HomeMy WebLinkAboutSite PlanFFE = 904.50
BUILDING AREA = 15,498
EXISTING GRAVEL PAVEMENT
CITY WATERMAIN
EASEMENT
10 FT SMALL
UTILITY EASEMENT9
6
20NO PARKING NO PARKING NO PARKING
15
17
20
20
22
22
21
21
13
20
20
22
24
6
24
10,000 GALLON
FUEL TANK
AREA WITH LEAK
CONTAINMENT (135%)
(20'x45'x2' DEEP)
FUEL PUMP
ISLAND LOCATION
14' WIDE
22
TO REMAIN FOR PHASE 1
STORMWATER
POND AREA
C6
6
C5
1
C5
4
C5
4
C5
3
C6
1
(9 TYP)
EXPANDED
STORMWATER
POND AREA
119.7'
98
.
5
'
20
'
9'7'
24
'
18
.
7
'
9'9'
9'
24
'
18
'
18
'
24
'
27'
60.7'
25
'
25'
4
9
.
5
'
2.7'
13.6'
10'
3'
25
'
25
'
25'
36.
1
'
2'
C5
1
C5
1C5
1
C5
2
C5
2
C5
2
C5
2
C5
9
C5
8
C5
8
1
18
.
7
'
2
C5
68'
C5
68'
C5
68'
34.3'
C5
4
C5
3
C5
2
C5
4
CITY WATERMAIN
EASEMENT
10 FT SMALL
UTILITY EASEMENT
DescriptionRev.Date
20
1
8
S
T
I
L
L
W
A
T
E
R
BU
S
F
A
C
I
L
I
T
Y
IM
P
R
O
V
E
M
E
N
T
S
ST
I
L
L
W
A
T
E
R
A
R
E
A
P
U
B
L
I
C
S
C
H
O
O
L
S
ST
I
L
L
W
A
T
E
R
,
M
N
5
5
0
8
2
1 06.06.18 Watershed Comments
Sheet:
Sheet Title:
Project #:
Drawn By:
Checked By:
Issue Date:
12176010
KJA
GAB
04.30.18
35
2
4
L
a
b
o
r
e
R
o
a
d
Wh
i
t
e
B
e
a
r
L
a
k
e
,
M
N
5
5
1
1
0
65
1
.
4
8
1
.
9
1
2
0
(
f
)
6
5
1
.
4
8
1
.
9
2
0
1
ww
w
.
l
a
r
s
o
n
e
n
g
r
.
c
o
m
C
2
0
1
8
L
a
r
s
o
n
E
n
g
i
n
e
e
r
i
n
g
,
I
n
c
.
A
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
.
P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C2.dwg
35
2
4
L
a
b
o
r
e
R
o
a
d
Wh
i
t
e
B
e
a
r
L
a
k
e
,
M
N
5
5
1
1
0
65
1
.
4
8
1
.
9
1
2
0
(
f
)
6
5
1
.
4
8
1
.
9
2
0
1
ww
w
.
l
a
r
s
o
n
e
n
g
r
.
c
o
m
La
r
s
o
n
En
g
i
n
e
e
r
i
n
g
,
I
n
c
.
Pr
o
j
e
c
t
T
i
t
l
e
:
ST
I
L
L
W
A
T
E
R
A
R
E
A
PU
B
L
I
C
S
C
H
O
O
L
S
18
7
5
S
O
U
T
H
G
R
E
E
L
E
Y
S
T
R
E
E
T
ST
I
L
L
W
A
T
E
R
,
M
I
N
N
E
S
O
T
A
5
5
0
8
2
Cl
i
e
n
t
:
Greg A. Buchal, P.E.
Date: Reg. No.:04.30.18 23793
I hereby certify that this plan,
specifications or report was prepared
by me or under my direct supervision
and that I am a duly licensed
Professional Engineer under the laws
of the state of Minnesota.
2 City Resubmittal
3
4
09.14.18
0
NORTH
20 40 80
City Resubmittal10.12.18
City Resubmittal11.06.18
NEW 6" BITUMINOUS PAVEMENT OVER
NEW 8" CRUSHED AGGREGATE BASE
OVER 24" GRANULAR BACKFILL
SEE DETAIL 1/C5
NEW 6" CONCRETE PAVEMENT OVER
NEW 6" CRUSHED AGGREGATE BASE
SEE DETAIL 3/C5
NEW 10" AGGREGATE OVER
NEW 24" GRANULAR BACKFILL
SEE DETAIL 2/C5
SYMBOL LEGEND
WHERE APPLICABLE, DIMENSIONS ARE FROM
BACK OF CURB TO BACK OF CURB OR BACK OF
CURB TO END OF STALL LINE.
PAVING AND
DIMENSION PLAN
C2
ADA STALLS REQUIRED = 6
ADA STALLS PROVIDED = 6
AUTOMOBILE STALLS = 177
SCHOOL VAN STALLS = 20
SHORT BUS STALLS = 24
LARGE BUS STALLS = 123
- INDICATES STALL COUNT IN ROW
PARKING STALL COUNT
LOT SIZE
Total Lot Size: 478,997 s.f. = 11.00 Acres
Breakdown:
Proposed Building: 15,498 s.f. = 3.24%
Proposed Gravel Pavement Areas (Phase 1): 182,980 s.f. = 38.20%
Proposed Concrete and Bituminous Pavement
(Phase 1): 61,563 s.f. = 12.85%
Proposed Open Space: 218,956 s.f. = 45.71%
Proposed Total Impervious Space = 54.29%
Business Park Max Impervious = 75%
Parking Lot Area = 244,993 s.f.
5% Landscaped Area Required = 12,249 s.f
Landscaped Area Provided = 16,830 s.f.
*All gravel pavement surface (existing and proposed) in
Phase 1 is going to be paved in Phase 2 of the project.
A timeline for Phase 2 has not yet been established but
is anticipated in 2 to 3 years.*
XX
Automobile parking lot to be constructed after septic
drainfield is abandoned.
Entrance drive paving, and curb and gutter to match
new construction for Hudson Blvd.
1
2
PLAN NOTES