HomeMy WebLinkAboutVOLLEYBALL COURT CONSTRUCTION estimate
VOLLEYBALL COURT CONSTRUCTION
LIONS PARK
August 22 Park Commission Meeting
Project description:
Rehabilitate volleyball court by removing all existing material to grade, oversize footprint to
desired size (50’x80’x 12”). Do engineering “visual” of subgrade, bring in new loads of washed
masonry sand.
Cost:
Engineering $1,000.00
Sand : 207 tons at $12.68 ton (148 cubic yards) – source Aggregate Industries (additional quotes
from Raleigh Excavating, Barton Sand and Gravel) - $2,624.76
Timbers: $800.00
Poles, nets and pads: $1,700.00
Labor, if needed: $3,000.00