Loading...
HomeMy WebLinkAboutTablyn Park Updates Document City of Lake Elmo Park Commission Tablyn Park Updates: 1) Baseball Field Work: Make Outfield level, move benches out from fence. Site grading is estimated at $8.66 per cubic yard (from FOCUS). 2) Entrance Gate: The budget for the Sunfish Lake Park gate was $18,000. The actual gate totaled $14,000. 3) Lights: The area is not on the City’s grid, and lights would need to be rented from Excel. The rent would be about $8 per month per light. Excel would own the lights and we would be paying for power. There is a limited selection of lights from Excel. We could potentially buy our own lights, however we would have to work with Excel to get the light approved. 4) Playground Feature: The Unity Dome: For Climbing, imaginative play, and music. Price: $12,500. Ages 5-12. Dimensions: 27’ x 27’. Rushmore: For climbing and imaginative play. Price: $18,000. Ages 5-12. Dimensions: 24' 8'' x 29' 1''. Unity Large Canopy: Inspired by traditional monkey bars. Price: $6,000. Ages 5-12. Dimensions: 25' 4'' x 21' 1''. Clubhouse Timber Tower: Apex Climber: 5) Remove Basketball Court: (30 x 35 feet or 1050 sq ft or 39 cu yd) a. Rent Demolition Equipment: b. Contractor Cost Estimate: $1,000 - $5,000. 6) Stairs: Anderson Concrete and Masonry did a rough estimate of $28,300 to replace the stairs. 7) Trail: A switchback trail would include regarding parts of the hill. The trail itself would be $2.62 per square foot, or $13.09 per linear foot for a 5 foot wide trail. This estimate includes excavation, a crushed aggregate base, asphalt, a 10% overhead cost, and a 5% contractor profit cost. If we added 1,000 feet of new trail, the estimate cost is $13,660. 8) Trees: Fruit Tree Prices: Small trees are $39.99 for a #5 container. Medium trees are $69.99, and large trees are $129.99. Evergreens: Small (very small):$19.99 to large $299.00 Shade and Ornamental Trees: Small: $74.99 to large $369.00. 9) Warming House/Toilets: Afton approved a warming house in 2010 at a cost of $4,250. Baglio Real Estate Group constructed the warming house. It is on a trailer and the City moves it onto the site in winter. Sample Estimate: Item: Quantity Estimate Cost: Entrance Gate 1 $18,000 Park Lights 4 $384 (annually) Parking Lot Playground Feature Unity Dome 1 $12,500 Rushmore 1 $18,000 Remove Basketball Court $5,000 Stairs: Replace $28,300 Trail (1,000 linear feet) $13,660 Trees 7 $1,000 Warming House $20,000 TOTAL ESTIMATED COST: $116,844