Loading...
HomeMy WebLinkAboutVOLLEYBALL COURT CONSTRUCTION estimate VOLLEYBALL COURT CONSTRUCTION LIONS PARK August 22 Park Commission Meeting Project description: Rehabilitate volleyball court by removing all existing material to grade, oversize footprint to desired size (50’x80’x 12”). Do engineering “visual” of subgrade, bring in new loads of washed masonry sand. Cost: Engineering $1,000.00 Sand : 207 tons at $12.68 ton (148 cubic yards) – source Aggregate Industries (additional quotes from Raleigh Excavating, Barton Sand and Gravel) - $2,624.76 Timbers: $800.00 Poles, nets and pads: $1,700.00 Labor, if needed: $3,000.00