Loading...
HomeMy WebLinkAbout2019-08-06 Inwood 6th Addition Preliminary Plat Review    PAGE 1 of 3  MEMORANDUM         Date:  August 6, 2019      To:  Ken Roberts, Planning Director   Re:  Inwood 6th Addition – Kwik Trip  Cc:  Chad Isakson, P.E., Assistant City Engineer    Preliminary Plat Review   From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Inwood 6th Addition  –  Kwik  Trip  Convenience  Store.  A  Preliminary Plan submittal was received on July 12, 2019. The submittal consisted of the following documentation  prepared by Carlson McCain:   Inwood 6th Addition Preliminary Plat dated June 28, 2019.   Kwik Trip Store #1078 Site Plans dated June 28, 2019.   Kwik Trip Store #1078 Storm Water Management Plan dated June 28, 2019.      STATUS/FINDINGS: Engineering has prepared the following review comments based on the plans submitted.       PRELIMINARY PLAT AND EASEMENTS  1. Outlot ownership should be identified on the Preliminary Plat and on the Preliminary Plans. Outlots A and  B should be shown as Developer owned.  2. Lot lines and easements are not shown consistently between the Preliminary Plat and the Preliminary  Plans. The plans must be revised to accurately reflect the proposed plat. The lot lines and easement  locations may be subject to revision once they can be accurately reviewed with respect to the proposed  improvements.   3. Drainage and utility easements must be provided for any public utilities constructed as part of the project,  including City owned watermain and hydrants, with the easements shown on the preliminary plans.  4. Consideration should be given to adjusting the east lot line of Outlot A further west to facilitate a shared  commercial driveway access between Outlot A and Outlot B. See comment #3 below for Site Plans, Traffic  and Access Management.   5. Final Construction Plans and Specifications must be prepared in accordance with the latest version of the  City Engineering Design Standards Manual, using City details, plan notes and specifications and meeting  City Engineering Design Guidelines. The Final Construction Plans must include detailed existing condition  information surrounding the plat boundaries to demonstrate that the proposed improvements match at  the  construction  limits.  Additional  existing  condition  information  is  required  along  5th  Street  North  including  existing  small  utilities,  lane  widths  and  pavement  markings,  existing  street  signs,  and  other  features that may be impacted by the improvements.    SITE PLANS, TRAFFIC AND ACCESS MANAGEMENT  1. Access Management Guidelines were reviewed and approved along 5th Street North as part of the Inwood  PUD  Preliminary  Plat/Plan  application  process  (see  SRF  Consulting  review  memo  dated  December  15,  2014). The Preliminary Plans were amended to eliminate access between Inwood Avenue (CSAH 13) and  Irene Avenue in accordance with this memorandum. Irene Avenue is located approximately 660 feet east  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4285      PAGE 2 of 3  of  Inwood  Avenue  which  meets  the  City’s  access  spacing  requirements  for  streets  and  commercial  driveways along a collector roadway.  2. The Kwik Trip Store site improvements show a proposed full access commercial driveway along the south  leg at Irene Avenue and an intermediate right‐in/right‐out access to be located approximately half way  between Inwood Avenue and Irene Avenue with the construction of a right turn lane. These improvements  have also been reviewed by SRF Consulting with the following recommendations:   The proposed full access commercial driveway at Irene Avenue is consistent with the approved  preliminary plans and access spacing requirements for 5th Street north. Right and left turn lanes  are already in place in anticipation of this intersection.   The proposed intermediate right‐in commercial driveway access is acceptable with modifications  to the proposed right turn lane. The right turn lane should be constructed using a 150‐foot full  width turn lane with 5:1 taper for a total turn lane length of 210 feet.   The  proposed  intermediate  right‐out  commercial  driveway  access should  be  eliminated.  It  is  recommended to design this driveway access as right‐in only with internal signage directing traffic  to the full driveway access intersection at Irene Avenue. A “No U‐turn” sign should also be placed  on eastbound 5th Street at the intersection with Irene Avenue. If a right‐out access is permitted  traffic safety concerns exist with vehicles attempting U‐turns at Irene Avenue and 5th Street which  is an uncontrolled intersection.   3. It is recommended that both the full access at Irene Avenue and  the intermediate right‐in access  be  constructed as shared commercial driveways to further manage access spacing along 5th Street North.   The full commercial driveway access at Irene Avenue should be constructed as a shared access to  both Outlot A and Outlot B.    It appears from the site plans that the right‐in access driveway is proposed as a shared access  between Lot 1, Block 1 and Outlot A, with the lot line dividing the access road.  4. Inwood Avenue (CSAH 13) and 5th Street North Traffic Signal. A traffic impact study must be completed to  review and evaluate the impacts to the intersection at Inwood Avenue (CSAH 13) and 5th Street North. A  financial contribution to traffic signal should be considered.    MUNICIPAL WATER SUPPLY  1. The proposed property is located in the Southwest Planning MUSA and water system high pressure zone.  2. Water availability charges and connection charges will apply to the service connections. A Met Council SAC  determination will be required to determine the WAC/Connection charges for each building.  3. Connection to the municipal water supply is readily available to serve this property. Based on the proposed  Inwood PUD 6th Addition plat lines, the existing watermain stub for the Kwik Trip Store (Lot 1, Block 1) will  now be located on the new Outlot A and may need to be extended across a portion of Outlot A to serve Lot  1, Block 1. The applicant will be required to connect, at its sole cost, to the existing 8‐inch DIP stub on  Outlot A, and/or the existing 16‐inch HDPE pipe located along Inwood Avenue, and extend watermain and  any required hydrants internal to the site.   4. The project proposes to extend a 6‐inch DIP watermain internal to the site with a hydrant placed near the  rear of the proposed building. The portion of the watermain internal to the site that serves a hydrant must  be City owned and operated and may need to be upgraded to an 8‐inch DIP pipe based on fire suppression  requirements. The applicant must submit fire suppression requirements for the building to determine the  size of watermain up to each hydrant.   5. The applicant will be responsible to place hydrants throughout the property at the direction of the Fire  Department.  All fire hydrants and connecting watermains shall be owned and maintained by the City.  6. The  applicant  may  be  required  to  construct  a  looped  watermain  with  a  second  connection  point,  depending upon site layout, or connect to the existing 16‐inch HDPE pipe located along Inwood Avenue.   7. Any watermain lines serving hydrants placed internal to the site will require minimum 30‐foot easements  centered over the hydrant and pipe. Easements must be dedicated to the City and be provided in the City’s  standard form of easement agreement.            PAGE 3 of 3  MUNICIPAL SANITARY SEWER  1. The proposed property is located in the Southwest Planning MUSA current Regional Sewer Staging Plan  and would discharge to the MCES WONE Interceptor.  2. Sewer availability charges and connection charges will apply to the service connections. A Met Council SAC  determination will be required to determine the SAC/Connection charges for each building.  3. Connection to the municipal sanitary sewer system is readily available to serve this property. The applicant  will be required to connect, at its sole cost, to the existing 8‐inch PVC stub that was installed to serve this  property. A 6‐inch diameter private sewer service is proposed to be extended internal to the site to serve  the Kwik Trip Store. No public sanitary sewer mains are proposed to be extended internal to the site.  4. Based on the proposed Inwood PUD 6th Addition plat lines, the existing sanitary sewer stub for the Kwik  Trip Store (Lot 1, Block 1) will now be located on the new Outlot A and will need to be extended across a  portion of Outlot A to serve Lot 1, Block 1. A private sewer service easement may be needed between the  property owners of Outlot A and Lot 1, Block 1.     STORMWATER MANAGEMENT  1. A State and South Washington Watershed District (SWWD) permit will be required. The site plan is subject  to a storm water management plan meeting State, SWWD and City rules and regulations.  2. The storm water management report indicates that the existing storm water facilities for this property,  located just south of the property, have been designed for Lot 1, Block 1 and Outlot A to each be 75%  impervious. The narrative also indicates that the proposed Kwik Trip site (Lot 1, Block 1) is proposed to be  70% impervious. Therefore, no additional storm water BMPs are proposed.  Preliminary  Plat  approval  should  be  contingent  upon  verification  of  these  assumptions  by the SWWD and City storm water  consultant.  3. The applicant is proposing a private storm sewer system internal to the commercial site to collect and  convey storm water runoff. The storm water will be discharged to the City owned storm water pond and  infiltration basin located to the south of the proposed site. This system was constructed as part of the  Inwood PUD development and will be turned over to the City upon acceptance of the Inwood PUD 1st  Addition development improvements.  4. A  new  (2nd)  storm  water  discharge  location  to  the  existing  storm  water  pond  is  proposed.  A  sump  manhole is shown on the plans as required with a SNOUT oil and debris stop device. The sump manhole  and SNOUT device should be relocated from manhole #102 to manhole #101.  5. The storm sewer system constructed for this development should remain privately owned and maintained.  The applicant will be required to execute and record a Stormwater Maintenance and Easement Agreement  in the City’s standard form of agreement. The agreement should provide a maintenance plan defining the  maintenance  responsibilities  for the private owner, the type of  maintenance  and  the  maintenance  intervals, including the SNOUT oil and debris stop device.  6. The storm sewer minimum pipe size should be 15‐inch diameter pipe.