HomeMy WebLinkAbout1. Prelim Plat Narrative 1-25-19
12445 55th Street North, Lake Elmo, Minnesota 55042 * Phone: 651-439-8833 * Website: FFSurveying.com
Bruce A. Folz, LS Timothy J. Freeman, LS
1939 – 2001 Principal
January 25, 2019
FOUR CORNERS 2ND ADDITION
PRELIMINARY PLAT
NARRATIVE
This project is a multi-phase PUD development. It consists of an 80-acre property that
has a garage building in the southwest corner that has had several tenants over the years.
This parcel was platted in the original FOUR CORNERS plat as Lot 1, Block 1. This Lot
1 was rezoned and has since been sold to the Stillwater Area School District to be used as
their bus garage and terminal. This is in accordance with the permitted use approved by
the City of Lake Elmo. The original plat created the Lot 1, Block 1 along with Outlots A,
B and C to be replatted later as well as a new alignment of Hudson Boulevard as required
by the City of Lake Elmo and Washington County. This realigned roadway is to facilitate
an upgraded intersection and traffic control that align with the road east of Manning
Avenue North, and north of the Holiday Station in West Lakeland Township. This
roadway was part of the MN DOT Right of Way prior to being turned over to local
control, to the City of Lake Elmo. The remaining Outlots and vacated right of way will
now be developed as a commercial and highway business project for various uses.
A concept plan for this project was previously approved showing the re-aligned roadway
with several lots for a few different uses. This project will require several plats to
ultimately build out the parcels approved with the initial concept plan.
The next phase is to plat the right of way and build the new road for this proposed
realignment of Hudson Boulevard (frontage road to I94). This plat (FOUR CORNERS
2nd ADDITION) is being platted to dedicate the new right of way. One of the steps
required is to vacate the existing right of way for Hudson Boulevard North. The City of
Lake Elmo and MN Dept of Transportation will have to vacate the unused right of way of
the old alignment for development. They will vacate the right of way, reserving a
temporary easement while the existing roadway is still being used during construction.
There is a map that shows the portion of right of way to be vacated… along with legal
descriptions for each vacation portion. The other item shown on this map is which
entities have jurisdiction of the existing and new right of way. Essentially, the City of
Lake Elmo received the right of way that contains the Hudson Boulevard North (frontage
road), and MN Dot has the balance of the right of way where the Interstate Highway 94
and its ramps… as well as the portion of Manning that crosses the Interstate 94. The
vacation step is critical for the realignment of the roadway process that the City of Lake
Elmo and Washington County are requiring. The alignment for the new Hudson
Boulevard has been in the planning stages for years now. The consultant engineering
company used by the City of Lake Elmo was hired to design the new alignment, to facilitate
the needs of the City of Lake Elmo. Our planning/platting efforts utilize this alignment for
Hudson Boulevard North as shown on these plans and plat.
This plat contains the 3 Outlots from the original plat, along with the proposed vacated right
of way from the old alignment of the frontage road and the MN Dot strip that now contains
a drainage ditch. This Preliminary Plat contains a Lot 1, Block 1 for the proposed Metro
Transit Park and Ride project as well as the Outlots to the north of it and south of the
realigned roadway right of way for future uses. The southerly Outlot C will contain a
regional ponding facilit y for the area that takes the place of the existing drainage ditch.
More detailed information on the potential users and their proposed development plans for
Outlots A and B will be submitted at the time they have potential users. It is impossible to
provide all of the detailed information required by the City Code for pr eliminary and final
plat on these Outlots without the user of the parcels identified. We anticipate that the two
Outlots will be replatted in the future phases, as the individual users come along. The users
will understand that the zoning requires only potential uses that are allowed in the code for
their appropriate zoning district. Rezoning of Lot 1, Block 1 of this phase is being rezoned
to allow the Park and Ride facility as a part of this request. The remaining outlots will be
rezoned when they are developed and replatted. The Comprehensive Plan is consistent with
the uses being proposed. The outlots in this phase also includes the requirement of uses that
develop impervious/greenspace at a ratio of 80/20 percent, as well as parking for 5 cars per
1000 square feet of usable building square footage.