HomeMy WebLinkAbout04 - 2019-09-03 Applewood Pointe Concept Plan Review    PAGE 1 of 3  MEMORANDUM           Date:  September 3, 2019      To:  Ken Roberts, Planner Director  Re:  Applewood Pointe at Lake Elmo (United Properties)  Cc:  Chad Isakson, Assistant City Engineer    Concept Site Plan Review  From:  Jack Griffin, P.E., City Engineer          We have reviewed the Applewood Pointe Concept PUD Plans. The Concept Site Plans consisted of the following  documentation received on August 12, 2019:   Narrative dated August 1, 2019, prepared by United Properties.   Concept Site Plan dated July 31, 2019.   Site Survey Analysis dated July 31, 2019.   Certificate of Survey dated July 17, 2019.   Wetland Delineations, not dated.      Engineering has the following review comments:    STREETS AND TRANSPORTATION     Eagle Point Boulevard Improvements. A Traffic Impact Study should be required to review the traffic  impacts that would be placed on the adjacent local roadway system from the higher density use of the  property. This review should include, but not be limited to:   Consideration for extending the right‐turn lane on Eagle Point Boulevard (at Hudson Boulevard) for an  additional 300‐400 feet. It has been reported that the peak hour traffic currently exceeds the turn  lane capacity.   Consideration for left and right turn lanes at the Applepointe Subdivision access locations.   Eagle Point Boulevard Right‐of‐way Dedication. Additional right‐of‐way may need to be dedicated to the  City along Eagle Point Boulevard to accommodate any proposed or potential future improvements for the  roadway corridor.   Hudson Boulevard Improvements. Hudson Boulevard Improvements should be required as part of the  Subdivision in accordance with the Hudson Boulevard Design Standards, with an Urban section along the  north boulevard and bituminous trail.   Hudson Boulevard Right‐of‐Way Dedication. Additional right‐of‐way dedication to the City along Hudson  Boulevard may be required to accommodate the Hudson Boulevard Improvements.   Site Access. The concept plan proposes two access locations along Eagle Point Boulevard, approximately  200  feet  apart.  The  north  access  is  proposed  only  80  feet  from the  existing  Eagle  Point  business  condominiums.  These  access  locations  do  not  meet  City  access  spacing  guidelines  along  Collector  Roadways and are not recommended as presented. A transportation review should be completed to  determine better Subdivision Access.    Pedestrian  Connectivity.  The  City  should  review  the  site  plan  to  determine  pedestrian  connectivity  surrounding the proposed Subdivision.   Private Streets. The streets interior to the development are proposed to remain privately owned and  maintained. Interior street design may require revisions to provide adequate fire lanes and safety access.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4285      PAGE 2 of 3    MUNICIPAL SANITARY SEWER   The proposed site is guided in the City’s Comprehensive Plan for Phase I of the Regional Sewer Staging  Plan and would discharge to the MCES WONE Interceptor.    Sanitary sewer service is available to the site. The applicant will be responsible to connect to the City  sanitary sewer system and extend sanitary sewer into the property at applicant’s sole cost.    The concept plan does not include a sanitary sewer utility plan for review but is proposing 100 REC units  plus additional potential facilities and amenities. The site was originally planned for up to 50 REC units.    The  applicant  will  be  required  to  connect  to  the  existing  sanitary  sewer  along  Hudson  Boulevard,  connecting to an existing 8‐inch sanitary sewer pipe extending northwest from the I94 Lift Station site.  Capacity  is  not  available  for  this  facility  to  connect  to  the  existing  15‐inch  sanitary  main  extending  southeast of this manhole.   A review of the impacts to the sanitary sewer system and adjacent I94 Lift Station will be required to  identify any improvements necessary to accommodate the added sewer flows.   Existing Utility Easements. The existing sanitary sewer utility easements along Hudson Boulevard and the  new commercial street corridor must be shown with any preliminary plan submittal and plan revisions  must be made to avoid encroachments/conflicts with these easements.   Any sanitary sewer main lines placed within the development will require minimum 30‐foot easements  centered over the pipe (or wider dependent upon the sewer depths) dedicated to the City and in the form  of the City’s Utility Easement Agreement.     MUNICIPAL WATER SUPPLY   The concept plan does not include a watermain utility plan for review but is proposing 100 REC units plus  additional potential facilities and amenities. The site was originally planned for up to 50 REC units. A  review of the impacts to the water system will be required to identify any improvements necessary to  accommodate the added water demands.   Municipal Water service is available to the site. The applicant will be responsible to extend municipal  water into the development at its cost and will be required to construct a looped watermain network  internal to the site with, at least, a second City watermain connection point.    Watermain is available to be extended to the property from an existing 12‐inch trunk watermain located  along  three  sides  of  the  proposed  site,  including  Hudson  Boulevard,  Eagle  Point  Boulevard  and  the  commercial driveway to the adjacent property.   The existing water system will need to be reviewed to determine if sufficient capacity for the proposed  high‐density  development  is  available  without  additional  improvements  to  the  water  system.  During  preliminary planning the applicant must provide domestic and fire suppression demands for the facility so  that staff may verify adequate water system capacity.   No watermain pipe oversizing is anticipated at this time. Further  review  will  be  completed  as  the  application moves forward through the process.   The applicant will be responsible to place hydrants throughout the property at the direction of the Fire  Department.  All fire hydrants shall be owned and maintained by the City.   Any  watermain  lines  and  hydrants  placed  within  the  development will  require  minimum  30‐foot  easements centered over the pipe. Easements must be dedicated to the City and be provided in the City’s  standard form of easement agreement.      STORMWATER MANAGEMENT   The concept plan does not address storm water management. The proposed development is subject to a  storm water management plan meeting State, South Washington Watershed District (SWWD) and City  rules. A permit will be required from the Minnesota Pollution Control Agency and SWWD.    Storm water facilities proposed as part of the site plan to meet State and SWWD permitting requirements  must be constructed in accordance with the City Engineering Design Standards Manual.      PAGE 3 of 3   Permitting  requirements  will  require  rate  control  from  all  points  of  discharge  from  the  site  and  will  require volume control (or infiltration). Overland emergency overflows or outlets are required as part of  the site plan for flood protection. The site plan will likely require additional storm water ponding or  infiltration to satisfy all storm water regulations.   If storm water ponds (detention) and infiltration basins are proposed, the 100‐year high water flood level  (HWL) for each basin must be fully contained within private property.   The  storm  water  facilities  constructed  for  this  development  should  remain  privately  owned  and  maintained. The applicant will be required to execute and record  a  Stormwater  Maintenance  and  Easement Agreement in the City’s standard form of agreement.   Even as privately owned and maintain facilities, maintenance access roads meeting the City engineering  design standards must be provided for all storm water facilities.