Improvements Active PR-009 Central Greenway Regional Trail Active PR-015 Dump Truck Active PR-017 New or Refurbished Ballfields Active PR-018 New Park Development Active PR-019 Dog Park Active PR-020 UtilityVehicile/Trail Groomer Public Works Department Status Project# Project Name Pending PW-013 2019 Street Improvements Pending PW-059 Keats Ave/TH 36 Acceleration Lane Active PW-004 Loader Active PW-006 Tractor Active PW-010 Lake Elmo Ave at 5th St Turn Lane Active PW-019 PickupTruck/plow Active PW-023 Vac Trailer Active PW-026 2020 Street Improvements Active PW-027 2021 Street Improvements Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 10 Active PW-029 CSAH 1 9/Hudson Blvd Signal&Turn Lane Active PW-030 CSAH 15/30th Street Signal Active PW-031 CSAH 6/Inwood Signal Active PW-034 15th Street North(MSA Street) Active PW-035 UP RR Crossing-Village Parkway Active PW-036 UP RR Crossing-Private Drive Closure Active PW-037 UP RR Crossing:Klondike Ave Active PW-038 2022 Street Improvements Active PW-039 2023 Street Improvements Active PW-040 2024 Street Improvements Active PW-041 2025 Street Irmprovements Active PW-042 2026 Street Improvements Active PW-043 Service Truck Active PW-044 Trac Hoe Active PW-045 Tandem Plow Truck Active PW-047 Dump Truck w/Plow Active PW-048 Mini Loader Active PW-049 Asphalt Hot Box Active PW-050 Dump Truck with Plow Active PW-052 Ideal Ave(CSAH 13)Phase 2 Active PW-053 Ideal Ave(CSAH 13)-Phase 3-CSAH 14 to CSAH 6 Active PW-054 Skidloader Active PW-055 2027 Street Improvements Active PW-056 2028 Street Improvements Active PW-057 Manning Ave Phase 3 Active PW-058 TH 36/Manning Interchange Active PW-060 Pickup wlplow Active PW-061 Pickup Active PW-062 DumpTruck w/plow,sander&underbody Active PW-063 Pickup wllift gate&plow Active PW-064 Pickup w/lift gate&plow Active PW-065 Dump Truck wlplow,sander&underbody New Recommendation PW-066 Manning Phase 4 New Recommendation PW-067 Manning/Hudson Stoplight New Recommendation PW-068 2029 Steet Improvements New Recommendation PW-069 5th St./Inwood Ave Signal Light Sewer Department Status Project# Project Name Active S-003 Hamlet on Sunfish Lake Sewer Extension Active S-005 Old Village Sewer Extension Phase 5&6 Active S-012 Section 36 Trunk Sewer Main Oversizing Active S-013 Sewer Oversizing Active S-016 Old Village Sewer Extension Phase 5&6 Active S-017 Old Village Sewer Extension Phase 7 New Recommendation S-18 Heritage Farms Sewer Extension Storm Water Department Status Prowect# Project Name Active SW-001 Phase 2 Regional Drainage Improvements Active SW-002 Phase 3 Regional Drainage Improvements Active SW-003 Kramer Lake Floodplain Study Active SW-004 Surface Water Management Plan(Comp Plan)update Water Department Status Project# Project Name Pending W-001 2019 Street Improvement Project-water component Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 11 Active W-005 OV Sewer Extension;Phase 5&6;water component Active W-006 Elevated Storage Tank#3 Active W-007 Hammes Estates 12"bypass Active W-008 Village East Trunk Watermain PRV Active W-010 Paint Water Tank at PW Active W-012 Well#4 Pump-Pull and Rebuild Active W-013 Watermain Oversizing Active W-014 Well&Pumphouse#5 Active W-017 2020 Street&Utility Improvements-Water Active W-018 2021 Street&Utility Improvements-Water Active W-019 SCADA Upgrade Active W-022 Utility Truck Active W-023 Water Meter Change Out Active W-024 Automated Radio Read System Active W-025 OV sewer extension phase 6&5;water component Active W-026 OV sewer extension Phase 7;water component Active W-027 Pressure Reduction Station-Connection to WT#3 Active W-028 Blackford Water Ext Active W-029 31st St Area Water Extension Active W-030 2023 Street Projects-water component Active W-031 2022 Street Projects-water component Active W-032 2024 Street Projects-water component Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 12 City of Lake Elmo, Minnesota Capital Improvement Plan - 2020 - 2024 2020 thm 2024 PROJECTS BY YEAR & PRIORITY Project Name Department Project# Priority Project Cost 2020 Priority I Critical Dump Truck w/Plow Public Works Department PW-047 1 250,000 5th St./Inwood Ave Signal Light Public Works Department PW-069 1 100,000 Elevated Storage Tank#3 Water Department W-006 1 275,000 Well&Pumphouse#5 Water Department W-014 1 2,510,000 Water Meter Change Out Water Department W-023 1 50,000 Total for:Priority 1 3,185,000 Priority 2 Very Important New City Hall,Fire Station,PW Improvements Admin/Finance Department AF-001 2 1,287,500 Village East Trunk Watermain PRV Water Department W-008 2 132,000 Blackford Water Ext Water Department W-028 2 37,000 31 st St Area Water Extension Water Department W-029 2 459,000 Total for:Priority 2 1,915,500 Priority 3 Important CV 1(Tahoe) Fire Department F-018 3 48,500 Sunfish Lake Park Improvements Parks and Recreation PR-007 3 120,000 2020 Street Improvements Public Works Department PW-026 3 2,574,000 Hamlet on Sunfish Lake Sewer Extension Sewer Department S-003 3 140,000 Sewer Oversizing Sewer Department S-013 3 35,000 Heritage Farms Sewer Extension Sewer Department S-18 3 980,000 Watermain Oversizing Water Department W-013 3 38,000 2020 Street&Utility Improvements-Water Water Department W-017 3 3,680,000 Utility Truck Water Department W-022 3 70,000 Total for:Priority 3 7,685,500 Priority 4 Less Important New Park Development Parks and Recreation PR-018 4 150,000 Total for:Priority 4 150,000 Total for 2020 12,936,000 2021 Priority I Critical Elevated Storage Tank#3 Water Department W-006 1 3,200,000 Water Meter Change Out Water Department W-023 1 50,000 Total for:Priority 1 3,250,000 Priority 2 Very Important New City Hall,Fire Station,PW Improvements Admin/Finance Department AF-001 2 4,609,250 Tractor Public Works Department PW-006 2 130,000 UP RR Crossing-Village Parkway Public Works Department PW-035 2 525,000 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 13 Project Name Department Project# Priority Project Cost UP RR Crossing-Private Drive Closure Public Works Department PW-036 2 105,000 UP RR Crossing:Klondike Ave Public Works Department PW-037 2 262,500 Mini Loader Public Works Department PW-048 2 120,000 TH 36/Manning Interchange Public Works Department PW-058 2 2,000,000 Manning/Hudson Stoplight Public Works Department PW-067 2 250,000 Total for:Priority 2 8,001,750 Priority 3 Important B 1 Fire Department F-010 3 60,000 Sunfish Lake Park Improvements Parks and Recreation PR-007 3 90,000 2021 Street Improvements Public Works Department PW-027 3 2,864,000 Manning Ave Phase 3 Public Works Department PW-057 3 250,000 Hamlet on Sunfish Lake Sewer Extension Sewer Department S-003 3 60,000 Old Village Sewer Extension Phase 5&6 Sewer Department S-005 3 929,775 Section 36 Trunk Sewer Main Oversizing Sewer Department S-012 3 250,000 OV Sewer Extension;Phase 5&6;water component Water Department W-005 3 626,588 Watermain Oversizing Water Department W-013 3 70,000 2021 Street&Utility Improvements-Water Water Department W-018 3 1,702,000 Pressure Reduction Station-Connection to WT#3 Water Department W-027 3 132,000 Total for:Priority 3 7,034,363 Priority 4 Less Important Asphalt Hot Box Public Works Department PW-049 4 60,000 Total for:Priority 4 60,000 Total for 2021 18,346,113 2022 Priority I Critical E1 Engine Fire Department F-011 1 580,000 Turnout Gear Replacements Fire Department F-017 1 60,000 New or Refurbished Ballfields Parks and Recreation PR-017 1 1,000,000 Dump Truck with Plow Public Works Department PW-050 1 250,000 Water Meter Change Out Water Department W-023 1 50,000 Total for:Priority 1 1,940,000 Priority 2 Very Important New City Hall,Fire Station,PW Improvements Admin/Finance Department AF-001 2 5,381,750 SCADA Upgrade Water Department W-019 2 50,000 Total for:Priority 2 5,431,750 Priority 3 Important CV 2(Tahoe) Fire Department F-019 3 52,500 Dump Truck Parks and Recreation PR-015 3 90,000 15th Street North(MSA Street) Public Works Department PW-034 3 1,045,000 2022 Street Improvements Public Works Department PW-038 3 3,045,000 Ideal Ave(CSAH 13)Phase 2 Public Works Department PW-052 3 800,000 Old Village Sewer Extension Phase 5&6 Sewer Department S-016 3 929,775 Phase 2 Regional Drainage Improvements Storm Water Department SW-001 3 600,000 Phase 3 Regional Drainage Improvements Storm Water Department SW-002 3 500,000 Kramer Lake Floodplain Study Storm Water Department SW-003 3 60,000 Automated Radio Read System Water Department W-024 3 300,000 OV sewer extension phase 6&5;water component Water Department W-025 3 626,588 2022 Street Projects-water component Water Department W-031 3 50,000 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 14 Project Name Department Project# Priority Project Cost Total for:Priority 3 8,098,863 Total for 2022 15,470,613 2023 Priority 2 Very Important Loader Public Works Department PW-004 2 185,000 Trac Hoe Public Works Department PW-044 2 85,000 Total for:Priority 2 270,000 Priority 3 Important Central Greenway Regional Trail Parks and Recreation PR-009 3 50,000 CSAH 15/30th Street Signal Public Works Department PW-030 3 250,000 2023 Street Improvements Public Works Department PW-039 3 2,289,200 Skidloader Public Works Department PW-054 3 70,000 Manning Ave Phase 3 Public Works Department PW-057 3 1,400,000 Old Village Sewer Extension Phase 7 Sewer Department S-017 3 548,625 Phase 2 Regional Drainage Improvements Storm Water Department SW-001 3 800,000 OV sewer extension Phase 7;water component Water Department W-026 3 265,650 2023 Street Projects-water component Water Department W-030 3 4,039,200 Total for:Priority 3 9,712,675 Priority 4 Less Important Dog Park Parks and Recreation PR-019 4 25,000 Paint Water Tank at PW Water Department W-010 4 800,000 Total for:Priority 4 825,000 Total for 2023 10,807,675 2024 Priority I Critical Manning Phase 4 Public Works Department PW-066 1 50,000 Total for:Priority 1 50,000 Priority 3 Important B 2 Fire Department F-012 3 90,000 Utility Vehicile/Trail Groomer Parks and Recreation PR-020 3 37,000 CSAH 6/Inwood Signal Public Works Department PW-031 3 250,000 2024 Street Improvements Public Works Department PW-040 3 1,653,000 Ideal Ave(CSAH 13)-Phase 3-CSAH 14 to CSAH 6 Public Works Department PW-053 3 800,000 Pickup w/plow Public Works Department PW-060 3 41,000 Watermain Oversizing Water Department W-013 3 119,000 2024 Street Projects-water component Water Department W-032 3 100,000 Total for:Priority 3 3,090,000 Priority 4 Less Important PickupTruck/plow Public Works Department PW-019 4 41,000 Total for:Priority 41,000 Total for 2024 3,181,000 GRAND TOTAL 60,741,401 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 15 City of Lake Elmo, Minnesota Capital Improvement Plan - 2020 - 2024 2020 thru 2024 FUNDING SOURCE SUMMARY Source 2020 2021 2022 2023 2024 Total Debt Service 2,754,000 15,159,613 11,883,113 4,739,200 2,453,000 36,988,926 General Fund 30,000 85,000 60,000 50,000 225,000 Grants/Donation 7,266,000 2,452,000 1,060,000 3,989,200 14,767,200 Municipal Sate Aid(MSA) 1,000,000 1,045,000 250,000 250,000 2,545,000 Park Dedication Fund 270,000 90,000 75,000 435,000 Sewer Fund 210,000 310,000 565,625 1,085,625 Storm Water Fund 17,000 17,000 Vehicle Replacement Fund 298,500 310,000 972,500 289,000 209,000 2,079,000 Water Fund 545,000 252,000 450,000 1,132,650 219,000 2,598,650 GRAND TOTAL 11,373,500 19,658,613 15,470,613 11,057,675 3,181,000 60,741,401 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 16 City of Lake Elmo, Minnesota Capital Improvement Plan - 2020 - 2024 2020 thru 2024 PROJECTS BY FUNDING SOURCE Source Project# Priority 2020 2021 2022 2023 2024 Total Debt Service New City Hall,Fire Station,PW Improvements AF-001 2 5,896,750 5,381,750 11,278,500 2020 Street Improvements PW-026 3 1,774,000 1,774,000 2021 Street Improvements PW-027 3 2,864,000 2,864,000 UP RR Crossing-Private Drive Closure PW-036 2 105,000 105,000 UP RR Crossing:Klondike Ave PW-037 2 262,500 262,500 2022 Street Improvements PW-038 3 3,045,000 3,045,000 2023 Street Improvements PW-039 3 2,289,200 2,289,200 2024 Street Improvements PW-040 3 1,653,000 1,653,000 Ideal Ave(CSAH 13)Phase 2 PW-052 3 800,000 800,000 Ideal Ave(CSAH 13)-Phase 3-CSAH 14 to CSAH 6 PW-053 3 800,000 800,000 Manning Ave Phase 3 PW-057 3 1,650,000 1,650,000 TH 36/Manning Interchange PW-058 2 1,000,000 1,000,000 Old Village Sewer Extension Phase 5&6 S-005 3 929,775 929,775 Old Village Sewer Extension Phase 5&6 S-016 3 929,775 929,775 Heritage Farms Sewer Extension S-18 3 980,000 980,000 Phase 2 Regional Drainage Improvements SW-001 3 600,000 800,000 1,400,000 Phase 3 Regional Drainage Improvements SW-002 3 500,000 500,000 OV Sewer Extension;Phase 5&6;water component W-005 3 626,588 626,588 Elevated Storage Tank#3 W-006 1 3,475,000 3,475,000 OV sewer extension phase 6&5;water component W-025 3 626,588 626,588 Debt Service Total 2,754,000 15,159,613 11,883,113 4,739,200 2,453,000 36,988,926 General Fund Turnout Gear Replacements F-017 1 60,000 60,000 UP RR Crossing-Village Parkway PW-035 2 25,000 25,000 Asphalt Hot Box PW-049 4 60,000 60,000 Manning Phase 4 PW-066 1 50,000 50,000 5th St./Inwood Ave Signal Light PW-069 1 30,000 30,000 General Fund Total 30,000 85,000 60,000 50,000 225,000 Grants/Donation New or Refurbished Ballfields PR-017 1 1,000,000 1,000,000 2020 Street Improvements PW-026 3 800,000 800,000 UP RR Crossing-Village Parkway PW-035 2 500,000 500,000 Manning/Hudson Stoplight PW-067 2 250,000 250,000 5th St./Inwood Ave Signal Light PW-069 1 70,000 70,000 Kramer Lake Floodplain Study SW-003 3 60,000 60,000 Well&Pumphouse#5 W-014 1 2,270,000 2,270,000 2020 Street&Utility Improvements-Water W-017 3 3,630,000 3,630,000 2021 Street&Utility Improvements-Water W-018 3 1,702,000 1,702,000 Blackford Water Ext W-028 2 37,000 37,000 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 17 Source Project# Priority 2020 2021 2022 2023 2024 Total 31 st St Area Water Extension W-029 2 459,000 459,000 2023 Street Projects-water component W-030 3 3,989,200 3,989,200 Grants/Donation Total 7,266,000 2,452,000 1,060,000 3,989,200 14,767,200 Municipal Sate Aid(MSA) CSAH 15/30th Street Signal PW-030 3 250,000 250,000 CSAH 6/Inwood Signal PW-031 3 250,000 250,000 15th Street North(MSA Street) PW-034 3 1,045,000 1,045,000 TH 36/Manning Interchange PW-058 2 1,000,000 1,000,000 Municipal Sate Aid(MSA)Total 1,000,000 1,045,000 250,000 250,000 2,545,000 Park Dedication Fund Sunfish Lake Park Improvements PR-007 3 120,000 90,000 210,000 Central Greenway Regional Trail PR-009 3 50,000 50,000 New Park Development PR-018 4 150,000 150,000 Dog Park PR-019 4 25,000 25,000 Park Dedication Fund Total 270,000 90,000 75,000 435,000 Sewer Fund Trac Hoe PW-044 2 17,000 17,000 Hamlet on Sunfish Lake Sewer Extension S-003 3 140,000 60,000 200,000 Section 36 Trunk Sewer Main Oversizing S-012 3 250,000 250,000 Sewer Oversizing S-013 3 35,000 35,000 Old Village Sewer Extension Phase 7 S-017 3 548,625 548,625 Utility Truck W-022 3 35,000 35,000 Sewer Fund Total 210,000 310,000 565,625 1,085,625 Storm Water Fund Trac Hoe PW-044 2 17,000 17,000 Storm Water Fund Total 17,000 17,000 Vehicle Replacement Fund B 1 F-010 3 60,000 60,000 E1 Engine F-011 1 580,000 580,000 B 2 F-012 3 90,000 90,000 CV 1(Tahoe) F-018 3 48,500 48,500 CV 2(Tahoe) F-019 3 52,500 52,500 Dump Truck PR-015 3 90,000 90,000 UtilityVehicile/Trail Groomer PR-020 3 37,000 37,000 Loader PW-004 2 185,000 185,000 Tractor PW-006 2 130,000 130,000 PickupTruck/plow PW-019 4 41,000 41,000 Trac Hoe PW-044 2 34,000 34,000 Dump Truck w/Plow PW-047 1 250,000 250,000 Mini Loader PW-048 2 120,000 120,000 Dump Truck with Plow PW-050 1 250,000 250,000 Skidloader PW-054 3 70,000 70,000 Pickup w/plow PW-060 3 41,000 41,000 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 18 Source Project# Priority 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund Total 298,500 310,000 972,500 289,000 209,000 2,079,000 Water Fund Trac Hoe PW-044 2 17,000 17,000 Village East Trunk Watermain PRV W-008 2 132,000 132,000 Paint Water Tank at PW W-010 4 800,000 800,000 Watermain Oversizing W-013 3 38,000 70,000 119,000 227,000 Well&Pumphouse#5 W-014 1 240,000 240,000 2020 Street&Utility Improvements-Water W-017 3 50,000 50,000 SCADA Upgrade W-019 2 50,000 50,000 Utility Truck W-022 3 35,000 35,000 Water Meter Change Out W-023 1 50,000 50,000 50,000 150,000 Automated Radio Read System W-024 3 300,000 300,000 OV sewer extension Phase 7;water component W-026 3 265,650 265,650 Pressure Reduction Station-Connection to WT#3 W-027 3 132,000 132,000 2023 Street Projects-water component W-030 3 50,000 50,000 2022 Street Projects-water component W-031 3 50,000 50,000 2024 Street Projects-water component W-032 3 100,000 100,000 Water Fund Total 545,000 252,000 450,000 1,132,650 219,000 2,598,650 GRAND TOTAL 11,373,500 19,658,613 15,470,613 11,057,675 3,181,000 60,741,401 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 19 City of Lake Elmo, Minnesota Capital Improvement Plan - 2020 - 2024 2020 thni 2029 PROJECTS BY FUNDING SOURCE Source # Priority 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total Debt Service New City Hall,Fire Station,PW aF-001 2 5,896,750 5,381,750 11,278,500 Improvements 2020 Street Improvements PW026 3 1,774,000 1,774,000 2021 Street Improvements PW-027 3 2,864,000 2,864,000 UP RR Crossing-Private Drive PW-036 2 105,000 105,000 Closure UP RR Crossing:Klondike Ave PW-037 2 262,500 262,500 2022 Street Improvements PW-038 3 3,045,000 3,045,000 2023 Street Improvements PW-039 3 2,289,200 2,289,200 2024 Street Improvements PW-040 3 1,653,000 1,653,000 2025 Street Irmprovements PW-041 3 2,000,000 2,000,000 2026 Street Improvements PW042 3 2,000,000 2,000,000 Ideal Ave(CSAH 13)Phase 2 PW-052 3 800,000 800,000 Ideal Ave(CSAH 13)-Phase 3- PW-053 3 800,000 800,000 CSAH 14 to CSAH 6 2027 Street Improvements PW-055 3 2,000,000 2,000,000 2028 Street Improvements PW-056 3 2,000,000 2,000,000 Manning Ave Phase 3 PW-057 3 1,650,000 1,650,000 TH 361Manning Interchange PW-058 2 1,000,000 1,000,000 2029 Steet Improvements PW-068 3 2,000,000 2,000,000 Old Village Sewer Extension Phase s-005 3 929,775 929,775 5&6 Old Village Sewer Extension Phase s-016 3 929,775 929,775 5&6 Heritage Farms Sewer Extension S-18 3 980,000 980,000 Phase 2 Regional Drainage sw001 3 600,000 800,000 1,400,000 Improvements Phase 3 Regional Drainage SW-002 3 500,000 500,000 Improvements Produced Using the Plan-It Capital Planning Software 20 Thursday,October 24,2019 Source # Priority 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total OV Sewer Extension;Phase 5&6; W-005 3 626,588 626,588 water component Elevated Storage Tank#3 W-006 1 3,475,000 3,475,000 OV sewer extension phase 6&5; w 025 3 626,588 626,588 water component Debt Service Total 2,754,000 15,159,613 11,883,113 4,739,200 2,453,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 46,988,926 General Fund Turnout Gear Replacements F-017 1 60,000 60,000 UP RR Crossing-Village Parkway PW-035 2 25,000 25,000 Asphalt Hot Box PW049 4 60,000 60,000 Manning Phase 4 PW-066 1 50,000 50,000 5th St./Inwood Ave Signal Light PW-069 1 30,000 30,000 General Fund Total 30,000 85,000 60,000 50,000 225,000 Grants/Donation Ranger F-015 3 16,000 16,000 New or Refurbished Ballfields PR-017 1 1,000,000 1,000,000 2020 Street Improvements PW-026 3 800,000 800,000 UP RR Crossing-Village Parkway PW-035 2 500,000 500,000 Manning/Hudson Stoplight PW-067 2 250,000 250,000 5th St./Inwood Ave Signal Light PW-069 1 70,000 70,000 Kramer Lake Floodplain Study SW-003 3 60,000 60,000 Well&Pumphouse#5 W-014 1 2,270,000 2,270,000 2020 Street&Utility Improvements- W-017 3 3,630,000 3,630,000 Water 2021 Street&Utility Improvements- w-018 3 1,702,000 1,702,000 Water Blackford Water Ext W-028 2 37,000 37,000 31 st St Area Water Extension W-029 2 459,000 459,000 2023 Street Projects-water W-030 3 3,989,200 3,989,200 component Grants/Donation Total 7,266,000 2,452,000 1,060,000 3,989,200 16,000 14,783,200 Municipal Sate Aid(MSA) CSAH 15/30th Street Signal PW-030 3 250,000 250,000 CSAH 6/Inwood Signal PW-031 3 250,000 250,000 15th Street North(MSA Street) PW-034 3 1,045,000 1,045,000 Produced Using the Plan-It Capital Planning Software 21 Thursday,October 24,2019 Source # Priority 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total TH 36/Manning Interchange PW-058 2 1,000,000 1,000,000 Municipal Sate Aid(MSA)Total 1,000,000 1,045,000 250,000 250,000 2,545,000 Park Dedication Fund Sunfish Lake Park Improvements PR-007 3 120,000 90,000 210,000 Central Greenway Regional Trail PR-009 3 50,000 50,000 New Park Development PR-018 4 150,000 150,000 Dog Park PR-019 4 25,000 25,000 Park Dedication Fund Total 270,000 90,000 75,000 435,000 Sewer Fund Trac Hoe PW-044 2 17,000 17,000 Hamlet on Sunfish Lake Sewer S-003 3 140,000 60,000 200,000 Extension Section 36 Trunk Sewer Main S-012 3 250,000 250,000 Oversizing Sewer Oversizing S-013 3 35,000 35,000 Old Village Sewer Extension Phase 7 S-017 3 548,625 548,625 Utility Truck W-022 3 35,000 35,000 Sewer Fund Total 210,000 310,000 565,625 1,085,625 Storm Water Fund Trac Hoe PW-044 2 17,000 17,000 Storm Water Fund Total 17,000 17,000 Vehicle Replacement Fund B 1 F-010 3 60,000 60,000 E1 Engine F-011 1 580,000 580,000 B 2 F-012 3 90,000 90,000 T2 Tender/Engine F-013 4 650,000 650,000 Boat and Trailer F-014 3 20,000 20,000 CV 1(Tahoe) F-018 3 48,500 55,000 103,500 CV 2(Tahoe) F-019 3 52,500 63,000 115,500 Dump Truck PR-015 3 90,000 90,000 Utility Vehicile/Trail Groomer PR-020 3 37,000 37,000 Loader PW-004 2 185,000 185,000 Tractor PW-006 2 130,000 130,000 Produced Using the Plan-It Capital Planning Software 22 Thursday,October 24,2019 Source # Priority 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total PickupTruck/plow PW-019 4 41,000 41,000 Trac Hoe PW-044 2 34,000 34,000 Dump Truck w/Plow PW-047 1 250,000 250,000 Mini Loader PW-048 2 120,000 120,000 Dump Truck with Plow PW-050 1 250,000 250,000 Skidloader PW-054 3 70,000 70,000 Pickupw/plow PW-060 3 41,000 41,000 Pickup PW-061 3 35,000 35,000 DumpTruckw/plow,sander& PW-062 3 205,500 205,500 underbody Pickup w/lift gate&plow PW-063 3 45,000 45,000 Pickup w/lift gate&plow PW-064 3 45,000 45,000 Dump Truck w/plow,sander& PW-065 3 230,000 230,000 underbody Vehicle Replacement Fund Total 298,500 310,000 972,500 289,000 209,000 55,000 35,000 1,028,500 230,000 3,427,500 Water Fund Trac Hoe PW-044 2 17,000 17,000 Village East Trunk Watermain PRV W-008 2 132,000 13Z000 Paint Water Tank at PW w 010 4 800,000 800,000 Well#4 Pump-Pull and Rebuild W-012 3 35,000 35,000 Watermain Oversizing W-013 3 38,000 709000 119,000 227,000 Well&Pumphouse#5 W 014 1 2409000 240,000 2020 Street&Utility Improvements- W 017 3 50,000 50,000 Water SCADA Upgrade W 019 2 50,000 50,000 Utility Truck W-022 3 35,000 35,000 Water Meter Change Out W 023 1 50,000 50,000 50,000 150,000 Automated Radio Read System W-024 3 3009000 300,000 OV sewer extension Phase 7;water W 026 3 265,650 265,650 component Pressure Reduction Station- W-027 3 132,000 13Z000 Connection to WT#3 2023 Street Projects-water W-030 3 50,000 50,000 component 2022 Street Projects-water W-031 3 50,000 50,000 component 2024 Street Projects-water W-032 3 100,000 100,000 component Water Fund Total 545,000 252,000 450,000 1,132,650 219,000 35,000 2,633,650 Produced Using the Plan-It Capital Planning Software 23 Thursday,October 24,2019 Source # Priority 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Total GRAND TOTAL 11,373,500 19,658,613 15,470,613 11,057,675 3,181,000 2,090,000 2,035,000 3,028,500 2,000,000 2,246,000 72,140,901 Produced Using the Plan-It Capital Planning Software 24 Thursday,October 24,2019 City of Lake Elmo, Minnesota Capital Improvement Plan - 2020 - 2024 2020 thm 2024 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2020 2021 2022 2023 2024 Total Admin/Finance Department New City Hall,Fire Station,PW Improvements AF-001 2 1,287,500 4,609,250 5,381,750 11,278,500 Debt Service 5,896,750 5,381,750 11,278,500 Admin/Finance Department Total 1,287,500 4,609,250 5,381,750 11,278,500 Fire Department B 1 F-010 3 60,000 60,000 Vehicle Replacement Fund 60,000 60,000 E1 Engine F-011 1 580,000 580,000 Vehicle Replacement Fund 580,000 580,000 B 2 F-012 3 90,000 90,000 Vehicle Replacement Fund 90,000 90,000 Turnout Gear Replacements F-017 1 60,000 60,000 General Fund 60,000 60,000 CV 1(Tahoe) F-018 3 48,500 48,500 Vehicle Replacement Fund 48,500 48,500 CV 2(Tahoe) F-019 3 52,500 52,500 Vehicle Replacement Fund 52,500 52,500 Fire Department Total 48,500 60,000 692,500 90,000 891,000 Parks and Recreation Sunfish Lake Park Improvements PR-007 3 120,000 90,000 210,000 Park Dedication Fund 120,000 90,000 210,000 Central Greenway Regional Trail PR-009 3 50,000 50,000 Park Dedication Fund 50,000 50,000 Dump Truck PR-015 3 90,000 90,000 Vehicle Replacement Fund 90,000 90,000 New or Refurbished Ballfields PR-017 1 1,000,000 1,000,000 Grants/Donation 1,000,000 1,000,000 New Park Development PR-018 4 150,000 150,000 Park Dedication Fund 150,000 150,000 Dog Park PR-019 4 25,000 25,000 Park Dedication Fund 25,000 25,000 Utility Vehicile/Trail Groomer PR-020 3 37,000 37,000 Vehicle Replacement Fund 37,000 37,000 Parks and Recreation Total 270,000 90,000 1,090,000 75,000 37,000 1,562,000 Public Works Department i Loader PW-004 2 185,000 185,000 Vehicle Replacement Fund 185,000 185,000 Tractor PW-006 2 130,000 130,000 Vehicle Replacement Fund 130,000 130,000 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 25 Department Project# Priority 2020 2021 2022 2023 2024 Total PickupTruck/plow PW-019 4 41,000 41,000 Vehicle Replacement Fund 41,000 41,000 2020 Street Improvements PW-026 3 2,574,000 2,574,000 Debt Service 1,774,000 1,774,000 Grants/Donation 800,000 800,000 2021 Street Improvements PW-027 3 2,864,000 2,864,000 Debt Service 2,864,000 2,864,000 CSAH 15/30th Street Signal PW-030 3 250,000 250,000 Municipal Sate Aid(MSA) 250,000 250,000 CSAH 6/Inwood Signal PW-031 3 250,000 250,000 Municipal Sate Aid(MSA) 250,000 250,000 15th Street North(MSA Street) PW-034 3 1,045,000 1,045,000 Municipal Sate Aid(MSA) 1,045,000 1,045,000 UP RR Crossing-Village Parkway PW-035 2 525,000 525,000 General Fund 25,000 25,000 Grants/Donation 500,000 500,000 UP RR Crossing-Private Drive Closure PW-036 2 105,000 105,000 Debt Service 105,000 105,000 UP RR Crossing:Klondike Ave PW-037 2 262,500 262,500 Debt Service 262,500 262,500 2022 Street Improvements PW-038 3 3,045,000 3,045,000 Debt Service 3,045,000 3,045,000 2023 Street Improvements PW-039 3 2,289,200 2,289,200 Debt Service 2,289,200 2,289,200 2024 Street Improvements PW-040 3 1,653,000 1,653,000 Debt Service 1,653,000 1,653,000 Trac Hoe PW-044 2 85,000 85,000 Sewer Fund 17,000 17,000 Storm Water Fund 17,000 17,000 Vehicle Replacement Fund 34,000 34,000 Water Fund 17,000 17,000 Dump Truck w/Plow PW-047 1 250,000 250,000 Vehicle Replacement Fund 250,000 250,000 Mini Loader PW-048 2 120,000 120,000 Vehicle Replacement Fund 120,000 120,000 Asphalt Hot Box PW-049 4 60,000 60,000 General Fund 60,000 60,000 Dump Truck with Plow PW-050 1 250,000 250,000 Vehicle Replacement Fund 250,000 250,000 Ideal Ave(CSAH 13)Phase 2 PW-052 3 800,000 800,000 Debt Service 800,000 800,000 Ideal Ave(CSAH 13)-Phase 3-CSAH 14 to CSAH 6 PW-053 3 800,000 800,000 Debt Service 800,000 800,000 Skidloader PW-054 3 70,000 70,000 Vehicle Replacement Fund 70,000 70,000 Manning Ave Phase 3 PW-057 3 250,000 1,400,000 1,650,000 Debt Service 1,650,000 1,650,000 TH 36/Manning Interchange PW-058 2 2,000,000 2,000,000 Debt Service 1,000,000 1,000,000 Municipal Sate Aid(MSA) 1,000,000 1,000,000 Pickupw/plow PW-060 3 41,000 41,000 Vehicle Replacement Fund 41,000 41,000 Manning Phase 4 PW-066 1 50,000 50,000 General Fund 50,000 50,000 Manning/Hudson Stoplight PW-067 2 250,000 250,000 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 26 Department Project# Priority 2020 2021 2022 2023 2024 Total Grants/Donation 250,000 250,000 5th St./Inwood Ave Signal Light PW-069 1 100,000 100,000 General Fund 30,000 30,000 Grants/Donation 70,000 70,000 Public Works Department Total 2,924,000 6,566,500 5,140,000 4,279,200 2,835,000 21,744,700 Sewer Department Hamlet on Sunfish Lake Sewer Extension S-003 3 140,000 60,000 200,000 Sewer Fund 140,000 60,000 200,000 Old Village Sewer Extension Phase 5&6 S-005 3 929,775 929,775 Debt Service 929,775 929,775 Section 36 Trunk Sewer Main Oversizing S-012 3 250,000 250,000 Sewer Fund 250,000 250,000 Sewer Oversizing S-013 3 35,000 35,000 Sewer Fund 35,000 35,000 Old Village Sewer Extension Phase 5&6 S-016 3 929,775 929,775 Debt Service 929,775 929,775 Old Village Sewer Extension Phase 7 S-017 3 548,625 548,625 Sewer Fund 548,625 548,625 Heritage Farms Sewer Extension S-18 3 980,000 980,000 Debt Service 980,000 980,000 Sewer Department Total 1,155,000 1,239,775 929,775 548,625 3,873,175 Storm Water Department i Phase 2 Regional Drainage Improvements SW-001 3 600,000 800,000 1,400,000 Debt Service 600,000 800,000 1,400,000 Phase 3 Regional Drainage Improvements SW-002 3 500,000 500,000 Debt Service 500,000 500,000 Kramer Lake Floodplain Study SW-003 3 60,000 60,000 Grants/Donation 60,000 60,000 Storm Water Department Total 1,160,000 800,000 1,960,000 Water Department OV Sewer Extension;Phase 5&6;water component W-005 3 626,588 626,588 Debt Service 626,588 626,588 Elevated Storage Tank#3 W-006 1 275,000 3,200,000 3,475,000 Debt Service 3,475,000 3,475,000 Village East Trunk Watermain PRV W-008 2 132,000 132,000 Water Fund 132,000 13Z000 Paint Water Tank at PW W-010 4 800,000 800,000 Water Fund 800,000 800,000 Watermain Oversizing W-013 3 38,000 70,000 119,000 227,000 Water Fund 38,000 70,000 119,000 227,000 Well&Pumphouse#5 W-014 1 2,510,000 2,510,000 Grants/Donation 2,270,000 2,270,000 Water Fund 240,000 240,000 2020 Street&Utility Improvements-Water W-017 3 3,680,000 3,680,000 Grants/Donation 3,630,000 3,630,000 Water Fund 50,000 50,000 2021 Street&Utility Improvements-Water W-018 3 1,702,000 1,702,000 Grants/Donation 1,702,000 1,702,000 SCADA Upgrade W-019 2 50,000 50,000 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 27 Department Project# Priority 2020 2021 2022 2023 2024 Total Water Fund 50,000 50,000 Utility Truck W-022 3 70,000 70,000 Sewer Fund 35,000 35,000 Water Fund 35,000 35,000 Water Meter Change Out W-023 1 50,000 50,000 50,000 150,000 Water Fund 50,000 50,000 50,000 150,000 Automated Radio Read System W-024 3 300,000 300,000 Water Fund 300,000 300,000 OV sewer extension phase 6&5;water component W-025 3 626,588 626,588 Debt Service 626,588 626,588 OV sewer extension Phase 7;water component W-026 3 265,650 265,650 Water Fund 265,650 265,650 Pressure Reduction Station-Connection to WT#3 W-027 3 132,000 132,000 Water Fund 132,000 132,000 Blackford Water Ext W-028 2 37,000 37,000 Grants/Donation 37,000 37,000 31st St Area Water Extension W-029 2 459,000 459,000 Grants/Donation 459,000 459,000 2023 Street Projects-water component W-030 3 4,039,200 4,039,200 Grants/Donation 3,989,200 3,989,200 Water Fund 50,000 50,000 2022 Street Projects-water component W-031 3 50,000 50,000 Water Fund 50,000 50,000 2024 Street Projects-water component W-032 3 100,000 100,000 Water Fund 100,000 100,000 Water Department Total 7,251,000 5,780,588 1,076,588 5,104,850 219,000 19,432,026 GRAND TOTAL 12,936,000 18,346,113 15,470,613 10,807,675 3,181,000 60,741,401 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 28 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Admin/Finance Department City of Lake Elmo, Minnesota Contact City Administrator Project# AF-001 Type Improvement Useful Life 40 years Project Name New City Hall,Fire Station,PW Improvements 1� Category Buildings Priority 2 Very Important Status Active Description New City Facilities 1.Space Needs Study in 2017 including fire station and public works needs 2.cost estimates from BKV Space Needs Study dated November 21,2017 for public works improvements 3.cost estimates for new fire station/city hall from Leo A Dlay study April 4,2018($10.5m)increased for inflation 4.Public Works Improvements to existing facility $250,000 in 2018 for larger salt shed $515,000 in 2020 for office addition $257,500 in 2021 for yard improvements 5.New City Hall/Fire Station 2020-2022 Justification Would allow all staff(except public works)to be at one site,community meeting rooms,updated council chambers.Locate single fire station in more central location with better access to main roads.Brookfield lease was$33k per year and increasing.Brookfield office builiding and land purchased in 2018 Lease expirations: 3-month to month with 60-90 day notice 1-annual 12/31/19 1-3/31/20 1-12/31/20 1-12/31/21 1-6/30/22 *relocation costs:personal property moving costs and reestablishment costs Expenditures 2020 2021 2022 2023 2024 Total Planning/Design 772,500 772,500 Construction/Maintenance 515,000 4,609,250 5,381,750 10,506,000 Total 1,287,500 4,609,250 5,381,750 11,278,500 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 5,896,750 5,381,750 11,278,500 Total 5,896,750 5,381,750 11,278,500 Budget Impact/Other Borrowing split over multiple years. 50%of funds borrowed must be spent within 12 months. Debt payments to be split amongst General Fund(80%),Water(10%)and Sewer(10%) 2020:degisn and preconstruction costs of new city hall/fire station($772,500);public works office addition($515,000) 2021:council chambers and fire apparatus bay additions($4,351,750)and public works yard impr($257,500) 2022:remodel of Brookfield and repurchase from EDA($5,381,750) costs are based off of 2019 build estimates and include construction inflation of 3% Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 29 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Fire Department City of Lake Elmo, Minnesota Contact Fire Chief Project# F-010 Type Equipment Useful Life 15 years Project Name B 1 Category Vehicles Priority 3 hnportant Status Active Description Replace 2001 B 1 brush/grass rig=F350 w/markings and lighting Justification End of Useful Life Replaces 2001 F-350 Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 60,000 60,000 Total 60,000 60,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 60,000 60,000 Total 60,000 60,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 30 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Fire Department City of Lake Elmo, Minnesota Contact Fire Chief Project# F-011 Type Equipment Useful Life 25 years Project Name El Engine g Category Vehicles Priority 1 Critical Status Active Description Replacement of 1997 Engine that was refurbished in 2007 Justification End of Useful Life May not be needed if in one station,depending on staffing and pumping capacity Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 580,000 580,000 Total 580,000 580,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 580,000 580,000 Total 580,000 580,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 31 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Fire Department City of Lake Elmo, Minnesota Contact Fire Chief Project# F-012 Type Equipment Useful Life 20 years Project Name B 2 Category Vehicles Priority 3Important Status Active Description Replacement of 2004 B 2 Brush/grass rig Justification Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 90,000 90,000 Total 90,000 90,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 90,000 90,000 Total 90,000 90,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 32 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Fire Department City of Lake Elmo, Minnesota Contact Fire Chief Project# F-017 Type Maintenance Useful Life Project Name Turnout Gear Replacements 1� Category Equipment:Fire Equip Priority 1 Critical Status Active Description Replacement of 24 sets of turnout gear Justification End of useful life Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 60,000 60,000 Total 60,000 60,000 Funding Sources 2020 2021 2022 2023 2024 Total General Fund 60,000 60,000 Total 60,000 60,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 33 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Fire Department City of Lake Elmo, Minnesota Contact Fire Chief Project# F-018 Type Equipment Useful Life 0 Project Name CV I (Tahoe) Category Vehicles Priority 3 hnportant Status New Recommendation Description Replace 2015 CV 1,(Duty vehicle)w/emergency equipment,lighting and graphics. Justification End of manufacturer's warranty. Optimize resale value.Possible offset of up to$35,000.00 resale.Will sell as is,or remove emergency equipment for possible reuse and sell as passenger vehicle. Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 48,500 48,500 Total 48,500 48,500 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 48,500 48,500 Total 48,500 48,500 Budget Impact/Other Less maintenance/repairs required to upkeep new vehicle Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 34 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Fire Department City of Lake Elmo, Minnesota Contact Fire Chief Project# F-019 Type Equipment Useful Life 5 years Project Name CV 2 Tahoe Category Vehicles Priority 3 hnportant Status New Recommendation Description Replace 2017 CV2,(Duty vehicle)w/emergency equipment,lighting and graphics. Justification End of manufacturer's warranty. Optimize resale value.Possible offset of up to$38,000.00 resale.Will sell as is,or remove emergency equipment for possible reuse and sell as passenger vehicle. Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 52,500 52,500 Total 52,500 52,500 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 52,500 52,500 Total 52,500 52,500 Budget Impact/Other Less maintenance/repairs required to upkeep new vehicle Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 35 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Parks and Recreation City of Lake Elmo, Minnesota Contact City Administrator Project# PR-007 Type Improvement Useful Life Project Name Sunfish Lake Park Improvements h Category Park Improvements Priority 3Important Status Active Description (2020) Development of 4 miles of mountain biking trails at$30,000 per mile per Trail Source (2021) Paving of trails Cost estimate: Ira rove trails to ADA standards in Area 2(prairie area):$90,000 for 6 foot wide asphalt I mile trail Justification Explore Mt biking at direction of Council(10/17) ADA trails consistent with Development Guide for Sunfish Lake Park as approved by MN Land Trust Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 120,000 90,000 210,000 Total 120,000 90,000 210,000 Funding Sources 2020 2021 2022 2023 2024 Total Park Dedication Fund 120,000 90,000 210,000 Total 120,000 90,000 210,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 36 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Parks and Recreation City of Lake Elmo, Minnesota Contact City Administrator Project# PR-009 Type Improvement Useful Life Project Name Central Greenwa Regional Trail Y g Category Park Improvements Priority 3lmportant Status Active Description Central Greenway Regional Trail beginning at CSAH 19 and I-94,traveling through Lake Elmo Park Reserve,east along Stillwater Bvld to Manning Ave and then north to TH36. Justification Trail would address the following community needs: -Deliver students safely to school -Bring people to our downtown -Bring people to our parks -Provide safe recreation -Trail Diversity-Provide feel of Lake Elmo -Omit need to bike down Hwy 5/CSAH 14 -Compatibility with public grant opportunities -Compatibility with private funding opportunities Feasibility of land acquisition will be a consideration Trail likely to be built in segments in conjuction with county road projects and as funding allows through Met Council or other state grants Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 50,000 50,000 Total 50,000 50,000 Funding Sources 2020 2021 2022 2023 2024 Total Park Dedication Fund 50,000 50,000 Total 50,000 50,000 Budget Impact/Other Additional trails to maintain-labor and materials for snow removal if desired by city Trail construction cost may be as high as S 12 million. City would expect cost share with county as well as grants to offset costs. 2023 costs are for trail through new roundabout at CSAH 19 and CSAH 10 Future costs will be added as they are known Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 37 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Parks and Recreation City of Lake Elmo, Minnesota Contact Public Works Director Project# PR-015 Type Equipment Useful Life Project Name DumpTruck Category Vehicles Priority 3 hnportant Status Active Description 550 dump pickup replaces 2009 vehicle. . Justification End of Useful life Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 90,000 90,000 Total 90,000 90,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 90,000 90,000 Total 90,000 90,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 38 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Parks and Recreation City of Lake Elmo, Minnesota Contact City Administrator Project# PR-017 Type Improvement Useful Life 40 years Project Name New or Refurbished Ballfields Category Park Improvements Priority 1 Critical Status Active Description New ballfields to be constructed or refurbished after Tartan ball fields are no longer used by the public Justification Replacement of some of the fields at Tartan Park lost to development of Royal Oaks Golf Course Community Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 1,000,000 1,000,000 Total 1,000,000 1,000,000 Funding Sources 2020 2021 2022 2023 2024 Total Grants/Donation 1,000,000 1,000,000 Total 1,000,000 1,000,000 Budget Impact/Other Funding to be provided from developer in development agreement with Royal Golf.Funds to be used for acquisition of land,if necessary,and builidngor refurbishing of(a)new ballfield(s). Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 39 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Parks and Recreation City of Lake Elmo, Minnesota Contact City Administrator Project# PR-018 Type Improvement Useful Life 40 years Project Name New Park Development P Category Park Improvements Priority 4 Less Important Status Active Description New park to be developed in the WildflowerNillage Preserve area in 2019 and in Inwood in 2020 Justification Areas identified during development as a park search area to provide recreational opportunities to new residents. Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 150,000 150,000 Total 150,000 150,000 Funding Sources 2020 2021 2022 2023 2024 Total Park Dedication Fund 150,000 150,000 Total 150,000 150,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 40 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Parks and Recreation City of Lake Elmo, Minnesota Contact Public Works Director Project# PR-019 Type Improvement Useful Life 25 years Project Name DO Park g Category Park Improvements Priority 4 Less Important Status Active Description Parks commission recommended the search and planning for a dog park somewhere near the denser developments Improvements would be minimal such as fencing Justification Residents on small lots in denser developments need a place to take their dogs for exercise. By providing a dog park those who let their dogs run off leash in other parks can be redirected Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 25,000 25,000 Total 25,000 25,000 Funding Sources 2020 2021 2022 2023 2024 Total Park Dedication Fund 25,000 25,000 Total 25,000 25,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 41 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Parks and Recreation City of Lake Elmo, Minnesota Contact Public Works Director Project# PR-020 Type Equipment Useful Life 10 years Project Name Utility Vehicile/Trail Groomer Category Vehicles Priority 3 hnportant Status Active Description Replaces 2014 Kubota Justification End of Useful Life Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 37,000 37,000 Total 37,000 37,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 37,000 37,000 Total 37,000 37,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 42 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Public Works Director Project# PW-004 Type Equipment Useful Life 15 years Project Name Loader Category Vehicles Priority 2 Very Important Status Active Description Replace 1999 loader Justification End of Useful Life Expenditures 2020 2021 2022 2023 2024 Total Equip/Vehicles/Furnishings 185,000 185,000 Total 185,000 185,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 185,000 185,000 Total 185,000 185,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 43 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Public Works Director Project# PW-006 Type Equipment Useful Life 15 years Project Name Tractor Category Vehicles Priority 2 Very Important Status Active Description Replace 2004 John Deere Tractor Cost include all ditch and mowing attachments Additional cost for snowblower($30k included in total) Additonal cost for win controls $15,000 Justification End of Useful Life Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 130,000 130,000 Total 130,000 130,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 130,000 130,000 Total 130,000 130,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 44 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Public Works Director Project# PW-019 Type Equipment Useful Life 10 years Project Name PickupTruck/plow Category Vehicles Priority 4 Less Important Status Active Description Replacement for 2012 F250 End of usefull life(7 years) Justification Replacement for 2012 F250 End of useful life Expenditures 2020 2021 2022 2023 2024 Total Equip/Vehicles/Furnishings 41,000 41,000 Total 41,000 41,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 41,000 41,000 Total 41,000 41,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 45 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-026 Type Improvement Useful Life 25 years Project Name 2020 Street Improvements h Category Street Reconstruction Priority 3Important Status Active Description Reconstruction of roads in Heritage Farms,Stonegate 2nd Justification Per pavement management plan reviewed by Engineer and Public Works Director Stonegate 2nd roads done in conjunction with water extension project and is covered by state grant Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 2,574,000 2,574,000 Total 2,574,000 2,574,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 1,774,000 1,774,000 Grants/Donation 800,000 800,000 Total 2,574,000 2,574,000 Budget Impact/Other $495,000 assessment revenue including$11,000 from City for Heritage Park Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 46 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-027 Type Improvement Useful Life 25 years Project Name 2021 Street Improvements h Category Street Reconstruction Priority 3Important Status Active Description $1,577,000 Tamarack Farms reconstruct and Hamlet on Sunfish Lake reclaim $1,287,000 for Ov Phase 5&6(completed in 2 years) Justification Per pavement management plan reviewed by Engineer and Public Works Director Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 2,864,000 2,864,000 Total 2,864,000 2,864,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 2,864,000 2,864,000 Total 2,864,000 2,864,000 Budget Impact/Other $473,100 assessment revenue for Tamarck and Hamlet $386,100 for OV 5&6 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 47 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-030 Type Maintenance Useful Life 25 years Project Name CSAH 15/30th Street Signal g Category Street Construction Priority 3Important Status Active Description CSAH 15/30th Street signal improvements. May be stand alone project or with CSAH 15 Phase 3 Justification Improvement needed due to increase of traffic Washington County study Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 250,000 250,000 Total 250,000 250,000 Funding Sources 2020 2021 2022 2023 2024 Total Municipal Sate Aid(MSA) 250,000 250,000 Total 250,000 250,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 48 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-031 Type Maintenance Useful Life 25 years Project Name CSAH 6/Inwood Signal g Category Street Reconstruction Priority 3Important Status Active Description CSAH 6/Inwood Signal Improvements-to replace 4-way stop. Justification Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 250,000 250,000 Total 250,000 250,000 Funding Sources 2020 2021 2022 2023 2024 Total Municipal Sate Aid(MSA) 250,000 250,000 Total 250,000 250,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 49 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-034 Type Improvement Useful Life 25 years Project Name 15th Street North (MSA Street Category Street Reconstruction Priority 3Important Status Active Description 15th Street reconstruction Justification Significant patching made in 2018 to extend road life a couple years. Recon needed per pavement management plan reviewed by Engineer and Public Works Director Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 1,045,000 1,045,000 Total 1,045,000 1,045,000 Funding Sources 2020 2021 2022 2023 2024 Total Municipal Sate Aid(MSA) 1,045,000 1,045,000 Total 1,045,000 1,045,000 Budget Impact/Other Potential for some assessments Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 50 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-035 Type Improvement Useful Life 40 years Project Name UP RR Crossing-Village Parkway Category Street Construction Priority 2 Very Important Status Active Description UP RR Crossing-Village Parkway Justification To allow connectivity between developing neighborhoods north and south of the tracks Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 525,000 525,000 Total 525,000 525,000 Funding Sources 2020 2021 2022 2023 2024 Total General Fund 25,000 25,000 Grants/Donation 500,000 500,000 Total 525,000 525,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 51 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-036 Type Improvement Useful Life 40 years Project Name UP RR Crossing-Private Drive Closure Category Unassigned Priority 2 Very Important Status Active Description UP RR Crossing-Private driveway closure required for Village Parkway Crossing Justification Railroad requirement in order to get new crossing at Village Parkway Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 105,000 105,000 Total 105,000 105,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 105,000 105,000 Total 105,000 105,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 52 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-037 Type Unassigned Useful Life 40 years Project Name UP RR Crossing: Klondike Ave g Category Street Construction Priority 2 Very Important Status Active Description UP RR Crossing-Klondike-upgraded crossing to inlcude light and gates Justification Railroad requirement in order to build new crossing at Village Parkway Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 262,500 262,500 Total 262,500 262,500 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 262,500 262,500 Total 262,500 262,500 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 53 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-038 Type Improvement Useful Life 25 years Project Name 2022 Street Improvements h Category Street Reconstruction Priority 3Important Status Active Description Annual Street Improvements-Fields of St Croix 1st and 2nd reclaims$1,758,000 And$1,287,000 for OV 5&6(Over 2 years) Justification Annual street improvements per Engineering recommendation Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 3,045,000 3,045,000 Total 3,045,000 3,045,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 3,045,000 3,045,000 Total 3,045,000 3,045,000 Budget Impact/Other $527,400 assessment revenue for Fields $386,100 assessment revenue for Ov 5&6 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 54 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-039 Type Improvement Useful Life 25 years Project Name 2023 Street Improvements h Category Street Reconstruction Priority 3Important Status Active Description Annual Street Imrpovements $1,803,000-Parkview Estates,Cardinal Ridge,Tones Pines,Beaut Crest,Irish Ct(reclaims) $486,200-Old Village Phase 7(Legion Ave N) Justification Annual street improvements per Engineering recommendation Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 2,289,200 2,289,200 Total 2,289,200 2,289,200 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 2,289,200 2,289,200 Total 2,289,200 2,289,200 Budget Impact/Other $540,900 assessment revenue for neighborhoods $145,860 for OV 7 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 55 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-040 Type Improvement Useful Life 25 years Project Name 2024 Street Improvements h Category Street Reconstruction Priority 3Important Status Active Description Annual Street Improvements Tana Ridge,Carriage Station,59th St Ct/55th St/Julep Way(reclaims) Justification Annual street improvements per recommendation by City Engineer Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 1,653,000 1,653,000 Total 1,653,000 1,653,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 1,653,000 1,653,000 Total 1,653,000 1,653,000 Budget Impact/Other $495,900 assessment revenue Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 56 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Public Works Director Project# PW-044 Type Equipment Useful Life Project Name Trac Hoe Category Vehicles Priority 2 Very Important Status Active Description Replace 2006 Case Backhoe with a more manuverable unit. Justification End of Useful Life Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 85,000 85,000 Total 85,000 85,000 Funding Sources 2020 2021 2022 2023 2024 Total Sewer Fund 17,000 17,000 Storm Water Fund 17,000 17,000 Vehicle Replacement Fund 34,000 34,000 Water Fund 17,000 17,000 Total 85,000 85,000 Budget Impact/Other $85,000 total cost split amongst water,stormwater,,streets,and parks sewer Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 57 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Public Works Director Project# PW-047 Type Equipment Useful Life Project Name DumpTruck w/Plow Category Vehicles Priority 1 Critical Status Active Description Single Axel plow truck to replace 1998 model Justification End of Useful Life Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 250,000 250,000 Total 250,000 250,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 250,000 250,000 Total 250,000 250,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 58 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Public Works Director Project# PW-048 Type Equipment Useful Life Project Name Mini Loader Category Vehicles Priority 2 Very Important Status Active Description Mini loader to replace 2006 Case Back Hoe with a more manuverable unit. Will be outfitted with a plow for cul de sacs and other narrow streets. Justification End of Useful Life Expenditures 2020 2021 2022 2023 2024 Total Equip/Vehicles/Furnishings 120,000 120,000 Total 120,000 120,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 120,000 120,000 Total 120,000 120,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 59 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Public Works Director Project# PW-049 Type Equipment Useful Life Project Name Asphalt Hot BOX l� Category Equipment:PW Equip Priority 4 Less Important Status Active Description Slide in unit for dump truck. Will replace a trailer hot box and utilize a single axel dump truck during the summer months Justification End of Useful Life Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 60,000 60,000 Total 60,000 60,000 Funding Sources 2020 2021 2022 2023 2024 Total General Fund 60,000 60,000 Total 60,000 60,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 60 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Public Works Director Project# PW-050 Type Equipment Useful Life Project Name Dump Truck with Plow Category Vehicles Priority 1 Critical Status Active Description Replace 2006 model Justification End of Useful Life Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 250,000 250,000 Total 250,000 250,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 250,000 250,000 Total 250,000 250,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 61 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-052 Type Improvement Useful Life 20 years Project Name Ideal Ave CSAH 13 Phase 2 Category Street Reconstruction Priority 3Important Status Active Description Cooperatvie project between Washington County,City of Oakdale and City of Lake Elmo Improvements to CSAH 13 from CSAH 14 to 44th St Justification Need determined by Washington County New development in Oakdale will increase traffic in area Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 800,000 800,000 Total 800,000 800,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 800,000 800,000 Total 800,000 800,000 Budget Impact/Other 30%assessment to residential properties and public works building Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 62 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-053 Type Improvement Useful Life 20 years Project Name Ideal Ave(CSAH 13)-Phase 3- CSAH 14 to CSAH 6 Category Street Reconstruction Priority 3Important Status Active Description Cooperative project between Washington County,City of Oakdale and City of Lake Elmo Per Washington County includes: Safety improvements including widening of shoulders Pavement imporvement Turn lane and intersection improvements Pedestrain and non-motorized upgrades Drainage Improvements Justification Need determined by Washington County Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 800,000 800,000 Total 800,000 800,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 800,000 800,000 Total 800,000 800,000 Budget Impact/Other All Ag property owned by 3M on Lake Elmo side Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 63 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Public Works Director Project# PW-054 Type Equipment Useful Life Project Name Skidloader Category Vehicles Priority 3 hnportant Status Active Description Additional skidloader to be used to mow park trails and asphalt in the summer.During the winter it can be used to aid in snow removal at city parking lots and possibly on park trails and sidewalks(w/blower) 2 speed highflow Justification additional skidloader needed due to growth in streets and parks Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 70,000 70,000 Total 70,000 70,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 70,000 70,000 Total 70,000 70,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 64 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-057 Type Improvement Useful Life 25 years Project Name ManningAve Phase 3 Category Street Reconstruction Priority 3Important Status Active Description CSAH 15 from CSAH 14 to CSAH 10 Per Washington County includes: Expansion to four lane divided highway Access management Intersection control Separate multi-use trail ,Landscaping and Aesthetics Justification Need determined by Washington County Expenditures 2020 2021 2022 2023 2024 Total Land Acquisition 250,000 250,000 Construction/Maintenance 1,400,000 1,400,000 Total 250,000 1,400,000 1,650,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 1,650,000 1,650,000 Total 1,650,000 1,650,000 Budget Impact/Other 30%assessment to residential properties Trail could come from park dedication funds lCounty could delay project if not inlcuded as part of their BOND-2022 Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 65 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-058 Type Improvement Useful Life 25 years Project Name TH 36/ManningInterchange g Category Street Construction Priority 2 Very Important Status Active Description New Interchange to replace stop lights at TH 36 and Manning Justification Cooperative project with MNDOT,Washington County,Stillwater,Grant,Oak Park Heights and Stillwater Township. Increased traffic on TH 36 Fatality at intersection in 2013 Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 2,000,000 2,000,000 Total 2,000,000 2,000,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 1,000,000 1,000,000 Municipal Sate Aid(MSA) 1,000,000 1,000,000 Total 2,000,000 2,000,000 Budget Impact/Other No cost estimates available Cost share between Wash Co,Mn DOT,Lake Elmo,Grant,Stillwater,and Stillwater Twp Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 66 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Public Works Director Project# PW-060 Type Equipment Useful Life 10 years Project Name Pickup � IOW W P Category Vehicles Priority 3 hnportant Status Active Description Pickup with plow to replace 2014 F250 Justification End of Useful Life Expenditures 2020 2021 2022 2023 2024 Total Equip/Vehicles/Furnishings 41,000 41,000 Total 41,000 41,000 Funding Sources 2020 2021 2022 2023 2024 Total Vehicle Replacement Fund 41,000 41,000 Total 41,000 41,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 67 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-066 Type Improvement Useful Life 40 years Project Name Mannin Phase 4 g Category Street Reconstruction Priority 1 Critical Status New Recommendation Description Manning Ave from I-94 to 1300 feet south of CSAH 10 Per Washington County includes: Expansion to a four lane divided highway Access management Intersection control improvements Separate mulit use trail Justification Need as determined by Washington County to ensure ongoing safe and efficient operation of this highway Expenditures 2020 2021 2022 2023 2024 Total Planning/Design 50,000 50,000 Total 50,000 50,000 Funding Sources 2020 2021 2022 2023 2024 Total General Fund 50,000 50,000 Total 50,000 50,000 Budget Impact/Other Local contribution may not be required until construction phase Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 68 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-067 Type Improvement Useful Life 25 years Project Name Manning/Hudson Stoplight Category Street Construction Priority 2 Very Important Status New Recommendation Description Stoploght at realigned Hudson Blvd and Manning Ave Justification per Washington County Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 250,000 250,000 Total 250,000 250,000 Funding Sources 2020 2021 2022 2023 2024 Total Grants/Donation 250,000 250,000 Total 250,000 250,000 Budget Impact/Other Funding from Four Corners 1 st Addition Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 69 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Public Works Department City of Lake Elmo, Minnesota Contact Engineer Project# PW-069 Type Improvement Useful Life 25 years Project Name 5th StAnwood Ave Signal Light g g Category Street Construction Priority 1 Critical Status New Recommendation Description New signal light at the intersection of Inwood Ave N and 5th St Justification Traffic study completed by Kwik Trip showed development would meet warrants for a singlaized intersection. Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2020 2021 2022 2023 2024 Total General Fund 30,000 30,000 Grants/Donation 70,000 70,000 Total 100,000 100,000 Budget Impact/Other Contributions from Hans Hagen and Kwik Trip will cover roughly 2/3rds of the city's cost of the project. City remaining funds to come from general fund.City cost is 1/3 of overall project cost(—$300,000)with remaining to be paid by Washington County Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 70 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Sewer Department City of Lake Elmo, Minnesota Contact Engineer Project# S-003 Type Improvement Useful Life 40 years ProiectName Hamlet on Sunfish Lake Sewer Extension Category wastewater Priority 3lmportant Status Active Description Sewer Extension to Hamlet on Sunfish Lake 2020-sewer extension and connection 2021-repair and upgrades of sewer lines Justification Per 2016 MPCA agreement 100%assessed Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 140,000 60,000 200,000 Total 140,000 60,000 200,000 Funding Sources 2020 2021 2022 2023 2024 Total Sewer Fund 140,000 60,000 200,000 Total 140,000 60,000 200,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 71 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Sewer Department City of Lake Elmo, Minnesota Contact Engineer Project# S-005 Type Improvement Useful Life 40 years Project Name Old Village Sewer Extension Phase 5 & 6 Category Wastewater Priority 3Important Status Active Description Sewer extension in the Old Village Phases 5&6(over 2 years) OV 5:33rd,Kraft,Lampert,32nd,Langley OV 6:Upper 33rd,34th,35th,36th Properties just south of railroad track would only be completed if easements granted to reach properties Justification Met Coucnil requirement to extend sewer Failing septic systems 100%Assessed Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 929,775 929,775 Total 929,775 929,775 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 929,775 929,775 Total 929,775 929,775 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 72 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Sewer Department City of Lake Elmo, Minnesota Contact Engineer Project# S-012 Type Improvement Useful Life 40 years ProiectName Section 36 Trunk Sewer Main Oversizing Category wastewater Priority 3lmportant Status Active Description Section 36 Trunk Sewer Main Justification Section 36 Trunk Sewer Main Development driven from Hudson Blvd to the north Expenditures 2020 2021 2022 2023 2024 Total Other 250,000 250,000 Total 250,000 250,000 Funding Sources 2020 2021 2022 2023 2024 Total Sewer Fund 250,000 250,000 Total 250,000 250,000 Budget Impact/Other Developer paid except for oversizing costs possibly Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 73 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Sewer Department City of Lake Elmo, Minnesota Contact Engineer Project# S-013 Type Improvement Useful Life 40 years ProjectName Sewer Oversizing Category Wastewater Priority 3lmportant Status Active Description Sewer Oversizing Justification Sewer oversizing based on developer pace and phasing Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 35,000 35,000 Total 35,000 35,000 Funding Sources 2020 2021 2022 2023 2024 Total Sewer Fund 35,000 35,000 Total 35,000 35,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 74 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Sewer Department City of Lake Elmo, Minnesota Contact Engineer Project# S-016 Type Improvement Useful Life ProjectName Old Village Sewer Extension Phase 5 & 6 Category Wastewater Priority 3Important Status Active Description Sewer extension in the Old Village Phases 5&6(over 2 years) OV 5:33rd,Kraft,Lampert,32nd,Langley OV 6:Upper 33rd,34th,35th,36th Properties just south of railroad track would only be completed if easements granted to reach properties Justification Met Coucnil requirement to extend sewer Failing septic systems 100%Assessed Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 929,775 929,775 Total 929,775 929,775 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 929,775 929,775 Total 929,775 929,775 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 75 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Sewer Department City of Lake Elmo, Minnesota Contact Engineer Project# S-017 Type Improvement Useful Life Project Name Old Village Sewer Extension Phase 7 Category Wastewater Priority 3Important Status Active Description Legion Ave N Justification Met Coucnil requirement to extend sewer Failing septic systems 100%Assessed Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 548,625 548,625 Total 548,625 548,625 Funding Sources 2020 2021 2022 2023 2024 Total Sewer Fund 548,625 548,625 Total 548,625 548,625 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 76 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Sewer Department City of Lake Elmo, Minnesota Contact Engineer Project# S-Ig Type Improvement Useful Life 40 years Project Name Heritage Farms Sewer Extension Category wastewater Priority 3Important Status New Recommendation Description Extension of municipal sewer to Heritage Farms neighborhood Justification Petition submitted by homeonwers in 2018 Failing septics with limited options for replacement Coordinated with road work for efficiency Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 980,000 980,000 Total 980,000 980,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 980,000 980,000 Total 980,000 980,000 Budget Impact/Other 100%assessed Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 77 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Storm Water Department City of Lake Elmo, Minnesota Contact Engineer Project# SW-001 Type Improvement Useful Life 40 years Project Name phase 2 Regional Drainage Improvements Category StormSewer/Drainage Priority 3lmportant Status Active Description Land acquistion(Schiltgen) Justification 2nd Phase to improving the regional drainage issues timing dependent upon development Expenditures 2020 2021 2022 2023 2024 Total Land Acquisition 600,000 600,000 Construction/Maintenance 800,000 800,000 Total 600,000 800,000 1,400,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 600,000 800,000 1,400,000 Total 600,000 800,000 1,400,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 78 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Storm Water Department City of Lake Elmo, Minnesota Contact Engineer Project# SW-002 Type Improvement Useful Life 40 years ProiectName phase 3 Regional Drainage Improvements Category StormSewer/Drainage Priority 3lmportant Status Active Description Phase 3 of Regional Drainage Improvements(VFW Park) Justification 3rd Phase of Regional Drainage Improvements(VFW Park) Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 500,000 500,000 Total 500,000 500,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 500,000 500,000 Total 500,000 500,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 79 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Storm Water Department City of Lake Elmo, Minnesota Contact Project# SW-003 Type Improvement Useful Life 40 years ProjectName Kramer Lake Floodplaln Study Category Unassigned Priority 3lmportant Status Active Description Kramer Lake Floodplain Study Justification Required for I94 Phase 3 area development Expenditures 2020 2021 2022 2023 2024 Total Planning/Design 60,000 60,000 Total 60,000 60,000 Funding Sources 2020 2021 2022 2023 2024 Total Grants/Donation 60,000 60,000 Total 60,000 60,000 Budget Impact/Other Funding to come from developer or included as watershed study Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 80 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-005 Type Improvement Useful Life 40 years Project Name OV Sewer Extension; Phase 5&6; water component Category Water Priority 3lmportant Status Active Description Replace waterman in Old Village phase 5;Upper 33rd,Lower 33r.34/36th St.W OV Phase 5 and 6 done over 2 years Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 626,588 626,588 Total 626,588 626,588 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 626,588 626,588 Total 626,588 626,588 Budget Impact/Other 100%covered by water fund Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 81 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-006 Type Equipment Useful Life 40 years ProjectName Elevated Storage Tank#3 Category Water Priority 1 Critical Status Active Description Water Tower#3 Justification needed for development in Phase 2 400 RECs available before needed Can be located in either Phase 2 or 3,the closer to Lake Elmo Ave the better Expenditures 2020 2021 2022 2023 2024 Total Land Acquisition 275,000 275,000 Construction/Maintenance 3,200,000 3,200,000 Total 275,000 3,200,000 3,475,000 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 3,475,000 3,475,000 Total 3,475,000 3,475,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 82 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-008 Type Improvement Useful Life 40 years ProiectName Village East Trunk Watermain PRV Category Water Priority 2 Very Important Status Active Description 12"water main pressure reduction valve with bypass Justification need to reduce pressure and accommodate water flows Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 132,000 132,000 Total 132,000 132,000 Funding Sources 2020 2021 2022 2023 2024 Total Water Fund 132,000 132,000 Total 132,000 132,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 83 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Public Works Director Project# W-010 Type Equipment Useful Life 25 years Project Name paint Water Tank at PW Category Water Priority 4 Less Important Status Active Description Justification Recommended by TKDA Utility study in 2016 Regular maintenance of water tank Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 800,000 800,000 Total 800,000 800,000 Funding Sources 2020 2021 2022 2023 2024 Total Water Fund 800,000 800,000 Total 800,000 800,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 84 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-013 Type Improvement Useful Life 40 years ProjectName Watermain Oversizing Category Water Priority 3Important Status Active Description Oversizing cost of watennain pipe installed by developers. Justification Ensures all pipe in the City will have flow capacity necessary for water system Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 38,000 70,000 119,000 227,000 Total 38,000 70,000 119,000 227,000 Funding Sources 2020 2021 2022 2023 2024 Total Water Fund 38,000 70,000 119,000 227,000 Total 38,000 70,000 119,000 227,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 85 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# w-014 Type Equipment Useful Life 40 years ProjectName well& Purn house#5 1� Category Water Priority 1 Critical Status Active Description Well and Pumphouse 75 Justification A 5th well and pumphouse to replace well 1 that was closed due to PFCs Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 2,510,000 2,510,000 Total 2,510,000 2,510,000 Funding Sources 2020 2021 2022 2023 2024 Total Grants/Donation 2,270,000 2,270,000 Water Fund 240,000 240,000 Total 2,510,000 2,510,000 Budget Impact/Other State Grant funds for about 90%or$2.27m Remainder to come from city water funds to cost share according to increased pump size Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 86 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-017 Type Improvement Useful Life 40 years ProiectName 2020 Street & Utility Improvements-Water Category Water Priority 3lmportant Status Active Description 2020 street improvement project-water component Hertitage Farms(existing water)and Stonegate 2nd(new water) Justification improvements to existing watermain in Heritage farms$50,000 extension of water to Stonegate 2nd due to PFCs$3,630,000 Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 3,680,000 3,680,000 Total 3,680,000 3,680,000 Funding Sources 2020 2021 2022 2023 2024 Total Grants/Donation 3,630,000 3,630,000 Water Fund 50,000 50,000 Total 3,680,000 3,680,000 Budget Impact/Other funding for Stonegate 2nd water component subject to city receving 3M settlement funds from the state Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 87 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-018 Type Improvement Useful Life 40 years ProiectName 2021 Street & Utility Improvements-Water Category Water Priority 3Important Status Active Description 2021 Street&Utility Improvements-water component(Hamlet on Sunfish Lake) Justification Over a dozen wells with PFAS advisories.Coordinate with road work for efficiency. Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 1,702,000 1,702,000 Total 1,702,000 1,702,000 Funding Sources 2020 2021 2022 2023 2024 Total Grants/Donation 1,702,000 1,702,000 Total 1,702,000 1,702,000 Budget Impact/Other Contingent upon getting state grant funds Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 88 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-019 Type Equipment Useful Life 15 years ProjectName SCADAU rade Pg Category Water Priority 2 Very Important Status Active Description Upgrade current water system SCADA Justification Current 2008 system useful life through 2023;however upgrades would provide critical functionality improvements Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 50,000 50,000 Total 50,000 50,000 Funding Sources 2020 2021 2022 2023 2024 Total Water Fund 50,000 50,000 Total 50,000 50,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 89 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Public Works Director Project# W-022 Type Equipment Useful Life ProiectName UtilityTruck Category Vehicles Priority 3 hnportant Status Active Description Replaces current 2007 vehicle vehicle used almost everyday for locates,rounds,meter change outs,etc Justification End of Useful Life Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 70,000 70,000 Total 70,000 70,000 Funding Sources 2020 2021 2022 2023 2024 Total Sewer Fund 35,000 35,000 Water Fund 35,000 35,000 Total 70,000 70,000 Budget Impact/Other $70,000 total cost shared equally amongst water and sewer Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 90 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Public Works Director Project# W-023 Type Improvement Useful Life 15 years Project Name Water Meter Change Out g Category Water Priority 1 Critical Status Active Description Replace 200 obsolete Sensus and Neptune meters each year with new Sensus 1 pro meters Justification Old meters not working properly leads to the need to estimate usage therefore billing process takes more staff time Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 50,000 50,000 50,000 150,000 Total 50,000 50,000 50,000 150,000 Funding Sources 2020 2021 2022 2023 2024 Total Water Fund 50,000 50,000 50,000 150,000 Total 50,000 50,000 50,000 150,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 91 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Public Works Director Project# W-024 Type Improvement Useful Life ProjectName Automated Radio Read System Category Water Priority 3lmportant Status Active Description Automated radio read system for water meters. Justification Eliminates the need to drive around and obtain reads. Improves billing and gives"real time"readings to help detect leaks. Expenditures 2020 2021 2022 2023 2024 Total EquipNehicles/Furnishings 300,000 300,000 Total 300,000 300,000 Funding Sources 2020 2021 2022 2023 2024 Total Water Fund 300,000 300,000 Total 300,000 300,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 92 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-025 Type Improvement Useful Life Project Name OV sewer extension phase 6 & 5; water component Category Water Priority 3lmportant Status Active Description Replacement of water mains in conjunction with sewer extension to Phase 6 and 5 done over 2 years Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 626,588 626,588 Total 626,588 626,588 Funding Sources 2020 2021 2022 2023 2024 Total Debt Service 626,588 626,588 Total 626,588 626,588 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 93 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-026 Type Improvement Useful Life ProjectName OV sewer extension Phase 7; water component Category Water Priority 3lmportant Status Active Description Old Village Phase 7 water main replacement on Legion Ave Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 265,650 265,650 Total 265,650 265,650 Funding Sources 2020 2021 2022 2023 2024 Total Water Fund 265,650 265,650 Total 265,650 265,650 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 94 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-027 Type Improvement Useful Life 40 years Project Name Pressure Reduction Station-Connection to WT #3 Category Water Priority 3lmportant Status Active Description Pressure reduction station-12" Justification nneded when water crosses Keats Ave Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 132,000 132,000 Total 132,000 132,000 Funding Sources 2020 2021 2022 2023 2024 Total Water Fund 132,000 132,000 Total 132,000 132,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 95 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-028 Type Improvement Useful Life 40 years ProiectName Blackford Water Ext Category Water Priority 2 Very Important Status Active Description Extension of water main to Blackford property Justification some private wells have received health based advisories and are on bottled water Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 37,000 37,000 Total 37,000 37,000 Funding Sources 2020 2021 2022 2023 2024 Total Grants/Donation 37,000 37,000 Total 37,000 37,000 Budget Impact/Other project continegent upon city recevieng state funds Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 96 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-029 Type Improvement Useful Life 40 years ProiectName 31St St Area Water Extension Category Water Priority 2 Very Important Status Active Description Petition recevied from city in 2017 to extend water on 31 st St south of the UP Railroad Justification private wells recevied health based advisories due to PFCs Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 459,000 459,000 Total 459,000 459,000 Funding Sources 2020 2021 2022 2023 2024 Total Grants/Donation 459,000 459,000 Total 459,000 459,000 Budget Impact/Other project contingent upon city receeving state funds Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 97 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-030 Type Improvement Useful Life 40 years ProiectName 2023 Street Projects-water component Category Water Priority 3lmportant Status Active Description Water extensions to Parkview Estates,Cardinal Ridge,Torres Pines and Irish Ct due to HAS contamination Upgrades to water system in Beaut Crest coordinated with road work for efficiency Justification Opportune time for water replacements is when road is already opened for construction Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 4,039,200 4,039,200 Total 4,039,200 4,039,200 Funding Sources 2020 2021 2022 2023 2024 Total Grants/Donation 3,989,200 3,989,200 Water Fund 50,000 50,000 Total 4,039,200 4,039,200 Budget Impact/Other New water main extensions contingent upon receving staet grant funds Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 98 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-031 Type Improvement Useful Life 40 years ProiectName 2022 Street Projects-water component Category Water Priority 3lmportant Status Active Description Water upgrades to Fields 2 Justification Aged watermain to be replaced when road work is done for efficiency Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 50,000 50,000 Total 50,000 50,000 Funding Sources 2020 2021 2022 2023 2024 Total Water Fund 50,000 50,000 Total 50,000 50,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 99 Capital Improvement Plan - 2020 - 2024 2020 thru 2024 Department Water Department City of Lake Elmo, Minnesota Contact Engineer Project# W-032 Type Improvement Useful Life 40 years ProiectName 2024 Street Projects-water component Category Water Priority 3lmportant Status Active Description Water system upgrades as road work is completed for efficiency Justification Expenditures 2020 2021 2022 2023 2024 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2020 2021 2022 2023 2024 Total Water Fund 100,000 100,000 Total 100,000 100,000 Budget Impact/Other Produced Using the Plan-It Capital Planning Software Thursday,October 24,2019 100 THE CITY CIF LAKE ELMO STAFF REPORT DATE: 11/13/2019 REGULAR ITEM#: MOTION TO: Planning Commission FROM: Ben Prchal, City Planner AGENDA ITEM: Variance Request to Allow Expansion of A Non-Conforming Structure REVIEWED BY: Ken Roberts, Planning Director BACKGROUND: The City has received a variance application Vance and Haupheng Vang of 2038 Inwood Ave.to allow an expansion of a legal non-conforming structure. The applicants would like to construct an addition onto the existing home that is on the property. The proposed addition would conflict with the required front and side yard setback(s). With the home being considered as legal non-conforming improvements from a dimensional standpoint would more than likely trigger the need for a variance. ISSUE BEFORE THE COMMISSION: The Planning Commission is being asked to hold a public hearing and make recommendation on the above-mentioned variance requests. PROPOSAL DETAILS/ANALYSIS: Applicant: Vance and Haupheng Vang Property Owners: Haupheng Vang Location: 2038 Inwood Ave.PID#21.029.21.34.0013, Subdivision name Torre Pines 2nd Addition Block I Lot 3 Request: Variance for Expansion of a Non-Conforming Structure for Front and Side Yard Setbacks Existing Land Use: Single-Family Detached Residential Dwelling Surrounding Land Surrounded by other single-family detached residential dwellings. Lake Elmo Use: Park Reserve is to the East of the property. Existing Zoning: RE—Residential Estate Comprehensive Plan: Rural Single Family History: This property holds an old home that currently does not meet the front yard setback. The development established around the home. Deadline for Action: Application Complete— 10-15-2019 60 Day Deadline— 12-14-2019 Extension Letter Mailed—N/A 120 Day Deadline—N/A Applicable Article V—Zoning Administration and Enforcement Regulations: Article XI—Rural Districts Request Details. The applicant is proposing to build an addition off the north side of the existing structure. At this point the existing setback from the side lot line (north line) is 64 ft. 6 inches. and the setback from the front lot line is 50 ft. 9 inches. There is no issue with the side setback as a 50 ft. side yard setback is required but the front yard setback falls short by 50 ft. (100 ft. required). The applicant would like to invest in the property and improve it so that it will become more accommodating for their family's needs. There is language in the Zoning Code that would allow certain improvements without the need for a variance. However, the language is not flexible enough to assist with obtaining the addition. (See Code Reference Below) The Applicant is seeking variances on the following items There is some language in place that would allow the home to be altered. However,the current front yard setback is already more than 10% of the reduced setback. The current side yard setback is conforming but the addition will conflict with the required 50 ft. side yard setback. Structure Setbacks: 154.151 Non-Conforming Uses,Buildings and Structures C.Preservation of Dimensionally Substandard Buildings or Structures. Except as provided in this chapter, buildings structures lawfully existing on the effective date _ of this chapter or on the effective date of any amendment to v this chapter may be maintained although the building or structure does not conform to the dimensional standards of N AS entrydrive r4:10 sq. this chapter. However, any such building or structure shall not be altered or improved beyond normal maintenance, ^ LO except that any lawful dimensional substandard residential I'`) P � building, accessory building, or structure may be altered or Amain I arm house&garage 0'- O improved if the existing substandard dimension relates on1X O o � to setback requirements and does not exceed the 10% of the 00 minimum setback requirements. Additionally,the alteration 0 6aiti sorfnce drf 20 s , Z or improvement shall conform to all of the provisions of -- 9 e I this chapter and shall not increase the existing substandard �-"- DRAIN"' 115 74 dimensions. Code Location Code Setbacks Proposed Setbacks Front yard setback(garage) 154.402 table 9-2 100 ft. also established in past variance 50 ft. 9 in. not compliant Side yard setback(garage) 154.402 table 9-2 50 ft. 27 ft. 11. compliant If the expansion was placed on the home where a variance would not be required from the front yard setback Staff believes that the home/addition would not be functional(see image below). Staff created a layout that would not conflict with the front yard setback which ends up placing the addition behind the existing garage (not to scale). Shifting the addition to a position on the home where neither the front nor the side lot line setbacks would then appear to directly interfere with the access to the garage and driveway. :)erty line ------- - �i�-=--------- ----------- \>� JAS E entry�dri� Addition +/- 100 ft. ♦� I Lf) M se&garage Garage -014 0 O O ` \ C hard surfdce drieS 120 z sq.ft MALIN FIELD TANK 5. �4 � Page 2 Lot Details and Details of the Development Lot Details.The property was established during the development of the Torre Pines Subdivision. The lot itself does not have any issues when it comes to zoning. As stated before the issue starts with the existing home. With the lots being established around the existing home it is not terribly surprising to Staff that the home would become Legal Non-Conforming. Code Location Code Setbacks Proposed or Existing Setbacks Lot area 154.402 table 9-2 2.5 acres 2.5 acres Front yard setback 154.402 table 9-2 100 ft. 50 ft. 9 in. —Existing setback 50 ft. 9 in. - Proposed setback Side yard setback 154.402 table 9-2 50 ft. 64 ft. 6 in. (North)—Existing 27 ft. 9 in. (North) - Proposed Impervious Surface 154.402 table 9-2 15% 11.5% - Proposed One important aspect worth a discussion is the approving resolutions for the development. Phase one of the development consisted of 15 lots with the discussed home being on lot 15. M■PlTO![ 4 VI • 1 y — I t p1.WAq�sEUOrt �.��.'�'�ry,r _.�i ��Y I I i i / /� A �Ih� --- .---------------- —a9--� \ 9 ��GD4 II f �R 11 K 2 gs,�}, '�r oo^ - v' ...�..I.a K o \__ �_ __ .0 ■ .I,�e-y� �•i 7t 'J.�II it O:�u �� � Icy �I +'+yKL a+3aR R 'li �, I L----- I y .. \N /�i �~ I onuwa u II. __�_�.•f r•.a•• ■ _rmr._=_ ■ 10 41, ----- ? -------------- ■2MT STREET NORTIM cj // � I I I 2 •il I 1 1 ■•.11.CE[.S\IBITC\ �"% e.�lY ` i v. S I e 1 ' I W � I 12 ``,any* _-' - -t— TREE T -18'd"• 4 WEILAND �/ � � ■ a"'3CL_�~ � I i I14 NpNNTOI mrre C AT 3 • I I i.mn _ _ I ''� aKIUN■ ham The issue then comes up during the approval for Phase 2. At first there doesn't seem to be any issues and it's a fairly straightforward development with no issues (except the legal non-conforming home). The problem that Staff found is condition number 7. Of the approving resolution(2008-038) for phase 2. The condition states: "The driveway access from Lot 13, Block 1 shall be moved to 21St Street prior to any expansion or replacement of the existing house on this lot." Page 3 The issue here is that there is no lot 13 for block 1 of the second addition. However,there is a lot 13 of block 1 in the first addition (see L_____-- phase I graphic). With that said, Staff speculates that there was a mistype and it should have said Block I Lot 3 and further IIIc j believes that the driveway condition was 1 �> intended for the existing home of the property a + at 2038 Inwood Ave. �r27'5j"r SPAN At this time Staff believes the intent was to redirect the driveway but it was miss-stated. This would be an appropriate time to correct .� 3 '.• �,� `a"^"'.�sue._ .,ap7 _.1 I the location of the driveway for the house to yy 215t St. but Staff does not believe it is entirely % �° •�bl"i I necessary. The driveway enters out onto a R SB9.S6"01'W 06]SS �` T County Road and though the driveway x connects to a road that is obviously busier than 215t St. the existing owner would like to have it remain in place. At the time when Inwood Ave (Hwy 13)is improved the homeowner may want to connect to 21St St. The City would also need to accept that requiring the driveway to connect to 2I'i St.would create another non-conformity. With the driveway connecting out to 21 St. the ' accessory building would be closer to the front lot line than the principle structure (the home). Though, that would conflict with the code it would not appear to be terribly detrimental to the neighbors. Although some individuals may find it more desirable to connect to 21 St. Staff does not necessarily see a gain in requiring the current owner to re-direct the driveway. Unless the Commission or City Council have different thoughts this may be an appropriate condition to have Washington County enforce as everything is already existing. Other Agency Review Washington County Comments. Washington County has stated that they would not like to see additional access created onto Inwood Avenue and instead have a new driveway installed for connection to 2I't St. Staff Comment - City Staff agrees that additional access should not be created but does not necessarily agree that enforcing a connection to 21't St. would need to be required at this time. Instead that connection could/should be required when Inwood Avenue is improved(expanded). Valley Branch Watershed Comments. The Watershed did respond but was uncertain if a permit would be required. Staff Comment — It would be appropriate to apply a condition requiring the property owner to reach out to the Watershed District and provide feedback on what will be required. City of Lake Elmo Engineer Comments. The comment memo from the City's Engineer is attached. To summarize the memo, additional encroachment is not recommended in anticipation of the expansion of Highway 13 (Inwood Ave.) and the setback line should be measured from the ROW line with an addition 15 ft. as that is what Page 4 the County would expect to acquire during the time that Hwy 13 is improved, eliminate one section of the driveway onto Highway 13, acquire an addition 15 ft. of ROW in anticipation of the expansion of Hwy 13. Torre Pines HOA. The applicant has obtained approval from the HOA architectural advisory board for the addition. RECOMMENDED FINDINGS: An applicant must establish and demonstrate compliance with the variance criteria set forth in Lake Elmo City Code Section 154.109 before an exception or modification to the property can be granted. The criteria is listed below, along with recommended findings from Staff regarding applicability of these criteria to the applicant's request. 1) Practical Difficulties. A variance to the provision of this chapter may be granted by the Board of Adjustment upon the application by the owner of the affected property where the strict enforcement of this chapter would cause practical difficulties because of circumstances unique to the individual property under consideration and then only when it is demonstrated that such actions will be in keeping with the spirit and intent of this chapter. Definition of practical difficulties; "Practical difficulties"as used in connection with the granting of a variance,means that the property owner proposes to use the property in a reasonable manner not permitted by an official control. FINDINGS: Variance For Front Yard Setback: With respect to the proposed variance for a reduced setback from the front lot line, strict enforcement of the City's zoning regulations will cause practical difficulties and the applicant is proposing to use the property in a reasonable manner. The request to expand the existing home on site does appear to be reasonable. Considering that the home is existing and the development was established around the existing home,property owners are limited when it comes to improvements that could comply with the code. Also, the addition does not further increase the non-conformity, the reduced setback does appear reasonable. Variance For Side Yard Setback: With respect to the proposed variance for a reduced setback from the side lot line, strict enforcement of the City s zoning regulations will cause practical difficulties and the applicant is proposing to use the property in a reasonable manner. With the Residential Estate requiring a minimum of 50 ft. as a setback from the side lot line, which is the largest of all rural zoning districts only being less restricting than the Agricultural district, requiring 100 ft. as the setback. Although, the existing structure does meet the setback requirement any addition larger than 14 ft. would trigger a variance. The City must keep in mind that perhaps there is an alternative to the request to avoid a variance. But placing the addition to the South of the existing home would more than likely infringe on the existing driveway, access to the garage, andpossibly the septic system. The addition to the north does appear reasonable and they are still able to maintain a 27 ft. and 9 in. setback from the north property line. 2) Unique Circumstances. The plight of the landowner is due to circumstances unique to the property not created by the landowner. FINDINGS: Variance For Front Yard Setback: With respect to the proposed variance for the front yard setback, the plight of the Applicant is unique and has not been caused by the applicant. Although the lot is large enough in size to accommodate the size of home that is desired the applicant was not involved with the construction/placement of the existing house or with the platting process that triggered this home to become legal non-conforming. With the structure being legal non-conforming, additions become difficult especially when the required setback is 100 ft. Given the circumstances, approval for the addition on the structure with a setback less than 100 ft.from the front lot line does appear to be reasonable. Page 5 Variance For Side Yard Setback: With respect to the proposed variance for the side yard setback, the plight of the Applicant is unique and has not been caused by the applicant. Generally speaking property owners do not have to contend with legal non-conforming structures in a new development. Although the home as existing, is capable of meeting the required setback from the northern side lot line there is limited room and options for expanding the structure. Beyond this, it is impractical to expand the structure to the south where the setbacks can be met. This is justified because an expansion would then being to conflict with the driveway, garage, and the driveway would be forced south towards the drain field is located. The standard appears to be met. 3) Character of Locality. The proposed variance will not alter the essential character of the locality in which the property in question is located. FINDINGS: Variance For Front Yard Setback: With respect to the proposed variance for the front yard setback, the addition would not appear to alter the character of the locality. Though affiliated with the Torre Pines Development the home primarily appears to have a limited impact on the development due to its location in the rear of the lot, as compared to the other homes. Allowing a variance to the front lot line appears to have limited bearing on the character of the locality. Variance For Side Yard Setback: With respect to the proposed variance for the side yard setback, the addition would not appear to alter the character of the locality. The City recognizes that allowing a reduced setback for the side yard lot line would be different from what has been allowed by the Zoning Code and the Locality. However, understanding that this was the original home in the subdivision and given its location on the property being able reasonably notice the setback form the development appears stretched. S o 1 Jim Inwood Avenue I �t Page 6 4) Adjacent Properties and Traffic. The proposed variance will not impair an adequate supply of light and air to properties adjacent to the property in question or substantially increase the congestion of the public streets or substantially diminish or impair property values within the neighborhood. FINDINGS Variance For Front Yard Setback: With respect to the proposed variance for the front yard setback, the proposed variance will not impair an adequate supply of light and air to the adjacent property or substantially increase congestion of the public streets or substantially diminish property values. Drawing a conclusion that allowing a variance from the front property line would cause negative impacts appears limited in this situation when reviewed through the required scope. Since the home is on the opposite side of the lot of where the neighborhood road is located the impacts of the proposal would be severely limited. Variance For Side Yard Setback: With respect to the proposed variance for the side yard setback, the proposed variance will not impair an adequate supply of light and air to the adjacent property or substantially increase congestion of the public streets or substantially diminish property values. The only property that would be perceivably impacted is the property to the north (vacant). However, there would still be an estimated 77 ft. setbackfrom the proposed home and anew home on the neighboring property to the north (838121"N.). There is also a strong stand of trees on the northern not that further helps to minimize the visibility of the structure. Although the required setback is being infringed on there still appears to be a sufficient setback to accommodate approval. Furthermore, allowance of the reduced setback appears to have a limited bearing on reducing property values when it comes to the setback. 21ST9TN t 50 Ft. 100.9 Ft. FISCAL IMPACT: None. OPTIONS: The Planning Commission may: • Recommend approval of the variance requests, subject to conditions of approval as recommended by Staff. • Amend conditions of approval and recommend approval of the variance requests, subject to amended conditions of approval. • Recommend denial of the variance requests. Page 7 RECOMMENDATION: Staff is recommending approval of the variance requests. Although the lots are larger in the Residential Estate Zoning classification the property owner is at a disadvantage when it comes to making improvements consisting expansions of the home. Staff is recommending the following conditions of approval: 1) The applicant shall reduce the number of access points onto Inwood Avenue from two to one. 2) The applicant shall follow up with the Valley Branch Watershed District regarding permitting and provide their conclusion to City Staff. If a permit is required then an approved permit shall be provided to the City prior to issuance of the building permit. 3) The applicant shall follow up with Washington County Septic Department regarding permitting and provide their conclusion to City Staff. If a permit is required then an approved permit shall be provided to City Staff prior to issuance of a building permit. Staff recommends the following motion: "Motion to recommend approval of the request for reduced front and side yard setbacks for the property at 2038 Inwood Ave., subject to conditions of approval as recommended by Staff ATTACHMENTS: • Applicants narrative • Survey/site plan • HOA Architectural Board Approval • Lake Elmo Resident Comments • Engineering Memo Page 8 VARIANCE REQUEST STATEMENT VANG PROPERTY 2038 INWOOD AVE NORTH LAKE ELMO, MINNESOTA The practical difficulties related to this land owner are the subject of the existing zoning requirements which were imposed upon this farm stead after it was built and lived in for many years. The owners would like to save this farm house and add an addition to meet their family residential requirements. The existing zoning requires a 100' front yard set-back. Our request for the variance is to allow a 50' front yard set-back which is the same set back as the existing farm house. This variance would allow the proposed addition to connect to the existing farm house. The existing zoning requires a 50' side yard set-back, while the R-2 areas in the City of Lake Elmo allow a 10' side yard set-back. The owner is requesting that the proposed addition be allowed to have a set-back of 26'. Unique circumstance of having the existing septic system located on the south side of the farm house, the garage located on the west side of the farm house and the existing front yard set-back will only allow the proposed addition to be located on the north side of the farm house. The existing road along the north side of the property will be removed to eliminate future traffic and allow space for the proposed addition. The Torre Pines property adjoining the north property line is heavily wooded. Allowing the proposed addition to be 24' closer to the property line would never be noticed unless the forest was cleared. The property in question is located in the Torre Pines development. Attached with this statement is a letter from Jack McGee, the chairman of the Torre Pines Homeowners Association Architectural Control Committee. In keeping with the character of the locality, the letter is a statement of approval for the Vang addition. RAPIER TRUSS RIDDE VENT I 34TH ST. 2.50 Acres i Z ( 108,918 S.F.) � Q SECTION i 16 �\ 00 Ln Ld ,� `♦` I `♦♦ i I ® CHICAGO & NORTHWESTERN R. R. i ♦I ♦♦ STILLANATER BLVD. /' i �\ O�♦+ I CSLi AH 8 �i I I \ I I 2.50 4c re s �� ♦``♦ --------------------------- Q I � I I I I / �� �.� �♦ �`♦, i remove exisitng drive along 9 9 6 — ��. �`�! north side fill in with grass 120 Z I m y I �` `` �` ♦'�l 218.8 cn ``♦` `\ �/ / // `♦`� �`�__________ --------------t---- —_ �. _._♦`_. �` / / �♦ I ro er line ' \ \ ® LLJ I Z 1 Uj /' i \ j� GAS a Q) i CD N E entry�drive 1\,� 0 sq.f 5 Z `r 1 I CPS k F A mom rm hollse&garage -w- ``�,i `♦` D listing outbuildi / ANG ---�- ---------, ._._._. .-.-.-._._..._. W CD ' V PROPERTY 50.74 _x LO ® i O 1 L 6�XC_ hard su00 120 Iced q.984 VICINITY MAP E, `; ---- �'_._._ _ D FIELDA 14 B % 0 SECTION 21 , T29N, R21 W 115 74 O NOT TO SCALE DRAINAGE ,-'� - - - IMPERVIOUS ANAYLSIS EASEMENT 100 A EXISTING HOUSE & GARAGE 19530 SQ.FT. set back O ------------------- — ' IlEdge of Water - , a B NEW ADDITION 29190 SQ.FT. ty line — — — — 2 5 .5 6 60.00 75 C IMPERVIOUS DRIVE AREA 59120 SQ.FT. 47.24 proper property line D EXISTING BARN 19200 SQ.FT. 1067 .35 - - - TLAND ZONE A E ENTRY DRIVE AREA 1,520 SQ.FT. VEGETA Tl VE F FUTURE PATIO AREA 1,000 SQ.FT. BUFFER I TOTAL IMPERVOUS AREA 12'9560 SQ.FT yy I sec rcation�o a hort twos Plre pared }—__ ——— ----< by me or under nny direct supmision ite PROPERTY SIZE 109,085 SQ.FT and that I nd a dalyregisof the architect under the Iaws of the I state of Minnesota. his IMPERVIOUS/LAND RATIO 11.5% < 15% ShYfN EDWARU ERBIN,PA PA,MN REG.I'_ f oATe slcaro u SITE PLAN DATE RMSE anTr REwseo REVISED OCTOBER 29,2019 out of the box architecture x A october 10, 2019 f=ASI suite 103,11200 Stillwater blvd lake elmo, minnesota 55042 phone:651 748 1078 fax:651 748 1272 VA N C E VA N G A D D 1 T 1 O N 2038 Inwood Ave. N. SITE PLAN & GRADING PLAN SCALE 1'=60'-0" new addition round vent roof shingles pewter siding sterling 9roY II II II II II II II II II LE iL I I II I I I I --1 --———————- T 1T--rl—h --L------------------------- ----------------------------------L----------------1-----------------------L L—L siding sterling gray n NORTH ELEVATION SCALE,/8"=,'-D" existing house siding pointed wood rim glacier white matching siding on new walls roof shingles pewter ❑❑❑❑❑ Ln ❑❑❑❑❑ N ❑❑❑❑❑ ❑ ❑ 000 ❑ ❑ I I1111 IFIIII I I I I II � I I I I I I I II I I I -------------------L----�, L-- -------- ------------ -------�- L---------------------------------------------------------------------------I----J L----r------------------------------------------L-------------------- —I hereby"r"Y that this plan, specification or report was prepared existing farm house new addition by me or under myaecgti supervision new addition and that I am o du we stered architect under the aws of the slate of Minnesota. n EAST ELEVATION scA�e vR ,o n WEST ELEVATION scALE va"=r-D" STE&1DWARD ERBM,Pk k MN FIG.110035 DATE SIGNED DATE DRAWN DALE RENSED out of the box architecture october 10, 2019 A3 suite 103,11200 stillwater blvd lake elmo,minnesota 55042 phone:651 748 1078 fax:651 748 1272 VA N C E VA N G A D D 1 T 1 O N 2038 Inwood Ave. N. ELEVATION & SECTION SCALE 1/s^=r 0^ 80'-0" 4' 16' 13'-8" 12-8" 80'-0" 16' 4' BATHROOM DINNING LIVING ROOM DINNING QD BEDROOM new house addition I KITCHEN ENTRY jII new house addition i I I it �li 0 O O EXISTING HOUSE ❑ existing house LO --- ❑ (-- 20'-313/4" 16 5 0 n FIRST FLOOR PLAN SCALE 1/8"=1'-0" hereby certify that this plan, specification or report was prepared by me or under myydirect supervision and that I am a Oul registered architect under the laws of the state of Minnesota. SIE4EN EDWARO ERBW,PA,�,W.3,J10035 DATE SIGNED DATE DRAWN DATE REVISED out of the box architecture october 10, 2019 Al suite 103,11200 stillwater blvd lake elmo,minnesota 55042 phone:651 748 1078 fax:651 748 1272 VA N C E VA N G A D D 1 T 1 O N 2038 Inwood Ave. N. FIRST FLOOR PLAN SCALE 118^=r a" 80'-0" 4' 16' 13'-8" 12'8" 13'-8" le16' 4' � o MOD DO 2 0 O m BEDROOM BEDROOM OPEN AREA II I II I II I II I UPPER FAMILY AREA I II I I II I II I II I r,ILI� I 38' fm ereby certify that this plan, ification or report was prepared e or under myydirect supervision that I am a dul registered hitect under the laws of the nSECOND FLOOR PLAN SCALE 118"=1'-0" te of Minnesota. N 11WW IR1111,Ik AVy IN C,11.11 DATE SIGNED DATE DMM _ O DATE RENSED out of the box architecture october 10, 2019 suite 103,11200 stillwater blvd lake elmo,minnesota 55042 ! A2 phone:651 748 1078 fax:651 748 1272 VA N C E VA N G A D D 1 T 1 O N 2038 Inwood Ave. N. FIRST FLOOR PLAN SCALL 1 s°=r 0° Jake McGee,Chairman Architectural Control Committee Torre Pines Homeowners Assn. 9263 22"'Street North Lake Elmo,MN 55042 Home:651-770-3332 Cell:612-889-3463 Email:jakemcgeengcomcast,nat October 8th, 20.19 Vance&Echao Vang 2038 Inwood Ave. Lake Elmo, MN 55042 Regards: Addition to your residence at 2038 Inwood Ave. Good afternoon Vance; On behalf of the Torre Pines Homeowners Association, I'm pleased to inform you that the Architectural Control Committee has reviewed the attached plans you submitted dated 9-23-19 for the addition to your residence at 2038 Inwood Ave. in Lake Elmo,MN and finds the design meets the architectural standards established by our association. In addition, we have reviewed the exterior product samples provided by your architect, Mr. Steve Erban. The exterior particle board siding in the textured, rough sawn"Sterling Gray"finish is approved and the"Glacier White"textured, rough sawn particle board trim is also approved. The Landmark Designer CertainTeed Shingles in the"Pewter" finish is also approved. Your site and grading plan dated 9-23-19, which was also submitted, indicates a wraparound driveway accessed from Inwood Avenue. For that construction and prior to submitting it for review by your ACC,please review Page 8, Section IV,Paragraph B of the First Amendment To Article VI of the Architectural Control Of the Declaration of Protective Covenants that was sent to you and Mr. Erban earlier. In particular, it notes that: "The approved materials for the driveway are concrete,masonry, bituminous or other hard surface products,No gravel or crushed rock will be permitted." And "Driveways must be installed within one year of the date a Certificate of Occupancy is issued for any dwelling constructed upon a lot." As noted on Page-3, Sect. 1-E of the First Amendment to Article VI, your city construction permit must be issued and construction commenced within six (6)months of this approval. If the City of Lake Elmo does not issue a building permit within six (6)months or modifies the Page 1 of 2 Jake McGee,Chairman Architectural Control Committee Torre Pines Homeowners Assn. 8263 22 d Street North Lake Elmo,MN 55042 Home:651-770-3332 Cell:612-889-3463 Email:iakemc eencomcast.net attached plans,please resubmit them to your ACC for approval prior to commencing construction. The Architectural Control Committee (ACC), your association and board of directors want to thank you for consulting with the ACC to maintain the beauty of Torre Pines. Our committee and association look forward to working with you and the Vang family on any of your future projects. If there are any questions or assistance we may offer during the construction process,please don't hesitate to contact me (612-889-3463). Thanks again Vance. Very best regards, C. � ®�. Jake McGee Chairman Torre Pines Architectural Control Committee Copy: Mr. Steve Erban, Architect for out of the box architecture Kathy Bourne, Torre Pines Board President Cindy McGee, Torre Pines Secretary Lisa Setterstrom, Torre Pines Treasurer Tony Yocum, Torre Pines Architectural Control Committee Jeff Caswell, Torre Pines Architectural Control Committee Mike Bourn, Torre Pines Architectural Control Committee Joe Schara, Torre Pines Architectural Control Committee Page 2 of 2 To: Ben Prchal—Lake Elmo City Planner From: M. Selby—Home owner 8311, 21St N, Lake Elmo, MN 55042 Subject: Variance request 2038 Inwood Ave. N In response to your notice of November 13t", 2019 1 am forwarding 7 concerns related to the variance request: 1) Concerns for a reduced property value of the lot being impacted by the variance which is not owned by the 2038 Inwood Ave property owners 2) Concerns for the other property values in the Torres Pines Association given the new structure's visibility from Inwood Ave due to the set back of 50FT vs the required 10OFT 3) Concerns for the impact on wildlife habits and movement from the new structure during construction with removal of vegetation, use of heavy equipment and disturbance of soil 4) Concerns for the environmental impact of changes to the landscape from the new structure that would impact natural drainage into the pond impacting wildlife in the area 5) Concerns for the ability for the city to safely expand the road if traffic increases in the area 6) Concerns that the house will be used for more than a single-family dwelling. The family and several adult children live in the house today. How can we verify that the new structure will not be used for more than a single family dwelling which would impact property values in the area 7) Linked to the single-family dwelling issue is the concern that there are already several vehicles on the property that do not have sufficient garage space and visually impacts the neighborhood property values I would appreciate consideration from the council on the negative impact of this variance on the neighborhood, safety and wildlife. Thank you. M. Selby FOCUSENGINEERING, inc. MEMORANDUM Cara Geheren, P.E. 651.300.4261 Jack Griffin,P.E. 651.300.4264 Ryan Stempski, P.E. 651.300.4267 Date: November 5, 2019 Chad Isakson, P.E. 651.300.4285 To: Ben Prchal, City Planner Re: 2038 Inwood Avenue From: Jack Griffin, P.E., City Engineer Inwood Avenue setback variance A variance request was received for the site plans for an addition to the home at 2038 Inwood Avenue, received on October 31, 2019. Engineering has the following review comments: 1. Additional encroachment toward CSAH13 is not recommended. The County has identified a future 150-foot right-of-way width along CSAH13, or 75 feet from the current centerline. The current right-of-way is 60 feet from centerline. It should be anticipated that the County will seek to acquire an additional 15-feet minimum for the future expansion of Inwood Avenue. Any housing setbacks should be measured using the future right- of-way condition. Setbacks should also consider that Inwood Avenue is designated as a high-volume County roadway with emphasis placed on mobility. 2. The secondary access to Inwood Avenue should be eliminated. Residential property should always be encouraged to access lower hierarchy roadways. In the case of 2038 Inwood Avenue, the lower hierarchy road is 21st Street North. Since the existing access is already in place to Inwood Avenue the access can be allowed to remain, however, the property should be required to eliminate the secondary access. Inwood Avenue is a Washington County roadway designated as an "A Minor Arterial" roadway in the 2040 Comprehensive Plan. The road is intended as a high-volume roadway with an emphasis on mobility and controlled access. 3. Should any variances be granted for this property, consideration should be made to require the dedication of an additional 15-feet right-of-way along Inwood Avenue and the requirement to remove the secondary access. PAGE 1 of 1