Loading...
HomeMy WebLinkAbout4-22-19 Planning Commission Meeting Packet 3800 Laverne Avenue North Lake Elmo, MN 55042 (651) 747-3900 www.lakeelmo.org NOTICE OF MEETING The City of Lake Elmo Planning Commission will conduct a meeting on Monday April 22, 2019 at 7:00 p.m. AGENDA 1. Pledge of Allegiance 2. Approve Agenda 3. Approve Minutes a. April 8, 2019 4. Public Hearings a. Final PUD Plan and Conditional Use Permit (CUP) - Metro Transit Park and Ride facility - property on the south side of Hudson Blvd, west of Manning Avenue 5. Business Items a. None 6. Communications/Updates a. City Council Update – April 16, 2019 1. Legacy at North Star 2nd Addition Final PUD and Final Plat b. Staff Updates 1. Upcoming Meetings: • May 13, 2019 • May 29, 2019 (Wednesday after Memorial Day) 7. Adjourn ***Note: Every effort will be made to accommodate person or persons that need special considerations to attend this meeting due to a health condition or disability. Please contact the Lake Elmo City Clerk if you are in need of special accommodations. STAFF REPORT DATE: 4/22/2019 PUBLIC HEARING ITEM#: TO: Planning Commission FROM: Ken Roberts, Planning Director AGENDA ITEM: Metro Transit Park and Ride facility for the property on the south side of Hudson Blvd, west of Manning Avenue REVIEWED BY: Ben Prchal, City Planner Sarah Sonsalla, City Attorney Jack Griffin, City Engineer BACKGROUND: The Planning Commission is being asked to consider a request for approval of a conditional use permit (CUP) and final PUD plans for the development of a Park and Ride lot by the Metropolitan Council (Metro Transit). Metro Transit is proposing this new facility for a future platted lot (Lot 1, Block 1, Four Corners Second Addition) that will be on the south side of the realigned Hudson Boulevard, west of Manning Avenue. (Please see Metro Transit’s project narrative, the attached maps and project plans for more information). GENERAL INFORMATION: Applicant: Metropolitan Council (Metro Transit) Property Owners: EN Properties, LLC Location: Southwest corner of Hudson Blvd and Manning Avenue (Lot 1, Block 1, Four Corners Second Addition) Request: Final PUD Plan approval and a CUP for a Park and Ride Lot Existing Land Use: Vacant Surrounding Land Use: Lake Elmo Sod Farm and Residential/Agricultural (Rural Development Transitional) and realigned Hudson Boulevard to the North; Stillwater Bus Facility and Vacant Land (Rural Development Transitional) to the West; I-94 to the South (Woodbury); Manning Avenue and a future development site to the east zoned commercial. Existing Zoning: C - Commercial Comprehensive Plan: C - Commercial 2 History: The property proposed for the Park and Ride lot is vacant land and is now part of the existing Hudson Boulevard. The portion of the property on which the park and ride facility is being proposed also has been vacant land. A concept plan of a park and ride was introduced to Council on September 19, 2006. On March 19, 2019, the City Council approved a Preliminary Plat, Preliminary Planned Unit Development (PUD) Plan and a Zoning Map Amendment for a commercial development to be known has Four Corners Second Addition. This proposal includes the realignment of Hudson Boulevard and the creation of several lots for commercial development (including a lot for park and ride lot) for the property generally on the northwest corner of Manning Avenue and Hudson Boulevard North. Deadline for Action: Application Complete – March 22, 2019 60 Day Deadline – May 21, 2019 (applicant has waived this, however) Extension Letter Mailed – N/A 120 Day Deadline – N/A Applicable Regulations: Chapter 153 – Subdivision Regulations Section 154.210 – Off-Street parking Article XII – Specific Development Standards Article V – General Regulations Article XIV – Commercial Districts Section 154.258 – Landscape Requirements ISSUE BEFORE THE COMMISSION: The Planning Commission is being asked to hold a public hearing, review and make recommendation on the land use requests for a park and ride facility for the property located on the south side of the future Hudson Boulevard, west of Manning Avenue. PROPOSAL DETAILS/ANALYSIS: FINAL PUD PLANS Minimum Lot Size Requirements. The site of the proposed Park and Ride Lot is consistent with the lot shown as Lot 1, Block 1 of the Four Corners Second Addition. This proposed lot will be 5.66 acres and meets the City standards for minimum lot size and width as outlined in the commercial zoning district regulations. PUD Review. The proposed final PUD plans for this facility are generally consistent with the preliminary PUD plans for the Four Corners Second Addition as approved by the City Council on March 19, 2019. 3 Final Plat. The developer of Four Corners Second Addition has not yet applied for nor received final plat approval for his subdivision. Until the developer records the final plat with Washington County, there is not an official lot for this particular project. Therefore, the City Council will not be able to consider this request until after the final plat of Four Corners Second Addition has been approved by the City Council and the plat has been recorded. Since it is not clear when the final plat will be approved and recorded, Metro Transit has agreed to waive the requirement under Minnesota Statutes Section 15.99 that requires approval of these types of land use applications within 60 days so that the City can commence the review process. This is with the understanding that City Council action on the applications for the Park and Ride lot will not be able to take place until the City Council takes action on the final plat for Four Corners Second Addition. Parkland Dedication. The City requires commercial development to provide fees to the City in lieu of park land dedication. The City will require the developer or applicant to pay these fees before recording the Four Corners Second Addition final plat. The current City parkland dedication fee for commercial properties is $4,500 per acre. Recommended Findings. 1) That the proposed Final PUD Plans for the Metro Transit Park and Ride facility is generally consistent with the PUD Plans for the Four Corners Second Addition as approved by the City of Lake Elmo on March 19, 2019. 2) That the Metro Transit Park and Ride Facility Final PUD Plan is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 3) That the Metro Transit Park and Ride Facility Final PUD Plan generally complies with the City’s Commercial zoning district standards except for impervious surface standard (78.8 percent versus a maximum of 75 percent) and parking lot setback standards. 4) That the Metro Transit Park and Ride Facility Final PUD plans comply with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, except as noted in this report or attachment thereof. 5) That the Metro Transit Park and Ride Facility Final PUD Plan complies with the City’s Planned Unit Development Ordinance. 6) That the Metro Transit Park and Ride Facility Final PUD Plan is generally consistent with the City’s engineering standards with the exceptions noted by the City Engineer in his review comments to the City dated April 18, 2019. Recommended Conditions of Approval. Staff recommends the following conditions be attached to the approval of the Metro Transit Park and Ride Facility Final PUD Plans: 1) Final grading, drainage, and erosion control plans, utility plans, sanitary and storm water management plans, and utility construction plans shall be reviewed and approved by the City Engineer. All changes and modifications to the plans requested by the City Engineer in his memo dated April 18, 2019 shall be incorporated into these documents. 4 2) Before the start of construction, Metro Transit shall enter into a site improvement agreement acceptable to the City Engineer and the City Attorney that delineates who is responsible for the design, construction, and payment of the required improvements (including watermains, fire hydrants and landscaping) with financial guarantees therefore. 3) Easements as requested by the City Engineer and Public Works Department will be documented on the final plat of Four Corners Second Addition. Easements in addition to those dedicated to the City on the plat may needed pending review by the City of detailed and updated utility and grading plans showing the location of all stormwater facilities, watermains and fire hydrants. 4) The Final Landscape, Tree Planting and Irrigation Plans shall be submitted for review and approval by the City Landscape Architect Consultant before the City releases any site work or building permits. 5) The applicant must obtain all other necessary City, State, and other governing body permits before the commencement of any construction activity on the parcel including but not limited to building permits, watershed district permits, etc. 6) Any plans for construction on this site must comply with the Lake Elmo Design Standards Manual and specific general site considerations and development standards for specific uses within the Commercial Zoning District. 7) The site plan is subject to a storm water management plan meeting State, Valley Branch Watershed District and City rules and regulations. The applicant/owner shall obtain all applicable permits before starting any site work. CONDITIONAL USE PERMIT What is a Park and Ride? The City Code defines a park and ride as follows: PARK AND RIDE. A parking lot or structure located along a public transit route designed to encourage transfer from private automobile to mass transit or to encourage carpooling for purposes of commuting, or for access to recreation uses. Request. A park and ride lot is a conditional use within the Commercial Zoning District and so it requires City approval of a conditional use permit. The proposed park and ride facility will have parking spaces for up to 550 vehicles on the 5.6 acre site, including 13 handicap parking spaces; electric vehicle charging stations; bike racks with an overhead canopy; bus stop and passenger waiting area with two 6’X13’ bus shelters; and a 10.5’X12’ restroom/maintenance building. The timeline for constructing this facility as indicated in the applicant’s narrative is to start in the fall of 2019 with completion in the spring of 2020. Consistency with the Comprehensive Plan. The City’s 2030 and 2040 Planned Land Use Maps indicate that much of this area is guided for commercial land uses. This land use designation is intended to accommodate a wide range and scale of commercial uses (such as retail, service, entertainment, and office) as they are throughout the City’s planned urban centers. Commercial 5 uses can range from small neighborhood convenience nodes, to community retail areas along major roadways, to large shopping centers, to auto-related commercial uses along freeways. The Draft 2040 Comprehensive Plan states “this land use designation identifies areas that are used for retail and services businesses.” While a park and ride is not a commercial use, there is potential benefit of the draw for other businesses near the Park and Ride. A deterrent of a park and ride is that taxes received by the City would not be as substantial as that of a business, because the property will presumably be tax- exempt due to its public use as a park and ride. The City does not currently have a park and ride within its boundaries. The Transportation Chapter of the City’s 2040 Comprehensive Plan identified the area of Hudson Boulevard and Manning Avenue as the site of a planned park and ride lot. The park and ride has been in discussion with the City since at least 2011, when the Planning Commission’s Work Plan included an item to discuss on potential rezoning on two sites for a park and ride along I-94. The corner of Hudson Boulevard and Manning Avenue was one of these sites. The Council adopted an ordinance on May 4, 2011, which allowed park and rides as a conditional use within the Rural Residential Limited Business Holding District (HD-RR-LB), which is no longer a zoning district within the City. Request Details/Reason for PUD and CUP. Metro Transit is proposing to construct a park-and- ride facility on Lot 1, Block 1 of the future Four Corners Second Addition. Currently, the Zoning Code lists a parking facility (which, by definition, includes park and ride lots) as a possible land use in the Commercial Zoning District – with City approval of a conditional use permit. Because of the proposed mix of land uses, setbacks and buildings within the development of Four Corners Second Addition, Mr. Emerson (the developer of Four Corners Second Addition) requested and the City approved a Planned Unit Development (PUD). The approved PUD allows the developer to propose several uses that then become permitted uses within the development. A PUD is an overlay zoning for a specific development site. With PUD plans, the developer is asking for some deviations or flexibility from the underlying zoning regulations (such as setbacks, impervious surface standards, etc.) as part of the preliminary plat and PUD. The PUD standards and regulations are a negotiation intended to provide more creativity and higher quality design in exchange for flexibility from the standard zoning requirements. While a park and ride lot is not a commercial use, there is potential benefit of the draw for other businesses near the Park and Ride. Additionally, the City wide planning policy in regards to transportation of the 2040 Comprehensive Plan encourages, supports, and advocates public transit service to the City at appropriate geographic locations as determined by the City. Also, public transportation has less of a negative impact on the environment than taking a car, and financial savings result from eliminating parking fees, not needing to pay for gas for individual vehicles and the personal time saved when bypassing slow traffic. According to the US Census Bureau, in 2016 approximately 85% of Lake Elmo residents commute to work, and approximately 1.8% of those who commute to work utilize public transportation. It is not known whether or not a park and ride would encourage increased use of public transportation. A deterrent of a park and ride is that if a public entity (such as Metro Transit) buys the land for use as a park and ride (or any other public 6 use), the City and other government entities will not receive any property taxes with respect to the property because it will be tax-exempt. According to a slide show presentation to the Metropolitan Council in 2015, it previously considered a location in Woodbury for the park and ride lot, but now it has moved the location to the northwest quadrant of I-94 and Manning Avenue. The Metropolitan Council reviewed seven locations for the park and ride but many were not possible due to various reasons. The park and ride will serve a new express bus service to downtown Minneapolis with six morning and six evening trips each day. Current and Future Park and Rides. There currently are seven parking lots in adjacent cities that could be used by Lake Elmo commuters. The figure below shows existing and proposed park and ride facilities near the proposed facility. Additionally, there is a new park and ride facility planned less than 1 mile from the southwestern city border to provide access to the Metro Gold Line Bus Rapid Transit (BRT). The numbers and percentages indicate the 2017 capacity of each park and ride. This information was derived from the 2017 Annual Regional Park and Ride System Report. • St. Croix Valley Recreation Center in Stillwater. • Guardian Angels Church in Oakdale (415 spaces, 81% utilized in 2017). • Walton Park in Oakdale (58 spaces, 50% utilized in 2017). • Woodbury Mall Theater in Woodbury (550 spaces, 79% utilized in 2017). • Woodbury Lutheran Church in Woodbury (90 spaces, 97% utilized in 2017). • Christ Episcopal Church Park and Ride next to Woodbury Lutheran Church Park-and-Ride. • There also is a park and car pool lot available in Grant near the intersection of TH 36 and Manning Avenue (CSAH 15). Bus service is not provided at this lot, but commuters may still park for free and carpool from this location (15 spaces, 7% utilized in 2017). 7 I-94 Impact. I-94 is identified as a High Priority on the Minnesota Interregional Corridor System (IRC) 2000 plan as part of the State Transportation Plan. Under this designation, I-94 has a goal 60-mph average peak hour operating speeds with minimal conflicts and interruptions to traffic flow. A corridor management plan has not yet been developed to examine the existing operations and determine future plans to meet those goals. It is expected that such a plan will be developed in the near future. It also is anticipated that Lake Elmo will have the opportunity to participate on some type of advisory panel in conjunction with development of that plan to express the City’s views and opinions on the corridor. The City will work with the Minnesota Department of Transportation (Mn/DOT), the County and adjacent communities on a corridor plan that is effective for all involved. Site Data. The entire subdivision area for the Four Corners Second Addition is 56.9 acres which includes all of Lot 1, Block 1, Outlots A, B and C and the right-of-way for Hudson Boulevard. The site of the proposed Park and Ride (Lot 1, Block 1) will be 5.66 acres (246,806 square feet.) Site Plan. Lot 1, Block 1 of the Four Corners Second Addition is the site of the proposed park and ride lot. This facility will provide about 550 parking spaces, including 13 handicap parking spaces; electric charging stations; bike racks with overhead canopy; bus stop and passenger waiting area with two 6’X13’ bus shelters; 10.5’X12’ restroom/maintenance building. Lot Easements. The City requires the developer to dedicate 10-foot-wide easements along all public rights-of-way and rear property lines, five-foot-wide easements along all side property lines and easements for storm water management and public utilities as are needed. The easements along the property lines for this lot will be dedicated with the final plat of Four Corners Second Addition. The applicant will need to show all easements (including those along property lines and those for the watermains and hydrants) on the site and construction plans when submitting revised plans to the City for review and approval. The project plans show fencing and a retaining wall along the southern (rear) property line (near I-94). The applicant will need to enter into an encroachment agreement with the City to place the fence and retaining wall in the easement. Urban Services Required. Because the property is within the MUSA, the City will require the site to be connected to City services (sanitary sewer and water). Therefore, the developer of the Four Corners Second Addition submitted utility (sanitary sewer and water) and other construction plans to the City for approval as part of the overall approval process for the plat. The project plans for the Park and Ride Lot show public utilities being extended into the site from connections to the new utilities in realigned Hudson Boulevard. Setback and Impervious Surface Requirements. The following table outlines how the proposed use adheres to the setback and impervious surface requirements of the Commercial zoning district. All of the proposed requirements are met except for impervious surface standard (78.8 percent versus a maximum of 75 percent). Because this site is part of a PUD, the City may allow flexibility from City standards without a variance. Staff does not find this amount of hard surface to be unreasonable, as the use is a parking lot with support facilities. This flexibility is noted in the recommended findings for the final PUD plans in order to memorialize that it is allowed within 8 this development. If the Commission wishes, it may recommend that it be a condition of approval of the conditional use permit that the applicant revise the plans to meet the required impervious surface standard. Parking Lot Setback Requirements. Parking lot setback requirements for the Commercial Zoning District are a 15-foot front yard setback, 10-foot side yard setback, 15-foot corner side yard setback, 10-feet rear yard setback, and 35 feet from residential zones. All relevant zoning standards are listed in the table below: Commercial District – Zoning Standards Standard Required Proposed Maximum Height 50 feet Not provided Maximum Impervious Coverage 75% 78.8% Front Yard Setback – Building 30 feet 94.2 feet Interior Side Yard Setback – Building 10 feet 44 feet Corner Side Yard Setback – Building 25 feet NA Rear Yard Setback - Building 30 feet NA Front Yard – Parking 15 feet About 100 feet Interior Side Yard – Parking 10 feet 10 feet?? Rear Yard - Parking 10 feet 10 feet?? Minimum Building Floor Size N/A N/A It appears that some of the edges of the parking lot may be less than 10 feet from the side and rear property lines as is typically required by the City Code. Staff measured to the back of the curb and it appears there are places that the back of the curb is only 7 or 8 feet from the property lines. The City may allow a reduced parking lot setback as part of the final PUD plan approval for the site. In this case the slightly reduced setback should not negatively impact neighboring properties or drainage as there will be a storm water pond to the southwest and the I-94 right-of-way to the southeast of this facility. General Site Design Considerations, Commercial Districts. The following outlines how the proposed development adheres to the City’s General Site Design considerations for the Commercial Zoning District.  Circulation. o Internal connections when feasible. There are no feasible internal connections to the site. The site will be accessed off of realigned Hudson Boulevard North and will share a driveway with the adjacent lot to the northeast. o Curb cuts minimized. There are two proposed curb cuts in order to provide better circulation.  Fencing and Screening. There is not a need for fencing or screening with this proposal as it will not be adjacent to any residential land uses. The applicant is proposing extensive 9 landscaping along Hudson Boulevard and to install a six-foot-tall vinyl coated chain link fence along the three other sides of the site.  Lighting Design. It is a recommended condition of approval that the applicant submit a photometric plan that meets the requirements of Sections 150.035-150.038 of the City Code.[EB1]  Exterior Storage. The applicant is not proposing any exterior storage with this facility. Standards for Park and Ride Lots within the Commercial Zoning District. There are no specific use standards for a park and ride facility within the Zoning Code. Parking Lot Requirements  Marking of Parking Spaces. Parking areas containing five or more spaces are required to be marked with painted lines at least four inches wide. This is shown on the plans.  Curbing. Open off-street parking areas designed to have head-in parking along the property line shall provide a bumper curb or barrier of normal height. This is shown on the plans.  Accessible Parking. The proposed number of parking spaces is 550. Of these, 13 are handicap –accessible with van access, which meets the Americans with Disabilities Act (ADA) requirements. Parking Lot Screening Standards  Interior Parking Lot Landscaping. At least 5% of the parking lot is devoted to islands or corner planting beds as is required per the City’s interior parking lot landscaping standards. Additionally, the number of trees required to be provided within these interior islands and corner beds is met.  Perimeter Parking Lot Landscaping. o Frontage Strip. A 30-foot wide frontage strip of landscaping is provided between the bus drive through lane and street. Screening has been provided along Hudson Boulevard in the form of trees and shrubs in the frontage strip along Hudson Boulevard. The requirement that one deciduous tree be planted every 50 linear feet has been met along Hudson Boulevard with the planting of eight trees in the landscape strip.  Screening. The City requires screening between land uses to provide visual and noise separation of intensive uses from less intensive uses. In this case, the property to the northeast is undeveloped and planned for commercial uses and the lot to the southwest is planned to be a stormwater pond. As such, there is not a need for the developer of this site to provide screening.  Tree Preservation and Landscape Plans. The applicant has submitted tree preservation and landscape plans that have been reviewed by the City’s landscape architect. In summary, the 10 proposed plans meet and exceed the City standards and requirements. I have attached the review comments of the City Landscape Architect for your reference. Lake Elmo Design Guidelines and Standards. The property is located within the I-94 district, and therefore must adhere to the Lake Elmo Design Guidelines and Standards. In this case, the project plans show one building on the site – a 10.5 –foot by 12-foot building that will serve as a driver restroom and for site maintenance. Metro Transit also is proposing to install two covered shelters for people waiting for a bus. The applicable design standard includes: • Site Design. Building is set back at least 30 feet from the right-of-way and oriented parallel to the street, providing convenient access to entrances and efficient on-site circulation. • Streetscape. Streetscape will be provided along Hudson Boulevard as a recommended condition of approval. • Landscaping. Trees and plant beds are utilized. Parking, service, storage and utility areas are buffered by plantings. • Parking. Parking areas utilize more than 60% of primary street frontage (it is a park and ride lot), but the applicant is proposing extensive landscaping adjacent to the primary street (Hudson Boulevard). • Building Design. There is one small building proposed with this facility. It will have no blank facades without windows or doors. The size, height, function and location of the building do not create any design concerns. • Building Materials. The building materials include fiber cement siding and ledge stone. The roof will consist of textured shingles. City Engineer Review. This review is attached and can be referenced in the Final PUD section of this report. Fire Chief Review. Chief Greg Malmquist reviewed the proposal and offered the following comments of items that need to be addressed (on final plans): • Ensure proper access throughout site • Ensure proper turning radius throughout. • Met with City Engineer and made recommendations for proposed fire hydrant locations. • Ensure proper markings and signage for “No Parking” areas to ensure access. As for fire hydrants, the Fire Chief is requesting the applicant to install six fire hydrants throughout the site. These will require the installation of watermains throughout the property to supply City water to the hydrants. All watermains and hydrants on the site will be public infrastructure and require drainage and utility easements around them to ensure they are accessible for City maintenance and repair purposes. Washington County Review. Washington County will likely require a signal at Hudson Boulevard and Manning Avenue in the next few years. A final determination of the timing and costs for such a project would be made when the traffic levels and the level of service for traffic movement through the intersection warrant the need for traffic signals. 11 Other Agency Review. The City also received the following comments about this proposal: West Lakeland Township: Should a traffic signal be included in this project, the current existing geometry of 2nd Street aligns with the proposed “signal ready” improvements. If Washington County require the Township leg to be upgraded with a dedicated right turn land (which is not currently shown), the townships position is that it is not needed at this time. This may possibly change some day in the future if 2nd Street is extended to the east and more development from the township contributes to the intersection and then the township will deal with it at that time. Township Supervisor Dave Schultz Note: This comment primarily focuses on the Hudson Blvd/Manning Avenue intersection and how and when it will be reconstructed. City of Woodbury: We have reviewed this at our weekly staff meeting and are supportive of the project. We were curious if the Met Council has indicated where the riders for the park and ride would be coming from (how many are currently using the Guardian Angles or Woodbury Theater lots and is there and estimate on new riders?) Janelle Schmitz – Assistant Community Development Director Wetland Delineation. There were no wetlands found on the property. I-94 Impacts. City staff sent a review request to MnDOT for the Four Corners Second Addition and for this request. They have several comments and note permitting requirements for this proposal. I have attached their comments for your review. Drainage easement encroachment would be required. Additionally, a part of State right-of-way will need to be vacated with the final plat for Four Corners Second Addition. Recommended Findings. In order to approve a conditional use permit, the City is required to find the proposal compliant with the following (staff comments are in bold). Pages 4 and 5 of the applicant’s project narrative includes responses to each of these findings. 1. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. The proposed use will not endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or City. A traffic signal is may be warranted at the intersection of Hudson Boulevard and Manning Avenue as this area continues to develop. 2. The use or development conforms to the City of Lake Elmo Comprehensive Plan. The proposal is consistent with the Comprehensive Plan in that the property is guided for Commercial, and transit-related park and rides are a conditional use within the Commercial zoning district. A park and ride also has the potential to draw businesses to the area. 3. The use or development is compatible with the existing neighborhood. The use of the site as a park and ride lot is compatible with the existing neighborhood as it will be located near I-94 and there is little existing development surrounding the area. 12 4. The proposed use meets all specific development standards for such use listed in Article 7 of this Chapter. The proposed use meets the specific development standards currently set forth within the Zoning Code. 5. If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 150, §150.250 through 154.800 (Shoreland Regulations) and Chapter 152 (Flood Plain Management). The proposed use is not within a City shoreland or floodplain. 6. The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The proposed project will be similar in character and design to the existing area. 7. The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. The proposed use will not be hazardous or create a nuisance on the property provided all the rules and regulations set forth by the City and other applicable agencies are met and all applicable permits are obtained. 8. The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. The proposed park and ride facility will be served adequately by essential public facilities and services. It is a recommended condition of approval that the applicant include all the necessary information about utilities and storm water management on updated plans to be reviewed and approved by the City Engineer. Provided this information is supplied, reviewed and approved by the City Engineer and other applicable agencies, the use will be adequately served by the aforementioned. 9. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The proposed use will not create additional requirements for public facilities and services. The developer of the Four Corners Second Addition will be installing public utilities in the realigned Hudson Boulevard which will serve this site and a larger area of Lake Elmo. 10. The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. Traffic to the site will increase as it is now vacant property. Hazardous materials are prohibited from being stored on site, and staff has reviewed the proposed lighting and determined that it should not cause a nuisance as proposed. 13 11. Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. The reconstruction of Hudson Boulevard west of Manning Avenue should accommodate the increased traffic created by the park and ride facility. 12. The proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. The proposed use of the site as park and ride facility will not result in the destruction, loss or damage of a natural or scenic feature. Recommended Conditions of Approval. Based on the aforementioned, Staff recommends that the Planning Commission recommend approval of the requested Conditional Use Permit for a Park and Ride Facility on Lot 1, Block 1, Four Corners Second Addition, subject to the following conditions: 1) The applicant must obtain all other necessary City, State, and other governing body permits before starting any construction activity on the parcel including but not limited to watershed permit, a MnDOT drainage permit, a MPCA Stormwater Construction permit, an approved stormwater management plan, a site work agreement with the City, utility plans, grading plan, parking lot permit, building permits, etc. 2) Final grading, drainage, and erosion control plans, sanitary and storm water management plans, landscape plans and utility construction plans shall be reviewed and approved by the City Engineer and applicable Staff. All changes and modifications to the plans requested by the City Engineer in the memorandum addressing the Metro Transit park and Ride CUP and PUD Plans dated April 18, 2019 shall be incorporated into these documents before the City will review and approve the plans. 3) All easements as requested by the City Engineer and Public Works Department shall be provided to the City before the start of any site work or construction. 4) The applicant shall submit a photometric plan to the City for approval, and all lighting must meet requirements of Sections 150.035-150.038 of the City Code. 5) Landscape plans must be approved by the City’s Landscape Architect before the start of construction. The landscape plans must meet all city requirements and must show the locations of utilities to ensure that all trees will be planted at least 10 feet away from any public utility lines or facilities. 6) The applicant shall obtain a sign permit from the City before installing any sign on the property. 7) The proposed building shall meet the Lake Elmo Design Guidelines and Standards. 8) The applicant shall be responsible to place hydrants throughout the property at the direction of the Fire Department. All fire hydrants shall be owned and maintained by the City and the City will require easements for the hydrants and watermains. 9) Before the start of construction, Metro Transit shall enter into a site improvement agreement acceptable to the City Engineer and the City Attorney that delineates who is responsible for the design, construction, and payment of the required improvements (including watermains, fire hydrants and landscaping) with financial guarantees therefore. 14 10) That the final plat for Four Corners Second Addition must be recorded with Washington County. 11) That applicant enter into an encroachment agreement with the City to place the fence and retaining wall in the easement. FISCAL IMPACT: If approved and the recommended conditions of approval are adopted, the applicant will be required to pay sewer and water availability charges. The maintenance of public streets, trails, sanitary sewer mains, and other public infrastructure should be considered with this proposal. The City will collect Sewer Accessibility Charges and Water Accessibility Charges and building permit fees from this site (but no property taxes). RECOMMENDATIONS: Staff recommends that the Planning Commission recommend approval of the Metro Transit Park and Ride Facility Final PUD Plans with recommended findings and conditions of approval: “Move to recommend approval of the Metro Transit Park and Ride Facility Final PUD Plans with recommended findings and conditions of approval as drafted by staff.” Staff recommends that the Planning Commission recommend approval of the Conditional Use Permit for a park and ride facility for Lot 1, Block 1, Four Corners Second Addition: “Move to recommend approval of a Conditional Use Permit for a park and ride facility as proposed by Metro Transit for Lot 1, Block 1, Four Corners Second Addition, subject to the conditions of approval as prepared by staff.” ATTACHMENTS: • CUP written statement dated March 22, 2019 (6 pages) • 2 City Maps • Four Corners Second Addition Preliminary Plat • CUP Application drawings and plans • Engineering Comments dated 04-18-2019 (3 pages) • Landscape Architect comments dated March 29, 2019 (5 pages) • MnDOT comments dated 2-15-2019 (3 pages) FES Inv=897.5 F E S I n v =8 8 9 .2 F E S I n v =8 8 9.2 FES Inv =890.2 F E S In v =8 9 0.1 FES Inv=884.8 FES Inv=889.9 LEGEND GENERAL NOTES: SITE NOTES: LEGEND DO NOT ENTER DO N O T EN T E R YI E L D Bu s Pa r k i n g On l y BUSES ONLY ENTER DO NOT Parking for Electric Vehicle Charging Only YI E L D PA R K I N G MI N U T E PI C K - U P ON L Y DR O P - O F F 10 OR HANSEN THORP PELLINEN OLSON,Inc. 7510 Market Place Drive Eden Prairie, MN 55344 952-829-0700 952-829-7806 fax Engineering Surveying Landscape Architecture GENERAL NOTES: LEGEND 3/18/19 Bus Parking Only BUSES ONLY ENTER DO NOT Parking for Electric Vehicle Charging Only PARKING MINUTE PICK-UP ONLY DROP-OFF 10 OR HANSEN THORP PELLINEN OLSON,Inc. 7510 Market Place Drive Eden Prairie, MN 55344 952-829-0700 952-829-7806 fax Engineering Surveying Landscape Architecture GENERAL NOTES: NOTE: 3/18/19 76"x 8" 1 8" FLAT SIGN S-16 PAINTED BACKGROUND & GRAPHICS. ADHERE LEGEND HANSEN THORP PELLINEN OLSON,Inc. 7510 Market Place Drive Eden Prairie, MN 55344 952-829-0700 952-829-7806 fax Engineering Surveying Landscape Architecture LANDSCAPE NOTES: CITY REQUIREMENTS: SEED MIX: LEGEND 3/18/19 X X X X X XX HANSEN THORP PELLINEN OLSON,Inc. 7510 Market Place Drive Eden Prairie, MN 55344 952-829-0700 952-829-7806 fax Engineering Surveying Landscape Architecture TREE PRESERVATION NOTES: LEGEND X 3/18/19 HANSEN THORP PELLINEN OLSON,Inc. 7510 Market Place Drive Eden Prairie, MN 55344 952-829-0700 952-829-7806 fax Engineering Surveying Landscape Architecture 3/18/19     PAGE 1 of 2  MEMORANDUM           Date:  April 18, 2019      To:  Ken Roberts, Planner Director  Re:  Metro Transit Park & Ride at I94 and CSAH‐15  Cc:  Chad Isakson, Assistant City Engineer    Engineering Plan Review  From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Metro Transit Park & Ride Station Engineering Plans at I94 and  Manning Avenue (CSAH‐15) received on March 25, 2019. The submittal consisted of the following documentation:     I‐94 and Manning Avenue Park & Ride Station Plans, dated 03.29.2019, prepared by SRF.   Stormwater Management, dated November 2018, prepared by SRF. Not Certified.      STATUS/FINDINGS:  Engineering has prepared the following review comments:      PRELIMINARY PLAT AND EASEMENTS   No lot easements have been provided as required.   A retaining wall and chain link fence are proposed along the length of the rear lot line. The retaining wall  and chain link fence encroach the required rear lot line easement. Temporary construction easements or  permits will be required from adjacent properties to construct the proposed retaining wall. Temporary  construction easements should be shown on the plans and provided to the City.   The plans show a future charging station encroaching the required side lot easement on the north side.  The plans should be revised to relocate the future charging station outside of the easement.   Drainage and utility easements must be added to the plans over all watermain and hydrants. Easements  must extend minimum 15‐feet from pipe and hydrants (see Utility Plan comments). Drainage and utility  easements must be provided in the City’s standard form of drainage and utility easement agreement.    STORMWATER MANAGEMENT   The site plan is subject to a storm water management plan meeting State, VBWD and City rules and  regulations. A storm water management plan has been submitted but has not yet been reviewed by the  VBWD. The stormwater management plan must be a prepared and certified by an engineer licensed in the  State of  Minnesota. The  plan must  be resubmitted with  professional certification. Any plan revisions  made to obtain the VBWD approval must be resubmitted to the City for review and approval.   The site plan shows storm water management being addressed using on‐site underground storage located  beneath the proposed parking spaces. The storm water facilities constructed for this development will  remain  privately  owned  and  maintained.  The  applicant  will  be  required  to  execute  and  record  a  Stormwater Maintenance and Easement Agreement in the City’s standard form of agreement.   The 100‐year high water flood level (HWL) and 100‐year HWL contour must be calculated and shown on  the grading plans, must be fully contained within private property, and must be protected by easement.        FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4285      PAGE 2 of 2  PERMITS/APPROVALS  • A copy of the VBWD permit is required prior to start of construction.  • A copy of the MnDOT drainage permit is required prior to start of construction.  • A copy of the MPCA Stormwater Construction permit is required prior to start of construction.     • Any plan revisions made to obtain the above permits must be resubmitted for City review and approval.   An executed Stormwater Maintenance and Easement Agreement in the City’s standard form is required  prior to start of construction.   Retaining walls that exceed 4 feet in height must have a design submitted and certified by an engineer  licensed in the State of Minnesota.   Written landowner permission must be provided for any off‐site grading work, easements and storm  water discharges to adjacent properties.   No construction for this project may begin until the applicant has received City Engineer approval for the  Final Construction Plans; the applicant has obtained and submitted to the City all applicable permits,  easements and permissions needed for the project; a site improvement agreement has been executed  with the City and all required securities have been provided, and a preconstruction meeting has been held  by the City’s engineering department.    CONSTRUCTION PLANS   Construction  Phasing.  The  plans  should  be  updated  to  better  identify  the  Hudson  Boulevard  Improvements as “proposed construction by others” and to require coordination between contractors.  The plans and specifications should carefully address construction phasing, such as the timing for water  and sewer connection and testing, and driveway connections to Hudson Boulevard.     C3.0. Grading, Drainage and Erosion Control. Revise the erosion control plans to include the City of Lake  Elmo  standard  plan  notes  for  erosion  control  and  City  standard details  for  erosion  control.  The  specifications must be updated to include the City of Lake Elmo  standard  specifications  for  erosion  control. The City specifications, details and plan notes must be identified to supersede all other plans and  specifications in case of conflict.   C3.0. Grading, Drainage and Erosion Control. Revise plans to identify Hudson Boulevard as “proposed”  and to be constructed “by others”. Add plan note that grading revisions may be required to match into  the final constructed grades for Hudson Boulevard.    C3.0. Grading, Drainage and Erosion Control. Add erosion control and restoration measures at the storm  sewer outfall pipe off‐site.   C4.0. Utility Plan. Revise the utility plans to show the sewer and water service connections to be located  at the right‐of‐way of Hudson Boulevard. The public improvement project must be updated to provide  sewer and water service stubs from the mains to the right‐of‐way consistent with City of Lake Elmo  standard service details.   C4.0. Revise the utilities shown in Hudson Boulevard from “existing” to “installed by others”.   C4.0. Utility Plan. Add hydrants interior to the site as required by the Lake Elmo Fire Department. See  attached plans showing required locations.   C4.0. Utility Plan. Revise plans to extend 8‐inch watermain interior to site to each hydrant and create a  looped main configuration. Update the plans to show a minimum 30‐foot utility easement centered over  all watermain and hydrants. Easement must extend minimum 15‐feet from all pipe and hydrants.   C4.0.  Utility  Plan.  Revise  the utility  plans  to  include  the  City  of  Lake  Elmo  standard  plan  notes  for  watermain and City standard details for watermain. The specifications must be updated to include the  City of Lake Elmo standard specifications for watermain. The City specifications, details and plan notes  must be identified to supersede all other plans and specifications in case of conflict.   C5‐X. Civil Details. The plans must be revised to replace all civil details, plan notes and specification for  erosion and sediment control to meet the standards of the City of Lake Elmo.   L1.0. Landscape Plans. All proposed utilities must be shown on the landscape plans and all trees relocated  to maintain 10 feet of separation from all public utilities.    LEGEND Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming Toll Free 800-472-2232 Web wenck.com To: Ken Roberts, City of Lake Elmo Planning Director From: Lucius Jonett, Wenck Landscape Architect Date: March 29, 2019 Subject: City of Lake Elmo Landscape Plan Review Metro Transit Park and Ride, Review #1 Submittals  Tree Preservation Plan, dated March 18, 2019, received March 26, 2019.  Landscape Plans, dated March 18, 2019, received March 26, 2019. Location: Northwest quadrant of the intersection of I-94 and Manning Avenue. Lot 1, Block 1 of the Four Corners 2nd Addition development. Land Use Category: C - Commercial Surrounding Land Use Concerns: None Special landscape provisions in addition to the zoning code: None Ken Roberts Planning Director City of Lake Elmo March 29, 2019 2 T:\6443 Lake Elmo\21 Metro Transit Park & Ride\01 Preliminary Plans\2019-03-26\2019-03-26 Metro Transit Park & Ride Landscape Plan Review.docx Tree Preservation: A. A tree preservation plan has been submitted that does not meet all requirements. 1. Significant trees are not appropriately designated: i. The nuisance tree category includes noxious or invasive species such as buckthorn, boxelder and cottonwood. Entire Site Total Caliper Inches of Significant Trees On-Site: 45.0 Cal Inches Common Trees 15 Conifer/Evergreen Trees 0 Hardwood Trees 0 Nuisance Trees 30 Significant Inches Removed On-Site 45 Cal Inches Common Trees 15 Conifer/Evergreen Trees 0 Hardwood Trees 0 Nuisance Trees 30 30% Tree Removal Limits (Cal. Inches) Allowed Proposed Subtract Common Tree Removals 4.5 15 Subtract Conifer/Evergreen Tree Removals 0 0 Subtract Hardwood Tree Removals 0 0 Removals in excess of 30% allowances Removals in excess of 30% allowances 10.5 Cal Inches Common Removals in Excess of 30% Allowance 10.5 Conifer Removals in Excess of 30% Allowance 0.0 Hardwood Removals in Excess of 30% Allowance 0.0 Common Tree Replacement Needed (1/4 the dia inches removed) 2.6 Cal Inches Conifer Tree Replacement Needed (1/2 the dia inches removed) 0.0 Cal Inches Hardwood Tree Replacement Needed (1/2 the dia inches removed) 0.0 Cal Inches Common Tree Replacement Required @ 2.5" per Tree 1.1 # Trees Conifer Tree Replacement Required @ 3" per 6' Tall Tree 0 # Trees Hardwood Tree Replacement Required @ 2.5" per Tree 0 # Trees B. Tree replacement is required because more than thirty (30) percent of the diameter inches of significant trees surveyed will be removed. C. Tree replacement calculations do not follow the current required procedure as of the ordinance updates approved on 9-19-2018: 1. A calculation must be provided which breaks out the number of inches removed for hardwood, evergreen/coniferous, and common trees. The 30% removal figure applies to each category individually and trees over the 30% allowance are to be replaced according to: i. Common tree species shall be replaced with new trees at a rate of one- fourth (1/4) the diameter inches removed. Ken Roberts Planning Director City of Lake Elmo March 29, 2019 3 T:\6443 Lake Elmo\21 Metro Transit Park & Ride\01 Preliminary Plans\2019-03-26\2019-03-26 Metro Transit Park & Ride Landscape Plan Review.docx ii. Coniferous/evergreen tree species shall be replaced with new coniferous or evergreen trees at a rate of one-half (1/2) the diameter inches removed. Since coniferous species are often sold by height rather than diameter inch, the following conversion formula can be used: Height of Replacement Coniferous Tree/2 = Diameter Inches of Credit iii. Hardwood deciduous tree species shall be replaced with new hardwood deciduous trees at a rate of (1/2) the diameter inches removed. D. This project is commercial development, therefore mitigation replacement trees can be included toward landscape required tree counts. Landscape Requirements: The preliminary landscape plans meet the code required number of trees. Preliminary Plan Preliminary Plan (Code Required) Proposed Street frontage 400 Lineal Feet Lake Shore 0 Lineal Feet Stream Frontage 0 Lineal Feet Total Linear Feet 400 Lineal Feet /50 Feet = Required Frontage Trees 8 Trees Development or Disturbed Area - SF Development or Disturbed Area 4.7 Acres *5 = Required Development Trees 24 Trees Interior Parking Lot Spaces* 550 Spaces /15 = Required Parking Lot Trees 37 Trees Perimeter Parking Lot Frontage Length* 0 Lineal Feet /50 = Required Frontage Strip Trees 0 Trees Required Mitigation Trees 1 Required Number of Trees** 70 Total Trees to Date 84 * Parking lot landscaping or screening trees are included in landscape required tree counts. None if 0 - 30 Parking Spaces 1 tree per 10 spaces if 31 - 100 Parking Spaces 1 tree per 15 spaces If >101 Parking Spaces ** Commercial development - mitigation replacement trees are included in landscape required tree counts. 1. A minimum one (1) tree is proposed for every fifty (50) feet of street frontage. 2. A minimum of five (5) trees are proposed to be planted for every one (1) acre of land that is developed or disturbed by development activity. Ken Roberts Planning Director City of Lake Elmo March 29, 2019 4 T:\6443 Lake Elmo\21 Metro Transit Park & Ride\01 Preliminary Plans\2019-03-26\2019-03-26 Metro Transit Park & Ride Landscape Plan Review.docx The landscape plans do meet the minimum compositions of required trees: Preliminary Plan Qty % Composition Deciduous Shade Trees 56 67% >25% required Coniferous Trees 22 26% >25% required Ornamental Trees 6 7% <15% required Tree Count 84 A. A landscape plan has been submitted that does not include all requirements. 1. Utilities are not shown on the landscape plan to review for tree placement conflicts. B. The landscape plan does meet the landscape layout requirements. C. Interior Parking Lot Landscaping – The development does include an interior parking lot with more than 30 spaces and satisfies the landscaping requirements. 1. At least 5% of the interior area of parking lots is devoted to landscape planting areas. The parking lot is measured at approximatively 203,250 square feet and planting areas measuring approximately 15,000 square feet in the parking lot islands and bump outs The planting area is approximately 7% of the interior of the parking lot area. 2. The interior parking lot planting area includes approximately 45 shade trees satisfying the minimum required tree planting requirements for interior parking lots. D. Perimeter Parking Lot Landscaping – The development does include a perimeter parking lot and satisfies the landscaping requirements. 1. A landscaped frontage strip is provided along Hudson Boulevard for screening from the public street. The width of the strip exceeds the required 8’ minimum. E. Screening – Screening is not required by City code. Findings: 1. Tree Preservation Plan – Boxelder trees were classified as common trees. According to the ordinance updates approved on 9-19-2018, they are now classified as nuisance trees and not required to be included in the tree inventory and mitigation calculations. 2. Tree Replacement Calculations – Because of the different tree classification, the applicant over estimated the number of replacement trees required. When calculated, 1.1 replacement trees is required. Fraction amounts are typically required to be rounded up. Since only 1 common tree (15” ash) is being removed and the fraction is 0.1; 1 replacement tree will be adequate. 3. Landscape Plan - Utilities are not shown on the landscape plan to review for tree placement conflicts. Ken Roberts Planning Director City of Lake Elmo March 29, 2019 5 T:\6443 Lake Elmo\21 Metro Transit Park & Ride\01 Preliminary Plans\2019-03-26\2019-03-26 Metro Transit Park & Ride Landscape Plan Review.docx Recommendation: The preliminary tree preservation and landscape plans meet and exceed City requirements. It is recommended that a condition of approval include: 1. Submit a revised landscape plan showing locations of utilities to review that all trees are 10’ minimum away from utility lines. Sincerely, Lucius Jonett, PLA (MN) Wenck Associates, Inc. City of Lake Elmo Municipal Landscape Architect Metropolitan District 1500 County Road B-2 West Roseville, MN 55113 An equal opportunity employer February 15, 2019 Ken Roberts, Planning Director City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, MN 55042 SUBJECT: Four Corners Second Edition Preliminary Plat MnDOT Review #P19-002 NW quad of I-94 and CSAH 15 (Manning Ave N) City of Lake Elmo, Dakota County Dear Mr. Roberts: MnDOT has reviewed the preliminary plat received 1/31/19 for the Four Corners Second Edition project in compliance with Minnesota Statute 505.03, subdivision 2, Plats. Before further development, please address the following: Design The preliminary plat shows the relocation of the frontage road (Hudson Blvd) and its intersection with CSAH 15 (Manning Ave N) within the MnDOT right-of-way, which extends several hundred feet north of I-94 along Manning Ave. Roadway configuration changes of this magnitude require a Level 2 layout, as noted in MnDOT’s review of the EAW for the Manning Avenue Corridor Management and Safety Improvement Project (see MnDOT comment letter of 12/21/2016 attached). MnDOT layout design guidance and layout requirements are provided at: http://www.dot.state.mn.us/design/geometric/index.html. Please direct questions regarding roadway design to Jeff Rones of MnDOT’s Metro District Design Section at 651-234-7647 or Jeff.Rones@state.mn.us. Traffic MnDOT strongly recommends that the city require a traffic impact study (TIS) to be performed, as the traffic volumes associated with the proposed development and uses are significant (likely exceeding 15,000 AADT) and meet MnDOT warrants for a TIS (2,500 or more new daily vehicle trips). See Chapter 5 of MnDOT’s Access Management Manual for TIS guidance: www.dot.state.mn.us/accessmanagement/docs/pdf/manualchapters/chapter5.pdf. Please direct questions regarding traffic to Kaare Festvog of MnDOT’s Metro District Traffic Engineering Section at 651-234-7814 or Kaare.Festvog@state.mn.us. Right-of-Way The 60’ drainage way shown on the future Lot 1 labeled “PARCEL No. 44 (TO BE VACATED BY MN DOT)” is currently owned in fee by MnDOT. Therefore, MnDOT will need to convey fee ownership of the parcel to the owner. Please contact Jennifer Matti in MnDOT’s Metro District Surveys Section at 651-234-3474 or Jennie.Bailey@state.mn.us regarding acquisition of the drainage way. Page 2 of 3 Please direct questions regarding right-of-way to Michael Lynch of MnDOT’s Metro District Right of Way Section at 651-234-7558 or Mike.Lynch@state.mn.us. Drainage A MnDOT drainage permit will be required to ensure that current drainage rates to MnDOT right-of- way will not be increased. MnDOT’s Drainage Permits Checklist is attached. The drainage permit application is available online at: https://dotapp7.dot.state.mn.us/OLPA and requires the following information: 1. A grading plan showing existing and proposed contours. 2. Drainage area maps for the proposed project showing existing and proposed drainage areas. Any off-site areas that drain to the project area should also be included in the drainage area maps. The direction of flow for each drainage area must be indicated by arrows. 3. Drainage computations for pre- and post-construction conditions during the 2-, 10-, 50- and 100-year rain events. 4. Time of concentration calculations. 5. An electronic copy of any computer modeling used for the drainage computations. 6. See also the attached Drainage Permits Checklist for more information. The application should be submitted to: MnDOT – Metropolitan District Permit Office 1500 West County Road B-2 Roseville, MN 55113 MnDOT will perform a thorough review of the application and request any additional information that may be needed. For questions, please contact Bryce Fossand of MnDOT’s Metro District Water Resources Section at 651-234-7529 or Bryce.Fossand@state.mn.us. Permits/No Impacts to Interstate Highway In addition to the drainage permit, any other work affecting or impacting MnDOT right of way on Manning Ave N will require a permit. No work within or impacts to the I-94 right-of-way will be allowed. Permit forms are available from MnDOT’s utility website: http://www.dot.state.mn.us/utility/forms.html. Please include one 11”x17” plan set and one full size plan set with each permit application. Please direct questions regarding these requirements to Buck Craig of MnDOT’s Metro District Permits Section at 651-234-7911 or Buck.Craig@state.mn.us. Review Submittal Options MnDOT’s goal is to review proposed development plans and documents within 30 days of receipt. Electronic file submittals are typically processed more rapidly. There are four submittal options: 1. Email documents and plans in .pdf format to metrodevreviews.dot@state.mn.us. Attachments may not exceed 20 megabytes per email. If multiple emails are necessary, number each message. 2. Upload .pdf file(s) to MnDOT’s external shared internet workspace site at: https://mft.dot.state.mn.us. Contact MnDOT Planning development review staff at metrodevreviews.dot@state.mn.us for access instructions and send an email listing the file name(s) after the documents have been uploaded. Page 3 of 3 3. Mail, courier, or hand deliver documents and plans in .pdf format on a CD-ROM compact disc to: MnDOT – Metro District Planning Section Development Reviews Coordinator 1500 West County Road B-2 Roseville, MN 55113 4. Submit printed documents via U.S. Mail, courier, or hand delivery to the address above. Include one set of full size plans. You are welcome to contact me with questions at 651-234-7795. Sincerely, David Elvin, AICP Senior Planner Copy via E-Mail: Adam Josephson, Area Engineer Ryan Coddington, Engineering Jeff Rones, Design Mike Lynch, Right of Way Jennifer Matti, Surveys Buck Craig, Permits Bryce Fossand, Water Resources Kaare Festvog, Traffic Engineering Carl Jensen, Transit Advantages Mike Nelson, Surveys Cameron Muhic, Multi-Modal Russell Owen, Metropolitan Council Michael Welling, Washington County Survey Division