Loading...
HomeMy WebLinkAboutTablyn Park Pricing Tablyn Park Pricing Feature Estimated Cost Skating Rink Parking and Gravel $2/sf ($26,200 based on 13,100 sf as measured from scaled drawing) Driveway (Source: https://www2.monroecounty.gov/files/parks/EPAMPU%20(DRAFT)%20Al l%20Appendices.pdf) Skating Rink  Refrigerated rink (if  $27/sf including installation costs ($129,600 based on 4800 sf as needed) measured from scale of drawing) (Source: A Skating Rink Feasibility Study http://web.williams.edu/wp-etc/ces/wmstn-skating-rink.pdf)  Boards  $65 per linear foot ($16,900 based on a circumference of 260 ft as measured from the scale drawing) (Source: A Skating Rink Feasibility Study http://web.williams.edu/wp-etc/ces/wmstn- skating-rink.pdf)  Maintenance  $11,450 (small Zamboni) or $6250 (attachments for existing lawnmowers) (Source: A Skating Rink Feasibility Study http://web.williams.edu/wp-etc/ces/wmstn-skating-rink.pdf) Warming House/Restrooms $400,000 (Source: Hopkins Park System Reinvestment Plan http://www.hopkinsmn.com/parks/parks/pdf/2015-open-house-final-boards.pdf) Convert Baseball to Soccer  $555-855 plus labor (Source: http://buckeyeturf.osu.edu/index.php?option=com_content&id =760:field-renovation-on-a-shoe-string-budget&Itemid=170)  Professional turf could cost around $4.75/sf ($182,400 based on 38,400 sf as calculated from measurements of drawing) ((Source: http://www.fieldturf.com/de/artificial-turf/faq) Rebuilding stairs from parking lot  Will vary depending on material  Concrete stairway $15,000 (Source: http://www.ucitymo.org/DocumentCenter/View/7667)  Wooden stairs $9200 (Source: previous research from 08/2015) Bringing switchback trail in to ADA  $50/foot including clearing and grubbing, grading, granular compliance subbase, concrete, seed/mulch, other costs ($57,500 based on approx. 1150 ft as calculated from measurements of drawing of entire trail – just the switchback is 300 ft)  $1.75/mile for natural surface trail ($2012.50 based on approx. 1150 ft as calculated from measurements of drawing of entire trail – just the switchback is 300 ft) (Source: http://www.nirpc.org/media/3539/appendix_b___trailcosts.pdf) Lighting  $27,000 (Source: Xcel, from previous research from 08/2015) Extended Parking Lot Area $3.50/sf ($42,000 based on 12,000 total sf for entire parking lot area as calculated from measurements of drawing) (Source: https://www2.monroecounty.gov/files/parks/EPAMPU%20(DRAFT)%20All%20Appendices.p df) New Playground Features  $35,000 - playground equipment similar to that of Easton Village  $12,500 (from previous research from 08/2015) Entrance Gate $300 for metal gate (Source: http://www.domyownpestcontrol.com/origin-point- brands-barrier-gate-p-8247.html?gclid=COutzo6HvMwCFQmQaQodoaAAOg) $1500 for automatic gate (Source: http://www.allsecurityequipment.com/) Pollinator Landscaping $5000 (Source: previous research from 08/2015) pg. 1