Tablyn Park Pricing
Feature Estimated Cost
Skating Rink Parking and Gravel
Driveway
$2/sf ($26,200 based on 13,100 sf as measured from scaled drawing)
(Source:
https://www2.monroecounty.gov/files/parks/EPAMPU%20(DRAFT)%20Al
l%20Appendices.pdf)
Skating Rink
• Refrigerated rink (if
needed)
• $27/sf including installation costs ($129,600 based on 4800 sf as
measured from scale of drawing)
(Source: A Skating Rink Feasibility Study
http://web.williams.edu/wp-etc/ces/wmstn-skating-rink.pdf)
• Boards • $65 per linear foot ($16,900 based on a circumference of 260 ft
as measured from the scale drawing) (Source: A Skating Rink
Feasibility Study http://web.williams.edu/wp-etc/ces/wmstn-
skating-rink.pdf)
• Maintenance • $11,450 (small Zamboni) or $6250 (attachments for existing
lawnmowers) (Source: A Skating Rink Feasibility Study
http://web.williams.edu/wp-etc/ces/wmstn-skating-rink.pdf)
Warming House/Restrooms $400,000 (Source: Hopkins Park System Reinvestment Plan
http://www.hopkinsmn.com/parks/parks/pdf/2015-open-house-final-boards.pdf)
Convert Baseball to Soccer • $555-855 plus labor (Source:
http://buckeyeturf.osu.edu/index.php?option=com_content&id
=760:field-renovation-on-a-shoe-string-budget&Itemid=170)
• Professional turf could cost around $4.75/sf ($182,400 based on
38,400 sf as calculated from measurements of drawing)
((Source: http://www.fieldturf.com/de/artificial-turf/faq)
Rebuilding stairs from parking lot • Will vary depending on material
• Concrete stairway $15,000 (Source:
http://www.ucitymo.org/DocumentCenter/View/7667)
• Wooden stairs $9200 (Source: previous research from 08/2015)
Bringing switchback trail in to ADA
compliance
• $50/foot including clearing and grubbing, grading, granular
subbase, concrete, seed/mulch, other costs ($57,500 based on
approx. 1150 ft as calculated from measurements of drawing of
entire trail – just the switchback is 300 ft)
• $1.75/mile for natural surface trail ($2012.50 based on approx.
1150 ft as calculated from measurements of drawing of entire
trail – just the switchback is 300 ft) (Source:
http://www.nirpc.org/media/3539/appendix_b___trailcosts.pdf)
Lighting • $27,000 (Source: Xcel, from previous research from 08/2015)
Extended Parking Lot Area $3.50/sf ($42,000 based on 12,000 total sf for entire parking lot area as
calculated from measurements of drawing) (Source:
https://www2.monroecounty.gov/files/parks/EPAMPU%20(DRAFT)%20All%20Appendices.p
df)
New Playground Features • $35,000 - playground equipment similar to that of Easton Village
• $12,500 (from previous research from 08/2015)
Entrance Gate $300 for metal gate (Source: http://www.domyownpestcontrol.com/origin-point-
brands-barrier-gate-p-8247.html?gclid=COutzo6HvMwCFQmQaQodoaAAOg)
$1500 for automatic gate (Source: http://www.allsecurityequipment.com/)
Pollinator Landscaping $5000 (Source: previous research from 08/2015)