HomeMy WebLinkAbout10-3-2016 Park Commission Packet
NOTICE OF MEETING
City of Lake Elmo Park Commission
3800 Laverne Avenue North
October 3, 2016 6:30 PM
AGENDA
1. Call to Order
2. Approve Agenda
3. Approve Minutes
a) September 19, 2016
4. Savona Park
5. November Meeting Agenda
6. Staff Reports & Commission Update
7. Adjourn
***Note: Every effort will be made to accommodate person or persons that need special considerations to attend
this meeting due to a health condition or disability. Please contact the Lake Elmo City Clerk if you are in need of
special accommodations.
Our Mission is to Provide Quality Public
Services in a Fiscally Responsible Manner
While Preserving the City’s Open Space
Character
MINUTES
City of Lake Elmo Park Commission
September 19, 2016
Members Present: Acting Chair Nelson, Commissioners Frick, Hartley, Neuenfeldt, Zeno,
Ames
Absent: Steele, Weiss, Silvernale
Others Present: City Administrator Kristina Handt, City Planner Emily Becker, Jamie Colemer,
Public Works and Clark Schroeder, Developer Representative, Tony Manzara, Interpretive
Nature Center Presenter.
The meeting was called to order by Chair Nelson at 6:30 PM.
Approval of Agenda
Agenda approved as presented.
Approval of Minutes
Commissioner Frick, seconded by Commissioner Hartley, moved to approve the June
20, 2016 minutes as amended. Motion passed 6- 0.
Commissioner Frick, seconded by Commissioner Hartley, moved to approve the
August 15, 2016 notes as amended. Motion passed 4-0-2. Hartley and Zeno Abstained.
Sally Manzara interpretive Nature Center
Tony Manzara presented a proposal to build a Nature Center in Lake Elmo’s Sunfish Park.
Discussion was held to determine if the Park Commission would be in favor, and to seek advice
for any changes before the Park Commission would recommend approval to the City Council.
Questions arose about the septic system and drain field, which has not been decided yet, but
may potentially entail a lift station or pump out tank. The details of the final plan
would need to meet building code as well as City approval. Responsibilities of the Friends
Organization and the City were discussed as well as details of operation including hours and
staffing, programs, and ideas to generate money, such as grants and donations. Manzara
presented a rough sketch of the exterior and interior of the Nature Center. The Park
Commission is interested but would like more information and more detailed blueprints of how
it actually will look and the materials that will be used.
Royal Golf Club Development
City has not received Preliminary Plat yet. Trail connectivity is a priority and the golf course may
or may not be included in the park dedication fees.
Clark Schroeder, Government Relations for Hollis Cavner Golf Course Development, presented a
summary of the course of events from 3m selling Tartan Park to the present progress of The
Royal Golf Course Development. Clark informed the Park Commission of the names and titles of
the people on The Royal Golf Club Team. Clark talked about the progress and explained that
they have been refining the development to try and accommodate working within the
regulations of Lake Elmo.
Rick Packer, President of H.C. Golf Course Development LLC, informed the Park Commission of
the development details. He indicated that the park dedication paid in fee does not include
public land. It would include a fitness center, swimming pool, and youth par 3 golf course.
A study of traffic motion and movements would be considered in relation to putting in a trail.
The Park Commission recommended that the trail extend to the east for a safe route for bikers
and trail users, also they recommend the trail reach to the Oakland Jr High School.
Packer reported that the streets of the development are projected to be in by the Fall of 2017
and the building of homes will then begin. There will be around three hundred homes and the
development will start in the west and move east.
Legends Preliminary Plat Application
City Planner, Emily Becker, informed the Park Commission about the proposed preliminary plat,
south of Sanctuary, and asked them to reaffirm or make additional recommendations.
There is 1.084 acres of park land and the value of 6.6 acres of land will go to park land
dedication. The Commission added to look at the grade to get up to Sanctuary Park, eight foot
wide trail to connect to City Trails and they recommended that a continuous trail from 50th
Street to connect to City Trails, as well as that the trail reach to the High School.
The trail plan was created in 2005 and staff would like the Park Commission to help identify the
gaps and what needs to be updated. Commissioner Ames explained that the Trails Plan was
intended to be a guide, and should not be considered to be a plan. Commissioner Frick pointed
out that a lot has changed in ten years and some of the trails on the guide are no longer useable.
It was concluded that the trails plan would be looked at as a preliminary view and updates would
need to be made.
October Meeting Agenda
A) Change meeting date to October 31st due to the Forum taking place on October 17,
2016
B) Savona
Staff Reports
Administrator Handt reported that they are seeking approval from City Council l for Lion’s Park
to secure Miller Architecture, Tablyn Park scale back plan, and additional $10,000 for both the
drain tile and curbing for Easton Village Park.
City Planner Becker reported on Hammes Tot Lot which is newly proposed and would be
association maintained, it will be located south of Goose Lake.
Lake Bridge Crossing wanted to incorporate the Hammes family name for the tot lot and also for
a Hammes name plate on the fishing pier for the City Park.
Meeting adjourned at 8:24 p.m.
Respectfully Submitted,
Patti Stucke
Administrative Assistant
ITEM 4
PARKS
COMMISSION COMMUNICATION
DATE: 10/3/2016
ITEM #: 4
AGENDA ITEM: Savona Park
SUBMITTED BY: Emily Becker, City Planner
REVIEWED BY: Kristina Handt, City Administrator
Stephen Wensman, Planning Director
BACKGROUND:
Earlier this year the Parks Commission agreed with having a smaller “pocket/neighborhood” park
that serves the Savona development along with a series of trails providing connections to the
Stonegate Park and other local and regional parks.
On July 5, 2016, City Council directed Parks Commission to work on plans for a neighborhood park
in the Savona neighborhood this fall to be built next year. The Savona Park is not currently in the
Parks and Recreation 2017-2021 Capital Improvement Plan (CIP), so its construction would require
an amendment.
On August 15, 2016, the Parks Commission met with residents of Savona to gain input and direction
on what they would like to see in the park. Tucker Pearce, a resident of Savona, had distributed
surveys to 25 residents of Savona. These survey results are attached.
Savona Parkland Dedication. The Savona 1st Addition Development Agreement required a cash
contribution of $209,429 in satisfaction of the City’s park dedication requirements. This charge was
based on the park dedication requirements for all the areas to be platted within the Savona
Preliminary Plat area. The Developer dedicated two acres for the subject Neighborhood Park and
1.74 acres of greenway and trails. The total acreage of parkland required to be dedicated was 10.80
acres, so the cash contribution was the appraised value of the remaining 7.06 acres of required
dedication.
ISSUE BEFORE COMMISSION:
What park improvements for Savona should be planned for next year? Future phases?
PROPOSAL DETAILS/ANALYSIS:
Included in your packet is a proposal from the residents in Savona of what they would like to have
built. They have divided the project into three phases. Staff provided very rough estimates on cost
shown in green in the report. Once the Commission provides more direction on what elements to
include staff can obtain direct quotes from providers. Staff’s estimate is that phase 1 would cost
$100,000 or more.
CIP Amendment. The Parks Commission is not being asked to recommend the amendment of their
CIP at this time, as the Council, if it so chooses, may amend the CIP to include Savona Parks
improvements.
2
Item 4
FISCAL IMPACT:
The Parks Commission has generally used $500 per house in determining how to plan for parks in
new developments. There are 309 houses planned in Savona with 88 certificates of occupancy issued
as of August 22, 2016.
Projected balance of Park Dedication Fund by 12/31/16 is $875,000.
RECOMMENDATION:
Staff recommends that the Parks Commission discuss the possibility of beginning the planning
process for Savona Park this fall to begin construction next year.
ATTACHMENTS
• Savona Park Surveys
• Savona Park Proposal from residents
1.) What would you like to see incorporated into a playground
Slides 92.00% 23
Swings 88.00% 22
Monkey Bars 72.00% 18
Climbing Wall 68.00% 17
Other 40.00% 10
Showing 10 responses
tire swing
gaga pit
Climbing dome, merry go round, see saw
Small splash pad
Splash pad
Zip line
Zip line
A zip line like at pebble park to appeal to wider age range
Zip (like pebble park), teeter totter like structure.
Bocce court
2.)Would you use a partially covered picnic area for family or neighborhood
events?
Yes 96.00% 24
No 4.00% 1
3.) Would you and your family utilize a basketball court with adjustable hoop
Yes 76.00% 19
No 24.00% 6
4.) Would you and your family utilize a small field for soccer, flag football,
frisbee, etc.
Yes 88.00% 22
No 12.00% 3
5.) Depending on the park land donated to the city and the graded of the lot if
a sliding hill is feasible for sledding should it be left in place? Is this
important to you?
Yes 80.00% 20
No 20.00% 5
6.) What would you and your family utilize more:
Bocce Ball Court 45.83% 11
Horseshoes 8.33% 2
Gaga Pit 25.00% 6
Other 20.83% 5
Tennis Court
Tennis court
Splash pad
I would just like to see play area for kids, no organized sports areas
Multi-purpose court w/adjustable nets for volleyball, tennis, etc
7.) Should we try and incorporate a splash pad into the playground
Yes 66.67% 16
No 16.67% 4
Other 16.67% 4
• I don't see where the money would come to build and maintain. Cheaper
than a pool but still expensive. The swimming pool at the reserve is so
close already.
• Not sure. Concerned that may bring a lot of traffic into neighborhood
• To save on cost, maybe just a small water feature that can be used by the
kids
• Pool
8.) Would you or your family utilize a sand Volleyball Court
Yes 72.00% 18
No 28.00% 7
9.) Anything that hasn’t been mentioned that you feel Savona needs in a park
• I feel a field is vital for older kids and adults. This could allow for several
sports to be played. Stationary grilling stations as well.
• Restroom and drinking fountain.
• More as a neighborhood - a tunnel that crosses under Keats like the one
on Woodbury Drive at Fox Run Road so that our neighborhood could
safely connect to the trail into the park reserve.
• We would love a swimming pool
• Is a pool not an option at this point?
• Glass backboards on basketball hoop. If u do it do it right
• Bathrooms
• More modern equipment that the other lake Elmo parks are lacking.
Integrative play equipment like seen in the newer Minneapolis and
Woodbury parks. Large swinging disc, zipline, teeter totter. A toddler
area like they installed at pebble park.
• Regarding picnic area: even if covered area is out of scope, at least a few
picnic tables.
• As far as everything listed above, a sledding hill is lowest on the priority
list for our family.
• If there is extra room incorporate the walking trails through the park. I
would take bocce and horseshoes if there is money and space.
• Frisbee golf and miniature golf course
10.) Open question you have for the parks commission regarding the park in
Savona
• Why does Lake Elmo want to maintain the park versus letting our
association do so? Would prefer association maintains
• What is the expected timeline for the park project?
• It would be great to have a park I have 3 kids and they are very buzy.
• Would the Lions or other civic group be willing to help fundraise for the
picnic shelter like the one at Powers Lake? With such a tight budget, I
don't know how there will be money for much more than playground
equipment.
• basketball court is #1!
• When can we expect a decision on what will be built, and when ground
will break. Also, is there anything else we Savonians can do to help move
this forward (send emails, etc)
• Will walking trails in Savona go to Stonegate Park for additional parks to
access?
32 Total Responses 1.) What would you like to see incorporated into a playground Slides 93.75% 30 Swings 87.50% 28 Monkey Bars 65.63% 21 Climbing Wall 65.63% 21 Other 40.63% 13 Other 13 responses Dog Area Basketball Sport Court Water feature, splash pad Tire swing gaga pit Climbing dome, merry go round, see saw Small splash pad Splash pad Zip line Zip line A zip line like at pebble park to appeal to wider age range Zip (like pebble park), teeter totter like structure. Bocce court 2.)Would you use a partially covered picnic area for family or neighborhood events? Yes 90.63% 29 No 9.38% 3 3.) Would you and your family utilize a basketball court with adjustable hoop Yes 75.00% 24 No 25.00% 8 4.) Would you and your family utilize a small field for soccer, flag football, frisbee, etc. Yes 87.50% 28 No 12.50% 4
5.) Depending on the park land donated to the city and the graded of the lot if a sliding hill is feasible for sledding should it be left in place? Is this important to you? Yes 71.88% 23 No 28.13% 9 6.) What would you and your family utilize more: Bocce Ball Court 41.38% 12 Horseshoes 10.34% 3 Gaga Pit 27.59% 8 Other 20.69% 6 Basketball Tennis Court Tennis court Splash pad I would just like to see play area for kids, no organized sports areas Multi-purpose court w/adjustable nets for volleyball, tennis, etc 7.) Should we try and incorporate a splash pad into the playground Yes 61.29% 19 No 25.81% 8 Other 12.90% 4
• I don't see where the money would come to build and maintain. Cheaper than a pool but still expensive. The swimming pool at the reserve is so close already.
• Not sure. Concerned that may bring a lot of traffic into neighborhood
• To save on cost, maybe just a small water feature that can be used by the kids
• Pool 8.) Would you or your family utilize a sand Volleyball Court Yes 70.97% 22 No 29.03% 9
9.) Anything that hasn’t been mentioned that you feel Savona needs in a park
• Benches
• Picnic tables and grill Community pool Dog park
• No
• A community pool would be a great addition, even if it does mean an increase in HOA fees.
• I would like the design to I corporate the neighborhood
• I feel a field is vital for older kids and adults. This could allow for several sports to be played. Stationary grilling stations as well.
• Restroom and drinking fountain.
• More as a neighborhood - a tunnel that crosses under Keats like the one on Woodbury Drive at Fox Run Road so that our neighborhood could safely connect to the trail into the park reserve.
• We would love a swimming pool
• Is a pool not an option at this point?
• Glass backboards on basketball hoop. If u do it do it right
• Bathrooms
• More modern equipment that the other lake Elmo parks are lacking. Integrative play equipment like seen in the newer Minneapolis and Woodbury parks. Large swinging disc, zipline, teeter totter. A toddler area like they installed at pebble park.
• Regarding picnic area: even if covered area is out of scope, at least a few picnic tables.
• As far as everything listed above, a sledding hill is lowest on the priority list for our family.
• If there is extra room incorporate the walking trails through the park. I would take bocce and horseshoes if there is money and space.
• Frisbee golf and miniature golf course 10.) Open question you have for the parks commission regarding the park in Savona
• Just want a family friendly park for all ages
• Why does Lake Elmo want to maintain the park versus letting our association do so? Would prefer association maintains
• What is the expected timeline for the park project?
• It would be great to have a park I have 3 kids and they are very buzy.
• Would the Lions or other civic group be willing to help fundraise for the picnic shelter like the one at Powers Lake? With such a tight budget, I don't know how there will be money for much more than playground equipment.
• basketball court is #1!
• When can we expect a decision on what will be built, and when ground will break. Also, is there anything else we Savonians can do to help move this forward (send emails, etc)
• Will walking trails in Savona go to Stonegate Park for additional parks to access?
A Few Notes from conversations with the Park Committee and Tucker
• A bathroom is not required, if we do one it would be a port a potty
• The trail can be moved, but Lennar would have to agree with it
• Some neighborhoods are adding outdoor exercise equipment, the cost is low around $2,500 each
• Easton Village the cost was around $75,000
• Bielenberg Splash Pad cost $500,000
• Picnic Shelter at Pebble Beach was $26,000
In Savona we would like to establish a park that can be used by kids of all ages, adults
and families that may not have kids. This would be a park where people can play or
gather for small events such as National Night Out, birthday parties or a picnic. It is
important to us that we keep as many of the trees as possible and utilize a design that
fits well into the neighborhood and Lake Elmo. Open space is needed for the kids to
play Frisbee, throw a football, etc. and so it would be ideal if this can come in the first
or second phase.
Phase 1
1.) A playground structure for the kids to play on. ($35,000)This doesn’t have to be
as large as say Easton Village but we would love to see more modern / creative
equipment used like they’ve used in Woodbury and Minneapolis in recent years.
If you need examples of these parks or the manufacturer we can provide them.
We would like to incorporate the following into the park (these are listed in
order of importance)
a. At least two slides, one for older kids and one that younger kids could
enjoy
i. Depending on expense one of these could be added in another
phase.
b. At least three swings
i. There should be one swing for infants/toddlers
c. Monkey Bars
d. A Climbing Wall
i. This could be added in another phase if the cost is too high.
e. Tire Swing
Notes: We would prefer some type of rubber material be used for the
playground but if the expense is too high we would opt for wood chips. We
feel that sand and small rocks are too easy to throw and get into kids/adults
eyes and we have some concerns with new studies that have come out on
the negatives of using rubber mulch.
2.) Half-Court Basketball Sport Court ($25,000)
a. We would like to use a sport court material that is easier on your body
when you fall for safety and liability reasons.
b. Adjustable hoop, again keeping with the idea of a park that is fun for kids
of all ages.
c. The basketball court could also be used for four square and other games;
this can be worked into the design of the sport court material.
Notes: Forward thinking to phase two or phase three we would like you to
consider another post to connect a net to the basketball hoop post for
badminton or volleyball net. We can provide examples of this if it would be
helpful. If you google Sport Courts Minnesota there are some wonderful
examples.
3.) A zip line, similar to the one you find at Pebble Park. ($15,000)This could be
standalone somewhere in the park again for kids of all ages to enjoy
4.) A bocce ball court. ($20,000) This could be utilized by kids as well as adults while
their kids are playing. Generally this is a concrete slab with artificial turf on top
surrounded by some wood railroad ties. We can provide examples of what we
are thinking if it would be helpful.
5.) Two to three picnic tables with the option to expand or replace them with
covered ones in a later phase.
6.) Benches around the park, as few as three, as many as six depending on the cost.
Some of this could be deferred to future stages. We feel areas for people to sit
would be important.
Phase 2
• Exercise Equipment along the walking / running trails in the park. This would be
good for adults and to teach kids about exercise and healthy living.
• Better Picnic tables - We understand the city is looking at standardizing picnic
areas but at the cost of $26,000 plus for a picnic area we are curious if other
options can be considered
o At the playground in the Washington County Park Reserve opposite the
swimming area they have picnic tables with small roofs. This may not
block out a large storm but could be used for shade and when there is
less rain.
• Add on to the sport court adding a volleyball / badminton net as noted in phase
one notes.
• Add on to the playground.
• Fit in items that are not able to be budgeted into phase 1.
Phase 3
• Add a 2nd Bocce Ball Court so multiple families can play at once. Not noted above
but people would have to bring their own bocce set.
• Add on to the playground.
• Fit in items that are not able to be budgeted into phase 1 phase 2.
Notes from the committee that took the survey results and park commission visit
input to create final recommendations:
• We discussed the idea of stationary grills but feel due to expense,
maintenance, etc. that if someone wants to grill they can bring a smaller
portable grill.
• We discussed a dog park but dogs really need a larger area to run, plus there
are concerns with maintenance and animal waste and we felt residents could
look at utilizing one of the dog parks in Stillwater or Woodbury.
• We felt although a sand volleyball court would be nice it would take up a lot
of room, only be usable three months of the year and were worried about
the maintenance due to animal waste and other issues with the sand. We
believe a better option is to incorporate this into the sport court in a 2nd or
3rd phase or bring a net to the open area and set it up when you want to use
it.
• A bathroom is not required; if we do add one it would be a port a potty due
to the large expense of adding one with running water. However we would
like to look at a creative way to add this along the tree line or add some type
of fencing around it so it’s not an eye sore to those using the park and those
that have to live bordering the park.
• If incorporating some of what we are looking for above means moving the
trail through the park to one side or the other we would like for the city to
work with Lennar on this. A resident of Savona would be more than happy to
talk to Lennar with you on this matter.
• We discussed the idea of a pool or splash pad but with the costs (Bielenberg
splash pad was approx. $500,000) we feel something like this would be
better in a more central location near downtown for all residents. A pool
doesn’t make sense unless it is a part of the HOA and it is too late for that.
• We don’t want to see specific parking spaces but a half circle pull off for cars
might be helpful if it is an option. This would allow for dropping off kids or
grandparents.