HomeMy WebLinkAbout2018-083CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION 2018-083
A RESOL UTION APPR 0 VING A CONDITIONAL USE PERMIT FOR A WIRELESS
COMMUNICATIONS FACILITY AT 11351 UPPER 33RD STREET NORTH
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, Verizon Wireless, 10801 Bush Lake Road, Bloomington MN 55438 (the
"Applicant") has submitted an application to the City of Lake Elmo (the "City") for a
Conditional Use Permit for a wireless communications facility the property located at 11530
Upper 3 Yd Street North (PID# 13.029.21.31.0018) (the "Property"); and
WHEREAS, the Applicant also submitted an application to the City for variances for
nine feet from the maximum height allowed for wireless communications to allow a wireless
communications facility 134 feet in height; a variance of 88.5 feet from the minimum setback
from the eastern property line to allow a setback of 45.5 feet from the easterly property line; and
a variance from the one-year expiration date requirement of the conditional use permit and
variance requests; and
WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo
Zoning Ordinance, Section 154.102; and
WHEREAS, the Lake Elmo Planning Commission held a public hearing on said matter
on July 9, 2018; and
WHEREAS, the Lake Elmo Planning Commission has submitted its report and
recommendation to the City Council as part of a Staff Memorandum dated July 9, 2018, and
WHEREAS, the City Council considered said matter at its July 17, 2018 meeting; and
NOW, THEREFORE, based on the testimony elicited and information received, the City
Council makes the following:
101 lin 11 fi=
1) That the procedures for obtaining said Conditional Use Permit are found in the Lake
Elmo Zoning Ordinance, Section 154.106.
2) That all the submission requirements of said Section 154.106 have been met by the
Applicant.
Resolution 2W 8-083
509020A SJS LA515-1
3) That the proposed Conditional Use Permit includes the following components:
a) A Conditional Use Permit for a wireless communications facility for the property
located at 11351 Upper 33rd Street North.
4) That the Conditional Use Permit for a school district transportation center will be for the
Property legally described as follows:
ALL OF THE FOLLOWING DESCRIBED TRACT WHICH LIES SOUTHERLY OF THE SOUTHERLY RIGHT OF
WAY OF SAID ST. P. S. & T. F. RY., (NOW OWNED AND OPERATED BY THE UNION PACIFIC RAILROAD):
THAT PART OF THE WEST HALF OF SECTION THIRTEEN (13), TOWNSHIP TWENTY-NINE (29) NORTH OF
RANGE TWENTY-ONE (21), LYING WITHIN THE FOLLOWING BOUNDARIES, TO -WIT: BEGINNING AT THE
QUARTER POST IN THE CENTER OF THE SOUTH LINE OF SAID SECTION; THENCE RUNNING NORTH
ALONG THE CENTER LINE OF SAID SECTION TO A POINT IN THE CENTER OF THE SAINT PAUL &
STILLWATER ROAD; THENCE SOUTHWESTERLY ALONG THE CENTER OF SAID ROAD TO A POINT FORTY
FOUR (44) RODS WEST OF THE EAST LINE OF THE NORTHWEST QUARTER OF SAID SECTION; THENCE
SOUTH ON A LINE PARALLEL WITH THE WEST LINE OF SAID SECTION TO A POINT IN THE SOUTH LINE
THEREOF FORTY-FOUR (44) RODS WEST OF THE CENTER POST IN SAID LINE; THENCE EAST FORTY-
FOUR (44) RODS TO THE PLACE OF BEGINNING, EXCEPTING, HOWEVER, A STRIP OF LAND ONE
HUNDRED (100) FEET IN WIDTH, BEING FORTY-FOUR (44) FEET ON THE NORTH SIDE AND FIFTY-SIX
(56) FEET ON THE SOUTH SIDE OF CENTERLINE OF ST. P. S. & T. F. RY. TRACK AS CONSTRUCTED OVER
AND ACROSS EAST FORTY-FOUR (44) RODS OF WEST ONE-HALF (WI/2), AND ALSO EXCEPTING
THEREFROM THE EAST 726 FEET OF THE SOUTH 1800 FEET OF THE SOUTHWEST QUARTER (SWI./4) OF
SECTION 13, TOWNSHIP 29 NORTH, RANGE 21 WEST, WASHINGTON COUNTY, MINNESOTA, ACCORDING
TO THE UNITED STATES GOVERNMENT SURVEY THEREOF, SUBJECT TO THE RIGHT OF WAY OF
MINNESOTA TRUNK HIGHWAY NO. 5 (ALSO KNOWN AS STILLWATER BOULEVARD NORTH), AND IS ALSO
SUBJECT TO A 20 FOOT ROAD EASEMENT RECORDED BY DOCUMENT NUMBER 328273 IN THE OFFICE OF
THE COUNTY RECORDER, WASHINGTON COUNTY, MINNESOTA, AND IS ALSO SUBJECT TO A NORTHERN
STATES POWER EASEMENT RECORDED IN BOOK 136 OF DEEDS, PAGE 297, IN THE OFFICE OF THE
COUNTY RECORDER, WASHINGTON COUNTY MINNESOTA SECTION 13 TOWNSHIP 029 RANGE 021
5) The proposed use will not be detrimental to or endanger the public health, safety, comfort,
convenience or general welfare of the neighborhood or the city. The tower has been
engineered to withstand high winds and has a fall zone that will not cause it to fall on an
adjacent property.
6) The use or development conforms to the City of Lake Elmo Comprehensive Plan, The
property is guided for and toned for public facilities, in which wireless communication
facilities are an allowed use, and certain wireless communication facilities require a
conditional use permit.
7) The use or development is compatible with the existing neighborhood. The wireless
communication facility will be screened with existing trees
8) The proposed use meets all specific development standards for such use listed in Article 7 of
this Chapter. The proposed use meets almost all requirements of the City's Wireless
Communications Facilities ordinance except for the required height and setback from
property lines, for which the applicant has requested variances.
9) If the proposed use is in a flood plain management or shoreland area, the proposed use meets
all the specific standards for such use listed in Chapter ISO, § 150.250 through 150.257
(Shoreland Regulations) and Chapter 152 (Flood Plain Management). The proposed use is
not in a flood plain management or shoreland area.
Resolution 2018-083 2
5090200 STS LA515-1
10) The proposed use will be designed, constructed, operated and maintained so as to be
compatible in appearance with the existing or intended character of the general vicinity and
will not change the essential character of that area. The proposed tower will be heavily
screened by existing trees and will not change the essential character of the neighborhoa
t t) The proposed use will not be hazardous or create a nuisance as defined under this Chapter to
existing or future neighboring uses. The proposed use will be setback further from the
property line than the fall zone and so will not be hazardous. It will be well screened and
fenced so as to not create a nuisance, and climbing will be discouraged.
12) The proposed use will be served adequately by essential public facilities and services,
including streets, police and fire protection, drainage structures, refuse disposal, water and
sewer systems and schools or will be served adequately by such facilities and services
provided by the persons or agencies responsible for the establishment of the proposed use.
The proposed use has adequate access, and the Fire Department has reviewed the
application and does not see an issue, as access can be achieved if need be through the
fence.
13) The proposed use will not create excessive additional requirements at public cost for public
facilities and services and will not be detrimental to the economic welfare of the community,
The City will enter in to a lease agreementfor which it will receive a negotiated amount.
14) The proposed use will not involve uses, activities, processes, materials, equipment and
conditions of operation that will be detrimental to any persons, property or the general
welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The
proposed use will not create excessive production of traffic, noise, smoke, fumes, glare or
odors.
15) Vehicular approaches to the property, where present, will not create traffic congestion or
interfere with traffic on surrounding public thoroughfares. There is an existing access road
that will be utilized until such time the cul-de-sac providing connection from Easton
Village is constructed.
16) The proposed use will not result in the destruction, loss or damage of a natural or scenic
feature of major importance. The proposed use will not result in in any destruction, loss or
damage or a natural or scenic feature Qf major importance.
NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Lake Elmo City
Council hereby approves the request by Verizon for a Conditional Use Permit for a wireless
communications facility with the following conditions of approval:
1) The applicant shall enter into a wireless communications tower agreement that addresses all
items listed in Section 150.121 of the Lake Elmo City Code addressing wireless
communications facilities with the City prior to the issuance of a building permit for the
proposed facility.
2) The applicant must submit proof of liability and worker's compensation insurance.
3) Monopole shall be constructed of, or treated with, corrosive resistant material.
Resolution 2018-083 3
509020v1 SJS LA515-1
4) An agreement providing for co -location and 6-month removal of unused and/or obsolete
towers shall be attached and become part of the permit,
5) The addition of antennas and associated equipment of an additional provider to an existing
permitted tower shall be considered co -location and shall require a zoning permit and site
plan approval. An amendment to a conditional use permit shall typically not be required.
6) All towers shall be reasonably protected against unauthorized climbing. The area around the
base of the tower and guy wire anchors shall be enclosed by a fence with a minimum height
of 6 feet with a locked gate.
7) All obsolete or unused towers and accompanying facilities shall be removed within 6 months
of the cessation of operations at the site unless a time extension is approved by the City.
After the facilities are removed, the site shall be restored to its original or an improved state
which includes removal of all concrete to 6 feet below normal grade and surrounding area
returned to nonnal grading. Electronic equipment shall not be removed in advance of
removal of obsolete or unused towers. To ensure compliance, the applicant must submit a
performance bond or letter of credit in an amount sufficient to cover all removal costs as
determined by the city prior to the issuance of a building permit for the facility. Failure to
remove the structure shall be cause for the city to remove the tower and associated equipment
and assess the cost against the required bonding or letter of credit instrument.
8) The city shall conduct a final inspection of the site to ensure that all requirements of the City
Code and all conditions of approval attached as part of the wireless communications permit
are met prior to the start of operation of the facility.
9) For installations of a facility in an area that could potentially be accessed by the public
(including rooftop installations or other locations that would be considered public versus
occupational) a radio frequency hazard analysis and a yearly report must be submitted before
December 31 of each year showing the results of on -site measurements at the site. A
registered professional engineer hired by the provider must sign these measurements and
report. At a minimum., the report must document any changes to the site over the course of
the previous year.
10) All lighting associated with the facility shall comply with the City's lighting ordinance. The
wireless communications tower shall not be illuminated by artificial means, as it is not
required by the Federal Aviation Administration.
11) The area around the base of the tower and guy wire anchors shall be enclosed by a fence with
a minimum height of six feet with a locked gate.
12) Building pen -nits shall be applied for and issued before any construction is started.
13) The applicant shall be compliant with all other minimum conditions outlined in Section
150.123 of the Lake Elmo City Code addressing wireless communications facilities.
14) The applicant shall enter in to a lease agreement approved by Council for both this site and
the water tower site at the comer of Ideal Avenue North and 30 Street North.
Resolution 2018-083 4
509020A SJS LA515-1
15) The applicant shall design the accessory equipment building to accommodate any additional
equipment that may be needed by additional carders on the tower.
16) The applicant shall submit a landscape plan to provide sufficient screening from the base of
the tower to be approved by the City's Landscape Architect,
Passed and duly adopted this 17"' day of July 2018 by the City Council of the City of Lake Elmo,
Minnesota.
?
Mike Pearson, Mayor
ATTEST:
Resolution 2018-083 5
5090200 SJS LA515-1