HomeMy WebLinkAbout06 -Springs at Lake Elmo Project PlansProject
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
Apr 12, 2019 - 3:10pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C1-TITLE.dwg
C1.01
TITLE SHEET
GEOTECHNICAL
PROFESSIONAL SERVICE INDUSTRIES, INC.
2915 WATERS ROAD, SUITE 112
EAGAN, MN 55121
TEL 651-646-8148
CONTACT: JOSEPH ROZMIAREK
DEVELOPER/OWNER
CONTINENTAL 483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
TEL 262-653-9352
CONTACT: GWYN WHEELER
ARCHITECT
KHALER SLATER
111 W WISCONSIN AVE
MILWAUKEE, WI 53203
TEL 414-373-2000
FAX 414-272-2001
CONTACT: DENNIS POHLMAN
CIVIL ENGINEER
SAMBATEK
12800 WHITEWATER DRIVE, SUITE 300
MINNETONKA, MN 55343
TEL 763-476-6010
FAX 763-476-8532
CONTACT: ERIC VOGEL, PE
LANDSCAPE ARCHITECT
SAMBATEK
12800 WHITEWATER DRIVE, SUITE 300
MINNETONKA, MN 55343
TEL 763-476-6010
FAX 763-476-8532
CONTACT: WILLIAM DELANEY, PLA
SURVEYOR
SAMBATEK
12800 WHITEWATER DRIVE, SUITE 300
MINNETONKA, MN 55343
TEL 763-476-6010
FAX 763-476-8532
CONTACT: CRAIG JOHNSON, LS
SHEET INDEX
SHEET DESCRIPTION
C1.01 TITLE SHEET
C2.01 ALTA SURVEY
C2.02 FINAL PLAT (1 OF 2)
C2.03 FINAL PLAT (2 OF 2)
C2.04 EXSTING CONDITIONS
C2.05 DEMOLITION PLAN
C3.01 SITE PLAN
C4.01 GRADING PLAN
C5.01 EROSION CONTROL PHASE I
C5.02 EROSION CONTROL PHASE II
C5.03 EROSION CONTROL NOTES AND DETAILS
C6.01 SANITARY SEWER AND WATERMAIN PLAN
C6.02 STORM SEWER PLAN
C9.01 DETAILS
L1.01 LANDSCAPE PLAN
L1.02 SHRUB PLAN WEST
L1.03 SHRUB PLAN EAST
L1.04 LANDSCAPE NOTE AND DETAILS
L1.05 TREE INVENTORY
for
Preliminary Site Development Plans
Springs at Lake Elmo
Continental Properties
Lake Elmo, Minnesota
Presented by:
NO SCALE
VICINITY MAP
SITE
CONSULTANT CONTACT LIST:
BENCHMARKS
N.T.S.
CITY OF LAKE ELMO ENGINEERING DESIGN STANDARDS (MARCH 2017)
CITY ENGINEER'S ASSOCIATION OF MINNESOTA STANDARD SPECIFICATIONS (2013)
MNDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION (2016 EDITION)
GOVERNING SPECIFICATIONS
COMMERCE DR
94
19
TAMARACK RD
WO
O
D
B
U
R
Y
D
R
HUD
S
O
N
R
D
10
BENCHMARK #1 = MNDOT Disc "8282 AX" - Elev=938.31
Located at NE Quad. of Int. Hwy. 94 & Keats Ave.
BENCHMARK #2 = TNH - ELEV=1001.01
South property line of subject property @ midpoint of line.
HUDSON BLVD N
SCALE IN FEET
0 12060
NORTH
To Continental 483 Fund LLC, DPS-Lake Elmo, LLC, a Minnesota limited liability company and First American Title Insurance Company:
This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2016 Minimum Standard Detail Requirements for
ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS, and includes Items 1, 2, 3, 4, 5, 6(b), 7(a), 7(b)(1), 7(c), 8, 9, 10, 11, 13, 14, 16, 17,
18, 19, and 20 of Table A thereof. The field work was completed on 01/21/2019.
Dated this 12th day of March, 2019
Sambatek, Inc.
Craig E. Johnson, LS
Minnesota License No. 44530
cjohnson@sambatek.com
1. Referencing Title Commitment No. NCS-938972-MKE, dated December 17, 2018, First American Title Insurance Company.
2. The bearing system is based on the Washington County coordinate system, NAD83 (1986 Adjust). With an assumed bearing of South 00
degrees 01 minutes 13 seconds West for the east line of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21.
3. The vertical datum is based on NAVD88.
BENCHMARK #1 = MNDOT Disc "8282 AX" - Elev=938.31
Located at NE Quad. of Int. Hwy. 94 & Keats Ave.
BENCHMARK #2 = TNH - ELEV=1001.01
South property line of subject property @ midpoint of line.
VICINITY MAP
SURVEY NOTES
Proposed Description
That part of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21, Washington County, Minnesota described as follows:
Commencing at the southwest corner of said Southwest Quarter of the Southeast Quarter; thence North 00 degrees 06 minutes 31 seconds East, assumed bearing,
along the west line of said Southwest Quarter of the Southeast Quarter, a distance of 82.86 feet to the north line of Parcel 29C of Minnesota Department of
Transportation Right of Way Plat No. 82-43; thence North 89 degrees 18 minutes 27 seconds East, along said north line, a distance of 40.00 to the point of beginning;
thence North 00 degrees 06 minutes 31 seconds East, a distance of 607.73 feet; thence North 89 degrees 40 minutes 54 seconds East, a distance of 1284.76 feet to the
east line of said Southwest Quarter of the Southeast Quarter; thence South 00 degrees 01 minutes 13 seconds West, along said east line, a distance of 428.20 feet to a
point 267.8 feet north of the southeast corner of said Southwest Quarter of the Southeast Quarter; thence South 89 degrees 54 minutes 16 seconds West, parallel to
the south line of said Southwest Quarter of the Southeast Quarter, a distance of 200.00 feet; thence South 00 degrees 01 minutes 13 seconds West, parallel to the east
line of said Southwest Quarter of the Southeast Quarter, a distance of 173.21 feet to said north line of Parcel 29C; thence South 89 degrees 18 minutes 27 seconds
West, along said north line, a distance of 1085.76 feet to the point of beginning.
The following notes correspond to the reference numbers listed in Schedule B, Section 2 of the title commitment.
SUBJECT PROPERTY
1.The surveyor has depicted the property corner monuments, or the witness to the corner that were found during the field work, and set property corner
monuments, or witnesses to the corner, at the locations where there did not appear to be any evidence of an existing monument.
2.The property does not have an assigned address.
3.The subject property lies within Flood Plain Zone X – 'Area Of Minimal Flood Hazard', according to FEMA per FIRM Map No. 27163C0245E dated 2/3/2010.
4.The gross area information of subject property 17.0159 Acres or 741,214 Square Feet.
5. The vertical relief is shown on the graphical portion of the survey.
6b. The zoning information has not been provided by the client.
7a.There are no buildings on the subject property.
7b.There is a building foundation on the subject property as shown and dimensioned.
7c.There are no buildings or heights to measure on subject property. The building foundations as shown, are at ground level.
8.Visible substantial features observed in the process of conducting the fieldwork are shown hereon.
9.There are no parking areas on the subject property.
10a.There were no division or party walls designated by the client to be shown on the survey.
11.A Gopher State One Call (GSOC) request was placed on 12/26/2018 for utility locates on this site and assigned GSOC Ticket No. 183600280. The surveyor makes no
guarantees that the underground utilities shown hereon comprise all such utilities in the area, either in service or abandoned. Utility suppliers often do not
respond to these requests in the field but may provide maps, plans, and drawings in lieu of physical location. Utility information shown hereon is a compilation of
the provided map information and those visible utilities and marked utilities which were located during the survey field work. The surveyor further does not
warrant that the underground utilities shown hereon are in the exact location as indicated, although they are located as accurately as possible from the available
information. The surveyor has not physically located the underground utilities. Pursuant to MS 216.D contact Gopher State One Call at (651-454-0002) prior to any
excavation.
13.The names of adjoining land owners according to the current county tax records are shown on the survey.
14.The distance to the nearest intersecting street is 1000 feet to 5th St. N. & Keats Av.
16.There is no evidence of recent earth moving work, building construction or building additions observed in the process of conducting the fieldwork.
17.No changes in street right of ways are proposed per City of Lake Elmo Bay. There is no observable evidence of recent street or sidewalk construction or repair.
18.There were wetland delineation markers observed in the process of conducting the field work.See survey. Per a Letter by the Department of the Navy, dated
February 8, 2019, File No. MVP-2018-03459-MMW, the wetland was delineated by Kjolhaug Environmental. The Department of the Navy agrees with the
delineated location per said Letter. A permit from the Department of the Navy must be obtained prior to any fill or dredging of the wetland.
19.Plottable off site easements and servitudes disclosed in the provided title documents and/or observed during the field work that appear to benefit and/or affect
the subject property are shown hereon.
20.A Sambatek Professional Liability Insurance Certificate of Insurance will be provided upon request.
"TABLE A" NOTES
CERTIFICATION
N.T.S.
KE
A
T
S
A
V
E
SITE
10TH STREET N
OVERHEAD ELECTRICAL WIRE
LIGHT
SANITARY SEWER
STORM SEWER
WATERMAIN
UNDERGROUND ELECTRIC
GUY ANCHOR
UTILITY POLE
GUARD POST
UNDERGROUND TELEPHONE
UNDERGROUND GAS
CHAIN LINK FENCE
WOOD FENCE
CONCRETE SURFACE
SIGN
FOUND MONUMENT
FOUND CAST IRON
MONUMENT
FOUND RIGHT-OF-WAY
MONUMENT
SET MONUMENT
MARKED LS 43933
SECTION LINE
UNDERLYING / ADJACENT LOT
TIE LINE
BOUNDARY LINE
DEED DISTANCE(100.00)
TRANSFORMER
GAS METER
COMMUNICATIONS MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
ELECTRIC METER
TELEPHONE PEDESTAL
CABLE TV BOX
GATE VALVE / HYDRANT
SANITARY MANHOLE
CLEAN OUT
STORM MANHOLE
STORM CATCH BASIN
FLARED END SECTION
RIGHT-OF-WAY LINE
WIRE FENCE
DECIDUOUS TREE
LEGEND
REGISTERED LAND SURVEYORRLS
FOUNDFD
FIBER OPTIC
IN
W
O
O
D
A
V
E
INT HWY 94
5TH STREET N
A.01/11/19 TITLE COMMITMENT
11.The right to erect and to maintain temporary on land adjoining Trunk Highway 12 and Interstate Highway 94, and also limitations on access to said highways, as
contained or shown in the following:
(a) Highway Easement, dated January 17, 1927, recorded February 18, 1927, in Book 111 of Deeds, at page 1; (Easement does not affect subject property)
(b) Highway Easement, dated January 19, 1927, recorded June 23, 1927, in Book 111 of Deeds, at page 206; (Easement does not affect subject property - lies
within existing R.O.W.)
(c) Final Certificate by the State of Minnesota, recorded April 30, 1959, in Book 220 of Deeds, at page 11; (Easement does not affect subject property - lies within
existing R.O.W.)
(d) Minnesota Department of Transportation Right of Way Plat No. 82-43 recorded March 22, 1882 as Doc. No. 429592; (Affects property and is depicted hereon)
(e) Warranty Deed, to the State of Minnesota, recorded September 30, 1983, as Doc. No. 452990 conveying Parcel 29G in the above Right of Way Plat No. 82-43;
(does not affect subject property)
(f) Final Certificate by the State of Minnesota, recorded August 17, 1987, as Doc. No. 548829 (acquiring Parcel 29C in the above Right of Way Plat No. 82-43); and
(R.O.W. Plat shown on survey)
(g) Quitclaim Deed, from the State of Minnesota, to the City of Lake Elmo, dated November 13, 2013, recorded December 30, 2013, as Doc. No. 3975938 (R.O.W.
Plat shown on survey)
12.Reservation of 50% of all minerals and mineral rights in the East Half of the Southwest Quarter of Section 34, as reserved in the following:
(a) Limited Warranty Deed, from the Federal Farm Mortgage Corporation, as grantor, to Lawrence Fehlen and Marie A. Fehlen, as grantees, dated November 8,
1939, recorded November 21, 1939, in Book 135 of Deeds, at page 632; and (does not affect subject property)
(b) Quit Claim Deed, from the Federal Farm Mortgage Corporation, to the United States of America, dated September 6, 1957, recorded November 22, 1957, in
Book 209 of Deeds, at page 493. (Does not affect subject property)
13.Terms and conditions, including an easement for pipeline purposes, as contained in the following:
(a) Right of Way Conveyance in favor of Standard Oil Company, dated August 7, 1946, recorded August 26, 1946, in Book 150 of Deeds, at page 219; (does not
affect subject property)
(b) Assignment of Rights of Way, from Standard Oil Company, to The American Oil Company, dated December 31, 1960, recorded January 25, 1961, in Book 236
of Deeds, at page 240; (does not affect subject property)
(c) Partial Release of Right of Way Conveyance, dated May 5, 1972, recorded May 8, 1972, as Doc. No. 298638; (does not affect subject property)
(d) Quit Claim Deed, from Amoco Oil Company, to the State of Minnesota, dated October 25, 1983, recorded December 29, 1983, as Doc. No. 457465; (does not
affect subject property).
(e)Agreement Limiting Right of Way Easement, dated July 19, 2001, recorded August 3, 2001, as Doc. No. 3172091; (does not affect subject property)
(f)Non Fee Property Assignment Agreement, from BP Products North America Inc., to BP Pipelines (North America) Inc., dated January 1, 2015, recorded
April 10, 2015, as Doc. No. 4021457; and (affects subject property-blanket in nature therefor not shown)
(g)Agreement and Acknowledgement, between BP Pipelines (North America) Inc., the City of Lake Elmo, and U.S. Home Corporation, dated June 15, 2016,
recorded July 28, 2016, as Doc. No. 4076835. (Does not affect subject property)
14.Easement for power line purposes as contained in the following:
(A)Final Decree, recorded April 13, 1972, in Book 316 of Deeds, at page 69; and (does not affect subject property)
(B)Assignment and Assumption of Easements, from XCEL Energy Inc., to Northern States Power Company, dated February 7, 2001, recorded March 8, 2001,
as Doc. No. 3145752. (Affects property - no easements to depict on survey)
15.Terms and conditions of the Petition and Waiver Agreement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964045. (Affects property -
no easements to depict on survey)
16.Terms and conditions of the Petition and Waiver Agreement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964046. (Affects property -
no easements to depict on survey)
17.Terms and conditions, including an easement for drainage and utility purposes in favor of the City of Lake Elmo, as contained in the Public Drainage & Utility
Easement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964047. (Affects property and easement is depicted hereon)
18.Terms and conditions, including an easement for public and drainage purposes in favor of the City of Lake Elmo, as contained in the Public Drainage & Utility
Easement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964048. (Does not affect subject property)
19.Terms and conditions, including an easement for public and drainage purposes in favor of the City of Lake Elmo, as contained in the Public Drainage and Utility
Easement, dated September __, 2013, recorded September 12, 2013, as Doc. No. 3964049. (Does not affect subject property)
20.Terms and conditions, including an easement for street purposes in favor of the City of Lake Elmo, as contained in the Permanent Public Street Easement
Agreement, recorded November 20, 2014, as Doc. No. 4007702. (Does not affect subject property)
21.Terms and conditions, including easements for drainage and utility purposes in favor of the City of Lake Elmo, as contained in the Drainage and Utility Easement
Agreement, recorded November 20, 2014, as Doc. No. 4007703. (Does not affect subject property)
22.Terms and conditions, including an easement for utility purposes in favor of the City of Lake Elmo, as contained in the Utility Easement, recorded November 20,
2014, as Doc. No. 4007704. (Easement affects property as shown - falls within proposed R.O.W.)
23.Terms and conditions of the Memorandum of Understanding, between U.S. Home Corporation, and DPS-Lake Elmo, LLC, dated October 3, 2014, which is
unrecorded, and of the Notice of Lien Rights by DPS-Lake Elmo, LLC, recorded November 20, 2014, as Doc. No. 4007705, which refers to said Memorandum of
Understanding. (Affects property - no easements to depict on survey).
24.Possible overlap of the Land with the parcel to the southeast, said parcel is described in the Warranty Deed, recorded September 21, 2015, as Doc. No. 4041879.
The legal description prepared by Sambatek, shown as proposed on this survey is contiguous to, and creates no gaps or overlaps with the southeast parcel as
described in said document.
B.01/24/19 WELLS LOCATED
Apr 12, 2019 - 3:10pm - User:clichty L:\PROJECTS\21654.01\CAD\Survey\Sheets\2165401-ALTA.dwg
C1.02
ALTA/NSPS
LAND TITLE
SURVEY
C.03/12/19 ATTORNEY COMMENTS
WELL
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
Know all persons by these presents: That Continental 483 Fund LLC, a Minnesota limited liability company, owner, of the following described property situated in the County of Washington, State of Minnesota,
to wit:
That part of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21, Washington County, Minnesota described as follows:
Commencing at the southwest corner of said Southwest Quarter of the Southeast Quarter; thence North 00 degrees 06 minutes 31 seconds East, assumed bearing, along the west line of said
Southwest Quarter of the Southeast Quarter, a distance of 82.86 feet to the north line of Parcel 29C of Minnesota Department of Transportation Right of Way Plat No. 82-43; thence North 89 degrees
18 minutes 27 seconds East, along said north line, a distance of 40.00 to the point of beginning; thence North 00 degrees 06 minutes 31 seconds East, a distance of 607.73 feet; thence North 89
degrees 40 minutes 54 seconds East, a distance of 1284.76 feet to the east line of said Southwest Quarter of the Southeast Quarter; thence South 00 degrees 01 minutes 13 seconds West, along said
east line, a distance of 428.20 feet to a point 267.8 feet north of the southeast corner of said Southwest Quarter of the Southeast Quarter; thence South 89 degrees 54 minutes 16 seconds West,
parallel to the south line of said Southwest Quarter of the Southeast Quarter, a distance of 200.00 feet; thence South 00 degrees 01 minutes 13 seconds West, parallel to the east line of said
Southwest Quarter of the Southeast Quarter, a distance of 173.21 feet to said north line of Parcel 29C; thence South 89 degrees 18 minutes 27 seconds West, along said north line, a distance of
1085.76 feet to the point of beginning.
Has caused the same to be surveyed and platted as SPRINGS AT LAKE ELMO and does hereby dedicate to the public for public use the public way, and the drainage and utility easements as created by this plat.
In witness whereof said Continental 483 Fund LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this
day of , 20 .
Signed: Continental 483 Fund LLC, a Minnesota limited liability company
By:, its
STATE OF
COUNTY OF
The foregoing instrument was acknowledged before me on this day of , 20 , by
, , of Continental 483 Fund LLC, a Minnesota limited liability company, on behalf of the company.
Notary Public, County, Minnesota Notary Printed Name
My Commission Expires
I Craig E. Johnson do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation
of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water
boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, existing as of the date of this certificate are shown and labeled on this Plat; and all public ways are shown and labeled on
this plat.
Dated this day of , 20 .
Craig E. Johnson, Licensed Land Surveyor,
Minnesota License No. 44530
STATE OF MINNESOTA
COUNTY OF
The foregoing instrument was acknowledged before me on this day of , 20 , by
Craig E. Johnson, a Licensed Land Surveyor.
Notary Public, County, Minnesota Notary Printed Name
My Commission Expires
CITY COUNCIL, Lake Elmo, Minnesota
This plat was approved by the City Council of Lake Elmo, Minnesota, this day of , 20 , and hereby certifies compliance with all requirements as set forth in the
Minnesota Statutes, Section 505.03, Subdivision 2.
Signed: Attest:
Mayor Clerk
COUNTY SURVEYOR, Washington County, Minnesota
Pursuant to Chapter 820, Laws of Minnesota, 1971, and in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this day of
, 20 .
By By
Washington County Surveyor
COUNTY AUDITOR/TREASURER, Washington County, Minnesota
Pursuant to Minnesota Statutes, Section 505.021, Subd.9 and Section 272.12, taxes payable in the year 20 , on real estate hereinbefore described, have been paid; and there are no delinquent taxes and
transfer has been entered, on this day of , 20 .
By By
Washington County Auditor / Treasurer Deputy
COUNTY RECORDER, Washington County, Minnesota
Document Number
I hereby certify that this instrument was filed in the office of the County Recorder for record on this day of , 20 ,
at o'clock .M. and was duly recorded in Washington County Records.
By: By:
Washington County Recorder Deputy
SAMBATEK, INC.
ENGINEERING, PLANNING
AND LAND SURVEYING
SHEET 1 OF 2 SHEETS
SPRINGS AT LAKE ELMO
LOT 1
BLOCK 1
JUNE AVENUE
NORTH
SAMBATEK, INC.
ENGINEERING, PLANNING
AND LAND SURVEYING
DENOTES 1/2 INCH BY 14 INCH IRON PIPE SET AND
MARKED BY LICENSE NO. 44530.
DENOTES 1/2 INCH OPEN END IRON MONUMENT
FOUND UNLESS NOTED OTHERWISE.
SECTION 34, TOWNSHIP 29 N, RANGE 21 W,
WASHINGTON COUNTY, MINNESOTA
NORTH
NOT TO SCALE
VICINITY MAP
SITE0
NORTH
SCALE IN FEET
1 INCH = 120 FEET
60 120
SEC 34
SHEET 2 OF 2 SHEETS
HUDSON BLVD. N.
SPRINGS AT LAKE ELMO
BEING 10 FEET IN WIDTH, UNLESS OTHERWISE
INDICATED, AND ADJOINING RIGHT-OF-WAY
LINES, FRONT, REAR AND SIDE LOT LINES AS
SHOWN ON THE PLAT.
10
10
DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS:
(NOT TO SCALE)
10
THE EAST LINE OF THE OF THE SW 1/4 OF THE SE 1/4 IS
ASSUMED TO HAVE A BEARING OF NORTH 00 DEGREES
10 MINUTES 13 SECONDS WEST.
HUDSON BLVD N
SCALE IN FEET
0 12060
NORTH
That part of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21, Washington County, Minnesota
described as follows:
Commencing at the southwest corner of said Southwest Quarter of the Southeast Quarter; thence North 00 degrees 06 minutes
31 seconds East, assumed bearing, along the west line of said Southwest Quarter of the Southeast Quarter, a distance of 82.86
feet to the north line of Parcel 29C of Minnesota Department of Transportation Right of Way Plat No. 82-43; thence North 89
degrees 18 minutes 27 seconds East, along said north line, a distance of 40.00 to the point of beginning; thence North 00 degrees
06 minutes 31 seconds East, a distance of 607.73 feet; thence North 89 degrees 40 minutes 54 seconds East, a distance of 1284.76
feet to the east line of said Southwest Quarter of the Southeast Quarter; thence South 00 degrees 01 minutes 13 seconds West,
along said east line, a distance of 428.20 feet to a point 267.8 feet north of the southeast corner of said Southwest Quarter of the
Southeast Quarter; thence South 89 degrees 54 minutes 16 seconds West, parallel to the south line of said Southwest Quarter of
the Southeast Quarter, a distance of 200.00 feet; thence South 00 degrees 01 minutes 13 seconds West, parallel to the east line of
said Southwest Quarter of the Southeast Quarter, a distance of 173.21 feet to said north line of Parcel 29C; thence South 89
degrees 18 minutes 27 seconds West, along said north line, a distance of 1085.76 feet to the point of beginning.
SUBJECT PROPERTY
OVERHEAD ELECTRICAL WIRE
LIGHT
SANITARY SEWER
STORM SEWER
WATERMAIN
UNDERGROUND ELECTRIC
GUY ANCHOR
UTILITY POLE
GUARD POST
UNDERGROUND TELEPHONE
UNDERGROUND GAS
CHAIN LINK FENCE
WOOD FENCE
CONCRETE SURFACE
SIGN
FOUND MONUMENT
FOUND CAST IRON
MONUMENT
FOUND RIGHT-OF-WAY
MONUMENT
SET MONUMENT
MARKED LS 43933
SECTION LINE
UNDERLYING / ADJACENT LOT
TIE LINE
BOUNDARY LINE
DEED DISTANCE(100.00)
TRANSFORMER
GAS METER
COMMUNICATIONS MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
ELECTRIC METER
TELEPHONE PEDESTAL
CABLE TV BOX
GATE VALVE / HYDRANT
SANITARY MANHOLE
CLEAN OUT
STORM MANHOLE
STORM CATCH BASIN
FLARED END SECTION
RIGHT-OF-WAY LINE
WIRE FENCE
DECIDUOUS TREE
LEGEND
REGISTERED LAND SURVEYORRLS
FOUNDFD
FIBER OPTIC
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
1.SUBJECT PROPERTY IDENTIFICATION NUMBER IS 3402921430003.
2.THE GROSS AREA OF THE SUBJECT PROPERTY IS 17.0159 ACRES OR 741,214 SQUARE FEET.
1.SURVEY COORDINATE BASIS: WASHINGTON COUNTY COORDINATE SYATEM NAD 83 (1986)
2.FIELD WORK WAS COMPLETED ON 01/21/2019.
3.THE VERTICAL DATUM IS BASED ON NAVD88.
BENCHMARK #1 = MNDOT DISC "8282 AX" - ELEV=938.31,
LOCATED AT NE QUAD. OF INT. HWY. 94 & KEATS AVE.
BENCHMARK #2 = TNH - ELEV=1001.01,
SOUTH PROPERTY LINE OF SUBJECT PROPERTY @ MIDPOINT OF LINE.
PROPERTY SUMMARY
SURVEY NOTES
WELL
Apr 12, 2019 - 3:11pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C2-2-EXCND.dwg
C2.04
EXSTING
CONDITIONS
HUDSON BLVD N
LEGEND DEMOLITION NOTES
1. DEMOLITION NOTES ARE NOT COMPREHENSIVE. CONTRACTOR SHALL VISIT THE SITE PRIOR
TO CONSTRUCTION TO OBTAIN A CLEAR UNDERSTANDING OF THE INTENDED SCOPE OF
WORK.
2. THE DESIGN SHOWN IS BASED ON ENGINEER'S UNDERSTANDING OF EXISTING CONDITIONS.
THE EXISTING CONDITIONS SHOWN ON THIS PLAN ARE BASED UPON ALTA AND TOPOGRAPHIC
MAPPING PREPARED BY XXXX DATED XX-XX-XXXX. IF CONTRACTOR DOES NOT ACCEPT
EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS WITHOUT EXCEPTION, CONTRACTOR SHALL
HAVE MADE, AT OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR
AND SUBMIT IT TO THE OWNER FOR REVIEW.
3. THE CONTRACTOR IS RESPONSIBLE FOR DEMOLITION, REMOVAL, AND DISPOSING IN A
LOCATION APPROVED BY ALL GOVERNING AUTHORITIES AND IN ACCORDANCE WITH
APPLICABLE CODES, OF ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING,
DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN
ON THE PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT
TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL
MATERIAL PER THE GEOTECHNICAL REPORT AND/OR GEOTECHNICAL ENGINEER.
4. CLEARING AND GRUBBING: CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM
THE SITE AND DISPOSING THE DEBRIS IN A LAWFUL MANNER. CONTRACTOR IS RESPONSIBLE
FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL.
6. CONTRACTOR IS RESPONSIBLE FOR THE DISCONNECTION OF UTILITY SERVICES TO EXISTING
BUILDINGS PRIOR TO DEMOLITION OF THE BUILDINGS.
7. CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO REMOVAL
AND/OR RELOCATION OF UTILITIES. CONTRACTOR SHALL COORDINATE WITH UTILITY
COMPANIES CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY
COMPANIES' FORCES AND ANY FEES WHICH ARE TO BE PAID TO UTILITY COMPANIES FOR
SERVICES. CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES.
8. CONTRACTOR IS SPECIFICALLY CAUTIONED THAT LOCATIONS OF EXISTING UTILITIES SHOWN
ON THIS PLAN HAVE BEEN DETERMINED FROM INFORMATION AVAILABLE. ENGINEER
ASSUMES NO RESPONSIBILITY FOR THE UTILITY MAPPING ACCURACY. PRIOR TO START OF
ANY DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES 48 HOURS
PRIOR TO ANY EXCAVATION FOR ON-SITE LOCATIONS OF EXISTING UTILITIES. THE LOCATIONS
OF UTILITIES SHALL BE OBTAINED BY THE CONTRACTOR BY CALLING MINNESOTA GOPHER
STATE ONE CALL AT 800-252-1166 OR 651-454-0002.
9. THE MAPPING LOCATION OF ALL EXISTING SEWERS, PIPING, AND UTILITIES SHOWN ARE NOT
TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT MAY OCCUR
ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY
ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTION
AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH WORK.
UTILITIES DETERMINED TO BE ABANDONED SHALL BE REMOVED IF UNDER THE BUILDING
INCLUDING 10' BEYOND FOUNDATIONS.
10. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO
BE REMOVED OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY
COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE
COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH
TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING
UTILITIES WITHIN THE ROAD RIGHT OF WAY DURING CONSTRUCTION.
11. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES,
ENCLOSURES, ETC., TO THE BEST PRACTICES.
12. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL
TIMES DURING DEMOLITION OF THE EXISTING FACILITIES.
13. PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED
AND APPROVED BY THE LOCAL AUTHORITY.
14. CONTRACTOR SHALL LIMIT SAW-CUT & PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE
IT IS REQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS
INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ITS REMOVAL AND REPAIR.
15. CONTRACTOR TO PROTECT EXISTING FEATURES WHICH ARE TO REMAIN. DAMAGE TO ANY
EXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE.
16. ABANDON OR REMOVE ALL SANITARY, WATER AND STORM SERVICES PER CITY STANDARDS.
COORDINATE ALL WORK WITH CITY. ALL STREET RESTORATION SHALL BE COMPLETED IN
COMPLIANCE WITH LOCAL STANDARDS.
17. CONTRACTOR SHALL PREPARE AND SUBMIT TO THE GOVERNING AUTHORITY A TRAFFIC
AND/OR PEDESTRIAN TRAFFIC PLAN PER CITY/COUNTY/STATE STANDARDS TO BE APPROVED
BY THE LOCAL GOVERNING AUTHORITY.
UNDERGROUND GAS
STONE RETAINING WALL
CHAIN LINK FENCE
UNDERGROUND ELECTRIC
UNDERGROUND CABLE TV
UNDERGROUND TELEPHONE
OVERHEAD ELECTRIC
SANITARY SEWER
WATERMAIN
STORM SEWER
LIGHT
HYDRANT
GAS METER
SPRINKLER HEAD
SPRINKLER VALVE
EDGE OF TREES
TREES / SHRUBS
CONCRETE
CONCRETE CURB
BITUMINOUS CURB REMOVE EXISTING CHAIN LINK FENCE
REMOVE EXISTING UTILITY
REMOVE EXISTING
REMOVE EXISTING TREE
REMOVE EXISTING BUILDING
REMOVE EXISTING CONCRETE PAVEMENT
REMOVE EXISTING BITUMINOUS PAVEMENT
SAW CUT EXIST BITUMINOUS PAVEMENT
REMOVE EXIST CONCRETE CURB
REMOVE EXISTING UTILITY LINE
EXISTING
REMOVE EXISTING LIGHT FIXTURE
REMOVE EXISTING GRAVEL DRIVE
REMOVE EXISTING LANDSCAPING
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL XX. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:11pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C2-DEMO.dwg
C2.05
DEMOLITION
PLAN
REMOVE TREE LINE
HUDSON BLVD N
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
25' B
U
F
F
E
R
50' B
U
F
F
E
R
D
E
F
F
B
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
01
01 01 01
01
010101
111111111111
9
10
9
10
7 7
11 11
6 6 6
9 10
11
12
8
9
6 7
7
10
9
10
10
3
10
10
9
7 6
2
04 04
04
04
04
04 04
04
05
050505
05
05
05
05
22
'
22'
22
'
R
1
8
'
R18
'
R1
8
'
05
05
04 04
05
20'12'20'
F
22'
23
'
9'
TYP18
'
TY
P
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
08 08 08
08
08
08
08
08
08
08
08
08
I
I
H
TY
P
TYP
9'
TY
P
18'
TYP
07
07
07
07
07
07
04 04 040404
R4'
R18'
R4'
R4
0
'
R1
8
'
22
'
R
1
8
'
R18
'
09
06 06
01
04
04
04 04
04
9'
18
'
04 04 04
22'
C
07
07
29
.
4
'
22'
07
07
07
J J
J
A
TYP
07
08
07
07
09
09
09
09
09
09
09 09 09 09
09
09
08
H H H HH
I
I
H
10'
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:12pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE.dwg
C3.01
SITE PLAN
AREA
GROSS SITE AREA
BUILDING INFORMATION
B20E (20 DU/BUILDING)
TOTAL RESIDENT BUILDINGS
GENERAL HOME MIX
STUDIO
1-BEDROOM
2-BEDROOM
3-BEDROOM
TOTAL HOMES
ZONING
EXISTING ZONING
PROPOSED ZONING
PARKING INFORMATION
GARAGE TOTALS:
NUMBER OF ATTACHED
MAINTENANCE GARAGES
NUMBER OF STAND ALONE
TOTAL GARAGE
PARKING REQUIRED PER CODE
SURFACE PARKING AMOUNT
TOTAL PARKING PROVIDED
UNIT PARKING RATIO
COVERED PARKING RATIO
CLUBHOUSE PARKING
*INCLUDED IN PARKING CALCS
1.ALL DIMENSIONS ARE ROUNDED TO THE NEAREST TENTH FOOT.
2.ALL DIMENSIONS SHOWN ARE TO THE FACE OF CURB TO FACE OF CURB UNLESS OTHERWISE NOTED.
3.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT “GUTTER OUT” WHERE WATER
DRAINS AWAY FROM CURB. ALL OTHER AREAS SHALL BE CONSTRUCTED AS “GUTTER IN” CURB.
COORDINATE WITH GRADING CONTRACTOR.
4.ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT.
5.ALL PARKING STALLS TO BE 9' IN WIDTH AND 18' IN LENGTH UNLESS OTHERWISE INDICATED.
6.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF
EXIT PORCHES, RAMPS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE
LOCATIONS.
7.SEE ARCHITECTURAL PLANS FOR LIGHT POLE FOUNDATION DETAIL AND FOR EXACT LOCATIONS OF LIGHT
POLE.
8.REFER TO FINAL PLAT FOR LOT BOUNDARIES, LOT NUMBERS, LOT AREAS, AND LOT DIMENSIONS.
9.ALL GRADIENTS ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE
OF 5% (1:20), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.08% (1:48). THE
MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS AISLE SHALL BE 2.08%
(1:48). THE CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA
ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS PAVEMENT. THE CONTRACTOR SHALL NOTIFY
THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS
THE DESIGN GRADIENT AND COORDINATE WITH GRADING CONTRACTOR.
10."NO PARKING" SIGNS SHALL BE PLACED ALONG ALL DRIVEWAYS AS REQUIRED BY CITY.
LEGEND
EASEMENT
CURB & GUTTER
BUILDING
RETAINING WALL
SAWCUT LINE
NUMBER OF PARKING
STALLS PER ROW
SIGN
PIPE BOLLARD
STANDARD DUTY
ASPHALT PAVING
CONCRETE PAVING
PROPERTY LIMIT
EXISTINGPROPOSED
KEY NOTE
DEVELOPMENT SUMMARY DEVELOPMENT NOTES KEY NOTES
WETLAND LIMITS
TREELINE
BUILDING, STOOPS, STAIRS SEE ARCHITECTURAL PLANS
TRASH/RECYCLING PICKUP AREA - SEE ARCHITECTURAL PLANS
MAIL KIOSK - SEE ARCHITECTURAL PLANS
POOL - SEE ARCHITECTURAL PLANS
MONUMENT SIGN - SEE ARCHITECTURAL PLANS
VEHICLE GATE - SEE ARCHITECTURAL PLANS
TRANSFORMER - LOCATION TBD
741,214 SF 17.02 AC
QUANTITY HEIGHT
15 UNITS 2-STORY / 35'
15 UNITS
HOMES PERCENTAGE
30 10%
120 40%
120 40%
30 10%
300 100%
RURAL DEVELOPMENT TRANSITIONAL
URBAN HIGH-DENSITY PLANNED UNIT (HDR.PUD)
120 GARAGES
1
42 GARAGES
163 GARAGES
525 SPACES
399 SPACES
562 SPACES
1.87
0.29
17 SPACES
(24 ADA)
XX
XX
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
CONCRETE SIDEWALK
DETAILS
A
B
C
D
E
F
G
B-612 CONCRETE CURB AND GUTTER - SEE SHEET C9.0101
B-618 CONCRETE CURB AND GUTTER - SEE SHEET C9.0102
TAPERED CURB - SEE SHEET C9.0103
4' SIDEWALK - SEE SHEET C9.0104
5' SIDEWALK - SEE SHEET C9.0105
STOP SIGN - SEE SHEET C9.0106
ACCESSIBLE PARKING SIGN - SEE SHEET C9.0107
ACCESSIBLE PARKING STALL - SEE SHEET C9.0108
ARCHITECTURAL
CONCRETE
DETAIL XX
CHAIN LINK FENCE - SEE ARCHITECTURAL PLANSH
DECORATIVE WOODEN FENCE - SEE ARCHITECTURAL PLANSI
CHAIN LINK FENCE
DECORATIVE
WOODEN FENCE
AIR CONDITIONING
UNIT
VALLEY GUTTER - SEE SHEET C9.0109
BITUMINOUS PATHJ
HUDSON BLVD N
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
1004.85
1004.85
1006.351006.35
1006.35
1006.35 1006.35
1006.65
1006.65
1006.65
1006.65
1006.65
1004.60
1004.60
1004.85
1004.85
1006.021006.02
1006.32
1006.32
1006.101006.10
1006.10 1006.10
1006.10 1005.771005.77
1004.60
1004.60 1004.60
1004.271004.27
1004.85
1004.521004.52
1006.20
1006.20
1006.20
1006.20
1006.20
1005.87
1005.87
1003.00
1003.00
1003.00
1003.00
1002.501002.50
1002.50
1002.50
1002.50
1002.501002.50
1002.50
1002.50
1002.50
1003.00
1003.00
1003.00 1003.00
1003.00
1003.00 1002.671002.67
1003.00
1003.00 1003.00
1003.00
1003.00 1002.671002.67
1002.171002.17
1002.67
1002.67
1002.171002.17
1005.50
1005.50
1005.50
1005.50
1005.50
1005.17
1005.17
1002.20
1002.20 1002.20
1002.20
1002.20 1001.871001.87
1005.47
1005.47
1005.47
1005.47
1005.47
1005.14
1005.14
1005.00
1005.00
1005.00
1005.00
1001.42
1001.42
1001.75
1001.75
1001.75
1001.75
1001.75
1000.901000.90 1000.501000.50
1000.70
1001.851001.851001.851001.901001.901004.051004.051004.951004.95
T W:1005.00
BW:1005.00
T W:1007.5
BW:1006.98
TW:1006.38
BW:1006.26
T W:1005.97
BW:1005.57
T W:1007.06
BW:1005.77
TW:1007.86
BW:1004.29
TW:1005.86
BW:1005.20
T W:1009.77
BW:1005.30
T W:1011.91
BW:1004.94
TW:1013.38
BW:1005.31
TW:1013.93
BW:1005.59
TW:1015.14
BW:1005.65
TW:1016.52
BW:1005.65
TW:1014.01
BW:1005.65
T W:1013.75
BW:1005.66
T W:1014.15
BW:1006.47
T W:1012.17
BW:1008.99
T W:1011.32
BW:1011.19
TW:1000.00
BW:999.88
T W:998.78
BW:995.98
T W:998.64
BW:995.45 TW:995.05
BW:994.95
TW:999.89
BW:992.57
T W:1000.22
BW:990.26
T W:1000.12
BW:989.36
T W:998.45
BW:987.00
T W:999.23
BW:990.00
T W:1000.00
BW:993.00
TW:1000.03
BW:993.38
T W:997.87
BW:993.96
25' B
U
F
F
E
R
50' B
U
F
F
E
R
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:12pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C4-GRAD.dwg
C4.01
GRADING PLAN
1.PROPOSED CONTOURS ARE TO FINISHED SURFACE ELEVATION. SPOT ELEVATIONS ALONG PROPOSED CURB DENOTE GUTTER GRADE.
2.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT “GUTTER OUT” WHERE WATER DRAINS AWAY FROM CURB. ALL
OTHER AREAS SHALL BE CONSTRUCTED AS “GUTTER IN” CURB.
3.ALL GRADIENT ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5% (1:20), EXCEPT AT CURB
RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.08% (1:48). MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR
ACCESS AISLE SHALL BE IN 2.08% (1:48). CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA
ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A
DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT. COORDINATE ALL WORK WITH PAVING
CONTRACTOR.
4.CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE
CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT
PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT.
5.SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE
SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY
DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING
HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S
PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR
THE CONSTRUCTION SITE.
6.CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S
SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE
FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER.
A GEOTECHNICAL ENGINEERING SOILS REPORT HAS BEEN COMPLETED BY:
COMPANY: INTERTEK-PSI
ADDRESS: 2915 WATERS ROAD, SUITE 112 EAGAN, MN 55121
PHONE: 651-646-8148
DATED: FEBRUARY 11, 2019
CONTRACTOR SHALL OBTAIN A COPY OF THE SOILS REPORT.
7.CONTRACTOR SHALL COMPLETE DEWATERING AS REQUIRED TO COMPLETE THE SITE GRADING CONSTRUCTION.
8.PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL SHALL BE PERFORMED ON THE STREET AND PARKING AREA SUBGRADE.
CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT
THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. CORRECTION OF
THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER.
9.REPLACE ALL SUBGRADE SOIL DISTURBED DURING THE CONSTRUCTION THAT HAVE BECOME UNSUITABLE AND WILL NOT PASS A TEST
ROLL. REMOVE UNSUITABLE SOIL FROM THE SITE AND IMPORT SUITABLE SOIL AT NO ADDITIONAL COST TO THE OWNER.
10.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL DEVICES
SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC
WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION
STANDARDS.
11.EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE SITE.
CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN
EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. CONTRACTOR SHALL SUBCUT CUT AREAS,
WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 6 INCHES. RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO A
MINIMUM DEPTH OF 6 INCHES.
12.TRENCH BORROW CONSTRUCTION: IF ALLOWED BY THE OWNER, CONTRACTOR SHALL COMPLETE “TRENCH BORROW” EXCAVATION IN
AREAS DIRECTED BY THE ENGINEER IN ORDER TO OBTAIN STRUCTURAL MATERIAL. TREES SHALL NOT BE REMOVED OR DAMAGED AS A
RESULT OF THE EXCAVATION, UNLESS APPROVED BY THE ENGINEER. THE EXCAVATION SHALL COMMENCE A MINIMUM OF 10 FEET
FROM THE LIMIT OF THE BUILDING PAD. THE EXCAVATION FROM THIS LIMIT SHALL EXTEND AT A MINIMUM SLOPE OF 1 FOOT
HORIZONTAL TO 1 FOOT VERTICAL (1:1) DOWNWARD AND OUTWARD FROM THE FINISHED SURFACE GRADE ELEVATION. THE TRENCH
BORROW EXCAVATION SHALL BE BACKFILLED TO THE PROPOSED FINISHED GRADE ELEVATION, AND SHALL BE COMPACTED IN
ACCORDANCE WITH REQUIREMENTS OF THE QUALITY COMPACTION METHOD AS OUTLINED IN MN/DOT SPECIFICATION 2105.3F2.
SNOW FENCE SHALL BE FURNISHED AND PLACED ALONG THE PERIMETER OF THE TRENCH BORROW AREA WHERE THE SLOPES EXCEED
2 FOOT HORIZONTAL TO 1 FOOT VERTICAL (2:1).
13.FINISHED GRADING SHALL BE COMPLETED, CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING, INCLUDING
ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH UNIFORM LEVELS OR
SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING GRADES. AREAS THAT HAVE
BEEN FINISHED GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR ALL
AREAS THAT HAVE BECOME RUTTED, ERODED OR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE
CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF
THE NEW WORK.
14.TOLERANCES
14.a.THE RESIDENTIAL BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.30 FOOT ABOVE, OR
0.30 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE.
14.b.THE COMMERCIAL BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.10 FOOT ABOVE,
OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE.
14.c.THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT ABOVE,
OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT IS MADE.
14.d.AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE REQUIRED
ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER.
14.e.TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS.
15.AFTER THE SITE GRADING IS COMPLETED, IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, CONTRACTOR SHALL TRANSPORT ALL
EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE.
16.CONTRACTOR SHALL DETERMINE THE LOCATION OF ANY HAUL ROADS THAT MAY BE REQUIRED TO COMPLETE THE SITE GRADING
CONSTRUCTION AND SHALL INDICATE HAUL ROADS ON EROSION AND SEDIMENT CONTROL “SITE MAP”. CONTRACTOR SHALL COMPLY
WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY OF EACH ROADWAY. CONTRACTOR SHALL POST WHATEVER SECURITY,
AND COMPLY WITH ALL CONDITIONS WHICH ARE REQUIRED BY EACH GOVERNING AUTHORITY OF EACH ROADWAY.
17.DISTURBED AREAS WITHIN WETLAND MITIGATION SITE AND ANY DISTURBED AREAS WITHIN THE WETLAND SHALL BE RESTORED WITH
6 TO 12 INCHES OF ORGANIC SOILS, PREFERABLY SOILS THAT WERE PREVIOUSLY REMOVED FROM WETLAND AREAS. SEEDING IN THE
WETLAND MITIGATION AREAS ABOVE THE NORMAL WATER LEVEL SHALL BE MN STATE SEED MIX 34-271, WET MEADOW SOUTH AND
WEST, OR APPROVED EQUAL. FOR STATE SEED MIXES, OATS AND WINTER WHEAT SHOULD BE SELECTED BASED ON THE TIME OF YEAR
THAT THE MIX IS BEING USED. OATS SHOULD BE INCLUDED IN MIXES IF BEING USED BETWEEN OCTOBER 15TH AND AUGUST 1ST.
WINTER WHEAT SHOULD BE USED BETWEEN AUGUST 1ST AND OCTOBER 15TH. THE SEEDING RATE IS THE SAME FOR OATS AND
WINTER WHEAT. MIX 34-271 SHOULD BE APPLIED AT 12 POUNDS PER ACRE. SEED SHALL BE WATERED UNTIL A HEALTHY STAND OF
VEGETATION IS OBTAINED.
18.FILL PLACED WITHIN THE BUILDING PAD AREAS SHALL BE IN CONFORMANCE WITH HUD/FHA PROCEDURES AND DATA SHEET 79G.
19.RETAINING WALL(S) SHALL BE CONSTRUCTED OF _________________ (MODULAR BLOCK, TREATED TIMBER, BOULDER, ETC.)
MATERIAL. CONTRACTOR SHALL SUBMIT TO THE ENGINEER AND LOCAL AUTHORITY CERTIFIED ENGINEERING DRAWINGS, DESIGN
CALCULATIONS AND SOIL BORINGS. THE CERTIFIED ENGINEER FOR THE RETAINING WALL(S) SHALL PROVIDE CONSTRUCTION
OBSERVATIONS OF THE RETAINING WALL IMPROVEMENT, AND A LETTER CERTIFYING THE INSTALLATION OF THE WALL(S) WAS
CONSTRUCTED IN CONFORMANCE WITH THE PLANS AND SPECIFICATIONS.
902.5
X
902
SPOT ELEVATION
CONTOUR
RIP RAP
OVERFLOW ELEV.
CURB & GUTTER
BUILDING
RETAINING WALL
PROPERTY LIMIT
EXISTINGPROPOSED
LEGEND
WETLAND LIMITS
TREELINE
STORM SEWER
SOIL BORINGS
GRADING NOTES
DRAINTILE
EOF
902.5
D
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
25' B
U
F
F
E
R
50' B
U
F
F
E
R
HUDSON BLVD N
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:12pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C5-EROS.dwg
C5.01
EROSION
CONTROL
PHASE I
THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL
THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP,
INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS,
SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE
NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL
REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE
RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE.
EROSION CONTROL MATERIALS
QUANTITIES
ITEM UNIT QUANTITY
SILT FENCE LINEAR FEET 4183
SILT DIKE LINEAR FEET 0
BIO-ROLL LINEAR FEET 6
CONSTRUCTION ENTRANCE UNIT 1
NOTE TO CONTRACTOR
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
* REFER TO SHEET C5.03 FOR GENERAL NOTES, MAINTENANCE
NOTES, LOCATION MAPS, AND STANDARD DETAILS
TEMPORARY STABILIZATION MEASURES
(SEED, MULCH, MATS OR BLANKETS AS
OUTLINED IN THE SWPPP)
TEMPORARY STORAGE AND PARKING AREA
DIRECTION OF
OVERLAND FLOW
TEMPORARY DIVERSION
DITCH
LIMITS OF DRAINAGE
SUB-BASIN
INLET PROTECTION DEVICE 1
INLET PROTECTION DEVICE 2
TEMPORARY STONE
CONSTRUCTION ENTRANCE
TEMPORARY SEDIMENT BASIN
LIMITS OF DISTURBANCE
OVERFLOW ELEV.
CONTOUR
CHECK DAM
SILT FENCE
SOIL BORINGS
EXISTINGPROPOSED
STORM SEWER
CURB & GUTTER
DRAINTILE
TSM
TS
SB
SILT DIKE
BIO-ROLL
LEGEND
IP-1
EOF
902.5
D
902
SOIL EROSION / SEDIMENTATION CONTROL OPERATION TIME SCHEDULE
CONSTRUCTION SEQUENCE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
TEMPORARY CONTROL MEASURES
STRIP & STOCKPILE TOPSOIL
ROUGH GRADE / SEDIMENT CONTROL
TEMPORARY CONSTRUCTION ROADS
FOUNDATION / BUILDING CONSTRUCTION
SITE CONSTRUCTION
PERMANENT CONTROL STRUCTURES
FINISH GRADING
LANDSCAPING / SEED / FINAL STABILIZATION
STORM FACILITIES
NOTE: CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PROJECT SCHEDULE
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
1004.85
1004.85
1006.351006.35
1006.35
1006.35 1006.35
1006.65
1006.65
1006.65
1006.65
1006.65
1004.60
1004.60
1004.85
1004.85
1006.021006.02
1006.32
1006.32
1006.101006.10
1006.10 1006.10
1006.10 1005.771005.77
1004.60
1004.60 1004.60
1004.271004.27
1004.85
1004.521004.52
1006.20
1006.20
1006.20
1006.20
1006.20
1005.87
1005.87
1003.00
1003.00
1003.00
1003.00
1002.501002.50
1002.50
1002.50
1002.50
1002.501002.50
1002.50
1002.50
1002.50
1003.00
1003.00
1003.00 1003.00
1003.00
1003.00 1002.671002.67
1003.00
1003.00 1003.00
1003.00
1003.00 1002.671002.67
1002.171002.17
1002.67
1002.67
1002.171002.17
1005.50
1005.50
1005.50
1005.50
1005.50
1005.17
1005.17
1002.20
1002.20 1002.20
1002.20
1002.20 1001.871001.87
1005.47
1005.47
1005.47
1005.47
1005.47
1005.14
1005.14
1005.00
1005.00
1005.00
1005.00
1001.42
1001.42
1001.75
1001.75
1001.75
1001.75
1001.75
1000.901000.90 1000.501000.50
1000.70
1001.851001.851001.851001.901001.901004.051004.051004.951004.95
25' B
U
F
F
E
R
50' B
U
F
F
E
R
HUDSON BLVD N
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:13pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C5-EROS.dwg
C5.02
EROSION
CONTROL
PHASE II
TEMPORARY STABILIZATION MEASURES
(SEED, MULCH, MATS OR BLANKETS AS
OUTLINED IN THE SWPPP)
TEMPORARY STORAGE AND PARKING AREA
DIRECTION OF
OVERLAND FLOW
TEMPORARY DIVERSION
DITCH
LIMITS OF DRAINAGE
SUB-BASIN
INLET PROTECTION DEVICE 1
INLET PROTECTION DEVICE 2
TEMPORARY STONE
CONSTRUCTION ENTRANCE
TEMPORARY SEDIMENT BASIN
LIMITS OF DISTURBANCE
OVERFLOW ELEV.
CONTOUR
CHECK DAM
SILT FENCE
SOIL BORINGS
EXISTINGPROPOSED
STORM SEWER
CURB & GUTTER
DRAINTILE SOIL EROSION / SEDIMENTATION CONTROL OPERATION TIME SCHEDULE
CONSTRUCTION SEQUENCE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
TEMPORARY CONTROL MEASURES
STRIP & STOCKPILE TOPSOIL
ROUGH GRADE / SEDIMENT CONTROL
TEMPORARY CONSTRUCTION ROADS
FOUNDATION / BUILDING CONSTRUCTION
SITE CONSTRUCTION
PERMANENT CONTROL STRUCTURES
FINISH GRADING
LANDSCAPING / SEED / FINAL STABILIZATION
STORM FACILITIES
NOTE: CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PROJECT SCHEDULE
THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL
THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP,
INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS,
SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE
NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL
REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE
RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE.
TSM
TS
SB
EROSION CONTROL MATERIALS
QUANTITIES
ITEM UNIT QUANTITY
SILT FENCE LINEAR FEET 2360
SILT DIKE LINEAR FEET 493
CONSTRUCTION ENTRANCE UNIT 1
INLET PROTECTION DEVICE (IP-1)UNIT 51
INLET PROTECTION DEVICE (IP-2)UNIT 51
SILT DIKE
BIO-ROLL
LEGENDNOTE TO CONTRACTOR
IP-1
EOF
902.5
D
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
902
* REFER TO SHEET C5.03 FOR GENERAL NOTES, MAINTENANCE
NOTES, LOCATION MAPS, AND STANDARD DETAILS
UNDERGROUND
STORM SEWER
SYSTEM
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2 IP1 IP2IP1IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2 IP1 IP2 IP1 IP2 IP1 IP2IP1IP2 IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2 IP1 IP2
IP1 IP2IP1IP2
IP1 IP2
IP1 IP2IP1IP2
IP1 IP2
IP1 IP2IP1IP2
IP1 IP2IP1IP2IP1IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
Apr 12, 2019 - 3:13pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C5-EROS.dwg
C5.03
EROSION
CONTROL
NOTES AND
DETAILS
ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM WATER POLLUTION PREVENTION PLAN SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL NO
LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. THE DESIGNATED CONTACT PERSON NOTED ON THIS PLAN MUST ROUTINELY INSPECT THE CONSTRUCTION
ON SITE ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. ALL EROSION AND SEDIMENTATION
CONTROL MEASURES SHALL BE CLEANED AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING:
1.ALL SILT FENCES MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/2 OF THE HEIGHT OF THE FENCE. THESE REPAIRS MUST BE
MADE WITHIN 24 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS.
2.TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE SEDIMENT REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE STORAGE
VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS (SEE PART 10.1-10.5 OF THE GENERAL PERMIT).
3.SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED FOR EVIDENCE OF SEDIMENT BEING DEPOSITED BY EROSION. CONTRACTOR MUST REMOVE ALL
DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS, AND RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL
RESULTS IN EXPOSED SOIL. THE REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS
CONSTRAINTS. CONTRACTOR SHALL USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. IF PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS OF
OBTAINING ACCESS. CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING
ANY WORK.
4.CONSTRUCTION SITE VEHICLE EXIT LOCATIONS MUST BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING ONTO PAVED SURFACES. TRACKED SEDIMENT MUST BE REMOVED FROM ALL
OFF-SITE PAVED SURFACES, WITHIN 24 HOURS OF DISCOVERY, OR IF APPLICABLE, WITHIN A SHORTER TIME TO COMPLY WITH PART 9.11-9.12 OF THE GENERAL PERMIT.
5.CONTRACTOR IS RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMPS, AS WELL AS ALL EROSION PREVENTION AND
SEDIMENT CONTROL BMPS, FOR THE DURATION OF THE CONSTRUCTION WORK AT THE SITE. THE PERMITTEE(S) ARE RESPONSIBLE UNTIL ANOTHER PERMITTEE HAS ASSUMED CONTROL (ACCORDING
TO PART 3.1 TO 3.8 OF THE MPCA GENERAL PERMIT) OVER ALL AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED OR THE SITE HAS UNDERGONE FINAL STABILIZATION, AND A (N.O.T.)
HAS BEEN SUBMITTED TO THE MPCA.
6.IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS
(E.G., FUGITIVE SEDIMENT IN STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY HAZARD TO USERS OF PUBLIC STREETS).
7.ALL INFILTRATION AREAS MUST BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING CONSTRUCTION ACTIVITIES IS REACHING THE INFILTRATION AREA AND THESE AREAS ARE PROTECTED
FROM COMPACTION DUE TO CONSTRUCTION EQUIPMENT DRIVING ACROSS THE INFILTRATION AREA.
1.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. WHERE A CONFLICT EXISTS BETWEEN LOCAL JURISDICTIONAL STANDARD SPECIFICATIONS
AND SAMBATEK STANDARD SPECIFICATIONS, THE MORE STRINGENT SPECIFICATION SHALL APPLY.
2.THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS COMPRISED OF THIS DRAWING (EROSION & SEDIMENTATION CONTROL PLAN-ESC PLAN), THE STANDARD DETAILS, THE PLAN
NARRATIVE, AND ITS APPENDICES, PLUS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS.
3.CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING & SUBMITTING THE APPLICATION FOR THE MPCA GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY. ALL CONTRACTORS AND
SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE SWPPP AND THE STATE OF MINNESOTA NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM GENERAL PERMIT (NPDES PERMIT, ISSUED AUGUST 1, 2018) AND BECOME FAMILIAR WITH THE CONTENTS. THE SWPPP AND ALL OTHER RELATED DOCUMENTS MUST BE KEPT AT THE SITE
DURING CONSTRUCTION. (NOTE TO THE PREPARER: EDIT APPLICATION PROCESS PER PROJECT REQUIREMENTS)
4.CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES (BMP'S) AS REQUIRED BY THE SWPPP & PERMITS. CONTRACTOR SHALL OVERSEE THE INSPECTION & MAINTENANCE OF THE BMP'S
AND EROSION PREVENTION FROM BEGINNING OF CONSTRUCTION AND UNTIL CONSTRUCTION IS COMPLETED, IS APPROVED BY ALL AUTHORITIES, AND THE NOTICE OF TERMINATION (NOT) HAS BEEN
FILED WITH THE MPCA BY EITHER THE OWNER OR OPERATOR AS APPROVED ON PERMIT. ADDITIONAL BMP'S SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO
OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. (NOTE TO THE PREPARER: REVISE INSPECTION RESPONSIBILITY PER OPTIONS IN SWPPP NARRATIVE (SECTION 02370))
5.CONTRACTOR SHALL COMPLY WITH TRAINING REQUIREMENTS IN PART 21.1-21.3 OF THE GENERAL PERMIT.
6.BMP'S AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS
DIRECTED BY PERMITTING AGENCY OR OWNER.
7.ESC PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL
TIMES.
8.CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THE ESC PLANS
SHALL BE CLEARLY DELINEATED (E.G. WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) ON THE DEVELOPMENT SITE BEFORE WORK BEGINS. GROUND DISTURBING ACTIVITIES MUST NOT OCCUR OUTSIDE
THE LIMITS OF DISTURBANCE.
9.GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE
PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES.
10.ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) MUST BE LIMITED TO A DEFINED AREA OF THE SITE AND SHALL BE CONTAINED AND PROPERLY TREATED OR
DISPOSED. NO ENGINE DEGREASING IS ALLOWED ON SITE.
11.ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY
LINER IS NOT ACCEPTABLE. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. LIQUID
AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE
EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. SELF-CONTAINED CONCRETE WASHOUTS ON CONCRETE DELIVERY TRUCKS ARE ALLOWED.
12.SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND
LEAKS.
13.DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
14.SOLID WASTE: COLLECTED SEDIMENT, ASPHALT & CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION & DEMOLITION DEBRIS & OTHER WASTES MUST BE DISPOSED OF
PROPERLY & MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS.
15.HAZARDOUS MATERIALS: OIL, GASOLINE, PAINT & ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS, LEAKS OR OTHER
DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. STORAGE & DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MPCA
REGULATIONS.
16.ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THIS PLAN, AND IN THE SWPPP, SHALL BE INITIATED AS SOON AS PRACTICABLE AND PRIOR TO SOIL DISTURBING ACTIVITIES
UPSLOPE.
17.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS STOPPED SHALL BE TEMPORARILY SEEDED, WITHIN 14 DAYS OF INACTIVITY. SEEDING SHALL BE IN ACCORDANCE WITH
MN/DOT SEED MIXTURE NUMBER 21-111 OR 21-112 DEPENDING ON THE SEASON OF PLANTING ( SEE MN/DOT SPECIFICATION SECTION 2575.3) SEEDING METHOD AND APPLICATION RATE SHALL
CONFORM TO MN/DOT SPECIFICATION SECTION 2575.3. TEMPORARY MULCH SHALL BE APPLIED IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3F1 AND 2575.3G. ALTERNATIVELY,
HYDRAULIC SOIL STABILIZER IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3H MAY BE USED IN PLACE OF TEMPORARY MULCH.
18.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY STABILIZED. THESE AREAS SHALL BE STABILIZED IN ACCORDANCE WITH
THE TIME TABLE DESCRIBED ABOVE. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN FOR VEGETATIVE COVER. (NOTE TO THE PREPARER: WHERE PERMANENT SEEDING IS NOT CALLED OUT
IN THE GRADING AND/ OR LANDSCAPE PLAN, REPLACE THE LAST SENTENCE IN THIS ITEM WITH THE FOLLOWING: SEED WET PONDS WITH MN/DOT SEED MIXTURE 310 "NATIVE WET TALL" BELOW THE
HWL. SEED ALL OTHER AREAS WITH SEED MIXTURE 260 "COMMERCIAL TURF". SEEDING METHOD AND APPLICATION RATE SHALL CONFORM TO MN/DOT SPECIFICATION SECTION 2573.3.)
19.CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT FROM CONVEYANCES & FROM TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE USED AS PERMANENT
WATER QUALITY MANAGEMENT BASINS. SEDIMENT MUST BE STABILIZED TO PREVENT IT FROM BEING WASHED BACK INTO THE BASIN, CONVEYANCES, OR DRAINAGEWAYS DISCHARGING OFF-SITE OR
TO SURFACE WATERS. THE CLEANOUT OF PERMANENT BASINS MUST BE SUFFICIENT TO RETURN THE BASIN TO DESIGN CAPACITY.
20.ON-SITE & OFF-SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BMP'S. STOCKPILE AND BORROW AREA
LOCATIONS SHALL BE NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS.
21.TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS & CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS
CURB & GUTTER SYSTEMS OR CONDUITS & DITCHES.
22.SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION.
23.DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES, CHECK DAMS,
INLET PROTECTION DEVICES, ETC.) TO PREVENT EROSION.
24.ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS
PAVING FOR ROAD CONSTRUCTION.
DEVELOPER/OWNER:
INTERTEK-PSI
2915 WATERS ROAD, SUITE 112
EAGAN, MN 55121
651-646-8148
SITE OPERATOR / GENERAL CONTRACTOR
SUPERINTENDENT:
CROSS BRACE
MI
N
.
15
"
18
"
MA
X
.
2" X 4" STAKE
3'
M
I
N
.
DROP INLET
WITH GRATE
2" X 4" WOOD
(TYP.)
5' MIN.
SECURELY FASTEN OVERLAPPING
ENDS OF SILT FENCE MATERIAL
TO ADJACENT STAKES WITH
THREE WIRE TIES OR OTHER
FASTENERS
ATTACH THE WOVEN WIRE
FENCE TO EACH POST WITH
THREE WIRE TIES OR OTHER
FASTENERS (SEE NOTE 1)
1. ATTACH THE WOVEN WIRE FENCE TO EACH POST AND THE GEOTEXTILE TO THE WOVEN WIRE FENCE
(SPACED EVERY 30") WITH THREE WIRE TIES OR OTHER FASTENERS, ALL SPACED WITHIN THE TOP 8" OF
THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE
AT LEAST 1" VERTICALLY APART.
2. WHEN TWO SECTIONS OF SILT FENCE MATERIAL ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED
ACROSS TWO POSTS.
3. MAINTENANCE SHALL BE PERFORMED AS NOTED IN THE SWPPP. DEPTH OF ACCUMULATED SEDIMENTS
MAY NOT EXCEED ONE-HALF THE HEIGHT OF THE FABRIC. MAINTENANCE CLEANOUT MUST BE
CONDUCTED REGULARLY TO PREVENT ACCUMULATED SEDIMENTS FROM REACHING ONE-HALF THE
HEIGHT OF THE SILT FENCE MATERIAL ABOVE GRADE.
4. ALL SILT FENCE INLETS SHALL INCLUDE WIRE SUPPORT.
OVERLAP
5' MIN.
SILT FENCE MATERIAL TO BE
FASTENED SECURELY TO WOVEN
WIRE FENCE WITH THREE TIES
SPACED AT 30" ON CENTER (SEE
NOTE 1)
DEFLECTOR PLATE
OVERFLOW 2 - TOP OF CURB BOX
OVERFLOW 1 - CENTER OF FILTER ASSEMBLY
10" FILTER ASSEMBLY
CURB
CG 3067
HIGH-FLOW FABRIC
MIRAFI FF101
ROAD DRAIN CASTING APPLICABILTY
·NEENAH R-3067
·NEENAH R-3512
NOT TO SCALE
5
0
'
M
I
N
.
ROAD
6"
M
I
N
.
CONSTRUCT 2' HIGH BERM WITH
MAXIMUM SIDE SLOPE OF 4:1
2" TO 3" GRAVEL
NOTE: ROCK EXITS SHALL BE INSTALLED PRIOR TO THE
START OF ANY SITE WORK. ROCK EXITS SHALL BE
INSPECTED FOLLOWING EACH RAINFALL.
MAINTENANCE OF ROCK EXITS SHALL INCLUDE A TOP
DRESSING OF NEW GRAVEL, OR REMOVAL AND
REPLACEMENT OF THE GRAVEL AS NEEDED, TO KEEP
THE EXITS FREE FROM COLLECTED MUD.
AS
REQU
I
R
E
D
M
I
N
0
.
5
%
G
R
A
D
E
8' X 8' MIN OR AS
REQUIRED TO
CONTAIN WASTE
CONCRETE
SIGN TO INDICATE THE LOCATION OF
THE CONCRETE WASHOUT AREA
2'-0" MIN
BERM AROUND PERIMETER
GROUND SURFACE
12" MIN
12" MIN
COMPACTED EMBANKMENT
MATERIAL (TYP.)3:1 OR FLATTER
SIDE SLOPES
NOTES:
1.CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT
ON SITE.
2.CONCRETE WASHOUT AREA SHALL BE LINED WITH MINIMUM 10 MIL THICK PLASTIC
LINER.
3.VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS
OFF PAVEMENT.
4.SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA,
AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE
CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS.
5.THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT
AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE.
6.AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE
AND DISPOSED OF AT AN ACCEPTED WASTE SITE.
7.WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE
SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE
CITY.
WOVEN WIRE
FENCE WITH SILT
FENCE MATERIAL
COVER
EXTEND WIRE FENCE
A MIN. OF 3" INTO
GROUND
EXTEND SILT FENCE
MATERIAL A MIN. OF
1'-0" INTO GROUND
EROSION & SEDIMENTATION CONTROL NOTES & DETAILS / "SITE MAP"
SITE LOCATION MAP
NOT TO SCALE
USGS MAP
GENERAL EROSION NOTES:
NOT TO SCALE
ROCK EXIT DRIVE
NOT TO SCALE
CONCRETE WASHOUT AREA
ROAD DRAIN INLET PROTECTION (IP-2)SILT FENCE INLET PROTECTION (IP-1)
NOT TO SCALE
POSTS: 2 X 4 WOODEN STAKE FENCE:
WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH
OPENING FABRIC: IN ACCORDANCE WITH
ASTM D 6461 LATEST EDITION.
NOT TO SCALE
PHASE I:
1.INSTALL STABILIZED CONSTRUCTION ENTRANCES.
2.PREPARE TEMPORARY PARKING AND STORAGE AREA.
3.CONSTRUCT THE SILT FENCES ON THE SITE.
4. INSTALL INLET PROTECTION DEVICES ON EXISTING STORM STRUCTURES, AS SHOWN ON THE PLAN.
5.CONSTRUCT THE SEDIMENTATION AND SEDIMENT TRAP BASINS, AS REQUIRED.
6. HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT TO PERFORM INSPECTION OF BMPs. GENERAL CONTRACTOR SHALL SCHEDULE
AND CONDUCT STORM WATER PRE-CONSTRUCTION MEETING WITH ENGINEER AND ALL GROUND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH
CONSTRUCTION.
7. CLEAR AND GRUB THE SITE.
8. BEGIN GRADING THE SITE.
9. START CONSTRUCTION OF BUILDING PAD AND STRUCTURES.
PHASE II:
1.TEMPORARILY SEED DENUDED AREAS.
2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS.
3.INSTALL RIP RAP AROUND OUTLET STRUCTURES.
4.INSTALL INLET PROTECTION AROUND ALL STORM SEWER STRUCTURES.
5.PREPARE SITE FOR PAVING.
6.PAVE SITE.
7.INSTALL INLET PROTECTION DEVICES.
8.COMPLETE GRADING AND INSTALL PERMANENT SEEDING AND PLANTING.
9.REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IF SITE IS STABILIZED), IF REQUIRED BY THE CONTRACT
AREA SUMMARY IN ACRES
PAVEMENT AREA 6.56 AC±
BUILDING AREA 4.67 AC±
SEEDED AREA 5.79 AC±
TOTAL DISTURBED 17.02 AC±
PRE - CONSTRUCTION IMPERVIOUS 0.05 AC±
POST - CONSTRUCTION IMPERVIOUS 11.23 AC±
SEQUENCE OF CONSTRUCTION
FRAME
MAINTENANCE NOTES:
SITE
COMMERCE DR
94
19
TAMARACK RD
WO
O
D
B
U
R
Y
D
R
HUD
S
O
N
R
D
10
SITE
HUDSON BLVD N
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
25' B
U
F
F
E
R
50' B
U
F
F
E
R
MH 02
RE=1013.90
IE=987.40
MH 03
RE=1002.41
IE=987.74
MH 04-A
RE=1002.53
IE=988.42
MH 04
RE=1002.82
IE=987.99
MH 05
RE=1002.32
IE=988.09
MH 07
RE=1001.54
IE=988.63
MH 09-C
RE=XXX.XX
IE=990.39
MH 11
RE=998.25
IE=991.12
85 LF - 8" PVC
SDR 26 @ 0.40%
26 LF - 8" PVC
SDR 26 @ 0.04%
62 LF - 8" PVC
SDR 26 @ 0.04%
148 LF - 8" PVC
SDR 26 @ 0.04%
109 LF - 8" PVC
SDR 26 @ 0.04%
138 LF - 8" PVC
SDR 26 @ 0.04%
143 LF - 8" PVC
SDR 26 @ 0.04%
216 LF - 8" PVC
SDR 26 @ 0.04%
108 LF - 8" PVC
SDR 26 @ 0.04%
MH 01
RE=1012.40
IE=986.76
161 LF - 8" PVC
SDR 26 @ 0.40%
8" CLEANOUT
RE=1002.21
IE=988.61
48 LF - 8" PVC
SDR 26 @ 0.04%
MH 06
RE=1002.07
IE=988.20
MH 08
RE=1000.51
IE=989.14126 LF - 8" PVC
SDR 26 @ 0.04%
MH 09
RE=999.21
IE=989.69
MH 09-A
RE=1000.22
IE=890.25
141 LF - 8" PVC
SDR 26 @ 0.04%
MH 09-B
RE=XXX.XX
IE=990.16
118 LF - 8" PVC
SDR 26 @ 0.04%
57 LF - 8" PVC
SDR 26 @ 0.04%
MH 10
RE=998.83
IE=990.26
63 LF - 8" PVC
SDR 26 @ 0.04%
MH 11-A
RE=999.25
IE=991.38
MH 11-B
RE=999.50
IE=991.82
112 LF - 8" PVC
SDR 26 @ 0.04%
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
8"
W
A
T
E
R
M
A
I
N
8" WATERMAIN
8" WATERMAIN8" WATERMAIN
8" WATERMAIN
8" WATERMAIN
8" WATERMAIN
8"
W
A
T
E
R
M
A
I
N
CONNECT TO EXISTING 12"
WATERMAIN WITH 12" x 8"
TEE WITH GATE VALVE
CONNECT TO EXISTING 12"
WATERMAIN WITH 12" x 8"
TEE WITH GATE VALVE
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
1. THE UTILITY IMPROVEMENTS FOR THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
"STANDARD UTILITIES SPECIFICATIONS" AS PUBLISHED BY THE CITY ENGINEERS ASSOCIATION OF
MINNESOTA (CEAM), EXCEPT AS MODIFIED HEREIN. CONTRACTOR SHALL OBTAIN A COPY OF THESE
SPECIFICATIONS.
1.1. ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY REQUIREMENTS.
1.2. CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO
OR TAP WATERMAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY.
ANY ADVERSE CONSEQUENCES OF ANY SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE
TO THE PUBLIC ARE THE LIABILITY OF CONTRACTOR.
1.3. A MINIMUM VERTICAL SEPARATION OF 18 INCHES AND HORIZONTAL SEPARATION OF 10-FEET
BETWEEN OUTSIDE PIPE DIAMETERS IS REQUIRED AT ALL WATERMAIN AND SEWER MAIN
(BUILDING, STORM AND SANITARY) CROSSINGS.
2. ALL MATERIALS SHALL BE AS SPECIFIED IN CEAM SPECIFICATIONS EXCEPT AS MODIFIED HEREIN.
2.1. ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY.
2.2. ALL SANITARY SEWER TO BE PVC SDR-35, UNLESS NOTED OTHERWISE.
2.2.1. ALL SANITARY SEWER SERVICES TO BUILDING SHALL BE PVC SCH 40 CONFORMING TO ASTM
D2665.
2.3. ALL WATERMAIN TO BE DUCTILE IRON - CLASS 52, UNLESS NOTED OTHERWISE.
2.3.1. ALL WATERMAIN TO HAVE 7.5-FEET OF COVER OVER TOP OF WATERMAIN.
2.3.2. PROVIDE THRUST BLOCKING AND MECHANICAL JOINT RESTRAINTS ON ALL WATERMAIN
JOINTS PER CITY STANDARDS.
2.4. ALL STORM SEWER PIPE TO BE SMOOTH INTERIOR DUAL WALL HDPE PIPE WITH WATER TIGHT
GASKETS, UNLESS NOTED OTHERWISE.
2.4.1. ALL STORM SEWER PIPE FOR ROOF DRAIN SERVICES TO BUILDING SHALL BE PVC SCH 40
CONFORMING TO ASTM D2665.
2.5. RIP RAP SHALL BE Mn/DOT CLASS 3.
3. COORDINATE ALL BUILDING SERVICE CONNECTION LOCATIONS AND INVERT ELEVATIONS WITH
MECHANICAL CONTRACTOR PRIOR TO CONSTRUCTION.
4. ALL BUILDING SERVICE CONNECTIONS (STORM, SANITARY, WATER) WITH FIVE FEET OR LESS COVER ARE
TO BE INSULATED FROM BUILDING TO POINT WHERE 5-FEET OF COVER IS ACHIEVED.
5. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT
PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY
RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE
CONSTRUCTION PHASES OF THIS PROJECT.
6. SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION
PRACTICES, CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB
SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS
REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE
DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF CONTRACTOR'S
PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF CONTRACTOR'S SAFETY
MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE.
7. ALL AREAS OUTSIDE THE PROPERTY BOUNDARIES THAT ARE DISTURBED BY UTILITY CONSTRUCTION SHALL
BE RESTORED IN KIND. SODDED AREAS SHALL BE RESTORED WITH 6 INCHES OF TOPSOIL PLACED BENEATH
THE SOD.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES
SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE
MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO
APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS.
9. ALL SOILS TESTING SHALL BE COMPLETED BY AN INDEPENDENT SOILS ENGINEER. EXCAVATION FOR THE
PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE
SOILS ENGINEER. THE UTILITY BACKFILL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE
SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS
AND SOIL INSPECTIONS WITH THE SOILS ENGINEER.
A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY:
COMPANY: INTERTEK-PSI
ADDRESS: 2915 WATERS ROAD, SUITE 112 EAGAN, MN 55121
PHONE: 651-646-8148
DATED: FEBRUARY 11, 2019
CONTRACTOR SHALL OBTAIN A COPY OF THIS SOILS REPORT.
11. CONTRACTOR SHALL SUBMIT 2 COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN
STRUCTURES TO ENGINEER. CONTRACTOR SHALL ALLOW 5 WORKING DAYS FOR SHOP DRAWING
REVIEW.
12. CONTRACTOR AND MATERIAL SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR
EACH STORM SEWER STRUCTURE.
13. (REMOVE IF THERE IS NO UNDERGROUND SYSTEM)
THE UNDERGROUND STORMWATER SYSTEM SHOWN ON THE UTILITY PLAN AND THE DETAIL SHEETS IS
FOR INFORMATIONAL PURPOSES ONLY AND DEPICTS THE MINIMUM STORAGE REQUIREMENTS AND THE
SYSTEM ELEVATIONS. THE CONTRACTOR (WITH THEIR SUPPLIER OR DESIGNER) SHALL SUBMIT DESIGN
DRAWINGS TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. THE DESIGN
DRAWINGS SHALL DEPICT THE FINAL LAYOUT AND DETAILS FOR CONSTRUCTION. THE DRAWINGS SHALL BE
CERTIFIED BY A LICENSED ENGINEER FOR THE STATE IN WHICH THE PROJECT IS CONSTRUCTED. THE
SUBMITTAL SHALL INCLUDE ALL NECESSARY PRODUCT INFORMATION, DESIGN CALCULATIONS AND
BEDDING REQUIREMENTS FOR THE PROPOSED STORMWATER SYSTEM. FOLLOWING CONSTRUCTION, THE
CERTIFYING ENGINEER SHALL SUBMIT A LETTER TO THE OWNER AND ENGINEER INDICATING THEY
OBSERVED THE INSTALLATION AND THE INSTALLATION OF THE STORMWATER SYSTEM WAS IN
CONFORMANCE WITH THE CERTIFIED DRAWINGS.
TELEPHONE
ELECTRIC
GAS LINE
FORCEMAIN (SAN.)
EASEMENT
WATERMAIN
SANITARY SEWER
EXISTINGPROPOSED
STORM SEWER
CURB & GUTTER
DRAINTILE
D
S S
SLS
LEGEND UTILITY CONSTRUCTION NOTES
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
Apr 12, 2019 - 3:13pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C6-UTIL.dwg
C6.01
SANITARY
SEWER AND
WATERMAIN
PLAN
HUDSON BLVD N
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
25' B
U
F
F
E
R
50' B
U
F
F
E
R
UNDERGROUND STORAGE 7
7,885 CF STORAGE
1,360 LF 24" PERFORATED PIPE
340 CY CLEAR STONE
UNDERGROUND FILTRATION 1
8,205 CF STORAGE
600 LF 36" PERFORATED PIPE
365 CY CLEAR STONE
UNDERGROUND FILTRATION 6
20,430 CF STORAGE
1,440 LF 36" PERFORATED PIPE
892 CY CLEAR STONE
106 LF - 12"
STORM @ 0.44%
90 LF - 15"
STORM @ 0.40%
80 LF - XX"
STORM @ 0.50%
73 LF - XX"
STORM @ 0.50%
62 LF - 18"
STORM @ 0.40%
57 LF - 15"
STORM @ 0.40%
69 LF - 15"
STORM @ 0.40%
70 LF - 40"
STORM @ 0.40%
36 LF - XX"
STORM @ 0.50%90 LF - 15"
STORM @ 0.40%
68 LF - 15"
STORM @ 0.40%
88 LF - 15"
STORM @ 0.40%
100 LF - 21"
STORM @ 0.25%
149 LF - 24"
STORM @ 0.25%
35 LF - 24"
STORM @ 0.25%
76 LF - 36"
STORM @ 0.25%
35 LF - 36"
STORM @ 0.40%
162 LF - 24"
STORM @ 0.40%
65 LF - 21"
STORM @ 0.40%
133 LF - 18"
STORM @ 0.40%
106 LF - 15"
STORM @ 0.50%
74 LF - 15"
STORM @ 0.50%
57 LF - 12"
STORM @ 0.50%
67 LF - 12"
STORM @ 0.50%
78 LF - 18"
STORM @ 0.40%
76 LF - 15"
STORM @ 0.40%
65 LF - 15"
STORM @ 0.40%
9 LF - 36"
STORM @ 0.25%
20 LF - 21"
STORM @ 0.40%
40 LF - 21"
STORM @ 0.40%
56 LF - 21"
STORM @ 0.30%
83 LF - 21"
STORM @ 0.30%
37 LF - 21"
STORM @ 0.30%
44 LF - 36"
STORM @ 0.30%
CBMH 200
RE=1000.49
IE=992.50
CBMH 300
RE=1000.45
IE=992.63
CBMH 301
RE=1000.43
IE=992.74
CBMH 302
RE=1000.38
IE=992.99
CBMH 303
RE=1000.62
IE=993.16
CBMH 303A
RE=1001.14
IE=992.87
CBMH 303B
RE=1000.57
IE=993.12
CBMH 303C
RE=995.82
IE=993.59
CBMH 303B1
RE=999.96
IE=993.52
CBMH 304
RE=1001.17
IE=993.41
CBMH 305
RE=1001.11
IE=993.64
CBMH 306
RE=1001.00
IE=993.91
CBMH 307
RE=1001.05
IE=994.19
CBMH 400F
RE=1000.82
IE=996.94
CBMH 308A
RE=1000.98
IE=996.85
CBMH 400E
RE=1003.02
IE=996.58
CBMH 400D
RE=1003.44
IE=996.31
CBMH 400C
RE=1003.89
IE=995.96
CBMH 400B
RE=1004.13
IE=995.71
CBMH 400A
RE=1003.01
IE=995.34
CBMH 400
RE=1002.15
IE=996.31
STMH 401
RE=1003.40
IE=995.27
CBMH 402
RE=1004.13
IE=995.46
CBMH 403
RE=1004.21
IE=995.55
CBMH 404
RE=1004.49
IE=996.20
CBMH 405
RE=1004.30
IE=996.73
CBMH 406
RE=1004.31
IE=997.10
CBMH 407
RE=1004.50
IE=997.38
CBMH 408
RE=1004.30
IE=997.72
STMH 500
RE=1004.81
IE=996.46
CBMH 501
RE=1004.27
IE=996.62
CBMH 502
RE=1005.01
IE=997.15
CBMH 503
RE=1005.01
IE=997.46
CBMH 504
RE=1005.15
IE=997.77
CBMH 505
RE=1005.06
IE=998.03
44 LF - 36"
STORM @ 0.30%
CBMH 201
RE=1000.50
IE=992.68
CBMH 202
RE=1000.50
IE=992.68
CBMH 203
RE=998.49
IE=992.76
CBMH 204
RE=1000.78
IE=992.95
CBMH 205
RE=1000.90
IE=993.22
CBMH 206
RE=1000.60
IE=993.39
STMH 207
RE=1001.45
IE=993.52
STMH 208
RE=1001.48
IE=993.87
STMH 209
RE=1001.52
IE=994.31
CBMH 210C
RE=1001.85
IE=995.52
CBMH 210B
RE=1001.83
IE=995.23
STMH 210A
RE=1002.67
IE=994.98
STMH 210
RE=1002.23
IE=994.85
STMH 211
RE=1003.51
IE=995.02
STMH 212
RE=1004.15
IE=996.12
STMH 213
RE=1004.90
IE=996.84
CBMH 214
RE=1004.69
IE=997.16
CBMH 215
RE=1005.62
IE=997.72
30 LF - 36"
STORM @ 0.25%
40 LF - XX"
STORM @ 0.50%
33 LF - 36"
STORM @ 0.25%
75 LF - 36"
STORM @ 0.25%
110 LF - 36"
STORM @ 0.25%
66 LF - 36"
STORM @ 0.25%
53 LF - 36"
STORM @ 0.25%
140 LF - 36"
STORM @ 0.25%177 LF - 36"
STORM @ 0.25%
214 LF - 36"
STORM @ 0.25%
70 LF - 36"
STORM @ 0.25%
33 LF - 18"
STORM @ 0.40%
64 LF - 15"
STORM @ 0.40%
72 LF - 18"
STORM @ 0.40%
276 LF - 24"
STORM @ 0.40%
180 LF - 18"
STORM @ 0.50%
78 LF - 15"
STORM @ 0.40%
142 LF - 15"
STORM @ 0.40%
CBMH 101
RE=1001.33
IE=990.00
FES
IE=988.61
202 LF - 36"
STORM @ 0.69%
FES
IE=994.94
71 LF - 12"
STORM @ 0.74%
105 LF - 12"
STORM @ 1.25%
UNDERGROUND FILTRATION 2
17,036 CF STORAGE
1200 LF 36" PERFORATED PIPE
749 CY CLEAR STONE
UNDERGROUND FILTRATION 3
17,036 CF STORAGE
1200 LF 36" PERFORATED PIPE
749 CY CLEAR STONE
UNDERGROUND INFILTRATION 4
11,071 CF STORAGE
500 LF 48" PERFORATED PIPE
440 CY CLEAR STONE
UNDERGROUND INFILTRATION 5
7,242 CF STORAGE
300 LF 48" PERFORATED PIPE
292 CY CLEAR STONE
UNDERGROUND FILTRATION 8
13,005 CF STORAGE
560 LF 48" PERFORATED PIPE
515 CY CLEAR STONE
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
Apr 12, 2019 - 3:13pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C6-UTIL.dwg
C6.02
STORM SEWER
PLAN
SCALE IN FEET
0 10050
NORTH
1. THE UTILITY IMPROVEMENTS FOR THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
"STANDARD UTILITIES SPECIFICATIONS" AS PUBLISHED BY THE CITY ENGINEERS ASSOCIATION OF
MINNESOTA (CEAM), EXCEPT AS MODIFIED HEREIN. CONTRACTOR SHALL OBTAIN A COPY OF THESE
SPECIFICATIONS.
1.1. ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY REQUIREMENTS.
1.2. CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO
OR TAP WATERMAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY.
ANY ADVERSE CONSEQUENCES OF ANY SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE
TO THE PUBLIC ARE THE LIABILITY OF CONTRACTOR.
1.3. A MINIMUM VERTICAL SEPARATION OF 18 INCHES AND HORIZONTAL SEPARATION OF 10-FEET
BETWEEN OUTSIDE PIPE DIAMETERS IS REQUIRED AT ALL WATERMAIN AND SEWER MAIN
(BUILDING, STORM AND SANITARY) CROSSINGS.
2. ALL MATERIALS SHALL BE AS SPECIFIED IN CEAM SPECIFICATIONS EXCEPT AS MODIFIED HEREIN.
2.1. ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY.
2.2. ALL SANITARY SEWER TO BE PVC SDR-35, UNLESS NOTED OTHERWISE.
2.2.1. ALL SANITARY SEWER SERVICES TO BUILDING SHALL BE PVC SCH 40 CONFORMING TO ASTM
D2665.
2.3. ALL WATERMAIN TO BE DUCTILE IRON - CLASS 52, UNLESS NOTED OTHERWISE.
2.3.1. ALL WATERMAIN TO HAVE 7.5-FEET OF COVER OVER TOP OF WATERMAIN.
2.3.2. PROVIDE THRUST BLOCKING AND MECHANICAL JOINT RESTRAINTS ON ALL WATERMAIN
JOINTS PER CITY STANDARDS.
2.4. ALL STORM SEWER PIPE TO BE SMOOTH INTERIOR DUAL WALL HDPE PIPE WITH WATER TIGHT
GASKETS, UNLESS NOTED OTHERWISE.
2.4.1. ALL STORM SEWER PIPE FOR ROOF DRAIN SERVICES TO BUILDING SHALL BE PVC SCH 40
CONFORMING TO ASTM D2665.
2.5. RIP RAP SHALL BE Mn/DOT CLASS 3.
3. COORDINATE ALL BUILDING SERVICE CONNECTION LOCATIONS AND INVERT ELEVATIONS WITH
MECHANICAL CONTRACTOR PRIOR TO CONSTRUCTION.
4. ALL BUILDING SERVICE CONNECTIONS (STORM, SANITARY, WATER) WITH FIVE FEET OR LESS COVER ARE
TO BE INSULATED FROM BUILDING TO POINT WHERE 5-FEET OF COVER IS ACHIEVED.
5. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT
PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY
RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE
CONSTRUCTION PHASES OF THIS PROJECT.
6. SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION
PRACTICES, CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB
SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS
REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE
DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF CONTRACTOR'S
PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF CONTRACTOR'S SAFETY
MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE.
7. ALL AREAS OUTSIDE THE PROPERTY BOUNDARIES THAT ARE DISTURBED BY UTILITY CONSTRUCTION SHALL
BE RESTORED IN KIND. SODDED AREAS SHALL BE RESTORED WITH 6 INCHES OF TOPSOIL PLACED BENEATH
THE SOD.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES
SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE
MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO
APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS.
9. ALL SOILS TESTING SHALL BE COMPLETED BY AN INDEPENDENT SOILS ENGINEER. EXCAVATION FOR THE
PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE
SOILS ENGINEER. THE UTILITY BACKFILL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE
SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS
AND SOIL INSPECTIONS WITH THE SOILS ENGINEER.
A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY:
COMPANY: INTERTEK-PSI
ADDRESS: 2915 WATERS ROAD, SUITE 112 EAGAN, MN 55121
PHONE: 651-646-8148
DATED: FEBRUARY 11, 2019
CONTRACTOR SHALL OBTAIN A COPY OF THIS SOILS REPORT.
11. CONTRACTOR SHALL SUBMIT 2 COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN
STRUCTURES TO ENGINEER. CONTRACTOR SHALL ALLOW 5 WORKING DAYS FOR SHOP DRAWING
REVIEW.
12. CONTRACTOR AND MATERIAL SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR
EACH STORM SEWER STRUCTURE.
13. (REMOVE IF THERE IS NO UNDERGROUND SYSTEM)
THE UNDERGROUND STORMWATER SYSTEM SHOWN ON THE UTILITY PLAN AND THE DETAIL SHEETS IS
FOR INFORMATIONAL PURPOSES ONLY AND DEPICTS THE MINIMUM STORAGE REQUIREMENTS AND THE
SYSTEM ELEVATIONS. THE CONTRACTOR (WITH THEIR SUPPLIER OR DESIGNER) SHALL SUBMIT DESIGN
DRAWINGS TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. THE DESIGN
DRAWINGS SHALL DEPICT THE FINAL LAYOUT AND DETAILS FOR CONSTRUCTION. THE DRAWINGS SHALL BE
CERTIFIED BY A LICENSED ENGINEER FOR THE STATE IN WHICH THE PROJECT IS CONSTRUCTED. THE
SUBMITTAL SHALL INCLUDE ALL NECESSARY PRODUCT INFORMATION, DESIGN CALCULATIONS AND
BEDDING REQUIREMENTS FOR THE PROPOSED STORMWATER SYSTEM. FOLLOWING CONSTRUCTION, THE
CERTIFYING ENGINEER SHALL SUBMIT A LETTER TO THE OWNER AND ENGINEER INDICATING THEY
OBSERVED THE INSTALLATION AND THE INSTALLATION OF THE STORMWATER SYSTEM WAS IN
CONFORMANCE WITH THE CERTIFIED DRAWINGS.
TELEPHONE
ELECTRIC
GAS LINE
FORCEMAIN (SAN.)
EASEMENT
WATERMAIN
SANITARY SEWER
EXISTINGPROPOSED
STORM SEWER
CURB & GUTTER
DRAINTILE
D
S S
SLS
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
UNDERGROUND
STORM SEWER
SYSTEM
UTILITY CONSTRUCTION NOTESLEGEND
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
Apr 12, 2019 - 3:14pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C9-DETL.dwg
C9.01
DETAILS
N.T.S.
SLOPE 3/4" PER FT.
1
3
13
-
1
/
2
"
1/2" R
6"
6"
6"8"12"
3" R
1/2" R
7"
A MINIMUM OF 4" OF CLASS 5
SHALL BE PLACED BELOW THE CURB
2 - #4 REINFORCING RODS AT CATCH BASINS
20 FEET IN LENGTH, CENTERED ON THE STRUCTURE
2"2"
2"
01 B612 CONCRETE CURB & GUTTER
13
-
1
/
2
"
1/2" R
6"
6"
6" MIN 8"18"
3" R
1/2" R
7"
A MINIMUM OF 4" OF CLASS 5
SHALL BE PLACED BELOW THE CURB
2 - #4 REINFORCING RODS AT CATCH BASINS
20 FEET IN LENGTH, CENTERED ON THE STRUCTURE
2"2"
2"
SLOPE 3/4" PER FT.
1
3
N.T.S.
02 B618 CONCRETE CURB & GUTTER
BITUMINOUS
6' MI
N
N.T.S.
03 CURB TRANSITION
BASE COURSE
WEAR COURSE
A
A
4" P.C. CONCRETE*
*THE THICKNESS SHALL BE INCREASED TO A
MINIMUM DEPTH OF __ INCHES AT DRIVEWAY
CROSSINGS.
GENERAL NOTES FOR CONCRETE CONSTRUCTION:
1.THE CONCRETE SIDEWALKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH
THE REQUIREMENTS OF MN/DOT "STANDARD SPECIFICATIONS FOR
CONSTRUCTION".
2.SIDEWALK CONTROL JOINTS SHALL BE LOCATED AT 5 FEET ON CENTER.
SIDEWALK EXPANSION JOINTS SHALL BE LOCATED AT A MAXIMUM OF 100
FEET ON CENTER, AND WHERE SIDEWALK ABUTS CURB, STRUCTURES, AND
OTHER FIXED OBJECTS. SEAL ALL EXPANSION JOINTS. BROOM FINISH SHALL BE
PERPENDICULAR TO THE LINE OF TRAFFIC.
SECTION
A-A
4" CLASS 5
4" P.C. CONCRETE
4'-0" WIDTH
2.00% MAX
N.T.S.
A
A
5" P.C. CONCRETE*
*THE THICKNESS SHALL BE INCREASED TO A
MINIMUM DEPTH OF __ INCHES AT DRIVEWAY
CROSSINGS.
GENERAL NOTES FOR CONCRETE CONSTRUCTION:
1.THE CONCRETE SIDEWALKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH
THE REQUIREMENTS OF MN/DOT "STANDARD SPECIFICATIONS FOR
CONSTRUCTION".
2.SIDEWALK CONTROL JOINTS SHALL BE LOCATED AT 5 FEET ON CENTER.
SIDEWALK EXPANSION JOINTS SHALL BE LOCATED AT A MAXIMUM OF 100
FEET ON CENTER, AND WHERE SIDEWALK ABUTS CURB, STRUCTURES, AND
OTHER FIXED OBJECTS. SEAL ALL EXPANSION JOINTS. BROOM FINISH SHALL BE
PERPENDICULAR TO THE LINE OF TRAFFIC.
SECTION
A-A
4" CLASS 5
4" P.C. CONCRETE
5' WIDTH
2.00% MAX
N.T.S.
05 CONCRETE SIDEWALK
04
WHITE LEGEND RED BACKGROUND
R1-1
N.T.S.
36" x 36" "STOP" SIGN
36"
36
"
N.T.S.
STOP SIGN DETAIL06
N.T.S.
12
"
3.
5
'
3'
1.
5
'
3'
3"
1'
VEHICLE IDREQUIRED
PARKINGNOTE: ANY SIGN FREE
STANDING IN
ASPHALT PARKING
LOT SHALL BE
MOUNTED AS
SHOWN.FOR VIOLATION
UP TO $200 FINE
5.
0
'
M
I
N
.
5
.
5
'
M
A
X
.
CONCRETE
GRANULAR BASE
PAVING
ONE WRAP OF #30
ROOFING FELT
6"Ø SCH. 40 STEEL
PIPE-FILL WITH CONC.
4" x 4" STEEL TUBE
(SEE SIGN DETAILS
THIS SHEET)
STANDARD MNDOT
SIGN NO. R7.8A
1.5'
ACCESSIBLE
VAN
PROVIDE VAN
ACCESSIBLE SIGN AT
RIGHT HAND
DISCHARGE PARKING
SPACES
07 ACCESSIBLE PARKING SIGN
STANDARD
STALL ADA STALL
ACCESS
ISLE ADA STALL
STANDARD
STALL
6"
TRANSITION
PAVEMENT TO FLUSH
WITH SIDEWALK
INTEGRAL
SIDEWALK CURB
SEE DETAIL
ACCESSIBLE
PARKING SIGN
WITH BOLLARD
SEE DETAIL
2'
STRIPING - 4"
TRAFFIC WHITE
INTEGRAL
SIDEWALK CURB
SEE DETAIL
INTEGRAL
SIDEWALK CURB
SEE DETAIL
1.8% (2% MAX.)
PLAN VIEW OF ADA PARKING
SECTION A-A
SECTION B-B
B
B
AA
N.T.S.
NO
P
A
R
K
I
N
G
08 ADA PARKING
3/4" PER FT.
AT ALL UTILITY TRENCH CROSSINGS, 2 #4 REINFORCING
RODS SHALL BE PLACED IN THE LOWER PORTION OF
THE GUTTER; RODS TO BE 20 FEET IN LENGTH.
1'-6"1'-6"
7"
N.T.S.
09 CONCRETE VALLEY GUTTER
4' CONCRETE SIDEWALK
HUDSON BLVD N
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
25' B
U
F
F
E
R
50' B
U
F
F
E
R
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision
and that I am a duly Licensed LANDSCAPE
ARCHITECT under the laws of the State of
Minnesota.
This certification is not valid unless wet signed in blue
ink. If applicable, contact us for a wet signed copy of
this survey which is available upon request at
Sambatek, Minnetonka, MN office.
4/12/201940252
William L Delaney
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:14pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-L1-LAND.dwg
L1.01
LANDSCAPE
PLAN
LEGEND
EASEMENT
CURB & GUTTER
BUILDING
RETAINING WALL
NUMBER OF PARKING
STALLS PER ROW
SIGN
PIPE BOLLARD
STANDARD DUTY
ASPHALT PAVING
HEAVY DUTY
ASPHALT PAVING
CONCRETE PAVING
PROPERTY LIMIT
EXISTINGPROPOSED
KEY NOTE
WETLAND LIMITS
TREELINE
XX
XX
CONCRETE SIDEWALK
ARCHITECTURAL
CONCRETE
DETAIL XX
CHAIN LINK FENCE
DECORATIVE
WOODEN FENCE
AIR CONDITIONING
UNIT
TREES CODE BOTANICAL NAME / COMMON NAME CONT CAL SIZE QTY
CM Acer x freemanii `Armstrong` / Armstrong Freeman Maple B & B 3"Cal.21
HB Celtis occidentalis / Common Hackberry B & B 3"Cal.15
GB Ginkgo biloba `Autumn Gold` TM / Maidenhair Tree B & B 3"Cal.13
IH Gleditsia triacanthos `Imperial` / Imperial Honeylocust B & B 3"Cal.11
KC Gymnocladus dioica `Espresso` / Kentucky Coffeetree B & B 3"Cal.11
SO Quercus bicolor / Swamp White Oak B & B 3"Cal.14
RP Quercus robur x warei`Long` / Regal Prince Oak B & B 3"Cal.15
BL Tilia americana `Boulevard` / Boulevard Linden B & B 3"Cal.9
PE Ulmus americana `Princeton` / American Elm B & B 3"Cal.16
CONIFERS CODE BOTANICAL NAME / COMMON NAME CONT CAL SIZE QTY
NS Picea abies / Norway Spruce B & B 6`18
AP Pinus nigra / Austrian Black Pine B & B 6`15
WP Pinus strobus / White Pine B & B 6`11
ORN. TREES CODE BOTANICAL NAME / COMMON NAME CONT CAL SIZE QTY
SB Amelanchier canadensis `Autumn Brilliance` / Autumn Brilliance Serviceberry B & B 2"Cal 9
JL Syringa reticulata / Japanese Tree Lilac B & B 2"Cal 6
TREE SCHEDULE
MITIGATION FROM TREE PRESERVATION PLAN
REQUIRED
COMMON TREES (46" @ 3" TREES)15 TREES
CONIFER TREES (149" @ 6' TREES) 50 TREES
HARDWOOD TREES (129" @ 3" TREES)43 TREES
TOTAL 108 TREES
SETBACK AREA LANDSCAPE REQUIREMENTS
REQUIRED
STREET FRONTAGE (1100 FT / 50 = 22 TREES @ 2.5")
(22 X 2.5" = 55" @ 3" TREES)18 TREES
DISTURBED AREA (17 ACRES X 5 = 85 TREES @ 2.5")
(85 X 2.5" = 213" @ 3" TREES)71 TREES
TOTAL 89 TREES
PROPOSED PLANTINGS
REQUIRED PROPOSED PERCENTAGE
OVERSTORY TREES 125 TREES 74%
CONIFEROUS TREES 44 TREES 26%
ORNAMENTAL TREES*15 TREES
TOTAL 197 TREES 169 TREES
SHRUBS AND PERENNIALS 1,449 UNITS
*DOES NOT COUNT TOWARDS REPLACEMENT TREE TOTALS.
LAKE ELMO, MN LANDSCAPE CODE
NON-STEEL EDGER
GROUND COVERS CODE BOTANICAL NAME / COMMON NAME CONT QTY
TUR HIG Turf Sod Highland Sod / Sod Sod 76,939 sf
SOD SCHEDULE
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
6G
GFE=1004.95
6G
GFE=1004.05
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
SCALE IN FEET
0 6030
NORTH
Apr 12, 2019 - 3:14pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-L1-LAND.dwg
L1.02
SHRUB PLAN
WEST
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision
and that I am a duly Licensed LANDSCAPE
ARCHITECT under the laws of the State of
Minnesota.
This certification is not valid unless wet signed in blue
ink. If applicable, contact us for a wet signed copy of
this survey which is available upon request at
Sambatek, Minnetonka, MN office.
4/12/201940252
William L Delaney
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SHRUBS CODE BOTANICAL NAME / COMMON NAME CONT QTY
CD Cornus sericea `Alleman`s Compact` / Dwarf Red Twig Dogwood 5 gal 188
CE Euonymus alatus `Compactus` / Compact Burning Bush 5 gal 55
LH Hydrangea paniculata `Jane` / Little Lime Hydrangea 5 gal 92
BJ Juniperus sabina `Broadmoor` / Broadmoor Juniper 5 gal 31
MK Syringa patula `Miss Kim` / Miss Kim Lilac 5 gal 16
HA Thuja occidentalis `Holmstrup` / Holmstrup Cedar 10 gal 210
TA Thuja occidentalis `Techny` / Techny Arborvitae B&B-6`8
GRASSES CODE BOTANICAL NAME / COMMON NAME CONT QTY
KFG Calamagrostis x acutiflora `Karl Foerster` / Feather Reed Grass 2 gal.161
PERENNIALS CODE BOTANICAL NAME / COMMON NAME CONT QTY
RRD Hemerocallis x `Rosy Returns` / Daylily 1 gal 58
LRS Perovskia atriplicifolia `Little Spire` TM / Little Spire Russian Sage 1 gal 128
PLANT SCHEDULE SHRUBS WEST
LEGEND
EASEMENT
CURB & GUTTER
BUILDING
RETAINING WALL
NUMBER OF PARKING
STALLS PER ROW
SIGN
PIPE BOLLARD
STANDARD DUTY
ASPHALT PAVING
HEAVY DUTY
ASPHALT PAVING
CONCRETE PAVING
PROPERTY LIMIT
EXISTINGPROPOSED
KEY NOTE
WETLAND LIMITS
TREELINE
XX
XX
CONCRETE SIDEWALK
ARCHITECTURAL
CONCRETE
DETAIL XX
CHAIN LINK FENCE
DECORATIVE
WOODEN FENCE
AIR CONDITIONING
UNIT
NON-STEEL EDGER
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
25' B
U
F
F
E
R
50' B
U
F
F
E
R
SCALE IN FEET
0 6030
NORTH
Apr 12, 2019 - 3:14pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-L1-LAND.dwg
L1.03
SHRUB PLAN
EAST
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision
and that I am a duly Licensed LANDSCAPE
ARCHITECT under the laws of the State of
Minnesota.
This certification is not valid unless wet signed in blue
ink. If applicable, contact us for a wet signed copy of
this survey which is available upon request at
Sambatek, Minnetonka, MN office.
4/12/201940252
William L Delaney
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SHRUBS CODE BOTANICAL NAME / COMMON NAME CONT QTY
CD Cornus sericea `Alleman`s Compact` / Dwarf Red Twig Dogwood 5 gal 114
CE Euonymus alatus `Compactus` / Compact Burning Bush 5 gal 16
LH Hydrangea paniculata `Jane` / Little Lime Hydrangea 5 gal 72
MK Syringa patula `Miss Kim` / Miss Kim Lilac 5 gal 17
HA Thuja occidentalis `Holmstrup` / Holmstrup Cedar 10 gal 184
GRASSES CODE BOTANICAL NAME / COMMON NAME CONT QTY
KFG Calamagrostis x acutiflora `Karl Foerster` / Feather Reed Grass 2 gal.99
PLANT SCHEDULE SHRUBS EAST
LEGEND
EASEMENT
CURB & GUTTER
BUILDING
RETAINING WALL
NUMBER OF PARKING
STALLS PER ROW
SIGN
PIPE BOLLARD
STANDARD DUTY
ASPHALT PAVING
HEAVY DUTY
ASPHALT PAVING
CONCRETE PAVING
PROPERTY LIMIT
EXISTINGPROPOSED
KEY NOTE
WETLAND LIMITS
TREELINE
XX
XX
CONCRETE SIDEWALK
ARCHITECTURAL
CONCRETE
DETAIL XX
CHAIN LINK FENCE
DECORATIVE
WOODEN FENCE
AIR CONDITIONING
UNIT
NON-STEEL EDGER
Apr 12, 2019 - 3:14pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-L1-LAND.dwg
L1.04
LANDSCAPE
NOTE AND
DETAILS
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision
and that I am a duly Licensed LANDSCAPE
ARCHITECT under the laws of the State of
Minnesota.
This certification is not valid unless wet signed in blue
ink. If applicable, contact us for a wet signed copy of
this survey which is available upon request at
Sambatek, Minnetonka, MN office.
4/12/201940252
William L Delaney
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
GENERAL NOTES:
1.THE CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH THE EXISTING
CONDITIONS RELATING TO THE NATURE AND SCOPE OF THE WORK.
2.THE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO THE ATTENTION OF THE LANDSCAPE
ARCHITECT DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES,
REGULATIONS, AND PERMITS GOVERNING THE WORK.
4.THE CONTRACTOR SHALL PROTECT EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, LAWNS AND
SITE ELEMENTS DURING CONSTRUCTION. DAMAGE TO SAME SHALL BE REPAIRED AND/OR
REPLACED AT NO ADDITIONAL COST TO THE OWNER.
5.LOCATE AND VERIFY ALL UTILITIES, INCLUDING IRRIGATION LINES, WITH THE OWNER FOR
PROPRIETARY UTILITIES AND GOPHER STATE ONE CALL 48 HOURS BEFORE DIGGING. CONTRACTOR
SHALL BE RESPONSIBLE FOR THE PROTECTION AND REPAIR OF ANY DAMAGES TO SAME. NOTIFY
THE LANDSCAPE ARCHITECT OF ANY CONFLICTS TO FACILITATE PLANT RELOCATION.
6.THE LANDSCAPE CONTRACTOR SHALL COORDINATE THE PHASES OF CONSTRUCTION AND
PLANTING INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE.
7.THE CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN SITE CONDITIONS WHICH MIGHT
NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR WARRANTY. UNDESIRABLE SITE
CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO
BEGINNING OF WORK.
8.THE PLAN TAKES PRECEDENCE OVER THE LANDSCAPE LEGEND IF DISCREPANCIES EXIST.
QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE.
CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN.
9.THE SPECIFICATIONS TAKE PRECEDENCE OVER THE PLANTING NOTES AND GENERAL NOTES.
10.EXISTING TREES AND SHRUBS TO REMAIN SHALL BE PROTECTED TO THE DRIP LINE FROM ALL
CONSTRUCTION TRAFFIC, STORAGE OF MATERIALS ETC. WITH 4' HT. ORANGE PLASTIC SAFETY
FENCING ADEQUATELY SUPPORTED BY STEEL FENCE POSTS 6' O.C. MAXIMUM SPACING.
11.LONG-TERM STORAGE OF MATERIALS OR SUPPLIES ON-SITE WILL NOT BE ALLOWED.
12.CONTRACTOR SHALL REQUEST IN WRITING, A FINAL ACCEPTANCE INSPECTION.
PLANTING NOTES:
1.NO PLANTS SHALL BE INSTALLED UNTIL FINAL GRADING AND CONSTRUCTION HAS BEEN
COMPLETED IN THE IMMEDIATE AREA.
2.A GRANULAR PRE-EMERGENT HERBICIDE SHALL BE APPLIED TO ALL PLANT BEDS AT THE
MANUFACTURERS RECOMMENDED RATE PRIOR TO PLANT INSTALLATION.
3.ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK,"
ANSI-Z60, LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL
CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIALS.
4.OVERSTORY TREES SHALL BEGIN BRANCHING NO LOWER THAN 6' ABOVE PAVED SURFACES.
5.ALL PLANTS MUST BE HEALTHY, VIGOROUS MATERIAL, FREE OF PESTS AND DISEASE AND BE
CONTAINER GROWN OR BALLED AND BURLAPPED AS INDICATED IN THE LANDSCAPE LEGEND.
6.PLANT MATERIALS TO BE INSTALLED PER PLANTING DETAILS.
7.ALL TREES MUST BE STRAIGHT TRUNKED AND FULL HEADED AND MEET ALL REQUIREMENTS
SPECIFIED.
8.THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED
UNSATISFACTORY BEFORE, DURING, OR AFTER INSTALLATION.
9.NO SUBSTITUTIONS OF PLANT MATERIAL SHALL BE ACCEPTED UNLESS APPROVED IN WRITING BY
THE LANDSCAPE ARCHITECT.
10.ALL PLANT MATERIAL QUANTITIES, SHAPES OF BEDS AND LOCATIONS SHOWN ARE APPROXIMATE.
CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF ALL PLANTING BEDS AT
SPACING SHOWN AND ADJUSTED TO CONFORM TO THE EXACT CONDITIONS OF THE SITE. THE
LANDSCAPE ARCHITECT SHALL APPROVE THE STAKING LOCATION OF ALL PLANT MATERIALS PRIOR
TO INSTALLATION.
11.ALL PLANTING AREAS MUST BE COMPLETELY MULCHED AS SPECIFIED.
12.MULCH: SHREDDED HARDWOOD MULCH, COLOR: DARK CHOCOLATE BROWN, CLEAN AND FREE OF
NOXIOUS WEEDS OR OTHER DELETERIOUS MATERIAL, IN ALL MASS PLANTING BEDS AND FOR
TREES, UNLESS INDICATED AS ROCK MULCH ON DRAWINGS. SUBMIT SAMPLE TO LANDSCAPE
ARCHITECT PRIOR TO DELIVERY ON-SITE FOR APPROVAL. DELIVER MULCH ON DAY OF
INSTALLATION. USE 3" FOR SHRUB BEDS, TREE RINGS, AND 3" FOR PERENNIAL/GROUND COVER
BEDS, UNLESS OTHERWISE DIRECTED.
13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MULCHES AND PLANTING SOIL QUANTITIES TO
COMPLETE THE WORK SHOWN ON THE PLAN.
14.USE ANTI-DESICCANT (WILTPRUF OR APPROVED EQUAL) ON DECIDUOUS PLANTS MOVED IN LEAF
AND FOR EVERGREENS MOVED ANYTIME. APPLY AS PER MANUFACTURER'S INSTRUCTION. ALL
EVERGREENS SHALL BE SPRAYED IN THE LATE FALL FOR WINTER PROTECTION DURING WARRANTY
PERIOD.
15.WRAP ALL SMOOTH-BARKED DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO DECEMBER 1 AND
REMOVE WRAPPING AFTER MAY 1. TREE WRAPPING MATERIAL SHALL BE WHITE TWO-WALLED
PLASTIC SHEETING APPLIED FROM TRUNK FLARE TO THE FIRST BRANCH.
16.ALL DECIDUOUS, PINE, AND LARCH PLANTINGS SHALL RECEIVE RODENT PROTECTION PER MNDOT
2571.31.2
14.PLANTING SOIL FOR TREES, SHRUBS AND GROUND COVERS: FERTILE FRIABLE LOAM
CONTAINING A LIBERAL AMOUNT (4% MIN.) OF HUMUS AND CAPABLE OF SUSTAINING
VIGOROUS PLANT GROWTH. IT SHALL COMPLY WITH MNDOT SPECIFICATION 3877 TYPE B
SELECT TOPSOIL. MIXTURE SHALL BE FREE FROM HARDPACK SUBSOIL, STONES,
CHEMICALS, NOXIOUS WEEDS, ETC. SOIL MIXTURE SHALL HAVE A PH BETWEEN 6.1 AND 7.5
AND 10-0-10 FERTILIZER AT THE RATE OF 3 POUNDS PER CUBIC YARD. IN PLANTING BEDS
INCORPORATE THIS MIXTURE THROUGHOUT THE ENTIRE BED IN A 6" LAYER AND
ROTO-TILLING IT INTO THE TOP 12" OF SOIL AT A 1:1 RATIO.ANY PLANT STOCK NOT PLANTED
ON DAY OF DELIVERY SHALL BE HEELED IN AND WATERED UNTIL INSTALLATION. PLANTS NOT
MAINTAINED IN THIS MANNER WILL BE REJECTED.
15.CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT EACH EXCAVATED TREE AND SHRUB PIT
WILL PERCOLATE PRIOR TO INSTALLING PLANTING MEDIUM AND PLANTS. THE CONTRACTOR
SHALL FILL THE BOTTOM OF SELECTED HOLES WITH SIX INCHES OF WATER AND CONFIRM THAT
THIS WATER WILL PERCOLATE WITHIN A 24-HOUR PERIOD. IF THE SOIL AT A GIVEN AREA DOES
NOT DRAIN PROPERLY, A PVC DRAIN OR GRAVEL SUMP SHALL BE INSTALLED OR THE PLANTING
SHALL BE RELOCATED IF DIRECTED BY THE LANDSCAPE ARCHITECT.
16.ALL PLANTS SHALL BE GUARANTEED FOR TWO COMPLETE GROWING SEASONS (APRIL 1 -
NOVEMBER 1), UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL COVER THE FULL COST OF
REPLACEMENT INCLUDING LABOR AND PLANTS.
17.CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 3 DAYS PRIOR TO PLANNED
DELIVERY. THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 24 HOURS IN
ADVANCE OF BEGINNING PLANT INSTALLATION.
18.SEASONS/TIME OF PLANTING AND SEEDING: NOTE: THE CONTRACTOR MAY ELECT TO PLANT IN
OFF-SEASONS ENTIRELY AT HIS/HER RISK. DECIDUOUS
18.1.POTTED PLANTS: 4/1 - 6/1; 9/21 - 11/1
18.2.DECIDUOUS /B&B: 4/1 - 6/1; 9/21 - 11/1
18.3.EVERGREEN POTTED PLANTS: 4/1 - 6/1; 9/21-11/1
18.4.EVERGREEN B&B: 4/1 - 5/1; 9/21 - 11/1
18.5.TURF/LAWN SEEDING: 4/1 - 6/1; 7/20 - 9/20
18.6.NATIVE MIX SEEDING: 4/15 - 7/20; 9/20-10/20
19.MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE.
PLANT MATERIAL SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE
PLANTS IS COMPLETE, INSPECTION HAS BEEN MADE, AND PLANTINGS ARE ACCEPTED EXCLUSIVE
OF THE GUARANTEE. MAINTENANCE SHALL INCLUDE WATERING, CULTIVATING, MULCHING,
REMOVAL OF DEAD MATERIALS, RE-SETTING PLANTS TO PROPER GRADE AND KEEPING PLANTS IN
A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME MAINTENANCE
RESPONSIBILITIES. HOWEVER, THE CONTRACTOR SHALL CONTINUE TO BE RESPONSIBLE FOR
KEEPING THE TREES PLUMB THROUGHOUT THE GUARANTEE PERIOD.
20.ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR DEFOLIATES (PRIOR TO TOTAL
ACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH
MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL LANDSCAPE LEGEND
SPECIFICATIONS.
21.WATERING: MAINTAIN A WATERING SCHEDULE WHICH WILL THOROUGHLY WATER ALL PLANTS
ONCE A WEEK. IN EXTREMELY HOT, DRY WEATHER, WATER MORE OFTEN AS REQUIRED BY
INDICATIONS OF HEAT STRESS SUCH AS WILTING LEAVES. CHECK MOISTURE UNDER MULCH PRIOR
TO WATERING TO DETERMINE NEED. CONTRACTOR SHALL MAKE THE NECESSARY
ARRANGEMENTS FOR WATER.
22.WEED PRE-EMERGENT TREATMENTS SHALL BE SPREAD IN ALL LANDSCAPE BEDS
TURF NOTES:
TURF ESTABLISHMENT SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE PROVISIONS OF THE
MN/DOT 2105 AND 2575 EXCEPT AS MODIFIED BELOW:
1.ALL AREAS TO RECEIVE SOD SHALL ALSO RECEIVE 6" OF TOPSOIL PRIOR TO INSTALLING SOD.
TOPSOIL SHALL BE FREE OF TREE ROOTS, STUMPS, BUILDING MATERIAL, AND TRASH, AND SHALL
BE FREE OF STONES LARGER THAN 1 1
2" INCHES IN ANY DIMENSION.
2.WHERE SOD ABUTS PAVED SURFACES, FINISHED GRADE OF SOD/SEED SHALL BE HELD 1" BELOW
SURFACE ELEVATION OF TRAIL, SLAB, CURB, ETC.
3.SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON
SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, SOD SHALL BE STAKED SECURELY.
4.TURF ON ALL OTHER AREAS DISTURBED BY CONSTRUCTION SHALL BE RESTORED BY SEEDING,
MULCHING AND FERTILIZING. SEED MIXTURE NO. 25-151 WILL BE PLACED AT THE RATE OF 120
POUNDS PER ACRE.
5.ALL DISTURBED AREAS TO BE TURF SEEDED, ARE TO RECEIVE 6" TOP SOIL, SEED, MULCH, AND
WATER UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. FOR SLOPES STEEPER THAN 3:1 OR IN
DRAINAGE SWALES INSTALL EROSION CONTROL BLANKET.
6.ALL DISTURBED AREAS TO RECEIVE NATIVE SEED, ARE TO RECEIVE PLANTING SOIL, SEED, MULCH,
AND WATER UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. FOR SLOPES STEEPER THAN 3:1 OR
IN DRAINAGE SWALES INSTALL EROSION CONTROL BLANKET.
GENERAL TREE SPECIFICATIONS:
1.ALL STREET AND PARKING LOT TREES SHALL BE LIMBED UP TO THE FOLLOWING HEIGHTS:
1.1.2" CAL. TREES: LOWEST BRANCH 6' HT.
1.2.3" CAL.+ TREES: LOWEST BRANCH 7' HT.
2.TREE CANOPY WIDTH SHALL BE RELATIVE TO HEIGHT/CALIPER OF TREE AND TYPE OF TREE.
2.1.1" CALIPER/6-8' HT: 3-4' WIDTH MIN.
2.2.2" CALIPER/12-14' HT: 4-5' WIDTH MIN.
2.3.3" CALIPER/14-16' HT: 6-7' WIDTH MIN.
3.CANOPY TREES SHALL NOT HAVE CO-DOMINATE LEADERS IN LOWER HALF OF TREE CROWN.
4.ALL TREES SHALL HAVE SYMMETRICAL OR BALANCED BRANCHING ON ALL SIDES OF THE TREE.
5.TREES SHALL NOT BE TIPPED PRUNED.
6.TREES SHALL BE FREE OF PHYSICAL DAMAGE FROM SHIPPING AND HANDLING. DAMAGED TREES
SHALL BE REJECTED.
7.SUMMER DUG TREES SHALL HAVE ROOTBALL SIZE INCREASED BY 20%
8.TREES WHICH EXCEED RECOMMENDED CALIPER TO HEIGHT RELATIONSHIP SHALL BE REJECTED.
IRRIGATION NOTES:
1.IRRIGATION SYSTEM TO BE DESIGN/BUILD. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR
APPROVAL OF SYSTEM LAYOUT PRIOR TO INSTALLATION.
2.ALL SOD TO RECEIVE SPRAY OR ROTOR IRRIGATION HEADS WITH MINIMUM DESIGN OF 1"
IRRIGATION PER WEEK.
3.ALL PLANT BEDS TO RECEIVE DRIP LINE IRRIGATION , WITH A MINIMUM DESIGN OF .25"
IRRIGATION PER WEEK.
4.CONTRACTOR TO INSTALL A TOTAL OF 4 QUICK COUPLERS AT THE CORNERS OF THE PROPERTY.
A 2.5" TYPE K SOURCE PIPE IS PROVIDED BY MECHANICAL.
NOTES
PROVIDE & INSTALL RODENT PROTECTION
1/2" HARDWIRE CLOTH, MESH CYLINDER, 8" DIA OR
GREATER X 24" HT.. STAKE IN PLACE
INSTALL TREE WITH ROOT FLARE VISIBLE AT TOP OF
THE ROOT BALL. REMOVE SOIL IN LEVEL MANNER FROM
TOP OF ROOT BALL TO EXPOSE 1ST 1/2" OR LARGER MAIN
ORDER ROOT IF NEEDED. SET ROOT BALL WITH MAIN
ORDER ROOT 1" ABOVE ADJACENT GRADE. DO NOT
COVER TOP OF ROOT BALL WITH SOIL.
INSTALL 3" LAYER OF SHREDDED HARDWOOD MULCH.
PLACE NO MULCH IN CONTACT WITH TREE TRUNK
REMOVE BURLAP, TWINE, ROPE AND WIRE FROM
TOP HALF OF ROOT BALL
BUILD 4" HIGH EARTH SAUCER BEYOND EDGE OF
ROOT BALL
EDGE CONDITION VARIES
PLACE ROOT BALL ON UNDISTURBED OR
COMPACTED SOIL
SCARIFY SIDES OF TREE PIT WITH SPADE BY HAND
TO BIND WITH PREPARED SOIL
PLANTING SOIL, REFER TO SPECIFICATIONS, COMPACT TO 85%
OF MAX. DRY UNIT WEIGHT ACCORDING TO ASTM D 698
TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT
PRESSURE SO THAT ROOT BALL DOES NOT SHIFT
DIG PLANTING PIT 4" TO 6"
DEEPER THAN ROOT BALL
UNDISTURBED
SUBGRADE
NOTE:
CONTRACTOR SHALL MAINTAIN TREES IN A PLUMB
POSITION THROUGHOUT THE WARRANTY PERIOD. IF
STAKING IS REQUIRED BY SITE CONDITIONS,
CONTRACTOR TO USE 2 OR 3 STAKE METHOD WITH 1"
WEBBING AROUND TRUNK OF THREE (NO WIRE OR
CABLING TO BE USED)
WRAP TREE TRUNKS PER NOTES.
30" RADIUS MULCH RING
A1.5 X A
MIN.
1
1
TREE PLANTING DETAIL
1/4" = 1'-0"
L1.04 P-01
1
INSTALL 3" LAYER OF MULCH, DO NOT PLACE IN
CONTACT W/ SHRUB STEM
APPLY PRE-EMERGENT HERBICIDE
EDGE CONDITION VARIES
EDGER, REFER TO PLAN AND SPECIFICATION
LOOSEN ROOTS OF CONTAINER GROWN PLANTS
EXCAVATE PLANT BED MIN. 4" DEEPER THAN
ROOT BALL HT.
SCARIFY SIDES AND BOTTOM OF PLANTING BED
WITH SPADE
UNDISTURBED SUBGRADE
PREPARE SOIL FOR
THE ENTIRE BED
SEE PLAN12"
MIN
4"
SHRUB PLANTING DETAIL
3/8" = 1'-0"
L1.04 P-02
2
INSTALL 3" LAYER OF SHREDDED HARDWOOD MULCH. DO NOT
PLACE IN CONTACT WITH PLANT
EDGE CONDITION VARIES
EDGER, REFER TO PLAN AND SPECIFICATION
LOOSEN ROOTS OF CONTAINER GROWN PLANTS
PLANTING SOIL
SCARIFY SIDES AND BOTTOM OF PLANTING BED WITH SPADE
UNDISTURBED SUBGRADE
PREPARE SOIL FOR
THE ENTIRE BED
18
"
MI
N
.
6"
REFER
TO PLAN
NOTE:
REFER TO EXTERIOR PLANTING SPECIFICATION
PERENNIAL PLANTING DETAIL
1/2" = 1'-0"
L1.04 P-03
3
HUDSON BLVD N
5TH STR
E
E
T
N
SCALE IN FEET
0 12060
NORTH
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND, LLC
SPRINGS AT
LAKE ELMO
9955 HUDSON
BLVD. N.
LAKE ELMO, MN
LCC
CEJ
01/09/19
21654.01
1.The bearing system is based on the Washington County coordinate system,
NAD83 (1986 Adjust). With an assumed bearing of South 00 degrees 01
minutes 13 seconds West for the east line of the Southwest Quarter of the
Southeast Quarter, Section 34, Township 29, Range 21.
TREE INVENTORY
SURVEY NOTES
Apr 12, 2019 - 3:15pm - User:clichty L:\PROJECTS\21654.01\CAD\Survey\Sheets\2165401-TREE.dwg
L1.05
TREE
INVENTORY