HomeMy WebLinkAbout5 8126 Hill Trail septic Permit8/28/2019 Issued Permit
https://washingtonseptic.onegov.rtvision.com/admst/viewcard.php?card=1&app=20231 1/2
D E PA R T M E N T O F P U B L I C H E A LT H A N D E N V I R O N M E N T
14949 62nd Street North P.O. Box 6
Stillwater, MN 55082-0006
Office: 651-430-6655 TTY: 651-430-6246 Fax: 651-430-6730
PERMISSION IS HEREBY GRANTED
To execute the work specified in this permit on the following identified property upon express condition that said persons and
their agents, and employees shall conform in all respects to the provisions of Ordinance #206, Washington county Development
Code, Chapter Four, Subsurface Sewage Treatment System Regulations. This permit may be revoked at any time upon violation
of any of the provisions of said ordinance.
Type of System: New Installation Mound
Design Criteria Mound Sizing Pressure Distribution
Percolation Rate: 40.00 MPI Rock Bed Width: 10.00 Feet Number of Laterals: 3
Depth to Restriction: 14 Inches Rock bed Length: 45.00 Feet Perforation Spacing: 3.0 Feet
Land Slope 9.00 %Absorption Width: 24.00 Feet Perforation Diameter: 7/32 Inch
Flow Rate: 450.00 GPD Depth of Clean Sand: 1.80 Feet Lateral Diameter: 1-1/2 Inches
Downslope Dike Width: 20.50 Feet Total Dynamic Head: 15 Feet
Upslope Dike: 9.60 Feet Pump 1: 26 GPM
Tank Sizes Length of Dike: 74.90 Feet
Tank 1: 1000 Gallons
Tank 2: 1000 Gallons
Pump Tank 1: 1000 Gallons
Authorized Work/Special Conditions
The granting of this permit does not alleviate the applicant from obtaining any other Federal, State, or local permits required by
law for this project.
Community City Of Lake Elmo
Permit Number 2019-1243
Owner Schrantz Michael G & Ruth G
Owner Address 5831 Hytrail Ave , Lake Elmo Mn 55042
Applicant Timothy Mercil
Project Address
Geo Code 0902921220008
Designer David R. Brown
8/28/2019 Issued Permit
https://washingtonseptic.onegov.rtvision.com/admst/viewcard.php?card=1&app=20231 2/2
Back-up area for second future on-site system must be protected from all traffic., Building sewer can be no closer than 20 feet from well
and must be pressure tested Schedule 40 within 50 feet., Call at least 24 hours before the time you need an inspection., Domestic strength
waste only. Industrial waste and hazardous wastes cannot enter the septic system., Effluent Filter & Alarm Required on outlet of last tank in
series, Establish a vegetative cover over the soil treatment area within 30 days of the installation. Protect the soil treatment area from
erosion until the vegetative cover is established., Install a meter to monitor wastewater flow., Installer must verify head and elevation so the
proper pump size is used., Install individual sewage treatment system as per approved design in area tested and shown on the site plan.,
Install only when soil is below the plastic limit (dry soil conditions)., Insulate tank lids to a value of R-10 if tanks are 2 feet or less from the
surface., Pressurized laterals can be no further apart than 36 inches and require accessible cleanouts at the end of each lateral., Rope off
and protect tested area from all vehicle traffic., This system must be installed by a certified/licensed sewage treatment system installer
holding a current license with the Minnesota Pollution Control Agency. , Use of tanks registered with the Minnesota Pollution Control
Agency required.
Required Inspections: Final, Rough-Up, Soil Treatment Area, Tank Inspection
Permit Issuance Date: 08/06/2019 bce191b19fa8c23965c034c2eaac6805
Permit Expiration Date: 08/05/2020 e21d10750ee723ce86cff7cdfd1b0775
Joe Sanders 08/06/2019 - Issued