HomeMy WebLinkAboutES Park Comm VBWD.doc; 8-17-09 Park Commission Date: 8-17-09 Regular Item: ITEM: Review of Ravine Restoration Project within DeMontreville Wildlife Park to repair an eroding ravine and to prevent sediment from washing into Lake DeMontreville. REQUESTED BY: Valley Branch Watershed District, Applicant SUBMITTED BY: Kelli Matzek, City Planner REVIEWED BY: Craig Dawson, Interim City Administrator Kyle Klatt, Planning Director Ryan Stempski, Assistant City Engineer Mike Bouthilet, Public Works Director SUMMARY AND ACTION REQUESTED: The Park Commission is being asked to receive and review information on the Ravine Restoration Project proposed by the Valley Branch Watershed District (VBWD). The grading project will take place entirely within the City-owned DeMontreville Wildlife Park to address erosion issues that occur largely due to the intermittent stream at the site and to prevent sediment from washing into Lake DeMontreville. A grading permit has been received and reviewed administratively as it is considered a public improvement project. The Assistant City Engineer has reviewed the proposed grading and found the project and resulting grades to be acceptable. ADDITIONAL INFORMATION o The City Forester reviewed the construction documents and made a site visit to the project area with the applicant. Dr. Widin found the plans for tree removal, tree protection, and re-vegetation and tree replacement appropriate for the project and the ravine restoration may help to prevent more damage to root systems of existing trees and vegetation. o Two of the three bridges crossing the intermittent stream will be removed for the restoration work. The bridges will be reinstalled by the City at appropriate locations after the work is complete. o Currently there are no plans or specifications in the Park CIP to alter, expand, or relocate the existing dirt trails in the park. The VBWD has agreed to replace any damaged portions of the dirt trail with another dirt trail during the time of the project. th o This item will be addressed by the City Council on Tuesday, August 18. The City Council will consider authorizing the Interim City Administrator to enter into a Project Agreement with the Valley Branch Watershed District for the project. ATTACHMENTS: 1. Location Map 2. City Forester Report 3. Engineer Report