EASTON VILLAGE 5 th Addition
Final Plat Narrative
March 12, 2019
The Easton Village 5th Addition, by Chase Development, consists of 17.57 acres and with a total of 48 new single
family lots. This project is located within Outlots E, F, H and the westerly 80 feet of Outlots D and G of
Easton Village 3rd Addition.
Per City Resolution No. 2014-058 and No. 2015-07, all conditions of approval were met with the first addition of
Easton Village. There have been four approved final plats for the Easton Village Project to date. After this 48
unit subdivision is completed a total of 26 units will remain to complete the entire Easton Village Project.
The proposed layout and lot design follow the latest approved preliminary plat that took into account
adjustments to road profiles of the two northerly cul de sacs. With the completion of the North Port project to
the south of Easton Village the normal water level of our ponding system is now at the final design which lowers
the high water level to the final condition. No variances are proposed for this project. The setbacks will remain
as required, with rear setbacks at 20 feet, front setbacks at 25 feet and side yard setbacks at 7.5 feet. City street
right of way and street and sidewalk sections are proposed per City standards.
The proposed storm sewer will be connected to the existing pond storm sewer constructed with Easton Village
3rd and 4th Additions. The water main and sanitary sewer will be extended from the constructed water and
EASTON VILLAGE 5th ADDITION
FINAL PLAT NARATIVE
Page 2 of 3
Block Lot
Area
(Sq. Ft.)
Avg.
Width of
Lot
Avg. Depth of
Lot
1 1 8,114 102 80
1 2 8,600 65 132
1 3 10,666 65 164
1 4 10,969 65 169
1 5 11,026 65 170
1 6 11,083 65 171
1 7 11,107 65 171
1 8 12,785 99 129
2 1 9,213 137 67
2 2 8,119 71 114
2 3 9,171 71 129
2 4 9,170 70 131
2 5 11,394 111 103
2 6 11,997 71 169
2 7 10,801 65 166
2 8 10,547 65 162
2 9 10,294 65 158
2 10 10,037 65 154
3 1 11,384 88 129
3 2 15,394 88 175
3 3 13,551 104 130
3 4 8,965 65 138
3 5 8,450 65 130
3 6 8,449 65 130
3 7 9,754 77 127
Block Lot
Area (Sq.
Ft.)
Avg.
Width of
Lot
Avg.
Depth of
Lot
3 8 20,028 113 177
3 9 12,528 65 193
3 10 14,484 75 193
3 11 10,973 89 123
3 12 8,544 65 131
3 13 9,837 75 131
3 14 9,950 75 133
3 15 9,972 70 142
3 16 11,277 75 150
3 17 12,130 75 162
3 18 13,672 100 137
4 1 14,574 75 194
4 2 18,039 93 194
4 3 9,919 78 127
4 4 9,381 72 130
4 5 9,706 72 135
4 6 9,179 65 141
4 7 9,331 65 144
4 8 10,167 72 141
4 9 9,657 72 134
4 10 8,518 65 131
4 11 9,672 65 149
4 12 15,129 83 182
Outlot A 11,338
sewer of Easton Village 4th Addition. All utilities will be constructed per city standards. The storm water
ponding has been finalized per the original design and is at the final normal water level and high water level per
the preliminary plat analysis.
One outlot is planned for this subdivision as previously identified on the preliminary plat. There will be a
temporary cul de sac provided at the end of the proposed extension of Village Parkway. An easement will not be
required for this cul de sac such that it resides entirely within Outlot I and J and the proposed right of way. The
existing cut through from 33rd Street North to the Village Parkway is proposed to remain until the connection of
34th Street is completed as part of this project.
Following is a list of the proposed lots and size of the lots in square feet:
There are no parks being proposed with this subdivision. However, the trail through the previously platted park
outlot will be constructed as part of this project. The total right of way dedication for this project is 226,139 sq.
ft. or 5.19 Acres.
EASTON VILLAGE 5th ADDITION
FINAL PLAT NARATIVE
Page 3 of 3
No know issues have arisen since the last addition to Easton Village.
There are four existing easements that were created with the previous development that are requested to be
vacated:
1) Temporary easement at the end of the cul de sac of Village Parkway
2) Temporary easement at the end of the cul de sac of the 4th Addition
3) Drainage and utility easement created for the trunk sewer for the 1st Addition.
4) Drainage and utility easement created for the storm sewer connection for the 4th Addition.
The final density of this addition is as depicted on the approved preliminary plat with no additional lots being
created or removed.
The project is proposed to start as soon as possible in the spring.