HomeMy WebLinkAbout07 - 2019-05-20 Four Corners 2nd Addition Final Plat Review    PAGE 1 of 2  MEMORANDUM           Date:  May 20, 2019      To:  Ken Roberts, Planner Director  Re:  Four Corners 2nd Addition Final Plat  Cc:  Chad Isakson, Assistant City Engineer    Engineering Review Comments  From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Four Corners 2nd Addition Final Plat/Plans received on April  26, 2019. The submittal consisted of the following documentation:     Four Corners 2nd Addition Final Plat, Sheets 1‐2, not dated, prepared by Folz Freeman Surveying (FFS).   Four  Corners  2nd  Addition  Hudson  Blvd  Realignment  &  Trunk  Utility  Extension  Plans,  dated  04.26.2019,  prepared by Larson Engineering.    Four Corners 2nd Addition Stormwater Management Plan, dated 04.26.2019, prepared by Larson Engineering.   Four Corners 2nd Addition Right‐of‐Way Vacation/Jurisdiction Exhibit, dated 01.22.2019, prepared by FFS.   Four Corners 2nd Addition Lake Elmo Easement Vacation Request, dated 01.23.2019, prepared by FFS.   Four Corners 2nd Addition MnDOT Right‐of‐Way Vacation Request, dated 01.23.2019, prepared by FFS.      STATUS/FINDINGS:  Engineering review comments have been provided in two separate memos; one for Final Plat  approval, and one to assist with the completion of the final Construction Plans.  Please see the following review  comments relating to the Final Plat application.      FINAL PLAT: FOUR CORNERS 2ND ADDITION   Lot 1, Block 1, Outlot A, Outlot B and Outlot C ownership has been identified as EN Properties LLC on the  Construction Plans. The Final Plat must be contingent upon the Plat being revised to include a drainage  and utility easement over all of Outlot C for maintenance of the storm water facilities.    All easements as requested by the City Engineer and Public Works department shall be documented on  the Final Plat prior to the release of the Final Plat for recording.    The proposed improvements cannot be constructed without the dedication of several critical drainage  and utility easements being dedicated to the City as shown on the Construction Plans. Final Plat must  therefore be contingent upon all drainage and utility easements, as required by the City Engineer and  Public Works Director, being dedicated in the City’s standard form of agreement, and signed by all parties  prior to the release of the Final Plat for recording. Easements include:   An off‐site roadway and utility easement to be acquired from the adjacent property north of the  plat  to  accommodate  the  Hudson  Boulevard  realignment  at  the  intersection  with  Manning  Avenue (CSAH‐15).   A roadway and utility easement with 80‐foot right‐of‐way to be provided to facilitate a public  street  connection  from  the  adjacent  property  to  the  north  to  Hudson  Boulevard  at  the  first  intersection west of Manning Avenue (CSAH 15).   A drainage and utility easement for the drainage ditch on the north side of Hudson Boulevard,  and for the storm sewer pipe stubs from STMH18 and CB27.   An on‐site and off‐site drainage and utility easement for the existing 100‐year HWL ponding.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4285      PAGE 2 of 2   Written landowner permission must be submitted as part of the final plat applications for any off‐site  grading work, easements and storm water discharges to adjacent properties.   Final Plat must be contingent upon obtaining MnDOT and Washington County permits for completing the  improvements as proposed, including the dedication of additional right‐of‐way along Manning Avenue, if  required,  sight  triangle  right‐of‐way  matching  existing,  and  additional  intersection  improvements  at  Hudson Boulevard and Manning Avenue (CSAH‐15), if required.   A State and Valley Branch Watershed District (VBWD) permit will be required. The site plan is subject to a  storm water management plan meeting State, VBWD and City rules and regulations.   The  storm  water  facilities  constructed  for  this  development  should  remain  privately  owned  and  maintained. The applicant will be required to execute and record  a  Stormwater  Maintenance  and  Easement Agreement in the City’s standard form of agreement.   Final Construction Plans and Specifications must be prepared in accordance with the City Engineering  Design Standards Manual dated March 2017, using City details, plan notes and specifications and meeting  City Engineering Design Guidelines.   Final Construction Plans and Specifications must be revised in accordance with the Construction Plan  engineering review memorandum dated May 20, 2019.    The Final Plat shall not be recorded until final construction plan approval is granted.   No construction for Four Corners 2nd Addition may begin until the applicant has received City Engineer  approval for the Final Construction Plans; the applicant has obtained and submitted to the City all  applicable permits, easements and permissions needed for the project; and a preconstruction meeting  has been held by the City’s engineering department.