a. Hammes Estates Proposed Park Facilities – Johnson
b. Easton Village Park Plan – Johnson
c. EMWREP “Clean Water” Geocache trail in Sunfish – Zuleger
d. February Meeting Date Change – Weis
e. February 11th Workshop w/ City Council – Zuleger
VI. Old Business 7:50 PM
a. New Development Review Process– Zuleger
b. Trail Committee Update – Weis/Johnson
c. New Park Signs - Zuleger/Bouthilet
VII. Staff Reports & Updates 8:20 PM
a. Park Commission featured on “Mayor Show” – Zuleger
b. Public Works update – Sunfish gate - Bouthilet
IX. Adjourn 8:30 PM
***Note: The Public is advised that there may be a quorum of City Council Members in attendance as observers. No official action can or will be
taken by the City Council at this meeting.
***Note: Every effort will be made to accommodate person or persons that need special considerations to attend this meeting due to a health
condition or disability. Please contact the Lake Elmo City Clerk if you are in need of special accommodations.
***Note: This meeting will be video recorded, but not broadcasted, for record-keeping purposes.
Our Mission is to Provide Quality Public Services
in a Fiscally Responsible Manner While
Preserving the City’s Open Space Character
MINUTES
City of Lake Elmo Park Commission
Monday, December 16, 2013
Members Present: Chairperson Weis, Hartley, Silvernale, Ames, Frick, Nelson, Zeno, Steele
Members Absent: Hietpas
Others Present: Administrator Zuleger, SPW Bouthilet, Council Member Reeves, Taxpayer Relations &
Communications Coordinator MacLeod, Planning Commissioner Rolf Larson
The meeting was called to order by Chairperson Weis at 6:35 PM.
Approval of Agenda
M/S/P: Hartley/Ames: Approved 7-0
Approval of November 18, 2013 Minutes
Steele questioned minutes regarding forming a subcommittee. Zuleger responded that the commission
planned on doing a workshop in January dedicated to prioritization of tasks as a group.
Regarding Sunfish Lake ski grooming, Zeno clarified that the group made a recommendation to groom at a
minimum of every two weeks; he didn’t make the recommendation himself.
Regarding Frick added that she said flatter trails would attract entry level skiers.
Old Business
a. MPCA Tree Planting Contract (Hietpas)
Zuleger spoke in Hietpas’s absence. Zuleger pointed out that the scope of services is optional, and the
associated costs per service are listed on the contract. He added that Hietpas has suggested that the
commission sign the agreement and get it back to the district. The cost/design is estimated to be $6,102.
Ames asked for clarification that no City funding would be used on this project and also asked to confirm that
they are approving planning but not materials or installation.
Steele asked for an estimate of cost for plants. Zuleger responded that the figures were discussed at a
previous meeting and are well within the budget. Zuleger believes the amount from the MPCA is approximately
$23,000.
Zuleger clarifies that the CWF grant funds include WCD design and MCC installation/oversight – the remaining
funds provided by the MPCA would go toward plant material.
M/S/P: Hartley/Zeno: Approve technical service agreement between Washington Conservation District
and City of Lake Elmo. Approved 7-0
b. Trail Feasibility Study Update (Weis)
Weis shared that the process with Washington County is more intensive than expected, and that they should
receive an update from Jack and Nick on Thursday, after a meeting with Washington County.
Zuleger clarified that because this trail must be on the County master plan in order to qualify for Legacy Funds.
Therefore before presenting the plan to the Met Council, it must first be presented to Washington County.
Weis noted that the trail subcommittee would be meeting with Griffin after the meeting with Washington County
on Thursday to look at options, and that an update would be provided in January.
New Business
a. Sunfish Lake Park Task Force (Steele)
Steele said that the Council had asked for a master plan for developing Sunfish Lake Park over several years.
At their last meeting, the task force set a goal is to provide a report/recommendation to City Council by June.
Steele shared an outline identifying major sections on report suggested by task force. Steele asked
commissioners to add additional bullet points as they see fit. Steele explained that they would address
improvements by area (wooded, treeless, and big hole). He added that they planned on incorporating ideas
expressed in survey.
Frick and Ames thanked Steele for his work on the outline/summary.
Weis asked if each section would have a proposed timeline for implementation. Steele responded that it would
be as detailed as possible to form a very concrete plan.
Ames noted that parking should be addressed. Steele confirmed.
M/S/P: Hartley/Ames: approve 2013 Park System fall audit. 7-0
b. Lake Elmo Representation on the MPOSC (Hietpas)
Zuleger reported that at the last Met Council meeting, former Mayor Johnston is now chair of the Parks and
Open Space Commission, and Hietpas was appointed as rep for section/region F. They are the group that
does Legacy funds for parks and trails in the metro area. This will be helpful in the trail planning.
Staff Report and Updates
a. Park Public Relations (MacLeod)
MacLeod provided update that individual web pages have been created for each park, and that she is
developing an interactive map to add to the site. She added that there will be an article on parks included in the
winter issue of “The Source,” and that the “park of the week” marketing in “fresh” will begin in January.
Audit Priority Work Session
Due to getting through agenda efficiently, Zuleger suggested amending the agenda to include an audit priority
work session. Weis added that the agenda should also be amended to include a date change for the January
meeting.
Agenda amended to include additional work from the audit and moving January meeting due to MLK holiday.
Meeting was moved to Thursday, January 30.
M/S/P: Ames/Steele: Agenda approved as amended. Approved 7-0
Zuleger asked the commission how they would like to tackle the audit and prioritize. Weis asked to clarify
objective. Zuleger responded that the objective is to determine how to spend the $220 allocated to park
improvements. Steele expressed concern that it would be hard to prioritize without knowing cost of
improvements. Zuleger reminded the commission that they have excess funds available (up to $900k) if
needed and an additional $150k-$200k would likely be added this year from new development.
The commission agreed to go through the audit and prioritize line by line, recognizing two parks most in need
of improvements to focus on.
Zuleger informed the commission that Gonyea and Mattamy development would likely bring some
improvements to Reid Park, next spring. Frick asked how many acres will be added to Reid. Zuleger said it
would likely be 8-10 acres.
Steele asked why they were only looking at six parks. Zuleger responded that they are the only ones that were
audited. Steele confirmed the parks that weren’t audited: Stonegate, Kleis, Parkview (Park Ridge), Fields II,
Tana. There is also an understanding that there will be a joint park at OakLand Jr. High. Steele confirms that
they should be free to add in additional parks that they think might need some work.
Inviting Entrance:
Priority was ranked: 1. Pebble, 2. Reid, 3. Tablyn. Steele suggested doing signage system-wide; determined a
high priority by commissioners. Zuleger said they would take a look at Carol Kriegler’s work with signs.
Way-finding signs.
Steele suggested that entrance signs and way-finding signs go together. Ames suggested that way-finding
signs are more important in some parks than others (where you can see everything from t he entrance of the
park). Nelson suggested auctioning old signs.
Reeves suggested focusing on big bucket items rather than on details in order to remain timely.
Park Lighting.
Commission agreed that lighting is a high priority Ames suggested that they differentiate what type of lights
they need and where they are needed.
Steele moveed to put Pebble as first priority, Reid and Tablyn second priority.
M/S/P: Hartley/Ames: approve lighting priorities. 7-0
Park Safety.
Nelson asked what electrical costs would be in parks that don’t already have it. Zuleger said it would be $1,500
at best.
Sunfish, Pebble, Tablyn, Reid were ranked in order of illegal activities.
Zuleger said that webcams are relatively inexpensive, also suggested call boxes as an option for parks with
power. Weis asked if police reports were primarily crimes being inflicted on people or illegal activity. Zuleger
responded that it depends on park. Primarily loitering at Reid, drug activity at Pebble.
Steele moved to prioritize installing cameras or call boxes in Sunfish, Pebble, Tablyn and Reid. Commission
agreed.
Steele suggested that disabled accessibility be considered low priority, as they are in good shape. Bouthilet
replied that standards are changing and it will need to be assessed at least.
Parking.
Hartley stated that increasing parking at Tablyn is priority. Steele added Carriage Station was in need in
parking as well; currently streets are too narrow. Steele suggested digging road out a few feet and adding
parking spaces along the side of the road and asked if it is feasible? Bouthilet responded that there is limited
room for parallel parking.
Weis asked about the Park off Inwood had parking; mentioned that it is not discussed much but is heavily
used.
Pebble, Tablyn determined priority for parking.
Pathways/Trails
Zuleger mentioned connection issues will be addressed at Reid and Tablyn (sidewalks at Reid/30th, and trail
connection at Tablyn)
Internal pathways well marked and maintained? Hartley mentioned that the stairs in Tablyn are in need of
work; trails need to be marked at Pebble. Ames thinks the staircase in Tablyn needs to be looked at in terms of
safety; Pebble improvements determined on the rest of the park plan), therefore leaving Tablyn at 1. Steele
agrees steps at Tablyn priority; clearing brush in sliding hill.
Commission discussed reconfiguring ball diamond at Tablyn – backstop close to retaining wall; bumpy field.
Zuleger mentioned that Stonegate will be expanded by new development that was just approved (boulder
ponds).
Pebble and Tablyn determined priority for pathways and trails.
Maintenance
Steele asked for Bouthilet’s recommendations regarding what needs to be replaced; to bring to next meeting.
Pebble, Reid Tablyn determined priority at this time.
Amenities
Steele asked if this section was referring to capital improvements. Zuleger clarified that they already touched
on capital improvement with parking. Steele suggested Pebble and Tablyn as priorities in amenities.
Weis asked if the LERT goes through, if the county would be interested in developing a new parking lot that
serves as an entrance serving both Tablyn and the Reserve. Zuleger anticipated they will know by spring if
they are included in the master plan. Ames suggested creating a contingency plan around parking in spring.
Weis suggested that what is left are ‘big dream’ items – restrooms, ball field, etc. Weis asked each
commissioner to suggest top item for improvement.
Hartley: Volleyball courts and move basketball court at Pebble. Lighting in parking and courts – also adding
bathrooms.
Zuleger reminded the commission that from the retreat the commission decided to add one bathroom each
year.
Steele: Pebble ranks top; but not sure on highest priority for bathroom.
Weis: As part of LERT master plan, funding may be available for a restroom at Tablyn
Ames: Transform first 100 yards of Pebble as you enter - from street to swing set.
Silvernale: Restroom combined with a picnic shelter (not park specific).
Zeno: Supports work in Pebble Park
Frick: Pebble top priority based on what was seen in audit. In Tablyn hopes that funding can be picked up
through trail; hopes improvements in Reid may be funded in part by new development.
Hartley: Can’t see into the entrance at Reid; at least wants to take down some weeds to open up visibility
Frick: Thought some cameras and a lit parking lot could help at Reid.
Ames: Adds brush removal to the list
Hartley: Discusses issues with buckthorn off of Ideal.
Nelson: Preserve character of the ball fields in VFW and Lions, but would like to see them upgraded.
Hartley mentioned flooding in Lions/VFW. Zuleger responded that they are in the process of Washington
county study and there are three issues that are naturally taking care of themselves. Options are being looked
at including retention ponds/drainage considerations.
Weis asked about time frame on the city center park project. Reeves responded that the village work group is
looking at village green, plans are still being solidified. Zuleger added that plans are dependent on airport
zoning.
Nelson mentioned the perspective of guests coming from out of town and how they view the downtown parks.
Zeno suggested that because they are unsure what is going to happen in that area, maybe best to do
temporary cosmetic touches but not invest a lot. Zuleger agreed that would be prudent; looking at 3 years to
finalize plans due to airport zoning and railroad crossing.
Ames mentioned utilizing new development to support trail plan. Zuleger responded that trails were being
implemented with new development.
Weis summed up big bucket priorities: Pebble, Reid, VFW (smaller bucket). Unsure on improvements in
Tablyn based on timing of LERT.
Commission reviewed Boulder ponds trail structure plan/map.
Meeting adjourned at 8:24 PM
Respectfully Submitted,
Alyssa MacLeod, Recording Secretary
NEW BUSINESS - ITEM Va
PARK COMMISSION
DATE: 1/30/14
AGENDA ITEM: VA
ITEM: Hammes Estates Development – Proposed Park Facilities
SUBMITTED BY: Nick Johnson, City Planner
REVIEWED BY: Dean Zuleger, City Administrator
Kyle Klatt, Community Development Director
SUMMARY AND ACTION REQUESTED:
The Park Commission is asked to review an updated development concept for the Hammes
Estates site. The Park Commission reviewed development concepts for the Hammes site at
meetings on July 15th and August 19th, 2013. The development team has since completed a
new concept and would like to present it to the Park Commission to discuss proposed park
facilities. The Park Commission should review the concept and provide feedback to the
development team.
REQUEST DETAILS
On August 19th, 2013, the Hammes development team presented a concept plan to the Park
Commission. The development concept, Attachment #1, included a small, centrally-located
neighborhood park (shown in dark red) intended to serve the Hammes neighborhood. According to
the minutes of the Park Commission meeting, the park size was approximately 13,500 feet (0.31
acres). At this meeting, the Park Commission unanimously recommended the proposed park
facilities for approval (Vote: 6-0). Since this time, the Hammes development team has created a
new concept (Attachment #2) with the goal of submitting a Preliminary Plat application in the near
future. When city staff was presented with the new concept, it was noted that the proposed park
facilities were not consistent with what the Park Commission approved. Before the development
team proceeds with compiling the Preliminary Plat application, staff suggested that the
development team present the new concept to the Park Commission to get their feedback.
In terms of amount and alignments of proposed trails, the new concept is fairly similar to the
previous or original concept. However, the new Hammes concept plan does not include a centrally
located neighborhood park. Instead, the new concept plan includes a new focus on the City owned
property at the southeast corner of Goose Lake. As part of the development, the applicants are
proposing to include a tot lot on this property, as well as installing a fishing pier. In meeting with
city staff, the applicants stated that a fishing pier would be an extremely desirable amenity for the
neighborhood. Staff has not yet completed extensive analysis of the City-owned property at Goose
Lake. There is some concern about the existence of flood plain and drainage in the area. Without
doing further analysis, it would difficult for staff to determine the viability of a City park at this
location.
2
NEW BUSINESS - ITEM Va
Finally, it should be noted that the City’s Park Plan does call for a neighborhood park in this general
location. The City’s Park Plan is included at Attachment #4.
ATTACHMENTS:
1. Original Hammes Concept Plan, dated 8-19-13
2. New Hammes Concept Plan, dated 1-3-14
3. Excerpt from Park Commission Minutes, 8-19-13
4. City Park Plan
ORDER OF BUSINESS:
- Introduction ....................................................................................... Planning Staff
- Report by Staff ................................................................................... Planning Staff
- Questions from the Commission ............................. Chair & Commission Members
- Discussion by the Commission ................................ Chair & Commission Members
- Action by the Commission....................................... Chair & Commission Members
NEW BUSINESS - ITEM Vb
PARK COMMISSION
DATE: 1/30/14
AGENDA ITEM: VB
ITEM: Easton Village Development – Proposed Park Facilities
SUBMITTED BY: Nick Johnson, City Planner
REVIEWED BY: Dean Zuleger, City Administrator
Kyle Klatt, Community Development Director
SUMMARY AND ACTION REQUESTED:
The Park Commission is asked to review a development concept, or Sketch Plan, for a proposed
single family subdivision to be called Easton Village. Per the established procedure, the Park
Commission is asked to review the proposed park facilities that are included with the concept.
The location of the proposed development is in the eastern portion of the Village. According to
the City’s Park Plan and Land Use Plan, this location is guided for a community park facility.
REQUEST DETAILS
The proposed single family residential subdivision, Easton Village, includes 224 single family lots on
approximately 98 total acres of land. The location of the proposed development is just south the
railroad tracks and west of Manning Ave. N. (CSAH 15). In the Easton Village Sketch Plan
(Attachment #1), the applicant shave proposed to include 6.1 acres of parkland. 5.6 acres of the
total parkland provided would serve the City’s planned community park, while 0.5 acres would
serve as a neighborhood park for Easton Village. Per the City Park Plan (Attachment #3), this general
area has been identified as a location for a community park and/or a community sports com plex. In
responding to this guidance, the Village Land Use Plan guided approximately 30 acres of land for
park or public land use in the area surrounding the rail road corridor. Approximately 14 of the total
30 acres was located to the south of the rail road tracks. Given this amount of acreage of parkland
guided in the Village Land Use Plan, it is clear the proposed development concept does not meet
the total acreage. However, it should be noted that the City’s plans to site a larger community park
in this area may be complicated by airport safety zones related to the operations of the Lake Elmo
Airport. In addition, it is important to note that if the development moves forward, a likely parkland
dedication amount would be a total of approximately 9.8 acres, making it difficult to achieve
enough land to account for a community recreation or sports facility.
In reviewing this Sketch Plan, staff would recommend that the Park Commission focus in on a
couple of critical questions related to parks in the Village Area:
1) What types of facilities should the City be planning for in the community park in the
Village?
2) How much acreage is required to site these facilities?
2
NEW BUSINESS - ITEM Vb
3) Is the proposed location of the parkland in the Village Land Use Plan, as well as the Easton
Village Sketch Plan, appropriate?
By focusing on these questions, it is staff’s goal to better define what the park expectations/plans
for the Village are. In addition to planning for a community park, there are also opportunities to
expand Reid Park if the Park Commission finds that desirable. It is all a matter of identifying
priorities in terms of how to best utilize parkland dedication (land and fees) to best serve the Village
with parks and recreation facilities.
ATTACHMENTS:
1. Easton Village Sketch Plan
2. Village Land Use Plan
3. City Park Plan
ORDER OF BUSINESS:
- Introduction ....................................................................................... Planning Staff
- Report by Staff ................................................................................... Planning Staff
- Questions from the Commission ............................. Chair & Commission Members
- Discussion by the Commission ................................ Chair & Commission Members
- Action by the Commission....................................... Chair & Commission Members
From:Jenn Radtke
To:Alyssa MacLeod
Subject:Clean Water Geocache Trail
Date:Wednesday, January 15, 2014 1:38:23 PM
Hi Alyssa,
EMWREP would like to host a “Clean Water” Geocache trail this summer with caches located at
some of the various clean water projects that the Washington Conservation District and the
Watersheds have helped to install in recent years. Before we can move forward in planning we need
permission to place a cache at the site of the project.
We would like to place a cache specifically at the prairie restoration at Sunfish Lake Park, not sure of
the exact location (I will have to go out there once the snow melts a bit) but am open to
suggestions. It would also be awesome if perhaps the week you feature Sunfish Lake Park in the
“Lake Elmo Fresh” you could also introduce the clean water trail? It should be ready to go in late
March if everything goes as planned.
Our plan is to present the coordinates for each cache and host the PDF with the information on our
website. We will use a Nalgene water bottle as the container and place inside a geocache log book,
pencil, short description of the clean water project, and some sort of “prize” such as a sticker or
zipper pull with a conservation message on it. Also for the first so many people (we haven’t decided
yet) who find all 8 (the last one will be at the WCD) will be able to stop in for a prize.
I realize this might have to move on the parks commission for approval, but I think it might aid in the
goal of raising park awareness!
Best,
Jenn
Jenn Radtke | Water Resource Education Assistant
East Metro Water Resource Education Program
Washington Conservation District
455 Hayward Ave | Oakdale, MN 55128
Ph: (651) 275-1136 x44 | Fax: (651) 275-1254
jradtke@mnwcd.org | www.mnwcd.org
Like us on Facebook | Follow us on twitter @EMWREP
Check out our blog!
Representing Brown’s Creek, Carnelian Marine - St. Croix, Comfort Lake - Forest Lake, Middle St. Croix,
Ramsey -Washington Metro, Rice Creek, South Washington and Valley Branch Watersheds, Cottage Grove,
Dellwood, Forest Lake, Lake Elmo, Stillwater, Willernie, West Lakeland, Woodbury, Washington County and the
Washington Conservation District