Loading...
HomeMy WebLinkAbout07 - 2019-07-24 Union Park Phase 1 Landscape Plan Review Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming Toll Free 800-472-2232 Web wenck.com To: Ken Roberts, City of Lake Elmo Planning Director From: Lucius Jonett, Wenck Landscape Architect Date: July 24, 2019 Subject: City of Lake Elmo Landscape Plan Review Union Village (formerly Bentley Village) 1st Phase, Review #1 Submittals • Final plat – Phase 1 Plans (Tree Inventory, Tree Preservation, Landscape), dated 5-24- 2019, received 5-24-2019. Location: Northwest quadrant of the intersection of Keats Ave. N & Interstate Hwy 94, Lake Elmo, MN. South of the Savona Development. Land Use Category: Urban Medium Density Residential Surrounding Land Use Concerns: The property to the north (Savona Development) is Urban Low Density Residential and is less intensive land use than the proposed Urban Medium Density Residential. Screening is required on the north boundary. The properties to the west (Lampert’s lumber yard), east and south are, or are guided, to be Commercial or Mixed-Use Commercial zones which are more intensive land use than this proposed Urban Medium Density Residential. Screening is not required on the west, east or south boundaries. Special landscape provisions in addition to the zoning code: This proposed development will be required to provide screening along all borders North, South, West and East consisting of either a masonry wall or fence in combination with landscape material that forms a screen at least six feet in height and not less than 90% opaque on a year- round basis. Ken Roberts Planning Director City of Lake Elmo July 24, 2019 2 T:\6443 Lake Elmo\20 Union Park (formerly Bentley Village)\02 Phase 1\2019-07-24 Union Park (formerly Bentley Village) Phase 1 Landscape Plan Review.docx Tree Preservation: A. A tree preservation plan has been submitted that does meet all requirements. Entire Site Total Caliper Inches of Significant Trees On-Site: 905 Cal Inches Common Trees 270 Conifer/Evergreen Trees 0 Hardwood Trees 635 Significant Inches Removed On-Site 724 Cal Inches Common Trees 236 Conifer/Evergreen Trees 0 Hardwood Trees 488 30% Tree Removal Limits (Cal. Inches) Allowed Proposed Subtract Common Tree Removals 81 236 Subtract Conifer/Evergreen Tree Removals 0 0 Subtract Hardwood Tree Removals 190.5 488 Removals in excess of 30% allowances Removals in excess of 30% allowances 452.5 Cal Inches Common Removals in Excess of 30% Allowance 155.0 Conifer Removals in Excess of 30% Allowance 0.0 Hardwood Removals in Excess of 30% Allowance 297.5 Common Tree Replacement Needed (1/4 the dia inches removed) 38.8 Cal Inches Conifer Tree Replacement Needed (1/2 the dia inches removed) 0.0 Cal Inches Hardwood Tree Replacement Needed (1/2 the dia inches removed) 148.8 Cal Inches Common Tree Replacement Required @ 2.5" per Tree 16 # Trees Conifer Tree Replacement Required @ 3" per 6' Tall Tree 0 # Trees Hardwood Tree Replacement Required @ 2.5" per Tree 60 # Trees B. There is a significant tree on the property. Tree ID #2742 – 44” DBH Oak. The tree is not marked for removal. C. Tree replacement is required because more than thirty (30) percent of the diameter inches of significant trees surveye d will be removed. D. Tree replacement calculations follow the required procedure and are correct. E. This project is residential development; therefore mitigation replacement trees shall be in addition to landscape required tree counts. Ken Roberts Planning Director City of Lake Elmo July 24, 2019 3 T:\6443 Lake Elmo\20 Union Park (formerly Bentley Village)\02 Phase 1\2019-07-24 Union Park (formerly Bentley Village) Phase 1 Landscape Plan Review.docx Landscape Requirements: The landscape plans meet the code required number of trees. Preliminary Plan 1st Phase (Code Required) Proposed Proposed Street frontage 5908 Lineal Feet Lake Shore 0 Lineal Feet Stream Frontage 0 Lineal Feet Total Linear Feet 5908 Lineal Feet /50 Feet = Required Frontage Trees 119 Trees Development or Disturbed Area - SF Development or Disturbed Area 41.6 Acres *5 = Required Development Trees 208 Trees Required Mitigation Trees 76 Required Number of Trees (*) 403 Total Trees to Date 403 124 * Residential development - mitigation replacement trees are in addition to landscape required tree Counts. 1. A minimum one (1) tree is proposed for every fifty (50) feet of street frontage. 2. A minimum of five (5) trees are proposed to be planted for every one (1) acre of land that is developed or disturbed by development activity. The landscape plans do meet the minimum compositions of required trees: Master Plan Qty % Composition Deciduous Shade Trees 173 43% >25% required Coniferous Trees 171 42% >25% required Ornamental Trees 59 15% <15% required Tree Count 403 Phase 1 Qty % Composition Deciduous Shade Trees 57 46% >25% required Coniferous Trees 51 41% >25% required Ornamental Trees 16 13% <15% required Tree Count 124 The landscape plans do show the required mitigation tree types and quantities: Required Preliminary Plat 1st Phase Common Trees 16 111 27 Conifers 0 171 51 Hardwood Trees 60 62 30 A. A landscape plan has been submitted that does meet all requirements. Ken Roberts Planning Director City of Lake Elmo July 24, 2019 4 T:\6443 Lake Elmo\20 Union Park (formerly Bentley Village)\02 Phase 1\2019-07-24 Union Park (formerly Bentley Village) Phase 1 Landscape Plan Review.docx B. The landscape plan does meet the landscape layout requirements: C. Interior Parking Lot Landscaping – The development does not include interior parking lots. D. Perimeter Parking Lot Landscaping – The development does not include perimeter parking lots. E. Screening – The landscape plan does meet screening requirements. Special Landscape Considerations: A. 5th Street – The development is along 5th Street, which has been previously or is schedule to be constructed by other developments. No additional landscape requirements are required of this applicant. Findings: 1. Requiring full screening along the north property line (5th Street) is not recommended as it will interfere with the required boulevard tree plantings in the 5th Street Design Guidelines. 2. The property to the South is currently vacant land (Rural Development Transitional guided for Commercial development in 2030 Comprehensive Plan and Mixed Use Commercial in draft 2040 Comprehensive Plan). Currently vacant can be interpreted as a currently less intensive use than this proposed development and by ordinance would require screening. Because the property to the South is planned to be a more intensive land use, then by ordinance future development of the South properties would be required to provide screening. The proposed single row planting along the south property of this development’s preliminary plat is a fair compromise for current conditions. If the development occurs in multiple phases, each phase should be evaluated for changes of intensity along the southern border, and screening requirements adjusted accordingly. Recommendation: The 1st Phase landscape plans submitted for the Union Park development are consistent with the preliminary plat landscape plans approved on July 24, 2019. It is recommended that the 1st phase landscape plans be approved. Sincerely, Lucius Jonett, PLA (MN) Wenck Associates, Inc. City of Lake Elmo Municipal Landscape Architect