NOTICE OF MEETING
The City of Lake Elmo
Planning Commission will conduct a meeting on
Monday December 9, 2019
at 7:00 p.m.
AGENDA
1. Pledge of Allegiance
2. Approve Agenda
3. Approve Minutes
a. November 13, 2019
4. Public Hearings
a. CONDITIONAL USE PERMIT(CUP)AMENDMENT- 11530 Hudson Boulevard(Stillwater School
District#834 School Bus Terminal).
b. PLANNED UNIT DEVELOPMENT—FINAL PLAN REVIEW—Lake Elmo Senior Living(391 Street)
c. MINOR SUBDIVISION-DPS Lake Elmo (property lying between Hudson Blvd and 5' Street North)
(Continental Development and Alan Dale(the property owner))
5. New Business
a. Driveway Ordinance Code Amendment
6. Communications/Updates
a. City Council Update
11-19-19 Meeting- Subdivision Ordinance Update
b. Staff Updates
c. Upcoming PC Meetings:
1. January 13,2020
2. January 27,2020
7. Adj ourn
***Note:Every effort will be made to accommodate person or persons that need special considerations to attend this
meeting due to a health condition or disability.Please contact the Lake Elmo City Clerk if you are in need of special
accommodations.
TI It: CITY OF
LAKE ELMO
City of Lake Elmo
Planning Commission Meeting
Minutes of November 13, 2019
Commissioner Weeks called to order the meeting of the Lake Elmo Planning Commission
at 7:00 p.m.
COMMISSIONERS PRESENT: Cadenhead, Hartley, Holtz, Steil and Weeks
COMMISSIONERS ABSENT: Risner
STAFF PRESENT: City Administrator Handt, Planning Director Roberts, City Planner
Prchal
Approve Agenda:
M/S/P: Hartley/Cadenhead move to approve the agenda as presented, Vote: 5-0,
motion carried unanimously.
Approve Minutes:
M/S/P: Hartley/Steil move to approve the October 16, 2019 minutes, Vote: 5-0, motion
carried unanimously.
Public Hearings
2020-2024 CAPITAL IMPROVEMENT PLAN
Handt reported on the items in the 2020 — 2024 Capital Improvement Plan (CIP). She
explained that it is a multi-year capital expenditure plan for the City's vehicles,
equipment, and public buildings that cost $25,000 or more and last five years or longer.
Holtz asked if the Manning and 30t" Street intersection and about Easton Village rail road
crossing. Cadenhead asked if the estimated street costs included the engineering and
construction costs.
Weeks opened the Public Hearing. No one from the public spoke. Weeks closed the
public hearing.
M/S/P: Hartley/Steil move to recommend to the City Council that the 2020-2024 Capital
Improvement Plan is consistent with the 2040 Comprehensive Plan, Vote: 5-0, motion
carried unanimously.
Lake Elmo Planning Commission Minutes; 11-13-19
Vang Residence Variance Requests - 2038 Inwood Avenue North
Prchal explained the proposed addition to the existing original farm house. The
addition would require a front yard and a side yard setback variance. Prchal explained
that an applicant must establish and demonstrate compliance with the variance criteria
set forth in Lake Elmo City Code Section 154.109 before an exception or modification to
the property can be granted. These include:
Practical Difficulties Findings for Front Yard Setback Variance: The request to expand
the existing home on site does appear to be reasonable. The addition does not further
increase the non-conformity, the reduced setback does appear reasonable. Considering
the home was existing when the development was established, property owners are
limited when it comes to improvements that could comply with the code.
Practical Difficulties Findings for Side Yard Setback Variance: The existing structure
does meet the setback requirement however any addition larger than 14 ft. would
trigger a variance. An addition to the South of the structure would interfere with the
existing driveway, access to the garage, and possibly the septic system. The addition to
the north does appear reasonable and they will maintain a 27 ft. and 9 in. setback from
the north property line.
Unique Circumstances Findings for Front Yard Setback Variance: The circumstances
are unique and have not been caused by the applicant. Although the lot is large enough
in size to accommodate the size of home that is desired the applicant was not involved
with the construction/placement of the existing house or with the platting process that
triggered this home to become legal non-conforming. Given the circumstances, the
addition with a setback less than 100 ft. from the front lot line does appear to be
reasonable.
Unique Circumstances Findings for Side Yard Setback Variance: The circumstances are
unique and have not been caused by the applicant. Although the home as existing, is
capable of meeting the required setback from the northern side lot line there is limited
room and options for expanding the structure. It is impractical to expand the structure
to the south where the setbacks can be met because an expansion would then be in
conflict with the driveway, garage, and the septic drain field. The standard appears to
be met.
Character of Locality Findings for Front and Side Yard Setback Variances:Though
affiliated with the Torre Pines Development the home has limited impact on the
development due to its orientation. Allowing a variance to the front and side lot line
appears to have limited bearing on the character of the locality.
Adjacent Properties and Traffic Variance For Front Yard Setback Findings: Since the
home is on the opposite side of the lot of where the neighborhood road is located the
impacts of the proposal would be severely limited.
Lake Elmo Planning Commission Minutes; 11-13-19
Adjacent Properties and Traffic Variance For Side Yard Setback Findings: The only
property that would be perceivably impacted is the vacant property to the north. There
would be approximately 77 ft. setback from the proposed addition and a new home on
the neighboring property to the north (8381 21St N.). There is also a stand of trees that
further helps to minimize the visibility of the structure. Allowing the reduced setback
appears to have a limited bearing on reducing property values when it comes to the
setback.
Cadenhead asked about the placement of the driveway onto 215t St. N verses Inwood
Ave N. He also asked if improvements to Inwood Avenue is on the Washington County
CIP within the next five years. Prchal and Weeks answered that it is not in the County
CIP. Cadenhead also mentioned that he appreciates that the house is not expanding to
the east, in case improvements to Inwood Avenue in this area happen in the future.
Steve Urban—architect—the applicant considered changing the orientation and
driveway approach from 2151 St N, but it would have required the removal of several
trees in order to establish a new driveway to the west.
Weeks opened the Public Hearing at 7:35 pm.
Megan Selby—8311 215t St N — lives on the property adjacent to the subject property
and is concerned with the impacts these variances may have on the vacant lot that is for
sale. Will it prevent the vacant lot from building a home similar to the rest of the
neighborhood? She also is concerned with the run off and environmental impacts the
addition will have on the shared pond that is primarily on her property. She is also
concerned the dwelling will not remain a single-family dwelling and will bring more
people onto the property.
Norm Fleming— HOA president—echoed the concerns of Selby. He also mentioned they
are happy to see the improvements that have been made to the property, but does
have concerns about noise from the property.
Urban responded that the addition will not be getting closer to the pond and should not
impact it. He stated that having an entrance onto 21St St N would have a much higher
impact on the pond and surrounding properties. Approving the variances keeps the
property facing onto Inwood and minimizes impacts onto the existing neighborhood to
the west.
Jake McGee—from Torre Pines development architectural control committee—the
applicant submitted the plans to the architectural committee on September 23. He
mentioned they have been great to work with and met the standards the committee
requested. He read the letter he sent the applicant. He stated that the hard surface
driveway proposed alone will increase the appearance of the property and meet the
requirements of the HOA.
Lake Elmo Planning Commission Minutes; 11-13-19
Weeks closed the Public Hearing at 7:40 pm.
Cadenhead stated he thinks that any time the City can remove direct access onto a busy
road or a highway, it should be recommended to make it safer for drivers.
Weeks stated that she thinks the driveway moving to 21St St N could wait until the
County makes improvements to Inwood Ave. Weeks said she supports the County and
engineering in only having one access point onto Inwood, not two. Roberts stated that
with the county project there may be driveway cost sharing opportunities.
Holtz asked about the size and number of bathrooms of the existing structure. He also
asked what the size and number of bedrooms and bathrooms would be after the
addition. Holtz additionally asked the average size of new homes being constructed
within the City and whether the size or number of bedrooms would indicate the desire
to use the property in violation of City code.
Prchal did state that the City does review additions to try and mitigate the ability for
people to convert properties into two-family structures.
M/S/P: Hartley/Holtz move to recommend approval of the request for reduced front
and side yard setbacks for the property at 2038 Inwood Ave., subject to conditions of
approval as recommended by Staff, Vote: 5-0, motion carried unanimously.
LAKE ELMO INWOOD APARTMENTS (5T" Street North and Island Trail)
Roberts reported that RPS Legacy LLC has requested City approval of a minor subdivision
to divide Outlot B of the Inwood 6t" Addition into two lots. The proposed minor
subdivision would create a 4.4 acre lot for a two-phase multiple-family housing
development and a 1.29 acre lot reserved for future use. The applicant has also
requested City approval of the preliminary Planned Unit Development (PUD) Plan for a
3-story, 68 unit rental housing development to be known has Lake Elmo Inwood
Apartments. This development is located on the south side of 5t" Street North,just west
of Island Trail.
In 2014 the City approved the concept plan and the preliminary plat for the Inwood
PUD, including commercial buildings near Inwood Avenue, an apartment building on the
corner of 51" Street and Island Trail and 4 and 8-unit residential buildings for the area
east of Island Trail.
The proposed plan includes a 3-story, 68-unit apartment building with a clubhouse area
located on the southwest corner of 5t" Street North and Island Trail and underground
parking for 70 vehicles and surface parking for 65 with a vehicle entrance on Island Trail.
The site plan also shows a future apartment building to the west of the proposed
Lake Elmo Planning Commission Minutes; 11-13-19
apartment building, that building is not part of this development review but shows the
developer's plan for the site.
David Schwiebel 1059 St. Claire -for RPS Legacy—said they manage 350 residential
properties. They plan to own and manage this property. RPS Legacy worked with Hans
Hagen (M/I Homes) to develop plans and establish infrastructure for the Inwood PUD.
Pete Keely, architect explained the site, projected residents, and the amenities. He also
described the architecture of the building and working with the developer of the single-
family homes. There have been comments about pitched roof and height concerns.
Weeks opened the Public Hearing at 8:35 pm.
Mike Reeves—8922 91" PI N — he stated he has been a resident of Lake Elmo for years
and served as a Planning Commission and on the City Council and approved the concept
plan for this development in 2014. He reviewed the meeting minutes and video—
conditions limit multi-family areas to 15 units per acre and require consistency of
commercial and multi-family structures with the single family areas. The proposal
establishes the number of units at 29 units per acre, nearly double what the Council
approved at concept plan in 2014. Had concerns that the staff report mentions the
modern industrial architecture is unusual for Lake Elmo and concerns that the design
should fit within Lake Elmo.
Scott Murphy—8669 Lower 8t" PI N —thanked the Commission for the work they do.
He stated he also reviewed the original approvals and saw that the overall density was
targeted at 11.5 units per acre. He is concerned that if the current proposal goes in at
such an increased density that it sets precedence for any future developer.
Mike McGinn - 8756 Upper 7t" PI N —talked about working with traffic engineers and
planners in traffic studies as a Police Officer, doing onsite reviews of safety concerns. 51n
and Island is the primary entrance into the development and mentioned the three story
building at that location alone could impact visibility and safety.
Alan Stocker- 8680 Upper 7tn PI N — mentioned the density, increased density, the
fagade of the building, setbacks, and green spaces. He wants the developer held to the
density that is in the 2040 Comprehensive Plan and would like to see something closer
to what was approved in concept plan with a lower density along 51" St N.
Milt Klohn —8761 Upper 71" PI —celebrating 60 years in Lake Elmo. Wants to echo a lot
of the same messages. He wants to strongly encourage the Commission to consider the
precedent they are setting by allowing that amount of density on the parcel. Asked the
applicant to provide the number and locations of properties that are located within 100
ft. of single-family homes.
Lake Elmo Planning Commission Minutes; 11-13-19
Al D'Arpa —8758 Lower 8th PI N —corner of Island Trail and Lower 81h Place N. Wants the
Planning Commission to consider the entrance of the parking off of Island Trail, due to in
the increase in traffic it will experience from this this development and the gas station
that was previously approved.
Mark LeClair—856 Ivywood Cir N —in calculating density, do you subtract the pond from
the calculations? Is concerned about the height of the structure when everything else
around it is one and two story structures, he more in favor of a flat roof. He also asked
about the berm.
Doug Roome—8875 Irving Blvd N —complimented Lake Elmo Planning and said he
would like to keep 51h St boulevard looking nice.
Mike Kaup—840 Ivywood Cir N — he Googled RPS Legacy and found 3 apartment
buildings and said their landscaping is not up to Lake Elmo standards and would need to
be improved upon.
Mark Rubbert—8740 91h Place N —traffic & pedestrian safety. Glad there will be a
control light at 51h and Inwood and may need to consider one at 51h and Island Trail if
traffic increases. Seniors are walking within the neighborhood and he would like to
preserve the safety of the pedestrians. He also would like the development to include a
place for residents of the apartment to take their dogs, like a dog run on site.
Dan Meyer—963 Irving Ct N — lived on Legion Lane for 22 years. Once Royal Golf
opened Arnie's restaurant, there was a lot more traffic on Legion Lane as through
traffic, they were driving at higher speed than the people just driving in and out of the
neighborhood. He foresees the same type of traffic increase on Island Trail.
Tom Nordland - 8801 Lower 8th PI N —asked if the applicant had reached out to anyone
in the neighborhood for input prior to submitting.
Dave Tetins - 958 Irving Ct N —spent time in Park City UT which was also settled by
Swedes and Norwegians and we could benefit from that type of design. He said he is
appalled by the design of the building. It does not match or even relate to the Inwood
development and wants them to consider the design.
Mary Marchant- 8946 9th Place N - crime concerns with the increased number of units
wants to know what the plan is for policing and property values with the number of
apartment buildings.
Bob Seifert - 8824 Lower 8th St— mentioned that there are children and disabled people
within the neighborhood and need to be considered for safety.
Lake Elmo Planning Commission Minutes; 11-13-19
Bob Haskins - 8719 Irving Blvd —if the market changes and the apartments do not stay
market rate, but go to Section 8 or otherwise subsidized housing, is there a process and
would we be notified? He would like the Commission to consider that as well.
Weeks closed the Public Hearing at 9:07 pm.
David Schwiebel, for the Developer, stated that the berms were constructed along 5tn
Street on the single family side of the development. The developer said pets would be
allowed with restrictions and stated that this is a master plan development with a park,
trails, extra wide street with sidewalks on Island Trail and 5t" St N and the development
did anticipate the density and multi-uses. Developer said Rosota in Roseville does have
single-family housing across the street and within a single-family neighborhood.
Holtz asked Roberts to explain the density within the 2040 Comprehensive Plan and this
development. The applicant provided a map of the Outlots south of 5t" St N. That
whole area is about 29 acres, the density is allowed up to 15 units per acre, in total, that
area could have up to 445 units. The entire PUD is considered, it is not per parcel.
Roberts explained that if anything is approved tonight and at Council the number of
units and the total remaining allowed units will be part of the resolution. There is no
way the number of units will go above 445, unless the Comprehensive Plan changes its
density limits and the developer asks for a change to match the new density.
Weeks said there are only 30 more units being proposed compared with the concept
plan, a three story building was approved in the area, she believes Lake Elmo is eclectic
and there is no predominate style, the land was rezoned for high density when the
entire PUD was approved and is the first of its kind in Lake Elmo, there is not much the
Planning Commission can do, since the City Council approved this density.
Holtz stated that there is nothing in the code to support a change to the roofline, the
developer knows the market they are trying to reach, personal taste of the Commission
cannot come into play as it can be considered to be arbitrary and capricious. He
thanked residents for coming out to express their opinions, but also said the number of
residents does not change the previous decision. He went on to say that Lake Elmo has
to change the housing stock that is available to meet the projected growth to the area.
This area of Lake Elmo is also a transition zone, as it has commercial, hotels, a golf
course, and single-family homes all in a small radius and the site is located near the
interstate and a busy county road.
M/S/P: Holtz/Hartley move to recommend approval of the Minor Subdivision request to
split Outlot B of Inwood 61" Addition into two lots, subject to the conditions of approval
as listed in the City staff report. Vote: 5-0, motion carried unanimously.
M/S/P: Holtz/Cadenhead move to recommend approval of the preliminary PUD Plan as
requested by David Schwebel of RPS Legacy Desoto for Outlot B of the Inwood 61n
Lake Elmo Planning Commission Minutes; 11-13-19
Addition for the project to be known as Lake Elmo Inwood Apartments (Inwood 71n
Addition) to be located on the south side of 5t" Street North, west of Island Trail, subject
to recommended conditions of approval and to have a shared driveway access with the
parcel to the south and to have the entire 26 acre area south of 5t" St N to not have a
residential density over the Comprehensive Plan allowed 445 units. Vote: 5-0, motion
carried unanimously.
New Business - None
Staff and Commission Updates
At the November 5, 2019 meeting City Council approved the 2040 Comprehensive Plan
Update, the preliminary plans for new Senior Housing on 39t" St N, the Zoning text
amendment for Accessory Building Heights in Rural Zoning Districts, the ability to post a
RFP to build and Mountain Bike trail in Sunfish Lake Park with a budget of$120,000.
Roberts said there was discussion at the City Council Workshop regarding the plan for
the land received from 3M. The Council is going to post a RFP for a master plan for City
Hall and the clean-up costs for the former 3M land to make it shovel ready. A grant will
be applied for with Washington County to help pay for the master plan costs. The CIP
outlines the remodel or new construction of City Hall beginning in 2021, with the
planning happening in 2020.
Holtz provided a report on the Community Design Team for the Stillwater Area School
District that he is part of. They are reviewing the status of the facilities within the
district and the growth in the southern part of the district. The Consultants should have
a final report in January. At the most recent meeting they discussed how to handle the
growth and all but one group had significant changes for Lake Elmo residents, with the
need for a new Elementary to replace Lake Elmo Elementary or a new Middle School
and moving the Elementary School into the Middle School.
Meeting adjourned at 9:55 pm
Respectfully submitted,
Tanya Nuss
Permit Technician
Lake Elmo Planning Commission Minutes; 11-13-19
THE CITY OF
LJA K E ELMO
STAFF REPORT
DATE: 12/9/2019
REGULAR
ITEM#: 4a
TO: Planning Commission
FROM: Ben Prchal, City Planner
AGENDA ITEM: Stillwater School District Conditional Use Permit Amendment
REVIEWED BY: Ken Roberts,Planning Director
Kristina Handt, City Administrator
Sarah Sonsalla, City Attorney
BACKGROUND:
The Stillwater School District is requesting an amendment to its conditional use permit("CUP")to operate a school
district transportation center(bus terminal)on its property located at 11530 Hudson Boulevard North. The CUP
was issued by the City to the School District on July 17,2019 through Resolution#2018-077. One of the
conditions in the CUP is that"[t]he property shall be connected to City sewer and water prior to the operation of the
bus terminal." The School District's property is part of the Four Corners lst Addition plat that was approved by the
City Council in 2018. A condition of the plat approval was that the developer(who is not the School District)was
to construct sanitary sewer and water facilities which would have brought sanitary sewer and water service to the
School District's property. The developer was to complete these improvements no later than October 31,2019. As
of this date, construction has not yet commenced. The School District has made all of the improvements on the
property that were required by the CUP conditions with the exception of connecting the property to sanitary sewer
and water services.
ISSUE BEFORE THE COMMISSION:
The School District is requesting an amendment to the CUP to amend Condition#9 of the CUP from "the property
shall be connected to City Sewer and Water prior to operation of the bus terminal"to "[t/he School District may
operate its bus terminal at the property using the well and septic system (septic tank and temporary toilets) either
until the School District connects to City sewer and water or until December 31, 2020, whichever comes first. The
School District agrees to connect to City sewer and water within 30 days after it becomes available."The Planning
Commission is being asked to hold a public hearing and make a recommendation to the City Council on this
requested amendment to the CUP.
PROPOSAL DETAILS/ANALYSIS:
Applicants: Stillwater Area Public Schools(Kristen Hoheisel), 1875 Greeley Street South,
Stillwater,
Property Owners: Stillwater School District
Location: 11530 Hudson Boulevard North(PID#36.029.21.43.0001)
Request: Conditional Use Permit—Amendment
Existing Land Use: School Bus Terminal
Existing Zoning: BP—Business Park
Surrounding Land South—1-94 and Woodbury; West—Outdoor Storage (RT—Rural
Use/Zoning: Development Transitional); East—Vacant land(RT—Rural Development
Transitional);North—Vacant land(RT—Rural Development Transitional)
Comprehensive BP—Business Park
Plan Guidance:
Deadline(s)for Application Complete— 11/5/2019
Action: 60 Day Deadline— 1/4/2019
120 Day Deadline—N/A
Applicable Article V: Zoning Administration and Enforcement
Regulations: Article XIV: Commercial Districts
CONDITIONAL USE PERMIT
Preivous Interim Use Permit. The School
PRIVA
District's property previously operated with »'
an interim use permit which was granted by
City Council Resolution No. 2014-095, = ...
which was for a bus/truck terminal. The use
was similar but focused more on the
maintenance of larger trucks. This interim Bus Te r m i n a I
use permit would have expired on
December 2, 2019. In this instance, the
interim use permit was terminated upon the '
rezoning of the School District property _
which was affiliated with the Four Corners
First Addition development. Another
condition of the IUP was that a portion of
the property would need to be used for
agricultural purposes or left available for agriculture. Development discussions lead to the realization that this might
not be practical; and so, the School District also no longer wanted to operate under the interim use permit for this
reason.
Existing Conditions. The School District received an approved CUP on July 17', 2018 and since has moved into
the building/site and have been operating there since October/November of this year(see School District's narrative).
The School District has completed all of the on-site improvements that were required by the CUP with the exception
of the connection of the property to sanitary sewer and water, along with other various improvements in the amount
of more than two million dollars. For sewage disposal,the School District has installed a temporary septic tank that
is supplemented by temporary toilets(this has been approved by the County). For water,the School District has been
using the existing well on the property (the well was approved by the Minnesota Department of Health for use).
Currently,the School District is in violation of the CUP because Condition#9 states that City sewer and water shall
be connected to the building/site prior to the commencement of formal operations.
Current Building. The current building was constructed in the 1990s and was used for office space by E&H
Earthmovers and also provided bus storage for the School District. It was then used by Kenworth Diesel Trucks for
sales, repairs and service of diesel trucks. As mentioned earlier, the building and site has received a two-million-
dollar investment by the School District over the course of the past year.
Previous Bus Terminal Operation. The previous location for the School District's bus terminal was in Oak Park
Heights in the Old Junker Landfill.
Bus Washing.The School District indicated on its application that the property use will include washing buses. The
School District has indicated that the buses will be washed at the facility's wash bay and that waste water from the
wash bay will run in to an oil separator with all of the shop drains,which will go in to a holding tank,which is then
disposed of by a sewer transport service. The oil separator is then emptied and maintained by a licensed transporter.
The School District indicates that once the property is connected to the City's sanitary sewer system that the
wastewater will go directly to the treatment plant after passing through the oil separator, and the oil separator will be
emptied and maintained by a licensed transporter. The disposal of this water is addressed in the engineering
comments.
City Engineer Review. Engineering concerns were finalized during the preliminary and final plat of Four Corners
1 st Addition and the initial approval of the School District's CUP.
Fire Chief and Building Official Review.The Fire Chief and Building Official are concerned that that the building
is sprinklered yet not connected to City water. Therefore, if there was a fire in the building, the sprinkler system
would not function.
Page 2
FINDINGS: Staff is recommending denial of the amendment to the CUP for the transportation center at 11530
Hudson Blvd N based on the following findings:
1. The developer of Four Corners I st Addition has had more than one year to construct the sanitary sewer
and water facilities that are needed for the School District's bus facility and has not done so. In fact,
the developer has not even started the project. To date,there has been no written assurances given to
the City by the developer of the Four Corners project that the sanitary sewer and water facilities that
are needed for the operation of the bus terminal will be constructed at any time in the near future.
2. Properties that are within a MUSA district are required to connect to City water and sanitary sewer
when they are developed. The School District's property is located within a MUSA district. Since it
is not connected to City water and sanitary sewer services, it is in conflict with the requirements of the
MUSA district, as outlined by the Comprehensive Plan and the use should not be allowed to continue
due to this conflict.
3. The building on the property is sprinklered yet not connected to City water. There is a safety hazard to
the occupants of the building if the building is allowed to operate without the sprinkler system
functioning, even if it is for a limited amount of time.
Recommended Conditions of Approval.
1) None—All conditions from Resolution 2018-77 shall remain in place.
FISCAL IMPACT:
When the School District connects to City water and sanitary sewer, it will be required to pay the City sewer and
water availability charges and will be responsible at its sole cost for bringing sewer and water into the site. The City
will collect Sewer Accessibility Charges(SAC) and Water Accessibility Charges(WAC) and building permit fees.
OPTIONS:
The Commission may:
❖ Recommend approval of the amendment to the CUP as proposed by the School District.
❖ Recommend approval of the amendment to the CUP with changes.
❖ Recommend denial of the amendment to the CUP.
If the request is denied by the City Council would mean that the School District would be in violation of Condition
#9 of its CUP. The City Council could then take separate action to revoke the CUP by holding a public hearing on
the revocation. If the City Council revokes the CUP, the School District would no longer be able to operate its bus
terminal on the property.
RECOMMENDATION:
Staff suggests that the Planning Commission recommend to the City Council denial of the CUP amendment request.
ATTACHMENTS:
• Narrative
• Resolution 2018-77
• Site Plan
Page 3
Independent School District 834
Stillwater
1875 South Greeley Street I Stillwater,Minnesota 55082
AREA PUBLIC SCHOOLS Tel:651.351.8340 1 fax:651.351.8380
www.stillwaterschools.org
November 5, 2019
Ken Roberts 1
Planning Director
City of Lake Elmo
3800 Laverne Ave. N.
Lake Elmo, MN 55042
RE: Stillwater Area Schools Amended CUP Application
Dear Mr. Roberts:
This letter is intended to supplement the information being submitted for a requested amendment to the School
District's approved CUP, Resolution 2018-077. Enclosed you will find the following:.
• Land Use Application Form
• Resolution 2018-077
• Escrow Agreement
• Acknowledgement of Responsibility Form
• Affirmation of Sufficient Interest
• Copy of Deed
• 10 copies of the Utility Plan—clean copy
• 10 copies of the Utility Plan—highlighted showing temporary and permanent utilities
• Address labels for property owners within 350 feet
• $500 application fee
The Stillwater Area Public Schools now owns the property located at 11530 Hudson Blvd. N., in the City of
Lake Elmo. Prior to the School District's ownership, the property was used as a bus/truck terminal pursuant to
an Interim Use Permit. The IUP allowed the truck terminal to operate at the site with a well and septic system.
The IUP was set to expire either on December 2, 2019 or until any portion of the Property was rezoned or when
public sanitary sewer was provided to the site.
The School District applied for and received approval for the rezoning of the property to Business Park on July
17, 2018, thereby automatically terminating the IUP. At the same meeting, the School District was granted the
CUP to use the property as a"School District Transportation Center."
One of the conditions in the approved CUP is that the School District connects to City sewer and water.
(Condition No. 9, which states: "The property shall be connected to City sewer and water prior to operation of
the bus terminal"). Unfortunately, the School District is dependent upon a developer to complete the extension
of sewer and water to the property. As the City is aware, the developer has failed to perform these obligations
as required by the developer's development agreement with the City.
Afton-Lakeland Elementary,Andersen Elementary,Brookview Elementary,Early Childhood Family Center,Lake Elmo Elementary,Lily Lake Elementary,
Oak-Land Middle School,Rutherford Elementary,St. Croix Valley Area Learning Center, Stillwater Area High School,Stillwater Middle School,
Stonebridge Elementary
Independent School District No. 834 Page 2
November 5,2019
Obviously, the default by the developer to timely perform under its development agreement with the City has
caused significant and direct consequences to the School District. At the end of October, the School District
was forced out of its former site due to the sale of that former site, and out of necessity, has moved its
operations to the property. It is important to point out a few significant facts:
1. The School District will complete all of the on-site improvements by December 1, 2019, as required in
its Site Improvement Agreement with the City. The School District has expended more than $2 million
for these improvements.
2. Prior to construction, the City informed the School District that it could request an extension of the IUP
to operate at the property using a well and septic system for a temporary period of time. Based on that
direction, the School District installed a temporary septic tank, supplemented by temporary toilets. The
existing well has been approved by the Minnesota Department of Health and the temporary septic
services have been approved by Washington County, pending acceptance by the City and a timeline for
when City services will become available. The City and School District now know that the IUP was
terminated upon the event of the rezoning,thereby making the extension of the IUP impossible.
The School District is, therefore, requesting an amendment to its existing Conditional Use Permit, specifically
asking that condition No. 9 of the CUP be amended as follows:
The School District may.operate its bus terminal at the property using the well and septic system (septic
tank and temporary toilets) either until the School District connects to City sewer and water or until
December 31, 2020, whichever occurs first. The School District agrees to connect to City sewer and
water within 30 days after it becomes available.
The City already approved the transportation center use in 2018 and determined in its findings that the School
District met the City's 12-factor test for the conditional use permit. This requested amendment provides a
minor modification to one of the conditions in the already approved use as a transportation center. While
proving that the School District's request meets the 12-factor test again is not required for an amendment to this
condition in the approved CUP, City Staff requested that we address the 12-factor test specifically as it relates
to the requested condition.To that end, we address the 12 factors as follows:
1. The temporary services will not be detrimental to or endanger the public health, safety or general
welfare. The existing well has been tested and approved by MDH. The septic tank and temporary
toilets are a short-term solution and have been accepted by Washington County, pending City approval
and a timeline for connection to City sewer. Well and septic systems have long been used in this area
and the School District's short-term solution will not endanger the public.
2. The temporary services conform to the Comp. Plan. The requirement that the property be connected to
City sewer and water as soon as they become available is included in the proposed amended language
and conforms to the Comprehensive Plan.
3. The temporary services are compatible with the existing neighborhood. The neighboring properties
suffer the same predicament as the School District's property and they also await the availability of City
services;therefore,the School District's situation is compatible with the existing neighborhood.
Independent School District No. 834 Page 3
November 5, 2019
4. N/A(no development standards for temporary services)
5. N/A(not in a floodplain or shoreland area)
6. The temporary services have been designed and are being operated and maintained so as to be
compatible with the intended character of the neighborhood and will not change the character of that
area. As soon as the property is able to connect to City services, these temporary services will be
removed, and the well will be sealed. The short-term solution will not alter the character of the area.
7. The temporary services will not create a nuisance to existing or neighboring structures. The septic tank
is emptied every 10 days, (and can be emptied with 24-hours' notice) and is equipped with an alarm at
75% capacity. The temporary toilets are serviced on a weekly basis. The School District has contracted
with service providers who will perform the necessary maintenance and will ensure that these temporary
services will not create a nuisance.
8. The temporary service locations are situated such that there is easy access for maintenance. Essential
services will not be hindered by the existence of these temporary services.
9. The temporary services will not create any additional requirements or costs for the City or the
community. The School District will perform all needed maintenance in a timely manner, as described
above.
10. The temporary services will not create excess traffic, noise, smoke, fumes, glare or odors in any way.
There is a mandatory protocol for maintenance, and as stated above, the temporary services will be
removed, and the well will be sealed upon connection to City services.
11. N/A (traffic congestion)
12. The location of the temporary services will not do any damage to natural or scenic features of the
property. The septic tank was strategically placed on the south side of the building for easy removal
upon connection to City services.
The School District is committed to performing its transportation operations pursuant to all of the City's
approvals, however, in the short term, this interim solution is necessary in order to provide continuous bus
service to the students in the Stillwater Area School District. We hope that this request is viewed favorably by
the Planning Commission and the City Council and look forward to addressing any of their questions or
concerns.
i
i
I
Very truly yours,
1:st n Hoheisel
Executive Director of Finance & Operations
i
Enclosures
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION 2018-077
A RESOLUTIONAPPROVLVG A CONDITIONAL USE PERMIT FOR A SCHOOL DISTRICT
TRANSPORTATION CENTER FOR A PORTION OF THE PROPERTY LOCATED AT 11530
HUDSONBOULEVARD NORTH
WHEREAS,the City of Lake Elmo is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, Stillwater Area Schools(Kristen Hoheisel), 1875 Greeley Street South,
Stillwater,MN 55082 (the"Applicant")has submitted an application to the City of Lake Elmo
(the"City")for a Conditional Use Permit for a school district transportation center for a portion
of the property located at 11530 Hudson Blvd N (PID# 36.029.21.43.0001) (the"Property"); and
WHEREAS, a request for a Preliminary and Final Plat to subdivide the Property in to
Lot 1, Block 1 of Four Corners, with three separate outlots was submitted by Terry Emerson,
2204 Legion Lane Circle North, Lake Elmo,IN 55042; and
WHEREAS,the Applicant also submitted applications to the City for a Zoning Text
Amendment to allow local transit as a conditional use within the Business Park zoning district;
and a Zoning Map Amendment to re-zone Lot 1, Block I of Four Corners from Rural
Development Transitional to Business Park; and
WHEREAS, notice has been published,mailed and posted pursuant to the Lake Elmo
Zoning Ordinance,Section 154.102; and
WHEREAS, the Lake Elmo Planning Commission held a public hcaring on said matter
on June 4, 2018 and June 18, 2018; and
WHEREAS,the Lake Elmo Planning Commission has submitted its report and
recommendation to the City Council as part of a Staff Memorandum dated July 17, 2018, and
WHEREAS,the City Council considered said matter at its July 17,2018 meeting; and
NOW,THEREFORE,based on the testimony elicited and information received, the City
Council makes the following:
FINDINGS
1) That the procedures for obtaining said Conditional Use Permit are found in the Lake
Elmo Zoning Ordinance, Section 154.106.
Resolution 2018-077 1
5090200 SJS LA515-1
2) That all the submission requirements of said Section 154.106 have been met by the
Applicant.
3) That the proposed Conditional Use Permit includes the following components:
a) A Conditional Use Permit for a school district transportation center for a portion
of the property located at 11530 Hudson Blvd N.
4) That the Conditional Use Permit for a school district transportation center will be for the
Property legally described as follows: Lot 1, Block I of Four Corners.
5) That the Zoning Text Amendment that was proposed by the Applicants allows local transit as
a conditional use within the Business Park zoning district.
6) That the City approved the Applicant's request for a Zoning Text Amendment to allow local
transit as a conditional use within the Business Park zoning district.
7) That the City approved the Applicant's request for a Preliminary and Final Plat to subdivide
the Property in to Lot 1,Block 1 of Four Corners along with three separate outlots.
8) That the City approved the Applicant's request for a Zoning Map Amendment to re-zone the
Property from Rural Development Transitional to Business Park.
9) The proposed use will not be detrimental to or endanger the public health,safety,comfort,
convenience or general welfare of the neighborhood or the city.Bus traffic is not expected to
be detrimental or dangerous, as trips and traffic will be limited to certain times of the day.
It is a recommended condition of approval that there be significant berming to provide a
sufficient screening of the parking lot.
10)The use or development conforms to the City of Lake Elmo Comprehensive Plan. The
property is guided for Business Park, in which local transit, which meets certain standards,
is a conditional use per the Zoning Code. The use also provides a significant number of
jobs per acre, which is a desired trait of the Business Park land use designation per the
Comprehensive Plan.
11)The use or development is compatible with the existing neighborhood. The use is compatible
with the existing neighborhood, as the existing use is a truck terminal, which is similar in
use and design to a bus terminal. The surrounding parcels are mostly vacant and
undeveloped..
12)The proposed use meets all specific development standards for such use listed in Article 7 of
this Chapter. The proposal complies with the proposed development standards as
recommended in the requested Zoning Text Amendment,although it does not comply with
many parking lot,screening, and landscape standards,which have been required as a
recommended condition of approval,
13)If the proposed use is in a flood plain management or shoreland area,the proposed use meets
all the specific standards for such use listed in Chapter 150, §150.250 through 150.257
Resolution 2018-077 2
509020A SJS LA515-1
(Shoreland Regulations) and Chapter 152 (Flood Plain Management). The property is located
outside the 0.2%annual chance floodplain.
14)The proposed use will be designed, constructed,operated and maintained so as to be
compatible in appearance with the existing or intended character of the general vicinity and
will not change the essential character of that area. While the proposed project is a
redevelopment/repurposing of an existing site and will not change the existing character of
the area, operations are not within a building and so would not meet the intended
character of the neighborhood.
15)The proposed use will not be hazardous or create a nuisance as defined under this Chapter to
existing or future neighboring structures. While the proposed use will create a significant
amount of traffic, it will be limited to certain times of the day.
16)The proposed use will be served adequately by essential public facilities and services,
including streets,police and fire protection, drainage structures,refuse disposal,water and
sewer systems and schools or will be served adequately by such facilities and services
provided by the persons or agencies responsible for the establishment of the proposed use.
There are plans to connect to City sewer and water at the applicant's cost. The use may
require the prompt need for the CSAH 15/Hudson Blvd traffic signal,for which the City
will be required to share 25%of the cost,and the Hudson Boulevard realignment.It is not
yet known if the applicant's stormwater managementplan meets all City,State, and Valley
Branch Watershed District requirements.
17)The proposed use will not create excessive additional requirements at public cost for public '
facilities and services and will not be detrimental to the economic welfare of the community.
While the use will not pay property taxes,sewer and water service charges will be paid by
the applicant.
18)The proposed use will not involve uses, activities,processes,materials, equipment and
conditions of operation that will be detrimental to any persons,property or the general f
welfare because of excessive production of traffic,noise, smoke, fumes, glare or odors. The
proposed use will generate a significant number of trips per day,though this will be limited
to certain times of the day. Minimal noise is expected to come from the site,except during
heavy traffic times at specific times within the morning or afternoon.
19)Vehicular approaches to the property, where present,will not create traffic congestion or
interfere with traffic on surrounding public thoroughfares. Traffic congestion could be
created from the significant number of trips to the site,though these would be limited to
certain times of the day.
20)The proposed use will not result in the destruction, loss or damage of a natural or scenic
feature of major importance. NIA
NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Lake Elmo City
Council hereby approves the request by Stillwater Area Schools for a Conditional Use Permit for
a school district transportation center with the following conditions of approval:
Resolution 2018-077 3
509020v1 SJS LA515-1
1) The Zoning Text Amendment to allow local transit (school district transportation center)
within the Business Park Zoning District must be approved.
2) No construction or use of the bus terminal (unless in accordance with the Interim Use
Permit approved by the City by Resolution 2014-095) may commence until all items as
outlined in the City Engineer review memo regarding the Four Corners Preliminary&Final
Plat (Stillwater Transportation Center) dated May 30, 2018 and all other subsequent
construction plan memos regarding the Stillwater Transportation Center have been
addressed;the Four Corners 1'Addition Final Plat has been recorded.
3) The applicant must obtain all other necessary City, State,and other governing body permits
prior to the commencement of any construction activity on the parcel including but not
limited to an approved stormwater management plan, utility plans, grading plan, street
construction plans(if required),parking lot permit,building permits,etc.
4) The Applicant shall submit a photometric plan, and all lighting must meet requirements
of Sections 150.035-150.038 of the City Code.
5) The above ground storage tank shall require development of diking around the tank,
suitably sealed to hold a leakage capacity equal to 115% of the tank capacity.The
applicant shall demonstrate that fire, explosion, or water or soil contamination hazards
are not present that would be detrirnental to the public health, safety, and general welfare.
The applicant shall also fill out an Aboveground Storage Tank Notification of Installation
or Change in Status Form as required by the Minnesota Pollution Control Agency
(MPCA).
b) The Applicant shall submit an updated Landscape Plan and Tree Preservation Plan which
includes sufficient berming and screening and addresses the comments in this report to be
reviewed and approved by the City's Landscape Architect.
7) Parking areas shall be paved with a durable surface including,but not limited to,hot
asphalt,bituminous or concrete; spaces shall be marked with painted lines at least four
inches wide;required interior and exterior parking lot screening is required; a bumper
curb or barrier of normal bumper height shall be provided; and must provide an adequate
number of Americans with Disabilities Act(ADA)accessible stalls.
8) A sign permit shall be obtained prior to erection of any sign on the property.
9)- The property shall be connected to City sewer and water prior to operation of the bus
terminal.
10)A Traffic Impact Study is required to determine timing and extent of improvements
required for the CSAH 15 and Hudson Boulevard intersection realignment and traffic
signal improvements as well as to determine if an eastbound left turn lane along Hudson
Boulevard is also needed at the site access.
11)The applicant shall be required to include a description of the sanitary sewer capacity
demands including the number of residential equivalency units(R.EC)based on the
Metropolitan Council Sewer Availability Charge(SAC) determination policy as well as a
description of the water capacity demands including average day use,peak day use, and
fire suppression demands.Demands must account for all planned uses and connections to
Resolution 2018-077 4
509020v1 SJS LA515-1
the sewer system including bus wash wastewater as well as include potable drinking
water,bus washing operations, etc.
12)Applicant shall be responsible to place hydrants throughout the property at the direction
of the Fire Department. All fire hydrants shall be owned and maintained by the City.
13)That the applicant contribute a onetime payment of$150,000 in recognition of lost tax
revenue as well as the City's cost share of the future traffic signal at the intersection of
Manning Avenue (CSAH 15) and Hudson Boulevard North.
Passed and duly adopted this 17th day of July 2018 by the City Council of the City of Lake Elmo,
Minnesota.
Mike Pearson,Mayor
A ST:
A�
Rte J h-nsoii,gj Clerk
Resolution 2018-077 5
509020v1 SJS LA515-1
- -
s.. . .. .. ..... .... . . ....
...................................
NE� ��
Bus Garage Sitem�rrilmlvl. Pro,;
— — SYMBOL LEGEND ci o N s
X—X X X—X X X—X X X X X X X� NEW 8: RUMINOUS PAVEMAGGREGATE
BASER �m Yts
_ NEW 8"CRUSHED AGGREGATE BASE
X X X� I SEE 24" L 1 8
/CS GRANULAR BACKFILL = m Z
X W
� �� E a
NEW 6"CONCRETE PAVEMENT OVER �/� d o J d
6 x NEW 6"CRUSHED AGGREGATE BASE �• o `m o
x 8 8 CS SEE DETAIL 3105 L = m d rn Ln -
C5 •�J m v w`
NEW 10 AGGREGATE OVER W $
x I NEW 24"GRANULAR BACKFILL
8 6 SEE DETAIL 2105 c
x
WHERE APPLICABLE,DIMENSIONS ARE FROM
BACK OF CURB TO BACK OF CURB OR BACK OF
J CURB TO END OF STALL LINE. 'A
- `.. x v,UJ N
1 STORMWATER x
LL O W
x _ POND AREA
O H
I fir` x I PARKING STALL COUNT 2 o
x � I LU w z
C5 ADA STALLS REQUIRED=6 W Z_
ADA STALLS PROVIDED=6 V)
- - - - - - - - x AUTOMOBILE STALLS=177
9 SCHOOL VAN STALLS=20 r l 2 ULJ
SHORT BUS STALLS 24
d'
I x C5 I I LA GE BUS STALLS=23 V1 ~
x I ®-INDICATES STALL COUNT IN ROW J J 0 j
J
J � � J
LOT SIZE U U) 0 fn
® 2 7 I I Total Lot Size:478,997 s.f.=11.00 Acres
x 2 0 13.6' �— x Breakdown:
Proposed Building:15,498 s.f.=3.24%
J_
r � " CS X—XJ I Proposed Gravel Pavement Areas(Phase 1):182,980 s.f.=38.20
1s Proposed Concrete and Bituminous Pavement
x
-�"" I (Phase l):61,563 s.f.=12.85% N (1)v,
i I I 25, rod 1 /-� I Proposed Open Space:218,956 s.f.-45.71% L.V ' )
W Q
� LL I
O
x g Proposed Total Impervious Space=54.29% _
Business Park Max Impervious=75% D)
� 1 �--- C5 � Z
F---- — ----- ---------i C5 Parking Lot Area=244,993 s.f. Q W V �
5%Landscaped Area Required=12,249 s.f to
J
1 ——, Landscaped Area Provided=16,830 s.f. C m Z
L.I C5 —— C5—— I e uNj I *All gravel pavement surface(existing and proposed)in U c d
I r— 2 Phase 1 is going to be paved in Phase 2 of the project. Q W
I I FUEL PUMP r——J I I C5 x A timeline for Phase 2 has not yet been established but > W
SLAND LOCATION I is anticipated in 2 to 3 years' ILL of 1<
_ I 14'WIDE - 60.T U) ' ) O Q
XI I 4 2 X I v, w
1 b,000 GALLON C5 I PLAN NOTES ap l- F-
FUEL TANK m a> U)
I AREA WITH LEAK 1 x I Automobile parking lot to be constructed after septic J
I TAIJMENT(135%) 1 5
l—x (2gx45'x2'DEEP) C5 C E M I O drainfeld is abandoned. Q L J_
/�' H
I I 27, I 2 Entrance drive paving,and curb and gutter to match m`V U)I I X O new construction for Hudson Blvd. F
119.7 BUILDING AREA-15,498
I FFE=904.50 EXISTING GRAVEL PAVEMENT �� m
TO REMAIN FOR PHASE 1 x EXPANDED a
STORMWATER I I hereby certify that this plan,
I POND AREA I specifcations or report was prepared
by me or under my direct supervision
I I and that I am a duly licensed
of theProfsional Engineer
state of Minnesotader the laws
N
x I Greg A.Buchal,P.E.
g x I 3 I I
$ I CS I � 1 _ I Date:04.30.18 Reg.No.:23793
I C5 No
I� t
Rev. Date Description
9'
I� I
iQ 06.06.18 Walershetl Comments
0 09.14.18 City Resubmittal
5 9 ®®' 1 I I ® n x I Q3 10,12.18 City Resubmitlal
i I I 6 9 CISN c C5 � X I ® 11.06.18 City Resubmittal
yl If (9 TYP) _ II _ I —X—XXxx x x
' ti J I I ITY SEM NT �
Project#: 12176010
Drawn By: KJA
I I4 'P 4 II I ae,
I 1 I=s n
r� °" --aC—[{—�� --------------------- ----------------------------
-- --- __
- —a�a
*14
Checked By: GAB T ————————— —
sue Date: 04.30.18
13
1 — - - - - — Sheet Title:
T T ICI 9 1-1-1 9_2 I I
In Ele ----- —
al.00 p Ele =900.56 I ------------- ------- ------- --------- ---------_ PAVING A ND
DIMENSION PLAN
___
NORTH
o zo ao fio C 2
P:\Projects\Projects-2017\12176010-Stillwater Bus Facility Evals\C.Design\Drawing Files\12176010-C2.dwg
sheer.