HomeMy WebLinkAbout04 -2019-06-17 Carmelite Site Improvements-Engineering Plan Review    PAGE 1 of 2  MEMORANDUM         Date:  June 17, 2019      To:  Ken Roberts, Planning Director  Re:  Carmelite Site Improvements  Cc:  Chad Isakson, Assistant City Engineer    Engineering Site Plan Review  From:  Jack Griffin, P.E., City Engineer          A  Site  Plan  engineering  review  has  been  completed  for  the  Carmelite  Hermitage  Chapel  Conditional  Use  Construction Plan set. The site is located at 8249 DeMontreville Trail North in Lake Elmo. The submittal consisted  of the following documentation received on May 28, 2019:   Site Plans prepared by Pioneer Engineering, dated April 26, 2019.   Stormwater Management Report prepared by Pioneer Engineering, dated April 26, 2019.   Certificate of Survey prepared by Landmark Surveying, dated June 27, 2018.   Wetland Delineation Report prepared by MNR, dated May 2, 2019.   Septic System Plan prepared by Steinbrecher Companies, Inc., dated May 8, 2019.      Engineering review comments are as follows:    STORMWATER MANAGEMENT   A Valley Branch Watershed District (VBWD) permit will be required. The site plan is subject to a storm  water management plan (SWMP) meeting State, VBWD and City rules and regulations.   The SWMP executive summary must be revised and resubmitted to clarify the required standards for this  project (City and VBWD) and to demonstrate compliance with those applicable standards.   The total new and recreated impervious surface area must be identified in detail.   The applicable standards must reference the VBWD rules and Stormwater Rules for the City of  Lake Elmo.   The report must state the soil types determined by the soil borings. Assumed infiltration rates  must be identified in the report and the report must demonstrate drawdown in 48 hrs.   A soil boring location map must be provided and verified that sufficient borings have been taken  in accordance with the City Engineering Design Standards Manual.    Storm water facilities proposed for meeting State and VBWD permitting requirements must be designed  and constructed in accordance with the City Engineering Design Standards Manual available on the City  website, dated March 2017.   Ownership. The storm water facilities constructed for this development should remain privately owned  and maintained.   Stormwater Maintenance and Easement Agreement. The applicant will be required to execute and record  a Stormwater Maintenance and Easement Agreement in the City’s standard form of agreement.   Maintenance  Access.  Even  as  privately  owned  and  maintained  facilities,  maintenance  access  roads  meeting the City engineering design standards must be provided for all storm water facilities.   Easements. The storm water facility 100‐year HWL must be fully contained within the subject property  and easements must be provided to protect the 100‐year HWL flood area.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283      PAGE 2 of 2   Sheet 4.10. The sanitary sewer and water services must be identified as to size and material. A plan note  should  be  added  to  indicate  the  sanitary  sewer  and  water  service  lines  per  state  plumbing  code  requirements.    Sheet 5.10. Revise grading plan to revise storm water BMP site to meet City of Lake Elmo and MN Storm  Water Manual standards and as follows:   Provide 10:1 aquatic bench and 10:1 maintenance bench around retention BMP.   Provide 3:1 length to width ratio for retention basin.   Provide  defined  rip  rap  overflow  location  between  retention  basin  and  infiltration  basin  and  define overflow spot elevation.   Provide retention basin NWL and ensure minimum 3‐feet depth. Show NWL level contour on the  plan sheet.   Provide 100‐year HWL contour for the 996.9 HWL. The 100‐year HWL of 996.9 is not shown  consistent between Sheets 5.10 and 5.30. Revise plans and use spot elevations has required to  demonstrate extent of 100‐year HWL.   Sheet 5.10 Provide drainage and utility easement over storm water BMP including the 100‐year HWL and  pond maintenance access road and access bench. Access road grade must be less than or equal to 10% to  the maintenance bench.    Sheet 5.10. Remove plan note that states “Remove Trees as required within grading limits”. All trees to be  removed must be surveyed and shown on the plans. Tree removal may be subject to replacement per City  ordinances.    Sheet 5.20. The rock construction entrance must be positioned for all grading activity on site; not just for  basin 100P.   The  site  plans  must  be  updated  to  show  the  proposed  on‐site  SSTS  design.  The  Septic  System  Plan  prepared by Steinbrecher Companies is not consistent with the site improvements plans.   The plans must call out detailed site protection from construction activities for the proposed on‐site  wastewater treatment system and for the proposed storm water infiltration basin.   No  construction  may  begin  until the  applicant  has  received  City Engineer approval for the Final  Construction  Plans;  the  applicant  has  obtained  and  submitted  to the City all applicable permits,  easements and permissions needed for the project; and a preconstruction meeting has been held by the  City’s engineering department.