Loading...
HomeMy WebLinkAboutTodd-Lake Elmo-A4flash side to roof-------~'ct-+--------. provide 2x4 blocking between rafters to nail sheathing attach 2x4 rafters to sides offloor·----1-. trusses with (2)8d nails at top plate and at all vert. and cross members hang 2x4 ceiling joists from 2x8 ledger -ledger attached to wall w/ ._,,_...,_ ____ ,_ (l)¼"x6" lag screw@ 16" O.C. (to,--+----+-~ studs) and nail rafters and joists to 2x6 sub fascia pre finished metal fascia and non vented soffit ~'---="""--;1(-----------"--5'---'-4'---"---------;I( T ical Roof Construction: T ical stair construction: wall on roof to be approximately ½ of the way back from front wall -------------.. • 1½" particle board treads -1" nosing • 1 x _ pine risers ( owner option to use hardwood risers and treads) -asphalt shingles -15lb felt underlayment -"ice shield" at all roof edges -½" roof sheathing -roof trusses@ 24" O.C. -1" air chute each truss space j ------use spray foam insulation at truss heels -----truss clips each truss, each side -typical -by truss supplier run exterior sheathing up to air chute for insulation block etal drip edge 7" pre finished metal fascia over 2x6 sub fascia ~---"re fmished vented metal soffit • (4) 2x12 stringers ~ see wall types for wall construction--~'3.i+-__,~ T ical Second Floor Construction: .-------,tt--~1----~.J.J:..:=:.=..:===-=-=--'-=--=--=-=--'---- owner to provide 36" high continuous handrail at one side of stairs 12'-10" open 11 /2x6 blocking for O.H. door :1 / -3 sides see plan for all header and // beam sizes /,;:;/ 4' landing / / // // // // // // // // // // "/ 17 T@ 10"=15'-10" 4" cone. floor slab (w/ optional W.W.M.) w/ 6 mil. poly vapor retarder over 6" gravel base -garage side floor slopes 4" to front wall (dashed) stair framing and floor trusses at stair hung from flush beam -verify beam height needed -¾" T&G plywood sub floor -24" floor trusses@ 16" O.C. -verify -(1) layer½" type "x" fire rated G.B. at garage ceiling '------R-21 spray foam insulation and vapor barrier continuous through floor space -typical llll-----spray foam around all windows, doors and penetrations ..,__----lower level walls are 10' studs with (1) bottom and (2) top plates 2x6 treated sill plate w/ ½" round x 16" anchor bolts @ 36" O.C. on curb block hold grade min. 6" below top of foundation wall B!E------2" (R-10) rigid insulation from footing to top of foundation wall on outside -flash top of insul. to wall under siding ,k l'-8" J @ GARAGE SECTION ¼"=1 '-0" d) z N -.:::I'" bO ,cl 0 ~ (I) lr) 1-4 ..c lr) a -~ ~ ...... 1-4 i::: < (I) d ~ ::E '"O z " '"O 0 ~ 0 ...... s ~ ..... ...... r:/)_ ...... 1-4 ~ d) ~ t-(I) z -.:::I'" ~ -.:::I'" 0\ ...:l °" sheet ......-1 I t- A4 N I t- (I) ~ Q